Permit history for 2222 Wilner Dr, Pittsburgh, 15221-

Pittsburgh, PA · 162 permits on file · 2022–2024

162
Permits on file
2022
First permit
2024
Most recent

Permits on file (162)

Ordered most recent first. Data from the city's open data portal.

MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Mar 13, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Mar 13, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 12, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 12, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment
Contractor: Climatech, Inc
Status: Completed
Jan 4, 2024
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
MECHANICAL ADDITION / ALTERATION
Exhaust system & heating/ventilation
Contractor: Climatech, Inc
Status: Completed
Dec 11, 2023
ELECTRICAL ADDITION / ALTERATION
Installing new 100amp service panel fed from existing meter to power site lighting. replacing existing 20amp breaker with new 100amp breaker. no change to meter, existing meter is being used
Status: Completed
Oct 26, 2023
ELECTRICAL ADDITION / ALTERATION
Installing new 100amp service panel fed from existing meter to power site lighting. replacing existing 20amp breaker with new 100amp breaker. no change to existing meter
Status: Completed
Oct 26, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replacing existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replacing existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
MECHANICAL ADDITION / ALTERATION
Replace existing hvac equipment with new
Contractor: Climatech, Inc
Status: Completed
Oct 12, 2023
ELECTRICAL ADDITION / ALTERATION
Installing new 100amp service panel fed from existing meter to power site lighting
Status: Completed
Sep 18, 2023
ELECTRICAL ADDITION / ALTERATION
Installing new 100amp service panel fed from existing meter to power site lighting.
Status: Completed
Sep 18, 2023
ELECTRICAL ADDITION / ALTERATION
Installing new 100amp service panel fed from existing meter to power site lighting. replacing existing 20amp breaker with new 100amp breaker.
Status: Completed
Sep 18, 2023
ELECTRICAL ADDITION / ALTERATION
New service at exisiting single family dwelling
Status: Completed
Sep 12, 2023
ELECTRICAL ADDITION / ALTERATION
100 amp house service panel for outdoor lighting
Status: Completed
Aug 18, 2023
ELECTRICAL ADDITION / ALTERATION
100 amp service
Status: Completed
Aug 16, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Feb 14, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Jan 25, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Jan 25, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Jan 19, 2023
ELECTRICAL MINOR ALTERATION
Electrical renovations to townhouse. changing out light fixtures and replacing them. changing out wiring devices and 120v smoke/co detectors. reconnect new indoor hvac unit (furnished and installed by others).
Status: Revoked
Jan 18, 2023
ELECTRICAL MINOR ALTERATION
Electrical renovations to townhouse. changing out light fixtures and replacing them. changing out wiring devices and 120v smoke/co detectors. reconnect new indoor hvac unit (furnished and installed by others).
Status: Completed
Jan 18, 2023
ELECTRICAL MINOR ALTERATION
Electrical renovations to townhouse. changing out light fixtures and replacing them. changing out wiring devices and 120v smoke/co detectors. reconnect new indoor hvac unit (furnished and installed by others).
Status: Completed
Jan 18, 2023
ELECTRICAL MINOR ALTERATION
Electrical renovations to townhouse. changing out light fixtures and replacing them. changing out wiring devices and 120v smoke/co detectors. reconnect new indoor hvac unit (furnished and installed by others).
Status: Revoked
Jan 18, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 22, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 22, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 22, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 22, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 22, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 22, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 22, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 22, 2022
ELECTRICAL MINOR ALTERATION
Status: Revoked
Dec 22, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 22, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 21, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 21, 2022
ELECTRICAL MINOR ALTERATION
Status: Revoked
Dec 21, 2022
ELECTRICAL MINOR ALTERATION
Status: Revoked
Dec 21, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 21, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 21, 2022
ELECTRICAL ADDITION / ALTERATION
Electrical renovations to townhouse. changing out light fixtures and replacing them in kind (same locations) also changing out wiring devices and 120v smoke/co detectors. reconnect new indoor hvac unit (furnished and installed by others.
Status: Completed
Dec 21, 2022
ELECTRICAL MINOR ALTERATION
Status: Completed
Dec 21, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 10, 2022
BUILDING MINOR ALTERATION
Status: Completed
Aug 2, 2022

Check permits at another Pittsburgh address

Free instant lookup, no signup.

Search Pittsburgh permits →
Disclaimer: Permit data comes from Pittsburgh's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Pittsburgh building department before buying, selling, or planning work.