Permit history for 8500 Essington Ave
Philadelphia, PA · 499 permits on file · 2021–2026
499
Permits on file
2021
First permit
2026
Most recent
93
Unique contractors
Permits on file (499)
Ordered most recent first. Data from the city's open data portal.
Electrical Addition and/or Alteration
Demo only of electrical cabinets/ electrical remotes, conduit, and wire of aw and f parking garage cell sites
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
May 15, 2026
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (41) sprinklers in phl rae3
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
May 14, 2026
Electrical Addition and/or Alteration
Install new conduit, explosion-proof fittings, and wiring to support the installation of a 12,000-gallon underground gasoline storage tank and two (2) fuel dispensers, in accordance with the approved drawings. work includes all required
Contractor:
VICTOR ELECTRO INC
Status: Issued
May 8, 2026
Electrical Addition and/or Alteration
Install fire alarm devices and tie in to existing building fire alarm system.-2017 nec.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Issued
May 6, 2026
Electrical Addition and/or Alteration
Replacement of existing bbc and ebbc switchgear in same location as existing. new lighting, grounding, and security cameras in the switchgear yard as per 2017 nec.
Contractor:
PHILIPS BROTHERS ELECTRICAL
Status: Issued
May 5, 2026
Building Addition and/or Alteration
For lobby renovation to a portion of an existing structure. **all work to be done per approved plans.** if field conditions vary contact design professional prior to the start of any work.** separate permits to be obtained for all other wor
Contractor:
LEOPARDO COMPANIES INC
Status: Issued
Apr 30, 2026
Electrical Addition and/or Alteration
Disconnect existing and re-feed (14) new rtu's @ e concourse phl. upgrade fire alarm and wire new duct detectors and shut down relays . all work per approved plans.
mp-2025-001869
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Apr 23, 2026
Electrical Addition and/or Alteration
Furnish and install fire alarm for new pretzel and pints space in terminal a east at phl airport as per 2016 nfpa 72.
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Apr 21, 2026
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (11) sprinklers in phl b-c connector spa
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Apr 21, 2026
Electrical Addition and/or Alteration
Electrical permit for combo cp-2026-000245
Contractor:
WHITEMARSH ELECTRICAL CONSTRUCION INC
Status: Issued
Apr 15, 2026
Fire Suppression Addition and/or Alterations
Ez kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans.
install 12 gallon kitchen fi
Contractor:
Joseph F Spaeder
Status: Issued
Apr 15, 2026
Fire Suppression Addition and/or Alterations
Ez kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans.
install 8 gallon kitchen fir
Contractor:
Joseph F Spaeder
Status: Issued
Apr 15, 2026
Plumbing Alterations
Plumbing permit (interior) for combo cp-2026-000245
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Issued
Apr 6, 2026
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2026-000245
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Issued
Apr 6, 2026
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) to an existing structure (b-c connector, space bc/27-ab (lafayette’s))
in terminal b of the philadelphia international airport. alterations for partial demolition and interior renova
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Issued
Mar 25, 2026
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (39) sprinkler heads for escape lounge t
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Mar 20, 2026
Plumbing Alterations
Installation of one (1) dish table, one (1) 3 compartment sink, one (1) 1 compartment prep sink, two (2) hand sinks, six (6) floor sinks, one (1) dump sink, one (1) mop sink, one (1) water closet, one (1) lavatory and one (1) hot water heat
Contractor:
MWI Mechanical, Inc.
Status: Issued
Mar 19, 2026
Electrical Addition and/or Alteration
Disconnect & remove the existing disconnects and starters from the mechanical and hvac equipment. install new feeders to the mechanical-supplied disconnects, vfds, and equipment. disconnect existing duct detectors and install new duct detec
Contractor:
CARR & DUFF INC
Status: Issued
Mar 18, 2026
Zoning New construction, addition, GFA change
For additions to terminals (d) & (e) and associated site work to an existing structure for use as part of the philadelphia international airport; size and location as per application/plan.
Contractor:
AECOM TECHNICAL SERVICES INC
Status: Issued
Mar 12, 2026
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2026-000612
Contractor:
MWI Mechanical, Inc.
Status: Issued
Mar 11, 2026
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (7) sprinkler heads in space bc29b
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Mar 6, 2026
Electrical Addition and/or Alteration
Install electrical panels and associated feeders to serve the space. provide lighting fixtures, branch circuit wiring, and wiring devices including receptacles and switches. install electrical connections for kitchen equipment and hvac unit
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Issued
Mar 6, 2026
Electrical Addition and/or Alteration
Fitout for new tenant (sunglass hut) to space-alteration to existing electrical system, including but not limited to new lighting fixtures to ceiling, display cases
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Issued
Mar 4, 2026
Building Addition and/or Alteration
For a level ii interior alterations toinclude a tenant fit-out to a portion of the existing airport terminal. for a business occupancy. alterations to include the erection of partition walls, provide finishes/ furnishings and accessibility
Contractor:
EINSTEIN CONSTRUCTION GROUP LLC
Status: Issued
Mar 4, 2026
Electrical Addition and/or Alteration
Electrical permit for combo cp-2026-001063
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Mar 3, 2026
Building Addition and/or Alteration
For an alteration to a portion of an existing structure. all work to be done per approved plans. **field conditions vary contact design professional prior to the start of any work. **separate permits to be obtained for all other work.**
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Mar 3, 2026
Mechanical Addition and/or Alterations
For the installation of registers, diffusers and appliances with associated ductwork to accommodate a new tenant at the airport . appliances to be installed in accordance with the manufacturer’s specifications. ** all work to be done per
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Issued
Feb 27, 2026
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-005421
Contractor:
H&W MECHANICAL SERVICES LLC
Status: Issued
Feb 18, 2026
Building Addition and/or Alteration
For level ii alterations with no change in occupancy classification. separate permits required for mechanical, electrical, plumbing and fire suppression work.
Contractor:
VRH CONSTRUCTION CORP.
Status: Issued
Feb 13, 2026
Mechanical Addition and/or Alterations
For ta mechanical system upgrade to an existing structure. appliances to be installed in accordance with the manufacturer’s specifications. **all work to be done per approved plans. **if field conditions vary contact design engineer prio
Contractor:
DOLAN MECHANICAL INC
Status: Issued
Feb 12, 2026
Fire Suppression Addition and/or Alterations
For alterations to an existing automatic wet sprinkler system to install heads throughout renovated bathrooms (rd5, rb2, rc1, and rf6) as per approved plans and in accordance with nfpa 13. see cp-2023-002079 for associated building permit.
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Feb 10, 2026
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (9) sprinkler heads to accommodate alter
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Feb 10, 2026
Zoning Change of Use
Eating and drinking establishments - sit-down restaurant
Contractor:
Nicholas Antico
Status: Issued
Feb 9, 2026
Fire Suppression Rough-In
Rough-in permit for fp-2026-000164
install (125) sprinklers to accommodate renovations to restrooms rd5, rb2, rc1, and rf6; new sprinklers will be tied into existing systems and backflow preventers
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Feb 9, 2026
Mechanical Addition and/or Alterations
For the installation of appliances with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact design engineer prior to the
Contractor:
Surety Mechanical Services Inc
Status: Issued
Feb 6, 2026
Fire Suppression Addition and/or Alterations
Ez kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans.
install pre-engineered, wet
Contractor:
ATLANTIC FIRE EQUIPMENT CO INC
Status: Issued
Feb 3, 2026
Plumbing Alterations
For the interior installation of drainage, waste, vent, and water supply for listed fixtures connecting to existing metallic piping. all piping for conveyance and supply for commercial space shall be metallic to roof extension. all work to
Contractor:
MWI Mechanical, Inc.
Status: Issued
Jan 31, 2026
Electrical Addition and/or Alteration
For the installation of new wiring, telecommunications wiring, emergency lighting, lighting, junction box, receptacles and outlets.
amended 3/13/26
add fire alarm devices to restaurant space. wiring to connect to the existing airport syst
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Issued
Jan 30, 2026
Building Addition and/or Alteration
For a level ii inerior alterations to an existing tenant space. for a new tenant fit-out at the airport. alterations to include the erection of partition walls, provide finishes/furnishings, and accessibility improvements throughout. buildi
Contractor:
INTECH CONSTRUCTION LLC
Status: Issued
Jan 30, 2026
Mechanical Addition and/or Alterations
To remove and replace 40 ft. radiant tube heater and tie it into existing gas line per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits required for all other work.
Contractor:
R. Brooks Mechanical, Inc.
Status: Issued
Jan 20, 2026
Electrical Addition and/or Alteration
Grounding, branch circuits, feeders, circuit breakers, receptacles, panelboards, transformers, safety switches, ac ductless split systems, lighting, lighting controls, smart glass tinting controls, existing fire alarm system to remain, disc
Contractor:
MULHERN ELECTRIC CO., INC.
Status: Issued
Jan 15, 2026
Electrical Addition and/or Alteration
Relocate power, data installation.
fire alarm installation in accordance with nfpa 72 & the philadelphia fire code 2018
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Issued
Jan 15, 2026
Electrical Addition and/or Alteration
Replace existing electrical distribution panel with new 225a, 120/208y distribution panel. disconnect and remove wiring to existing hvac equipment and replace with new branch circuit wiring to replacement equipment. install branch circuit w
Contractor:
E J ELECTRIC INC
Status: Issued
Jan 13, 2026
Electrical Addition and/or Alteration
Furnish & install upgrade to phl video security surveillance system, network hardware and cable, cctv cameras, power wire, cat6, and fiber throughout terminals d & e as per 2017 nec.
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Jan 13, 2026
Building Addition and/or Alteration
For level ii interior alterations to existing business occupancy, alterations to include the erection of partition walls, provide finishes/ furnishings and accessibility improvments throughout. all work to be done per approved plans. if fie
Contractor:
J & J 2000 INC
Status: Issued
Jan 12, 2026
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (70) sprinklers to accommodate interio
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Jan 8, 2026
Electrical Addition and/or Alteration
Install a damage detection camera system at both the
customer exit and customer entrance. the system consists of an arch with cameras and lights to detect the presence of damage and relay the images to hertz personnel. install receptacle
Contractor:
LANE-VALENTE INDUSTRIES INC.
Status: Issued
Jan 8, 2026
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-003902
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Jan 5, 2026
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (33) sprinklers to accommodate alterat
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Dec 31, 2025
Electrical Addition and/or Alteration
Provide new electrical & tele/data services to new kiosk. all work to be done according to the 2017 nec and per approved plans.
Contractor:
J.W. Carrigan
Status: Issued
Dec 30, 2025
Electrical Addition and/or Alteration
Fire alarm modifications for a paris baguette store in philadelphia international airport terminal c space 8. per approved drawings.
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Dec 30, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2025-003902
Contractor:
MWI Mechanical, Inc.
Status: Issued
Dec 15, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-003902
Contractor:
MWI Mechanical, Inc.
Status: Issued
Dec 15, 2025
Building Addition and/or Alteration
For level ii interior alterations without a change in use and occupancy classification to existing tsa staff area (group b) located in d/e connector pre-security area of the philadelphia international airport. all work to be done per approv
Contractor:
D LAURO & RODGERS INC
Status: Issued
Dec 12, 2025
Building Addition and/or Alteration
For a tenant fit-out to an existing space (space ae-01) for a new vendor at the airport. alterations to include the selective demolition of existing partitions and the new erection of partition walls, provide finishes/furnishings, and ac
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Issued
Dec 12, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-003812
Contractor:
MWI Mechanical, Inc.
Status: Completed
Dec 2, 2025
General Permit Minor EZ Roof Covering Replacement
Ez permit re-roofing- for the installation of new roof coverings on exiting roofs as per attached standard. deviations from these standards require submission of construction and site plans.
Status: Issued
Nov 19, 2025
Electrical Rough-In
Rough-in permit for ep-2025-010738 grounding, branch circuits, feeders, circuit breakers, receptacles, panelboards, transformers, safety switches, ac ductless split systems, lighting, lighting controls, smart glass tinting controls, existin
Contractor:
MULHERN ELECTRIC CO., INC.
Status: Completed
Nov 13, 2025
Plumbing Alterations
Domestic water piping with 1 water heater
sanitary piping with 2-grease traps,1-trench drain,19 floor sinks
9 floor drains and 1 hand sink
Contractor:
MWI Mechanical, Inc.
Status: Issued
Nov 11, 2025
Electrical Addition and/or Alteration
The modification of the fire alarm system in the tenant space. all work to be done according to the 2017 nec, 2016 nfpa 72 and
per plans.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Nov 3, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-003811
amendment :add fire alarm devices .
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Oct 30, 2025
Mechanical Addition and/or Alterations
For the installation of two (2) type i commercial kitchen hoods and new hvac systems, associated duct work, ductless systems, and registers/diffusers as per approved plans. separate permit required for electrical, plumbing, fire suppressio
Contractor:
H&W MECHANICAL SERVICES LLC
Status: Issued
Oct 30, 2025
Plumbing Alterations
Installation of the following fixtures with associated piping:
Contractor:
MWI Mechanical, Inc.
Status: Completed
Oct 27, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-003811
Contractor:
MWI Mechanical, Inc.
Status: Completed
Oct 27, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (10) existing sprinkler heads for alte
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Oct 27, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (27) sprinklers to accommodate interio
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Oct 27, 2025
Electrical Addition and/or Alteration
Installation of new 100 amp mlo panel, lighting and fixtures, outlets, receptacles, cctv's, tv's, speakers, wireless access points, kiosks, and data rack with associated wiring and telecommunications wiring as per 2017 nec. ***not appro
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Oct 24, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-003814
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Oct 22, 2025
Electrical Addition and/or Alteration
Electric panels, general lighting, emergency lighting, lighting controls, receptacles, kitchen and hvac equipment power wiring. fire alarm system (conduit pathways for security, data, audio, video. all work is to be done according to approv
Contractor:
PALMAN ELECTRIC INC
Status: Issued
Oct 21, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (18) sprinklers to accommodate interio
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Oct 21, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-003814
for the installation of fuel gas piping, grds and associated ductwork, and one (1) type 1 commercial kitchen hood exhaust system as per approved plans and in accordance with 2018 imc.
Contractor:
PARADIGM MECHANICAL LLC
Status: Issued
Oct 20, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2025-003814
Contractor:
Churchville Mechanical Inc
Status: Issued
Oct 20, 2025
Building Addition and/or Alteration
For interior alterations to an existing structure. alterations to include concrete repair. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtai
Contractor:
Quinn Construction, Inc.
Status: Issued
Oct 20, 2025
Building Addition and/or Alteration
For level ii interior alterations without a change in use and occupancy classification to an existing group b eating establishment in space #c08 within philadelphia international airport terminal c. existing building is fully sprinklered. a
Contractor:
D LAURO & RODGERS INC
Status: Issued
Oct 20, 2025
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to existing coffee shop in space c-12-b of terminal c of an existing airport as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separate p
Contractor:
EINSTEIN CONSTRUCTION GROUP LLC
Status: Completed
Oct 16, 2025
Building Addition and/or Alteration
For the replacement of curtain wall at terminal d-e and associated connector bridges as per approved plans. spearate permits required for other work. *2018 ibc*
Contractor:
DANIEL J. KEATING COMPANY
Status: Issued
Oct 14, 2025
Electrical Addition and/or Alteration
Upgrade and install electric lighting: recessed downlights, cylindrical downlight led, linear direct/indirect led as per 2017 nec.
Contractor:
GREENTECH ENERGY SERVICES
Status: Issued
Oct 13, 2025
Electrical Addition and/or Alteration
Replacing the mufids monitors with new monitors as per 2017 nec and per plans..
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Issued
Oct 8, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-003215
Contractor:
KASER MECHANICAL LLC
Status: Issued
Oct 7, 2025
Building Addition and/or Alteration
For a roof system upgrade to house new mechanical equipment per approved plans.**. all work to be done per approved plans.** if field conditions vary contact design engineer prior to the start of any work**iebc 2018** electrical work to in
Contractor:
KASER MECHANICAL LLC
Status: Issued
Oct 7, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-003215
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Oct 7, 2025
Mechanical Addition and/or Alterations
For the removal and replacement of twenty-one (21) hvac rtus at philadelphia international airport terminals d and e baggage claim as per approved plans and in accordance with 2018 imc. separate permits to be obtained for all other work. if
Contractor:
DOLAN MECHANICAL INC
Status: Issued
Sep 29, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-001091
Contractor:
ERNEST D MENOLD INC
Status: Completed
Sep 24, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (46) sprinklers to accommodate alterat
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Sep 23, 2025
Building Addition and/or Alteration
For change of occupancy at space e9 and level ii alterations to include new partitions, fixtures, furnishings, finishes as per approved plans. separate permits required for mep and fire suppression work.
Contractor:
PENN ACOUSTICS INC
Status: Issued
Sep 22, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (15) sprinkler heads to accommodate al
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Sep 22, 2025
Electrical Addition and/or Alteration
Electrical panels, transformer & feeders, wiring devices, lights, hvac & kitchen equipment wiring, security system devices and wiring, communication devices & wiring. all work is to be done according to approved drawings-2017 nec
amend
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Sep 19, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-001091
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Sep 16, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2025-001091
Contractor:
Churchville Mechanical Inc
Status: Completed
Sep 12, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (18) existing sprinkler heads to accom
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Sep 12, 2025
Plumbing Alterations
Furnish and install:
required sanitary and domestic water piping
5 toilets
5 lavatories
1 floor drain
1 mop receptor
1 trap primer
1 domestic recirc pump
1 electric water heater
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Sep 10, 2025
Site / Utility Permit General Earth Disturbance ONLY
For a earth disturbance permit per approved plans.
Contractor:
C ABBONIZIO CONTRACTORS INC
Status: Issued
Sep 8, 2025
Zoning Signs (Accessory / Non-Accessory)
For the installation of 123 directional signs. size and location as shown in the application / plans.
Contractor:
HDR ENGINEERING INC
Status: Issued
Sep 5, 2025
Building Addition and/or Alteration
For a level ii interior alteration to an existing space c-2 located in terminal c (airport). alterations to include finishes/furnishings upgrade. for use as eating and drinking establishments-take-out-restaurant. building is fully sprinkler
Contractor:
D LAURO & RODGERS INC
Status: Completed
Sep 5, 2025
Electrical Addition and/or Alteration
Replacement of existing substations with new electrical substations in various electrical substations at philadelphia airport. utilizing existing service feeders to new transformers, switchboards, panelboards, disconnect switches, and circ
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Aug 25, 2025
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to existing retail space (space bc-17 a/b) for new tenant within existing airport building as per approved plans. existing building fully sprinklered. *2018 iebc review*
Contractor:
EINSTEIN CONSTRUCTION GROUP LLC
Status: Completed
Aug 22, 2025
Zoning Change of Use
Eating and drinking establishments - take-out restaurant; eating and drinking establishments - sit-down restaurant
Contractor:
Nicholas Antico
Status: Issued
Aug 19, 2025
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. all work to be done per approved plans. if field conditions vary conta
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Aug 12, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-003643
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Aug 11, 2025
Building Addition and/or Alteration
For level ii alterations to an existing tenant space for use as an assembly occupancy (a-2 restaurant), alterations to include the erection of partition walls, provide finishes/furnishings and accessibility improvements throughout. all work
Contractor:
VRH CONSTRUCTION CORP.
Status: Completed
Aug 11, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2025-003643
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Issued
Aug 8, 2025
Mechanical Addition and/or Alterations
For the installation of ductwork and register/diffuser as per approved plans.
Contractor:
PARADIGM MECHANICAL LLC
Status: Issued
Aug 6, 2025
Building Addition and/or Alteration
For alterations to the philadelphia international airport associated with the installation/replacement of mechanical and plumbing systems. all work to be done per approved plans. if field conditions vary contact design engineer prior to the
Contractor:
Surety Mechanical Services Inc
Status: Issued
Aug 5, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (2) sprinkler heads for interior alter
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Aug 5, 2025
Building Addition and/or Alteration
Replacement of 21 existing rooftop air-handling units at d-ticketing and c-d connector bridge, d-hammerhead, and e-f connector bridge, and replacement of existing equipment support at phl international airport. project includes hydronic pip
Contractor:
Surety Mechanical Services Inc
Status: Issued
Aug 5, 2025
Building Addition and/or Alteration
For alterations to the philadelphia international airport associated with the installation/replacement of utility work
for phl-terminal ae, space ae01. all work to be done per approved plans. if field conditions vary contact design engine
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Issued
Aug 1, 2025
Electrical Addition and/or Alteration
Removal and replacement of twenty-six (26) rooftop air handling units (rtus) on the roof of the b/c baggage claim building as
well as four (4) chilled water pumps, two (2) heat exchangers, two (2) fan coil units, two (2) hot water supply p
Contractor:
WESCOTT ELECTRIC COMPANY
Status: Issued
Aug 1, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-003466 - installation of electrical and telecommunication wiring and devices with in a single tenant place not exceeding 2000 sqft.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Jul 31, 2025
Electrical Addition and/or Alteration
Install fire alarm system according to the 2017 nec, 2016 nfpa 72 and per plans.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Jul 29, 2025
Zoning Change of Use
Retail sales - food, beverages, and groceries; retail sales - consumer goods
Contractor:
Nicholas Antico
Status: Issued
Jul 25, 2025
Electrical Addition and/or Alteration
Utilize existing core drills and provide a new floor box as shown on sheet e-003 detail 5 "configuration b1". provide (2) 1" conduits to the new floor box "a". relocate existing power and date circuits shown.
provide a new floor box to mat
Contractor:
Lonnelectric LLC
Status: Issued
Jul 24, 2025
General Permit Minor EZ Interior Non-Load-Bearing Wall Demo.
Ez interior non-load-bearing wall demolition - for the interior demolition on non-load-bearing partition walls and ceilings as per attached standard. deviations from these standards require submission of construction and site plans. structu
Status: Completed
Jul 23, 2025
Electrical Addition and/or Alteration
Install wiring, lighting, switches, exit sign, emergency lighting and receptacle outlets according to the 2017 nec and per plans.
amendment: add fire alarm devices and connect to existing building system.(on site travel essentials)
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Jul 18, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (31) sprinkler heads, to accommodate i
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Jul 18, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-003084
Contractor:
ELC HOLDING COMPANY
Status: Completed
Jul 17, 2025
Building Addition and/or Alteration
For level ii alterations to include new partitions, fixtures, furnishings, finishes as per approved plans. separate permits required for mep and fire suppression work. *2018 iebc*
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Issued
Jul 17, 2025
Building Addition and/or Alteration
For level ii interior alterations to an existing tenant space located at the airport. building is fully sprinklered. all work to be done per approved plans. if field conditions vary contact design professional prior to the start of any wo
Contractor:
D LAURO & RODGERS INC
Status: Completed
Jul 16, 2025
Electrical Addition and/or Alteration
Remove and replace existing roof top units and associated fire alarm .all work is to be done according to approved drawings-2017 nec,2016 nfpa-72.
Contractor:
WESCOTT ELECTRIC COMPANY
Status: Completed
Jul 14, 2025
Jul 10, 2025
Mechanical Addition and/or Alterations
For the installation of a new hvac systems, associated duct work, rooftop units, ductless systems, and registers/diffusers as per approved plans. separate permit required for electrical, plumbing, fire suppression. *asbestos abatement requ
Contractor:
Surety Mechanical Services Inc
Status: Issued
Jul 2, 2025
Electrical Addition and/or Alteration
Equipment replacement 600v or less (remove existing ticketing kiosks and install new kiosks), installation of low voltage wiring as per 2017 nec.
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Issued
Jul 2, 2025
Fire Suppression Addition and/or Alterations
Ez kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans.
install kitchen fire suppr
Contractor:
Joseph F Spaeder
Status: Issued
Jul 1, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2024-001395
Contractor:
Surety Mechanical Services Inc
Status: Issued
Jun 23, 2025
General Permit Minor EZ Roof Covering Replacement
Ez permit re-roofing- for the installation of new roof coverings on existing roofs as per attached standard. deviations from these standards require submission of construction and site plans.
replacement of sheathing in excess of 10% of ro
Status: Completed
Jun 20, 2025
Electrical Addition and/or Alteration
Removal of old fleet charging station and installation of new ev chargers.
all work is to be done according to approved drawings-2017 nec .
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Jun 13, 2025
Electrical Addition and/or Alteration
Disconnect and make electrical safe qty: (16) rtus
furnish and install conduit, wiring as described for the new hvac units.
disconnect and make the existing fire alarm devices safe.
install new fire alarm equipment for the bridge and te
Contractor:
CARR & DUFF INC
Status: Issued
Jun 12, 2025
Zoning Signs (Accessory / Non-Accessory)
For the erection of nine (9) freestanding directional signs [li-36, li-37, li-38, li-39, li-42, li-43, li-45, li-60, & li-61] and the refacing of thirteen (13) existing directional signs [li-40, li-44, li-46, li-47, li-48, li-57, li-58, li-
Contractor:
HDR ENGINEERING INC
Status: Issued
Jun 11, 2025
Mechanical Addition and/or Alterations
For installation of hvac appliances, equipment, ductwork and register/diffusers per approved plans and manufacturer's specifications.
Contractor:
Surety Mechanical Services Inc
Status: Issued
Jun 11, 2025
Electrical Addition and/or Alteration
Disconnect and make electrically safe qty (21) hvac rtus. replace hvac rtu(s) as per plans and 2017 nec.
disconnect and install new fire alarm devices per drawings for the d/e baggage claim rtus as per 2016 nfpa 72.
Contractor:
CARR & DUFF INC
Status: Issued
Jun 11, 2025
Mechanical Addition and/or Alterations
For anew mechanical work. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. ** separate permits required for all other work.**
Contractor:
Surety Mechanical Services Inc
Status: Issued
Jun 10, 2025
Building Addition and/or Alteration
For partial demolition and for level ii alteration to an existing structure at delta sky club. alterations to include the erection of partition walls, provide finishes/furnishings and accessibility improvements throughou, construction of fi
Contractor:
DANIEL J. KEATING COMPANY
Status: Completed
Jun 5, 2025
Electrical Addition and/or Alteration
The scope of work involved with this project encompasses removal, relocation,
replacement of existing fire alarm devices, and installation of new and compatible fire
alarm devices throughout the areas of work . all work is to be done acco
Contractor:
WESCOTT ELECTRIC COMPANY
Status: Completed
Jun 2, 2025
Zoning Site Clearing or Earth Disturbance ONLY
For the site clearing work including removal of bus shuttle waiting areas; removal of long term parking associated with the philadelphia international airport to replace with open vegetated space. size and location as shown on plans.
Contractor:
A D MARBLE & COMPANY INC
Status: Issued
May 29, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate 40 sprinkler heads in ceiling from off
Contractor:
ARORA SYSTEMS GROUP, LLC.
Status: Completed
May 22, 2025
Electrical Addition and/or Alteration
Install (6) duplex receptacles and (10 drive-thru lane light, fed from existing panel. install low voltage wiring for (6) cctv cameras and (2) card readers. all wiring to be in surface mounted conduit. no building permit involved.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Issued
May 21, 2025
Electrical Addition and/or Alteration
Installation of conduit and wire throughout parking garage for way-finding, signage, and cctv cameras-2017 nec.
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
May 20, 2025
Building Addition and/or Alteration
For level ii alterations to an existing structure. alterations to include modifications to the existing roof to accommodate the replacement rooftop units. all work to be done per approved plans. if field conditions vary contact design engin
Contractor:
Surety Mechanical Services Inc
Status: Issued
May 14, 2025
Mechanical Addition and/or Alterations
For the replacement of fourteen (14) rooftop units. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of
Contractor:
EDWARD J. MELONEY INC.
Status: Issued
May 13, 2025
Electrical Addition and/or Alteration
Modification to electrical system and telecommunication work per drawings to existing restaurant. note that baba bar is the current name on the ep contract (last location aka tailgate)
Contractor:
J.W. Carrigan
Status: Completed
May 8, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-000744
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
May 8, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-000744
Contractor:
J.W. Carrigan
Status: Completed
May 8, 2025
Electrical Rough-In
Rough-in permit for ep-2025-004373 installation of conduit and wire throughout parking garage for way-finding, signage, and cameras
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
May 7, 2025
Plumbing Alterations
Pp work includes removal of existing hwh and installation of new hwh-see drawing.
Contractor:
Churchville Mechanical Inc
Status: Completed
May 6, 2025
Site / Utility Permit General Earth Disturbance ONLY
For the removal of existing concrete and trench asphalt, installation of new concrete curb & island, backfill and repave asphalt for new electrical vehicle charging stations per approved plans.
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
May 5, 2025
Building Addition and/or Alteration
For level ii alterations to an existing structure. alterations to include the erection of partition walls,
provide finishes/furnishings and accessibility improvements throughout. for use as previously approved. all work to be done per app
Contractor:
VRH CONSTRUCTION CORP.
Status: Issued
May 2, 2025
Building Addition and/or Alteration
For level ii alterations to include new flooring, fixtures, equipment, furnishings as per approved plans. separate permits for mep and fire suppression work. *2018 iebc*
Contractor:
VRH CONSTRUCTION CORP.
Status: Completed
Apr 30, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-002193
Contractor:
J.W. Carrigan
Status: Completed
Apr 30, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2024-004116
Contractor:
E J ELECTRIC INC
Status: Completed
Apr 30, 2025
Fire Suppression Addition and/or Alterations
Ez kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans.
install 2 tank fire suppre
Contractor:
Joseph F Spaeder
Status: Issued
Apr 28, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-001537
amendment: install fire alarm system. all work to be done according to the 2017 nec, 2016 nfpa 72 and per plans.
Contractor:
WHITEMARSH ELECTRICAL CONSTRUCION INC
Status: Completed
Apr 28, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate 8 sprinkler heads to accommodate inter
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Apr 25, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-001537
Contractor:
PARADIGM MECHANICAL LLC
Status: Completed
Apr 24, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2025-001537
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Apr 23, 2025
Building Addition and/or Alteration
For level ii alterations to an existing structure. alterations to include the erection of partition walls,
provide finishes/furnishings and accessibility improvements throughout. for the installation of registers, diffusers, and appliance
Contractor:
D LAURO & RODGERS INC
Status: Completed
Apr 22, 2025
Building Addition and/or Alteration
For level ii alterations to an existing structure. alterations to include the repair of the existing roof. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate per
Contractor:
BELCHER ROOFING CORP
Status: Issued
Apr 17, 2025
Building Addition and/or Alteration
For roof covering removal and replacement as per approved plans and in accordance with 2018 iebc. separate permits to be obtained for all other work.
Contractor:
BELCHER ROOFING CORP
Status: Issued
Apr 15, 2025
Building Addition and/or Alteration
For the installation of new roof covering system over existing one layer epdm roof system. work will include selective demolition and installation of new (2) ply sbs modified bitumen roofing system over existing epdm roof membrane. work a
Contractor:
BELCHER ROOFING CORP
Status: Issued
Apr 15, 2025
Site / Utility Permit General Earth Disturbance ONLY
For an earth disturbance permit. **work to be performed as per approved plans** earth disturbance only**
Contractor:
C ABBONIZIO CONTRACTORS INC
Status: Issued
Apr 11, 2025
Fire Suppression Addition and/or Alterations
Fire suppression system permit for combo cp-2024-004116
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Apr 11, 2025
Plumbing Alterations
Install 7 floor sinks, 3 floor drains, 2 three compartment sinks, 3 hand sinks, 2 ice machine, 1 prep sink and 1 grease interceptor according to the 2018 ppc and per plans.
Contractor:
DELCO STORM AND SEWER SERVICES
Status: Amendment Application Incomplete
Apr 8, 2025
Zoning Parking Only
For the installation of electric vehicle charging station and associated parking per approved plan.
Contractor:
WSP USA INC
Status: Issued
Apr 7, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (500) sprinklers to accommodate change
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Apr 4, 2025
Electrical Addition and/or Alteration
Work in the electrical contract includes, but is not limited to, the following as per 2017 nec:
1. electrical service and distribution.
2. interior lighting.
3. communication and security.
4. electrical connections to equipment furnishe
Contractor:
WESCOTT ELECTRIC COMPANY
Status: Completed
Apr 3, 2025
Building Addition and/or Alteration
For level i alterations (with no change in occupancy) in existing building per approved plans. separate permits required for mechanical, electrical and plumbing work.
Contractor:
DANIEL J. KEATING COMPANY
Status: Issued
Apr 2, 2025
Electrical Addition and/or Alteration
**electrical work to include the installation of a new receptacle for espresso machine. remove all power from disconnected display case (branch circuit, conduit, wiring, junction box and receptacle). existing receptacle for the quick se
Contractor:
J.W. Carrigan
Status: Completed
Mar 31, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2024-006304
Contractor:
Churchville Mechanical Inc
Status: Completed
Mar 31, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2024-006307
amendment: relocate unit 10 ft back as per approved plans.
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Mar 28, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2024-006225
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Mar 28, 2025
Building Addition and/or Alteration
For a level i interior alteration to an existing tenant space ( phl-b11) located in terminal b (airport). alterations to include finishes/furnishings upgrade. building is fully sprinklered. ** all work to be done per approved plans. **if f
Contractor:
VRH CONSTRUCTION CORP.
Status: Completed
Mar 28, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2024-006306
Contractor:
Churchville Mechanical Inc
Status: Completed
Mar 26, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2024-006225
Contractor:
Churchville Mechanical Inc
Status: Completed
Mar 26, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2024-006307
Contractor:
Churchville Mechanical Inc
Status: Completed
Mar 26, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2024-006306
Contractor:
J.W. Carrigan
Status: Completed
Mar 24, 2025
Electrical Addition and/or Alteration
Remove existing exhaust fans. install new conduit and raceway system for new exhaust fans and mechanical equipment. install new branch circuit wiring for new equipment. the exhaust fans and mechanical equipment are to be interconnected.
Contractor:
J.W. Carrigan
Status: Completed
Mar 24, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2024-006445
Contractor:
J.W. Carrigan
Status: Completed
Mar 24, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2024-006307
Contractor:
J.W. Carrigan
Status: Completed
Mar 24, 2025
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans. if field conditions vary contact design engineer p
Contractor:
KASER MECHANICAL LLC
Status: Amendment Application Incomplete
Mar 12, 2025
Mechanical Addition and/or Alterations
For the installation of registers / diffusers with associated ductwork to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans. if field conditions vary
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Mar 3, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2024-006565
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Feb 21, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2024-006565
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Feb 21, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2024-006565
for the installation of hvac appliance, the relocation of grds, and the installation of a type 1 commercial kitchen exhaust hood with associated exhaust fan, makeup air system, and du
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Feb 21, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (10) sprinklers to accommodate interio
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Feb 19, 2025
Building Addition and/or Alteration
For level ii interior alterations without a change in occupancy to an existing group a-2 sit-down restaurant in space d9 within terminal d of the philadelphia international airport. existing building is fully sprinklered. all work to be don
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Feb 18, 2025
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for renovations to holdrooms in terminal 'e' of an existing airport building as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separate permits required for any m
Contractor:
DANIEL J. KEATING COMPANY
Status: Issued
Feb 18, 2025
Electrical Addition and/or Alteration
Install (16) scan guns and stanchion supports. scan guns are usb connected to existing computer.
install (4) fail-safe and stack-light devices on existing baggage conveyor. install associated wiring to existing junction box with motor cont
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Issued
Feb 12, 2025
Electrical Addition and/or Alteration
Demo existing power and lighting per drawing- install power and lighting per drawings for temp corridors and exit lanes as per 2017 nec. ***fire alarm installation will be applied for under a separate application.***
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Completed
Feb 11, 2025
Electrical Addition and/or Alteration
Disconnect existing and re-feed (14) new rtu's @ e concourse phl. upgrade fire alarm and wire new duct detectors and shut down relays .all work is to be done according to approved drawings-2017 nec,2016 nfpa-72,2018 phila fire code.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Feb 7, 2025
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Steven Abel
Status: Expired
Feb 7, 2025
Electrical Addition and/or Alteration
Install a new scada system for monitoring island ave and main terminal substations at philadelphia international airport. all work in accordance with the 2017 nec.
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Feb 4, 2025
Mechanical Addition and/or Alterations
Replace (10) roof top units over terminal "a" east with all assocated ductwork connections into existing and replacing air dirt sep, glycol make up, pumps & heat exchangers as per approved plans.
Contractor:
DOLAN MECHANICAL INC
Status: Issued
Feb 4, 2025
Building Addition and/or Alteration
For a level i interior alteration to an existing space b5 located in terminal b (airport). alterations to include finishes/furnishings upgrade. building is fully sprinklered. ** all work to be done per approved plans. **if field conditions
Contractor:
VRH CONSTRUCTION CORP.
Status: Completed
Jan 31, 2025
Building Addition and/or Alteration
For a level ii interior alteration to an existing space b12 located in terminal b (airport). alterations to include finishes/furnishings upgrade. building is fully sprinklered. ** all work to be done per approved plans. **if field condition
Contractor:
VRH CONSTRUCTION CORP.
Status: Completed
Jan 31, 2025
Building Addition and/or Alteration
For a level i interior alteration to an existing tenant space ( phl-b10) located in terminal b (airport). alterations to include finishes/furnishings upgrade. building is fully sprinklered. ** all work to be done per approved plans. **if f
Contractor:
VRH CONSTRUCTION CORP.
Status: Completed
Jan 31, 2025
Building Addition and/or Alteration
For level i interior alterations to an existing tenant space located in terminal b. all work to be done per approved plans.** if field conditions vary contact design professional prior to the start of any work. **separate permits to be obt
Contractor:
VRH CONSTRUCTION CORP.
Status: Completed
Jan 31, 2025
Electrical Addition and/or Alteration
Disconnect & remove the feeders, disconnect switches & starters from the existing mechanical & hvac equipment. install new feeders, disconnects & starters for the new mechanical & hvac equipment. remove the existing 1' x 4' light fixtures &
Contractor:
CARR & DUFF INC
Status: Issued
Jan 30, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2024-006106
Contractor:
MWI Mechanical, Inc.
Status: Completed
Jan 24, 2025
Electrical Addition and/or Alteration
Electrical permit for combo cp-2024-006106
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Jan 23, 2025
Zoning Change of Use
Eating and drinking establishments - take-out restaurant
Contractor:
RUTH E BROWN
Status: Issued
Jan 23, 2025
Building Addition and/or Alteration
For level ii alterations to create one tentant space (bc30) from two tentant spaces (bc29a & bc30). alterations to include the erection of partition walls, provide finishes/furnishings and accessibility improvements throughout.
for use as
Contractor:
EINSTEIN CONSTRUCTION GROUP LLC
Status: Completed
Jan 22, 2025
Electrical Addition and/or Alteration
Install a 50 amp panel & feeder. install new lights normal & emergency using the exisitng circuiting. install switches, receptacles & data jacks. all work in accordance with the 2017 nec.
* no fire alarm work.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Jan 20, 2025
Plumbing Alterations
Phl airport 1589.17 sanitary lift station upgrade - plumbing
demo pipe & pumps in 11 lift stations
replace pipe and pumps in 11 lift stations. all piping must be metallic.
Contractor:
Surety Mechanical Services Inc
Status: Issued
Jan 15, 2025
Mechanical Addition and/or Alterations
For the replacement of rooftop unit as per approved plans. separate permit required for electrical, plumbing, fire suppression.
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
Jan 7, 2025
Plumbing Alterations
Furnish and install condensate drain line from roof top unit to existing roof drain
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
Jan 7, 2025
Electrical Addition and/or Alteration
Fire alarm only: install new fire alarm devices (federal donuts, oyster house)
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Dec 31, 2024
Electrical Addition and/or Alteration
Disconnect power to (1) existing rooftop ahu unit and subsequently reconnect power to (1) new ahu unit in same location re-utilizing existing circuitry. connected to mech permit mp-2024-005354 scope.
Contractor:
JANUS ASSOCIATES INC DBA COBRA ELECTRIC
Status: Completed
Dec 30, 2024
Electrical Addition and/or Alteration
Electrical permit for combo cp-2024-006104
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Dec 30, 2024
Building Addition and/or Alteration
For a level ii interior alteration to an existing space c07 located in terminal c (airport). alterations to include finishes/furnishings upgrade. building is fully sprinklered. ** all work to be done per approved plans. **if field condition
Contractor:
EINSTEIN CONSTRUCTION GROUP LLC
Status: Completed
Dec 26, 2024
Electrical Addition and/or Alteration
Installation of a 100amp sub panel, furnish 2 temp 20amp outlets/circuits.
all work in this application is temporary, as they have future remodel in the space coming.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Dec 17, 2024
Building Addition and/or Alteration
For level ii alterations to include structural work, new partitions, doors, floors, finishes as per approved plans. separate permits required for any mep and fire suppression work.
Contractor:
DANIEL J. KEATING COMPANY
Status: Completed
Dec 16, 2024
Dec 13, 2024
Plumbing Alterations
Plumbing permit (interior) for combo cp-2024-002400
install 3 mop sinks, 3 eyewashers, 3 hot water heaters, 4 floor drains, 2 backflow preventers, 4 hose bibbs and 4 water hyrants according to the 2018 ppc and per plans.
Contractor:
JOHN J BEE INC
Status: Completed
Dec 12, 2024
Electrical Addition and/or Alteration
Install a 400 amp circuit breaker in the existing substation tv3-2. install a new 400 amp panel & feeder dub-1. reconnect the existing panel, transformer, disconnects, pump control panels, ahu-1,ef-1 & vsd. provide feeders to the new pumps
Contractor:
E J ELECTRIC INC
Status: Issued
Dec 12, 2024
Electrical Addition and/or Alteration
Demo the power wiring to the (12) existing lift station ejector pumps & pump controllers. install new coduits conductors & circuiting to the (12) new lift station ejector pumps & pump controllers. all work in accordance with the 2017 nec.
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Dec 11, 2024
Electrical Addition and/or Alteration
Replace ceiling lights in restrooms. install receptacle for new soup kettles. wiring to be fished through existing accessible ceiling space. no building permit involved.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Nov 26, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (66) sprinklers to accommodate interio
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Nov 18, 2024
General Tank Install/Removal
Remove (6) six undergorund tanks. the removal must comply with the regulations of the pennsylvania department of environmental protection (padep). see pa engineer report that removal of tanks has no impacts on the existing structure and no
Status: Completed
Nov 13, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Issued
Nov 6, 2024
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans
Contractor:
DOLAN MECHANICAL INC
Status: Issued
Nov 4, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (10) sprinklers to accommodate interio
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Oct 17, 2024
Electrical Addition and/or Alteration
Install lighting, receptacles, telecommunications wiring as per 2017 nec.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Oct 16, 2024
Electrical Addition and/or Alteration
Add outlet for cooler and replace ballast in cabinet lights. wall fishing surface mount wire mold.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Oct 9, 2024
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2024-000645
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Oct 2, 2024
Electrical Addition and/or Alteration
Demo and replacement of variable message signs at phl airport terminal a through f septa platforms. install new 120v power and fiber optic cable to each new sign in existing locations. only electrical and fiber work****
Contractor:
EAGLE I ELECTRIC INC
Status: Expired
Sep 27, 2024
Electrical Addition and/or Alteration
Replace (31) lights, (2) exit signs, install (10) wiring devices, (2) plug mold strips, (1) 60 amp panel, (11) data jacks. utilize existing wiring, and fish new wiring through existing drop ceilings. *no new construction being done. no bui
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Sep 25, 2024
Mechanical Addition and/or Alterations
For alterations to an existing hvac system. all work to be done as per approved plans and in accordance with 2018 imc. separate permits to be obtained for all other work. if site conditions vary, contact design engineer prior to start of wo
Contractor:
MWI Mechanical, Inc.
Status: Completed
Sep 17, 2024
Plumbing Alterations
Amendment dated october 7, 2024: proposed amendment to reflect doa approval and add'l 580sq'. architect transmittal details changes to the plumbing system
original: plumbing permit (interior) for combo cp-2024-000645
install 13 floor s
Contractor:
Churchville Mechanical Inc
Status: Completed
Sep 13, 2024
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to fort mifflin tunnel within an existing airport facility as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separate permits required fo
Contractor:
DANIEL J. KEATING COMPANY
Status: Issued
Sep 13, 2024
Electrical Addition and/or Alteration
Electrical permit for combo cp-2024-000645
electric: install all wiring according to approved drawings-2017 nec
**no fire alarm work on this permit**
amendment: additional 580sq' added, also, drawings reflect doa approval-see architectur
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Sep 13, 2024
Electrical Addition and/or Alteration
Install (1) equipment cabinet
install (2) battery cabinets on (1) proposed 16'x11"x12'-4" equipment platform
install (1) h-frame with (1) 2oo amp ppc, (2) hoffman enclosures, (1) fiber trough, (1) grounfd bar, (2) gps antennas and (1) dis
Contractor:
SWARTLEY BROS ENGINEERS INC
Status: Issued
Sep 11, 2024
Building Addition and/or Alteration
For level ii interior alterations without change of occupancy classification to phl airport terminal retail space (tenant fitout of food establishments in existing food establishment spaces. space bc-11 is oyster house; space bc-13 is fede
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Sep 10, 2024
Plumbing Alterations
New dishwasher, hand sink, and mop sink
hub drain and kitchen sink with disposal
4 fixtures
direct fixture replacment without piping.
Contractor:
MWI Mechanical, Inc.
Status: Expired
Sep 9, 2024
Mechanical Addition and/or Alterations
For upgrade to the existing hvac system as per approved plans.
Contractor:
DOLAN MECHANICAL INC
Status: Issued
Sep 5, 2024
Electrical Addition and/or Alteration
Install (1) 200 amp panel, (1) 30 kva transformer, (1) 100a panel and associated feeders. install lights and wiring devices. install wiring and terminations to hvac equipment and motors. install lightning protection system.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Sep 5, 2024
Building Addition and/or Alteration
For level ii alterations to an existing attached structure. alterations to include the erection of partition walls,
provide finishes/furnishings and accessibility improvements throughout.
for use as previously approved. all work to be d
Contractor:
EINSTEIN CONSTRUCTION GROUP LLC
Status: Completed
Sep 4, 2024
Plumbing Alterations
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
keegan&cunnius plumbing and mechanical
Status: Issued
Sep 4, 2024
Building Addition and/or Alteration
For the removal and replacement of a detached one (1) story with a pre-engineered metal building (pemb) on new reinforced concrete foundations for use as lavatory dump site f accessory to the philadelphia international airport. building is
Contractor:
DANIEL J. KEATING COMPANY
Status: Completed
Aug 26, 2024
Zoning New construction, addition, GFA change
For the removal and replacement of one (1) detached structure (lavatory dump site f) as part of the existing philadelphia international airport. size and location as shown on plans.
Contractor:
R S & H INC
Status: Completed
Aug 21, 2024
Electrical Addition and/or Alteration
Replacement of pole-mounted light fixtures and replacement of interior high hat fixtures throughout philadelphia airport. one for one replacement to newer leds
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Jul 8, 2024
Electrical Addition and/or Alteration
Furnish and install conduit and wire from panel lp to the chargers // install (4) new chargers // commissioning system as per 2017 nec.
Contractor:
RNH ELECTRIC CO OF NJ INC
Status: Completed
Jul 3, 2024
Electrical Addition and/or Alteration
Install fire alarm devices and associated fire alarm wiring for hvac units as per 2016 nfpa 72.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Jun 19, 2024
Plumbing Alterations
Replace 3 wall hung toilets with piping
Contractor:
MWI Mechanical, Inc.
Status: Completed
Jun 14, 2024
Electrical Addition and/or Alteration
Install conduit duct banks for power & communications. install (1) new 800 amp circuit breaker in the existing substation. install (3) 300 amp circuit breakers in the existing substation, install conduits & feeders to (3) vfd"s & 150 hp pum
Contractor:
E J ELECTRIC INC
Status: Completed
Jun 10, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (9) sprinklers to accommodate renovati
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Jun 10, 2024
General Sign
For the erection of two (2) freestanding signs as per approved plans. separate permits required for electrical work.
Status: Completed
May 29, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (6) sprinkler heads for renovations to
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
May 23, 2024
Building Addition and/or Alteration
For sitework and installation of cooling towers, pumps and control equipment per approved plans.
Contractor:
DANIEL J. KEATING COMPANY
Status: Issued
May 22, 2024
Building Addition and/or Alteration
For the removal of tower b, for roof infill and associated construction, and for alrterations to the exterior wall as per application/plans. all work to be done in accordance with the 2018 iebc. *asbestos abatement required prior to start o
Contractor:
HAINES & KIBBLEHOUSE INC
Status: Issued
Apr 22, 2024
Electrical Addition and/or Alteration
Install new lighting and power distribution, conduit in slab, and tele/data wiring as per 2017 nec.
amendment: install fire alarm devices as per 2016 nfpa.
Contractor:
J.W. Carrigan
Status: Completed
Apr 19, 2024
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2024-001787
Contractor:
ELC HOLDING COMPANY
Status: Completed
Apr 18, 2024
Plumbing Alterations
Install 1 mop sink, 1 three compartment sink, 1 grease interceptor, 2 hand sinks, 3 floor sinks, 1 backflow preventer, 1 prep sink and 1 hot water heater according to the 2018 ppc and per plans.
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Apr 18, 2024
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to support areas in airport terminal d (rooms 1012, 1019, & gates d5 and d7) as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separate p
Contractor:
BITTENBENDER CONSTRUCTION LP
Status: Completed
Apr 18, 2024
Mechanical Addition and/or Alterations
To remove and replace existing rooftop units and new ductwork to be connected to existing duct risers at terminal e. all appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if
Contractor:
Surety Mechanical Services Inc
Status: Completed
Apr 11, 2024
Electrical New Construction
Electrical permit for combo sp-2023-001017
Contractor:
E J ELECTRIC INC
Status: Completed
Mar 23, 2024
Electrical Addition and/or Alteration
Install fire alarm. all work is to be done according to approved drawings-2017 nec,2016 nfpa-72,2018 phila fire code.
**separate electrical permits req'd for interior wiring**
Contractor:
WHITEMARSH ELECTRICAL CONSTRUCION INC
Status: Completed
Mar 20, 2024
Electrical Addition and/or Alteration
Electrical permit for combo cp-2024-000990
Contractor:
SIGNORA ELECTRIC CO INC
Status: Completed
Mar 18, 2024
Mechanical Addition and/or Alterations
For the installation of new cooling tower, piping and pumps per approved plans.
Contractor:
Surety Mechanical Services Inc
Status: Completed
Mar 13, 2024
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2024-000990
Contractor:
Surety Mechanical Services Inc
Status: Completed
Mar 13, 2024
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to existing retail space m02 within an existing airport facility (bc connector) as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separat
Contractor:
VRH CONSTRUCTION CORP.
Status: Completed
Mar 12, 2024
Fire Suppression Addition and/or Alterations
For the alteration of an existing fire suppression system complying with nfpa 13 with an exsiting backflow prevention assembly. all work shall be performed by a fire suppression contractor licensed by the city of philadelphia.
** phl rest
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Mar 12, 2024
Site / Utility Permit Sitework with Onsite Utility Services
For sitework per approved plans. separate permits required for mechanical, electrical and plumbing.
Contractor:
A P CONSTRUCTION INC
Status: Completed
Mar 11, 2024
Zoning Signs (Accessory / Non-Accessory)
For the erection of two single-faced freestanding sign. size and location as shown in the plans.
Contractor:
RUTH E BROWN
Status: Completed
Mar 8, 2024
Electrical Addition and/or Alteration
Amendment: install/ relocate new fire alarm devices as per 2016 nfpa 72.
new light fixtures, security equipment installation, and sound system as per 2017 nec. ***no fire alarm on this permit***
Contractor:
WHITEMARSH ELECTRICAL CONSTRUCION INC
Status: Completed
Mar 8, 2024
Electrical Addition and/or Alteration
Install new conduits and electrical feeders for (15) gpu’s and (15) pc-air units being replaced between terminals d & e as per 2017 nec. install/replace electrical panels, disconnects, and meters as per 2017 nec.
Contractor:
EAGLE I ELECTRIC INC
Status: Issued
Mar 8, 2024
Fire Suppression Addition and/or Alterations
Kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans.
install ul 300 system per cod
Contractor:
Joseph F Spaeder
Status: Expired
Mar 7, 2024
Building Addition and/or Alteration
For exterior and level ii interior alterations to upgrade philadelphia international airport terminal emergency electrical substations. existing building is fully sprinklered. all work to be done per approved plans and in accordance with 20
Contractor:
THE SULLIVAN COMPANY
Status: Issued
Feb 29, 2024
Fire Suppression Addition and/or Alterations
Kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans.
install ul 300 wet chemical c
Contractor:
Joseph F Spaeder
Status: Completed
Feb 22, 2024
Electrical Rough-In
Rough-in permit for ep-2024-001743 fire alarm system in tenant space per drawing
Contractor:
WHITEMARSH ELECTRICAL CONSTRUCION INC
Status: Expired
Feb 21, 2024
Electrical Addition and/or Alteration
Furnish and install new lighting, power, and tele-data for new coffee shop in airport as per 2017 nec. install fire alarm as per 2016 nfpa 72.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Feb 21, 2024
Zoning New construction, addition, GFA change
For partial demolition of the existing structure. size and location per plans.
Contractor:
AECOM TECHNICAL SERVICES INC
Status: Issued
Feb 21, 2024
Mechanical Addition and/or Alterations
For a new mechanical system installation to accommodate an existing space ( bc-26ab). work to include, the installation of registers, diffusers and appliances with associated ductwork. appliances to be installed in accordance with the manu
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Feb 13, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (9) sprinkler heads to accommodate ten
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Feb 8, 2024
Electrical Addition and/or Alteration
Replace (15) lights in millwork. replace 30 track head lamps. *no new wiring required. no building permit is applicable for this job.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Feb 8, 2024
Electrical Addition and/or Alteration
Install electrical service, two 60 amp circuit breakers, 4 electrical vehicle stations and chargers according to the 2017 nec and per plans.
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Completed
Jan 31, 2024
Building Addition and/or Alteration
For interior level 2 alterations for fit-out of a coffee shop as per plans. no change in occupancy classification.
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Jan 30, 2024
Plumbing Alterations
Replace 3/4" backflow device, water heater, laundry sink and water lines.
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Jan 26, 2024
Plumbing Alterations
Install 2 new 100 gallon hot water heaters, 1 recirculation pump and piping, and new pvc flue exhaust.
Contractor:
Surety Mechanical Services Inc
Status: Completed
Jan 24, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (10) sprinkler heads to accommodate in
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Jan 24, 2024
Mechanical Addition and/or Alterations
For the installation of a new hvac systems, associated duct work, and registers/diffusers as per approved plans. separate permit required for electrical, plumbing, fire suppression
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Jan 23, 2024
Electrical Addition and/or Alteration
Relocate (2) existing 120/208v/ 3 phase panels. install lights normal & emergency, switches, sensors, & lighting control panels. install wiring for the receptacles, & data/ com. provide power for the mechanical, hvac, kitchen equipment, & s
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Jan 22, 2024
Electrical Addition and/or Alteration
Furnish and install power, lighting, telecommunications, and security for a new airport lounge space as per 2017 nec. install fire alarm as per 2016 nfpa 72.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Jan 17, 2024
Building Addition and/or Alteration
For level 2 alterations to existing tenant space as per plans.
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Jan 15, 2024
Mechanical Addition and/or Alterations
For the installation of appliances to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans. if field conditions vary contact design engineer prior to the
Contractor:
EDWARD J. MELONEY INC.
Status: Issued
Jan 9, 2024
Mechanical Addition and/or Alterations
For the replacement of twelve (12) ventilation fans and eight (8) duct heaters. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact design eng
Contractor:
Surety Mechanical Services Inc
Status: Completed
Jan 3, 2024
Building Addition and/or Alteration
For interior accessibility upgrades per approved plans at airport terminals a through f.
Contractor:
A P CONSTRUCTION INC
Status: Issued
Dec 29, 2023
Building Addition and/or Alteration
For the erection of a canopy to an existing structure. work to include exterior improvement as per approved plans. **if field conditions vary contact design engineer prior to the start of any work**iebc 2018** separate permits required for
Contractor:
A P CONSTRUCTION INC
Status: Completed
Dec 29, 2023
Electrical Rough-In
Rough-in permit for ep-2023-012367 furnish and install demo new lighting power fire alarm and tele-data for new coffee shop in airport
as per nec 2017
Contractor:
EAGLE I ELECTRIC INC
Status: Expired
Dec 27, 2023
Zoning Change of Use
Personal services
Contractor:
Mon & Associates Consulting LLC
Status: Completed
Dec 25, 2023
Fire Suppression Addition and/or Alterations
For the installation of 323 new sprinkler heads to an existing fire suppression system complying with nfpa 13 throughout the building. as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Dec 19, 2023
Plumbing Alterations
Demo storm water pumps in aw, ae, bc east , bc west, cd, de, e concourses and demo piping.
install new storm water pumps in aw, ae, bc east , bc west, cd, de, e concourses and new piping.
Contractor:
Surety Mechanical Services Inc
Status: Completed
Dec 19, 2023
Building Addition and/or Alteration
For construction of concrete pad accessory to electrical work.
Contractor:
C ABBONIZIO CONTRACTORS INC
Status: Expired
Dec 15, 2023
Plumbing Alterations
Install 1 three compartment sink, 1 grease interceptor, 2 hand sinks, 2 prep sinks, 1 ejector sump pump, 1 mop sink, 5 floor sinks
and 1 hot water heater according to the 2018 ppc and per plans.
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Dec 14, 2023
Fire Suppression Rough-In
Rough-in permit for fp-2023-002836 install (323) new sprinklers and piping tied to existing wet system and backflow preventer, in phl de terminal connector passenger lounge
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Dec 7, 2023
Zoning New construction, addition, GFA change
For the erection of a canopy structure accessory to an existing structure. size and location as shown in plan
Contractor:
KS Engineers, P.C.
Status: Completed
Dec 5, 2023
Electrical Addition and/or Alteration
Furnish and install (6) outlets in the b/c food court for the fashion show
fishing wire down existing columns.
as per nec 2017
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Nov 21, 2023
Electrical Addition and/or Alteration
Fit-out of existing space. coffee quick service to be replaced by coffee quick service.
eagle i electric will be removing and replacing existing electrical fixtures as well as adding new fixtures for lighting and upgrading some kitchen eq
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Nov 21, 2023
Electrical Addition and/or Alteration
Disconnect power to the existing hvac equipment to be removed. provide power to the (7) new hvac units using new & existing conduits & existing panels. all work in accordance with the 2017 nec.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Nov 15, 2023
Mechanical Addition and/or Alterations
For the installation of a new hvac systems, associated piping as per approved plans. separate permit required for electrical, plumbing, fire suppression
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Nov 15, 2023
Electrical Addition and/or Alteration
Renovations to existing baggage handling tug tunnels to include replacement of luminaires, telecommunications wiring, exhaust fans and sump pumps to include associated 120v and 480v branch circuiting as per 2017 nec. all wiring replaces e
Contractor:
E J ELECTRIC INC
Status: Completed
Nov 15, 2023
Mechanical Addition and/or Alterations
For the installation of a new hvac systems, associated duct work, rooftop unit, and registers/diffusers as per approved plans. separate permit required for electrical, plumbing, fire suppression
Contractor:
R. Brooks Mechanical, Inc.
Status: Expired
Nov 13, 2023
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (5) sprinklers to accommodate retail s
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Nov 10, 2023
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (40) sprinkler heads to accommodate in
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Nov 7, 2023
Mechanical Addition and/or Alterations
For the installation of a new hvac system including registers, and diffusers with associated appliances and ductwork as per plans. for the installation of commercial kitchen exhaust hood as per plans.
Contractor:
ERNEST D MENOLD INC
Status: Completed
Nov 6, 2023
Electrical Rough-In
Rough-in permit for ep-2023-010700 electrical fit out of existing airport commercial space.
Contractor:
EAGLE I ELECTRIC INC
Status: Expired
Nov 6, 2023
Fire Suppression Addition and/or Alterations
For the installation of 113 new concealed pendent sprinklers to an existing fire suppression system complying with nfpa 13 throughout the building as per approved plans. all work shall be performed by a fire suppression contractor licensed
Contractor:
Oliver Sprinkler Co., Inc.
Status: Issued
Nov 3, 2023
Building Addition and/or Alteration
Renovation of existing retail space at phl airport, f terminal hub, space fh14 as per approved plans.
Contractor:
AIRPORT CONSTRUCTION SERVICES
Status: Completed
Nov 2, 2023
Plumbing Alterations
Install 12 floor sinks, 2 grease interceptors, 1 three compartment sink, 2 hand sinks, 1 mop sink, 1 hot water heater and
1 prep sink according to the 2018 ppc and per plans.
Contractor:
Churchville Mechanical Inc
Status: Completed
Nov 1, 2023
Building Addition and/or Alteration
Level i exterior alterations (no change of occupancy) for renovations to an existing administrative building (ppa building) for roof replacement and glazing repair (not substantial improvement) as per approved plans. no interior work on thi
Contractor:
ROBERT GANTER CONTRACTORS INC
Status: Expired
Nov 1, 2023
Building Addition and/or Alteration
For the installation of four (4) ev vehicle charging stations and signs as per approved plans. separate permit required for electrical work.
Contractor:
Guth DeConzo Construction Management
Status: Expired
Oct 31, 2023
General Sign
For the erection of two (2) statically illuminated signs. size and location as shown in application / plans. separate permit requried for electrical work.
Status: Issued
Oct 20, 2023
Electrical Addition and/or Alteration
Install 20a/1p branch power and telecommunications circuits to additional lane of security screening equipment.
as per nec 2017
Contractor:
E J ELECTRIC INC
Status: Completed
Oct 18, 2023
Plumbing Alterations
F&i new domestic water - sanitary/vent piping
f&i new fixtures
(12) water closets
(2) urinals
(12) lavs
(1) kitchen sink
(1) mop sink
(2) showers
(20) floor drains
(14) floor sinks
(2) trench drains
(5) trap primers
(2) hose b
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Oct 17, 2023
Building Addition and/or Alteration
For level ii interior alterations with a partial change in occupancy to create a group a-2 sit-down restaurant in terminal c spaces c5 & c6 of the philadelphia international airport. all work to be done per approved plans and in accordance
Contractor:
D LAURO & RODGERS INC
Status: Completed
Oct 5, 2023
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13) - for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (173) sprinkler heads to accommodate
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Oct 5, 2023
Electrical Addition and/or Alteration
Upgrade conduit and feeders between existing switchgear and existing disconnects at face of building serving (3) passenger boarding bridges. install new lsig breakers at existing panels and demand meters at existing disconnects (meters fbo)
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Oct 4, 2023
Electrical Addition and/or Alteration
Install floor outlet poke throughs as per 2017 nec
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Issued
Sep 29, 2023
Electrical Addition and/or Alteration
Provide 120v power to two new signs. all work in accordnce with the 2017 nec.
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Completed
Sep 28, 2023
Electrical New Construction
Electrical permit for combo cp-2023-002294
Contractor:
FOLEY, PAUL
Status: Completed
Sep 25, 2023
Electrical Addition and/or Alteration
New lights and wiring devices fed from existing panel. install communication jacks. fire alarm modifications.. all work is to be done according to approved drawings-2017 nec,2016 nfpa-72,2018 phila fire code.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Sep 21, 2023
Mechanical Addition and/or Alterations
Remove and replace existing gas-fired infrared tube heaters per approved plans and manufacturer's specifications.
Contractor:
DREAM MECHANICAL INC
Status: Completed
Sep 18, 2023
Mechanical Addition and/or Alterations
For the installation of a new hvac system including registers and diffusers with associated ductwork as per plans. for the installation of a type 2 commercial kitchen exhaust hood as per plans.
Contractor:
ELC HOLDING COMPANY
Status: Completed
Sep 12, 2023
Building New Construction
Modular construction of a temporary (more than 180 days customer service booth accessory to an existing customer service and car rental building as per approved plans and bbs variance no. mi-2023-004002. bbs proviso: applicant is allowed to
Contractor:
WOODSIDE ASSOCIATES INC
Status: Completed
Sep 8, 2023
Electrical Rough-In
Rough-in permit for ep-2023-008430 furnish and install power, lighting, fire alarm, telecommunications, and security for a new airport lounge space. as per nec 2017
Contractor:
EAGLE I ELECTRIC INC
Status: Expired
Sep 7, 2023
Mechanical Addition and/or Alterations
For a new mechanical work to include coil cleaning, filter replacement and thermostat relocation. ** work to be performed per approved work. ** if field conditions vary contact design professional prior to start of work**
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Aug 31, 2023
Plumbing Alterations
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
TANDEM ASSOCIATES INC
Status: Completed
Aug 29, 2023
Electrical Addition and/or Alteration
Furnish and install fiber data cable, raceways and associated equipment to ticket counters in e-terminal. conduit and cable will be run in existing exposed areas or fished. * no other trades or building permit required for this project.
as
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Aug 28, 2023
Electrical Addition and/or Alteration
Furnish and install demo, power, tele/data, and lighting to renovate an airport store.all work is to be done according to approved drawings-2017 nec. ** the electric panels are existing.
** no fire alarm work on this permit**
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Aug 22, 2023
Electrical Addition and/or Alteration
Install lights normal & emergency, switches, sensors, & time clock. install receptacles, floor boxes, & data/com wiring, & devices.
install fire alarm devices connecting to the existing building system.
all work in accordance with the 20
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Aug 21, 2023
Electrical Addition and/or Alteration
*install feeders to the new replacement equipment (2) reclaim pump controllers, (2) brush system controllers, (4) sump pumps, new ro pump controller, (1) new gfci, (8) new light fixtures, and (2) three- way switches as per 2017 nec.
** the
Contractor:
FOLEY, PAUL
Status: Completed
Aug 21, 2023
Electrical Addition and/or Alteration
Install fire alarm devices as per 2016 nfpa 72. relocate fire alarm devices.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Aug 18, 2023
Mechanical Addition and/or Alterations
For installation of hvac system as per approved plans.
Contractor:
Surety Mechanical Services Inc
Status: Completed
Aug 6, 2023
Plumbing New Construction or Additions
Amend permit per pba proviso approval on hearing date 5/2/2024 -
a) existing pvc piping can remain in place until may 02, 2027. (3 years)
b) after may 02, 2027, all existing non-metallic piping must be removed to and including the underg
Contractor:
RIVER MECHANICAL INC
Status: Completed
Aug 3, 2023
Building Addition and/or Alteration
For level ii alteration to passenger lounge to be located in de terminal connector of the philadelphia international airport. building is fully sprinklered. separate permits required for mep & fp work.
amendment to the second and third flo
Contractor:
D LAURO & RODGERS INC
Status: Completed
Jul 27, 2023
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
modify (6) sprinkler heads to accommodate inter
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Jul 24, 2023
Zoning Parking Only
For the addition of four(4) electrical vehicle charging station to an existing parking lot.
Contractor:
Paulette Ahmad
Status: Issued
Jul 20, 2023
Building Addition and/or Alteration
Level i alterations (no change of occupancy) for renovations to existing car wash building to include updating/replacing equipment and roof re-covering as per approved plans. *2018 iebc review*
**separate permits required for any mep work*
Contractor:
WOODSIDE ASSOCIATES INC
Status: Completed
Jul 19, 2023
Electrical Addition and/or Alteration
Install electrical equipment to trailer-transformer, disconnect switch as per 2017 nec
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Completed
Jun 16, 2023
Building New Construction
For the erection of a detached building (one story trailer) as a part of philadelphia international airport as per approved plans. separate permits required for mep work. building is not sprinklered.
Contractor:
WIDNER CONSTRUCTION MANAGEMENT
Status: Completed
May 30, 2023
Fire Suppression Addition and/or Alterations
Fire suppression system permit for combo cp-2022-004301
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
May 30, 2023
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to existing retail tenant space bc-15 for a new tenant within an existing airport facility (bc connector) as per approved plans. existing building fully sprinklered. *20
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
May 26, 2023
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (8) sprinkler heads to accommodate int
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
May 26, 2023
Building Addition and/or Alteration
For level ii interior alterations (new tenant fit-out) to retail tenant space # fh-2 in terminal "f" of the philadelphia international airport without a change in existing group m use & occupancy classification. all work to be done per appr
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
May 25, 2023
Electrical Rough-In
Rough-in permit for ep-2023-004786 new lights, wiring devices, power to lighted millwork; wiring to connect to existing panel. data cabling and jacks. install fire alarm devices and connect to existing local zone. as per 2017 nec
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Expired
May 24, 2023
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances
for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plan
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
May 24, 2023
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2023-001611
Contractor:
MWI Mechanical, Inc.
Status: Completed
May 18, 2023
Electrical Addition and/or Alteration
Electrical permit for combo cp-2023-001611
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
May 17, 2023
Electrical Addition and/or Alteration
Electrical permit for combo cp-2023-001530
Contractor:
J.W. Carrigan
Status: Completed
May 16, 2023
Building Addition and/or Alteration
For a level i interior alterations to an existing tenant space on the 1st floor level of an existing structure(airport). for useas a business occupancy . alterations to include finishes upgrade and provide furnishings, and accessibility i
Contractor:
EINSTEIN CONSTRUCTION GROUP LLC
Status: Completed
May 16, 2023
Plumbing Alterations
Plumbing alterations for new tenant in space per drawings. new hand sink, dump sink, dishwasher, and floor drains
3 fixtures
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Expired
May 15, 2023
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2023-001530
Contractor:
ELC HOLDING COMPANY
Status: Completed
May 11, 2023
Building Addition and/or Alteration
For a level ii interior alterations to a portion of the 2nd and 3rd floor level of an existing structure. alterations to include the erection of partition walls, provide finishes/furnishings, and accessibility improvements throughout. **
Contractor:
D LAURO & RODGERS INC
Status: Completed
May 11, 2023
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and appliances with associated ductwork for areas throughout an existing airport. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved pl
Contractor:
EDWARD J. MELONEY INC.
Status: Issued
May 10, 2023
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) to an existing structure (space #fh-3) in terminal f of the philadelphia international airport. alterations to include partial demo and interior renovations, provide finishes and furnis
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
May 8, 2023
Electrical Addition and/or Alteration
Renovations to 22public restrooms within the philadelphia airport, inclusive of required renovations to ancillary spaces associated with the support and maintenance of the public restrooms, at terminals ae, b, c, d, e and f. renovations and
Contractor:
E J ELECTRIC INC
Status: Issued
May 8, 2023
Plumbing Alterations
Renovations to 22public restrooms within the philadelphia airport, inclusive of required renovations to ancillary spaces associated with the support and maintenance of the public restrooms, at terminals ae, b, c, d, e and f. renovations and
Contractor:
KASER MECHANICAL LLC
Status: Issued
May 4, 2023
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2022-004301
Contractor:
RIVER MECHANICAL SERVICES INC
Status: Completed
May 2, 2023
Electrical Addition and/or Alteration
Furnish and install (6) gfci-protected circuits in the b/c foodcourt as per 2017 nec.
we will be running wires in the existing drop ceiling and fishing down existing columns, there is not any new building construction
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Apr 28, 2023
Mechanical Addition and/or Alterations
For the installation of registers, diffusers and appliances with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact desi
Contractor:
Surety Mechanical Services Inc
Status: Completed
Apr 28, 2023
Electrical Addition and/or Alteration
Reuse abandoned 200 amp service from nextel and install new 200 amp service, grounding, fiber and telecommunication cabinets for dish network as per 2017 nec
Contractor:
TRISTRUX LLC
Status: Completed
Apr 25, 2023
Electrical Addition and/or Alteration
Electrical permit for combo cp-2022-004301
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Apr 24, 2023
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to restrooms within an existing airport facility as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separate permits required for mep & fi
Contractor:
DANIEL J. KEATING COMPANY
Status: Issued
Apr 24, 2023
Plumbing Alterations
Plumbing permit (interior) for combo cp-2022-004301
Contractor:
RIVER MECHANICAL INC
Status: Completed
Apr 21, 2023
Electrical Addition and/or Alteration
Installing (1) 225a 120/208v 3 phase outdoor panel for new vacuum addition as per print. includes (2) 3 phase 208v-60a vac circuits, (1) 3 phase 208v-30a compressor circuit and miscellaneous power to shed as per 2017 nec.
Contractor:
21ST CENTURY ELECTRIC INC
Status: Completed
Apr 4, 2023
Electrical Addition and/or Alteration
Extend existing circuitry for new ticket koisk locations by fishing new wires as per 2017 nec
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Completed
Mar 28, 2023
Electrical Addition and/or Alteration
Demo existing chiller and pumps. provide new circuit breakers and feeders for the new chiller and pumps. low voltage control wiring by others -per 2017 nec
Contractor:
PALMAN ELECTRIC INC
Status: Completed
Mar 28, 2023
Building Addition and/or Alteration
For level ii interior alterations to terminal e of the philadelphia international airport as per approved plans and in accordance with 2018 iebc. no change to existing use & occupancy classifications. separate permits required for mechanica
Contractor:
AVCON USA, LLC
Status: Completed
Mar 23, 2023
Electrical Addition and/or Alteration
Install lights normal & emergency, switches, sensors,light controls & receptacles. provide power for the kitchen equipment. relocate the existing 200 amp lv2 panel. all work in accordance with the 2017 nec.
** the electric panels are exis
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Mar 22, 2023
Electrical Addition and/or Alteration
Electrical line voltage, electrical low voltage, and lightning protection work associated with a roof replacement project as per 2017 nec
Contractor:
MULHERN ELECTRIC CO., INC.
Status: Completed
Mar 20, 2023
Zoning Change of Use
Personal services; office - business and professional; eating and drinking establishments - sit-down restaurant
Contractor:
Mon & Associates Consulting LLC
Status: Issued
Mar 14, 2023
Electrical Rough-In
Rough-in permit for ep-2023-001873 furnish and install new lighting and power for the renovation of a juice store in the airport as per 2017 nec
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Mar 2, 2023
Electrical New Construction
Install fire alarm system as per approved drawings-2017 nec,2016 nfpa-72,2018 phila fire code.
Contractor:
WHITEMARSH ELECTRICAL CONSTRUCION INC
Status: Completed
Feb 28, 2023
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. (cp-2023-000018)
relocate (4) sprinkler heads
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Feb 27, 2023
Building Addition and/or Alteration
For a level ii interior alterations to an existing tenant space. for use as a eating and drinking establishment occupancy. alterations to include the erection of partition walls, provide finishes/furnishings, and accessibility improvements
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Feb 24, 2023
Building Addition and/or Alteration
For a level ii alterations to an existing structure. alterations to include the replacement of the roof structure and ramp tower. building is fully sprinklered. all work to be done per approved plans. if field conditions vary contact design
Contractor:
D A NOLT INC
Status: Completed
Feb 10, 2023
Plumbing Alterations
Install the following fixtures
4 toilets,4 lavs,1 mop sink,1 drinking fountain
6 floor drains and 4 shower drains
2- electric hot water heaters and 1-2" backflow preventer
domestic water piping and cast iron sanitary and vent piping
r
Contractor:
MWI Mechanical, Inc.
Status: Completed
Jan 28, 2023
Fire Suppression Addition and/or Alterations
Ez kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans.
relocate ansul system in h
Contractor:
Joseph F Spaeder
Status: Completed
Jan 24, 2023
Plumbing Alterations
Removing (2) water coolers in terminal d and replacing with (1) new beverage dispenser
removing (2) water coolers in terminal e and replacing with (1) new beverage dispenser
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Expired
Jan 20, 2023
Mechanical Addition and/or Alterations
Alterations to existing hvac system to accomodate new fitness center in space fh01 within terminal f of an existing airport facility as per approved plans. *2018 imc review*
Contractor:
ERNEST D MENOLD INC
Status: Completed
Jan 10, 2023
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (23) sprinkler heads
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Jan 10, 2023
Mechanical Addition and/or Alterations
For the replacement of hvac system (water cooled chiller), associated duct work as per approved plans. separate permit required for electrical, plumbing, fire suppression
Contractor:
ELC HOLDING COMPANY
Status: Completed
Jan 10, 2023
Site / Utility Permit Foundation
For the erection of 14 auger cast piles. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. all future beams, girders, posts, and connections to the future prefabricated
Contractor:
WIDNER CONSTRUCTION MANAGEMENT
Status: Completed
Jan 6, 2023
Electrical Addition and/or Alteration
Provide electrical assistance in providing power to conveyor systems at airport as per 2017 nec.
Contractor:
JJ White inc.
Status: Completed
Jan 4, 2023
Electrical Addition and/or Alteration
Furnish and install power, lighting, data, and fire alarm for renovation of airport store.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Dec 27, 2022
Electrical Addition and/or Alteration
New lights, wiring devices fed from existing panel. communication cable and jacks.
clean/replace fire alarm devices as needed per plans as per 2017 nec and nfpa 72
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Dec 22, 2022
Building Addition and/or Alteration
For level 2 alterations to space for tenent fit-out for fitness center within airport as per plans.
Contractor:
D LAURO & RODGERS INC
Status: Completed
Dec 16, 2022
Electrical Addition and/or Alteration
Electrical distribution modifications associated with the pc air & gpu replacements at selected terminal gates as per 2017 nec
Contractor:
CHARLES H MACDONALD ELECTRIC I
Status: Completed
Dec 14, 2022
Zoning Change of Use
Retail sales - wearing apparel and accessories; personal services
Contractor:
Mon & Associates Consulting LLC
Status: Completed
Dec 9, 2022
Site / Utility Permit Foundation
For the erection of foundation for light poles as per approved plans. separate permits required for any other work.
Contractor:
CARR & DUFF INC
Status: Completed
Nov 15, 2022
Electrical Addition and/or Alteration
Install electric for new hvac unit as per 2017 nec
data closet -f&i conduit
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Expired
Nov 11, 2022
Electrical Addition and/or Alteration
Install a 70 amp circuit breaker, 45 kva transformer, 200 amp/175amp fused disconnect switch, 175 amp panel & feeder, 60 amp ups system. install lights normal & emergency, switches ,controls, receptacles, conduits & strings, pathways for lo
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Nov 8, 2022
Plumbing New Construction or Additions
Install new water lines, sanitary lines, fixtures and hot water heaters. all piping will be metallic.
Contractor:
Surety Mechanical Services Inc
Status: Completed
Nov 2, 2022
Electrical New Construction
Install new 100-amp electric feeder and panel.
install new lighting.
install duplex receptacles.
install data and speakers outlets
as per 2017 nec
Contractor:
WHITEMARSH ELECTRICAL CONSTRUCION INC
Status: Completed
Nov 1, 2022
Mechanical Addition and/or Alterations
Install of hvac system in it room. 60,000 btu , 5 ton , 13 seer, 200 cfms. replacement of unit only, in-like and kind. if other work is performed, a building permit will be required.
Contractor:
RIVER MECHANICAL INC
Status: Completed
Nov 1, 2022
Building Addition and/or Alteration
For alterations to existing spaces d12 and d13, to include new interior partiions, rated shaft enclosure installations, rated floor/ceiling assemblies, and wall/floor/ceiling finishing. (iebc 2018, work-area method, lvl iii alterations) **s
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Oct 31, 2022
Plumbing Alterations
Install floor drains and sinks for new restaurant tenant.
Contractor:
Churchville Mechanical Inc
Status: Completed
Oct 31, 2022
Electrical Addition and/or Alteration
Furnish and install two temporary power circuits for temporary kiosks as per 2017 nec
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Oct 21, 2022
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and the relocation of existing grease duct hood with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if
Contractor:
ERNEST D MENOLD INC
Status: Completed
Oct 21, 2022
Electrical Rough-In
Rough-in permit for ep-2022-010681
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Oct 21, 2022
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact des
Contractor:
Surety Mechanical Services Inc
Status: Completed
Oct 17, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. (cp-2022-005537)
relocate (24) sprinkler heads
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Oct 11, 2022
Building Addition and/or Alteration
Level ii interior alterations for fit-out of new restaurant tenant in space e12 of an existing airport facility (concourse e) as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separate permits required for an
Contractor:
D LAURO & RODGERS INC
Status: Completed
Oct 4, 2022
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2021-009016
Contractor:
Surety Mechanical Services Inc
Status: Expired
Sep 9, 2022
Mechanical New Construction
For the installation of hvac appliances, grds, and associated ductwork and for the installation of a fuel gas piping system. all work to be done per approved plans and in accordance with 2018 imc and 2018 ifgc. separate permits to be obtain
Contractor:
Surety Mechanical Services Inc
Status: Completed
Sep 9, 2022
Electrical Rough-In
Rough-in permit for ep-2022-008892 install new 100-amp electric feeder and panel.
install new lighting.
install duplex receptacles.
install data and speakers outlets
as per 2017 nec
Contractor:
WHITEMARSH ELECTRICAL CONSTRUCION INC
Status: Completed
Sep 9, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
modifying (7) sprinklers
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Sep 8, 2022
Mechanical Addition and/or Alterations
Alterations to existing hvac to accomodate new tenant layout in space b1b in an existing airport facility (terminal b) as per approved plans. *2018 imc review*
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Expired
Sep 6, 2022
Building Addition and/or Alteration
For level ii alterations and renovations to the 1st floor of an existing building. for use as previously approved.
as per approved plans.
*********separate permits required for mechanical & electrical work*********
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Aug 31, 2022
Electrical Addition and/or Alteration
Furnish & install upgrade to phl video surveillance system, network hardware and cable, cctv cameras, 120vac to cctv camera boxes in terminals aeast, c and f as per 2017 nec
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Aug 25, 2022
Electrical Addition and/or Alteration
Relocation of 12 strand fiber due to the closing of starbucks space as per 2017 nec
Contractor:
EAGLE I ELECTRIC INC
Status: Expired
Aug 19, 2022
Plumbing Alterations
Replace hand washing sinks and drains without piping
Contractor:
Churchville Mechanical Inc
Status: Expired
Aug 12, 2022
Electrical Rough-In
Rough-in permit for ep-2022-007337 furnish & install upgrade to phl video surveillance system, network hardware and cable, cctv cameras, 120vac to cctv camera boxes in terminals aeast, c and f as per 2017 nec
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Aug 8, 2022
Electrical Addition and/or Alteration
**please note there is no associated building permit**
install the following surface-mounted fixtures via surface-mounted conduit - no walls will be opened.
(mechanic area)
1-new exterior wall light
2-new exterior spotlight
2-new surf
Contractor:
NORTHSTAR ELECTRICAL SVCS INC
Status: Completed
Aug 5, 2022
Building Addition and/or Alteration
For renovations of existing septa platforms at the philadelphia international airport. separate permts required for mechanical, electrical and plumbing.
Contractor:
DANIEL J. KEATING COMPANY
Status: Expired
Aug 1, 2022
Electrical Addition and/or Alteration
In customer waiting area disconnect electric devices for led backwall displays and remove circuits. provide/install new electrical circuits and devices for new displays. also provide conduit drops down wall for low voltage vendor as per 201
Contractor:
HARD HAT SERVICES LLC
Status: Completed
Jul 8, 2022
Electrical Addition and/or Alteration
Demolition of existing electrical lighting and replace with new as per 2017 nec
Contractor:
WESCOTT ELECTRIC COMPANY
Status: Completed
Jul 7, 2022
Fire Suppression Addition and/or Alterations
Kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans.
install kitchen fire suppress
Contractor:
Joseph F Spaeder
Status: Expired
Jul 6, 2022
Electrical Addition and/or Alteration
Gold members waiting area disconnect electric devices for led backwall displays and remove circuits. provide/install new electrical circuits and devices for new displays. also provide conduit drops down wall for low voltage vendor as per 20
Contractor:
HARD HAT SERVICES LLC
Status: Completed
Jun 28, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of (1) sprinkler head as per attached standards. deviations from these standards require submission of construction and site plans.
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Jun 28, 2022
Electrical Addition and/or Alteration
Disconnect/remove electric and data in existing gold board tv display. installation of new circuits using existing conduit and breakers, and connect to new gold board as per 2017 nec
Contractor:
HARD HAT SERVICES LLC
Status: Completed
Jun 28, 2022
Electrical Addition and/or Alteration
Furnish and install conduit, wire, and equipment for tracking system of vehicle maintenance as per 2017 nec.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Jun 27, 2022
Electrical Addition and/or Alteration
Remove and replace 3 pendent fixtures on existing track and install 3 new pendent fixtures and tie into existing lighting circuit and control. provide new power for digital display and connect new store front signage to existing power as pe
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Jun 7, 2022
Electrical Addition and/or Alteration
Disconnect electric and data wiring in existing cash wrap. reconnect existing electric and data to new cash wrap after installation.
disconnect existing electric from floor fixtures. reconnect to existing electric to new floor fixtures aft
Contractor:
SIGNORA ELECTRIC CO INC
Status: Completed
May 31, 2022
Electrical New Construction
Electrical permit for combo sp-2022-000216
Contractor:
LANE-VALENTE INDUSTRIES INC.
Status: Completed
May 26, 2022
Site / Utility Permit Sitework with Onsite Utility Services
For the installation of electric vehicle chargers as per approved plans.
Contractor:
LANE-VALENTE INDUSTRIES INC.
Status: Expired
May 24, 2022
Plumbing Alterations
Install one sink and associated piping as per ppc 2018
Contractor:
Churchville Mechanical Inc
Status: Completed
May 19, 2022
Building Addition and/or Alteration
For the repair of existing column on the second floor level accessory to existing airport. all work to be done per approved plans. if field conditions vary contact structural engineer prior to the start of any work. separate permits to be o
Contractor:
WATTS RESTORATION CO INC
Status: Expired
May 3, 2022
Building Addition and/or Alteration
For level ii interior alterations to the space bc-14 as per approved plans. separate permits required for mechanical, electrical, plumbing and fire suppression works.
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
May 2, 2022
Building Addition and/or Alteration
For level 2 alterations for interior fit-out of tenant space in phl space bc-3 for merchantile store "1920 merch co" per drawings.
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
May 2, 2022
Electrical Addition and/or Alteration
Furnish and install new lights, power, data and fire alarm for an airport news store all work is to be done according to approved drawings-2017 nec,2016 nfpa-72,2018 phila fire code.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Apr 28, 2022
Electrical Addition and/or Alteration
Furnish & install led apron lighting system for concourses b,c, d including electrical power distribution infrastructure with the concourse and substations, boarding bridge-mounted led task lighting, led flood lighting, high mast light pole
Contractor:
CARR & DUFF INC
Status: Completed
Apr 25, 2022
Electrical Rough-In
Rough-in permit for ep-2022-003422 furnish and install new lights, power, data and fire alarm for an airport news store as per 2017 nec and nfpa 72
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Apr 22, 2022
Plumbing Alterations
Install 1 hub drain
water piping for fixture
Contractor:
MWI Mechanical, Inc.
Status: Completed
Apr 12, 2022
Electrical Addition and/or Alteration
Install (3) 200 amp panels, (1) 200 amp sub-meter, (1) 112.5 kva transformer, new lighting, switches, receptacles, kitchen & mechanical equipment connections, communication outlets and security cameras as per 2017 nec. install fire alarm
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Apr 11, 2022
Electrical Addition and/or Alteration
Remove, relocate, install new poke thru devices with 120v branch power and telecommunication cabling at airport terminal security screening checkpoints as per 2017 nec.
Contractor:
E J ELECTRIC INC
Status: Completed
Apr 7, 2022
Zoning New construction, addition, GFA change
For the erection of a detached building (one story trailer) as a part of philadelphia international airport (size and location as shown on plans).
Contractor:
Urban Engineers, Inc.
Status: Completed
Apr 6, 2022
Building Addition and/or Alteration
For concrete repairs within existing parking garage as per approved plans. separate permits required for any other work.
Contractor:
WATTS RESTORATION CO INC
Status: Expired
Apr 6, 2022
Electrical Addition and/or Alteration
Install 13 receptacles in existing space. new wiring to terminate in existing panel. wiring to be run through existing conduits. no new building construction, cutting or patching will be necessary. project is just electrical. as per 2017 n
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Apr 5, 2022
Electrical Addition and/or Alteration
Disconnect existing 120v branch power, telecommunication and low voltage control wiring from parking area access control equipment. remove and replace equipment, reconnect 120v branch power, telecommunication and low voltage controls as per
Contractor:
E J ELECTRIC INC
Status: Completed
Apr 1, 2022
Electrical Addition and/or Alteration
Disconnect and remove (2) existing floor receptacles.
plate existing holes on bottom of floor and patch with non-shrink grout.
core (4) new holes for floor receptacles at new location.
provide (2) new floor receptacles and install (4) to
Contractor:
SIGNORA ELECTRIC CO INC
Status: Completed
Mar 30, 2022
Electrical Addition and/or Alteration
Install new power and data to ticketing kiosks as per 2017 nec
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Expired
Mar 24, 2022
Building Addition and/or Alteration
For level ii alterations (w/o a change of occupancy) to an existing group b space (airport operations center) within an existing group a-3 (airport) occupancy, as per plans; see sub-permits for associated mechanical and electrical work; bui
Contractor:
SMITH CONSTRUCTION CO OF PHILADELPHIA
Status: Expired
Mar 23, 2022
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to existing retail space in de08 in an existing airport facility as per approved plans. existing building fully sprinklered. all work to be done per approved plans. if f
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Mar 18, 2022
Plumbing Alterations
Install 2 floor drains, 1 hot water heater, 1 hud drain, 1 washing machine box, 2 shower/tub and 1 water closet according to the 2018 ppc.
Contractor:
MWI Mechanical, Inc.
Status: Completed
Mar 16, 2022
Plumbing Alterations
Install 1 kitchen sink, 1 ejector pump and 1 electric water heater according to the 2018 ppc.
Contractor:
MWI Mechanical, Inc.
Status: Completed
Mar 9, 2022
Mechanical Addition and/or Alterations
For alterations to fuel gas pippong as per plans.
Contractor:
KASER MECHANICAL LLC
Status: Completed
Mar 9, 2022
Electrical Rough-In
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Mar 9, 2022
Mechanical Addition and/or Alterations
For alterations to an existing mechanical system to include new makeup air units, gas piping, and associated ductwork, and for the installation of two (2) (16' & 20') type i kitchen hoods for a restaurant with exhaust fan and a make up air
Contractor:
RIVER MECHANICAL INC
Status: Completed
Mar 7, 2022
Electrical Addition and/or Alteration
Install (12) lights, (3) switches, (27) receptacles, connection to (5) mechanical equipment, (1) 30 kva transformer, (1) 100 amp panel, (11) tele/data jacks as per 2017 nec. relocate (2) horn/strobes as per nfpa 72 with no additional wiri
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Mar 2, 2022
General Tank Install/Removal
**tank closure permit** for the closure in place of one (1) 6,000 gallon underground storage fuel oil tank (ust) tank #3. remove any petroleum product / water from tank. conduct a confirmatory soil sampling of surrounding soil. contingency
Status: Expired
Feb 24, 2022
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pl
Contractor:
MWI Mechanical, Inc.
Status: Completed
Feb 23, 2022
Electrical Rough-In
Rough-in permit for ep-2022-001176 install (12) lights, (3) switches, (27) receptacles, connection to (5) mechanical equipment, (1) 30 kva transformer, (1) 100 amp panel, (11) tele/data jacks. relocate (2) horn/strobes as per 2017 nec and n
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Feb 21, 2022
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13 throughout the building to include 6" main fire service line with
a 6" ames 2000ss backflow prevention assembly. as per approved plans. all work shall be performed by a fire supp
Contractor:
Harring Fire Protection, LLC
Status: Completed
Feb 14, 2022
Mechanical Addition and/or Alterations
For installation of registers, diffusers, and appliances with associated ductowork for space accessory to airport. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Feb 14, 2022
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with manufactuerer's specifications. all work to be done per approved plans. if field conditions vary contact de
Contractor:
MWI Mechanical, Inc.
Status: Completed
Feb 12, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocate (5) sprinkler heads space # ab-6 (cp-2
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Feb 9, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocate (14) sprinkler heads terminal e8c (cp-
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Feb 7, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocate (11) sprinkler heads suite c12-a
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Feb 7, 2022
Plumbing Alterations
Installation of all interior supply and drain/waste/vent pipe to the listed fixtures per the 2018 philadelphia plumbing code. sizes and locations per plans.
Contractor:
RIVER MECHANICAL INC
Status: Completed
Feb 3, 2022
Building Addition and/or Alteration
For alterations to include the installation of an accessible service counter, insulated walk-in cooler, interior partitions, and wall/floor/ceiling finishing. (iebc 2018, work-area method, lvl ii alterations; non-substantial improvement)
Contractor:
D LAURO & RODGERS INC
Status: Completed
Feb 3, 2022
Electrical Addition and/or Alteration
Furnish & install (3) 120v circuits, fiber cable from e-terminal ops data cabinet to gate e-13, and (10) cat 5 data cables to podiums. all work in accordance with the 2017 nec.
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Expired
Feb 2, 2022
Electrical Addition and/or Alteration
Replace existing lights with new. replace existing switches and receptacles with new. add new wiring devices. wiring to new hvac unit. replace ceiling speakers. install (1) tele/data jack. relocate (2) speaker/strobes to adjacent wall. new
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Feb 2, 2022
Electrical Addition and/or Alteration
Alterations for renovations to restaurant in space fh-08 in an existing airport facility as per 2017 nec. re-wire new luminaires to existing lighting circuit. installation of new power and equipment as per 2017 nec.
Contractor:
WHITEMARSH ELECTRICAL CONSTRUCION INC
Status: Completed
Jan 31, 2022
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to employee area on the lower level of terminal e within an existing airport facility as per approved plans. existing building fully sprinklered. *2018 iebc review*
**s
Contractor:
EINSTEIN CONSTRUCTION GROUP LLC
Status: Completed
Jan 27, 2022
Plumbing Alterations
For the removal and re-installation of existing grease trap. replacement of any damaged sanitary waste pipe only. separate fuel gas permit required.
Contractor:
KASER MECHANICAL LLC
Status: Completed
Jan 24, 2022
Building Addition and/or Alteration
For interrior level 2 alterations as per plans.
Contractor:
EINSTEIN CONSTRUCTION GROUP LLC
Status: Completed
Jan 24, 2022
Building Addition and/or Alteration
For level ii alteration without change of occupancy classification of existing retail space within philadelphia international airport as per approved plans.
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Jan 19, 2022
Electrical Addition and/or Alteration
The
infrastructure and baggage handling system work associated with the
replacement of eight existing explosive detection ctx 9400 units with six
new government furnished ctx 9800 units. this recapitalization project
will include change
Contractor:
JJ White inc.
Status: Completed
Jan 18, 2022
Site / Utility Permit Sitework with Onsite Utility Services
3" domestic water service tie-in to existing pwd 20" water main
Contractor:
MCCLOSKEY MECHANICAL CONT INC
Status: Completed
Jan 14, 2022
Plumbing New Construction or Additions
Plumbing permit for combo sp-2021-000905
Contractor:
MCCLOSKEY MECHANICAL CONT INC
Status: Completed
Jan 14, 2022
Plumbing Alterations
Fixture replacement without piping for existing bathrooms
Contractor:
Greg Rossi
Status: Completed
Jan 11, 2022
Electrical Addition and/or Alteration
Remodel of the existing operations center workstations, install new power, new lighting communications, audio/visual, a new power panel and ups as per 2017 nec.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Jan 5, 2022
Electrical New Construction
New construction including 13.2kv service from existing customer-managed medium voltage distribution to the existing customer-provided outdoor 13.2kv primary/480v secondary electrical distribution equipment, 480/277v and 208/120v branch pow
Contractor:
E J ELECTRIC INC
Status: Completed
Dec 28, 2021
Electrical Addition and/or Alteration
Running conduit and wire from an existing electrical panels within philadelphia international airport to antennas in areas throughout airport as per approved drawings-2017 nec.
work is under gp-2021-012388.
Contractor:
CARR & DUFF INC
Status: Completed
Dec 21, 2021
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to restaurant in space fh-08 in an existing airport facility as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separate permits required
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Dec 2, 2021
Electrical Addition and/or Alteration
Install cat-6 cable through accessible ceiling to (1) ceiling mount people counter sensors. no cutting of building finishes necessary to install wiring as per 2017 nec
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Expired
Nov 23, 2021
Electrical Addition and/or Alteration
Install cat-6 cable through accessible ceiling to (1) ceiling mount people counter sensors. no cutting of building finishes necessary to install wiring as per 2017 nec
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Expired
Nov 23, 2021
Electrical Addition and/or Alteration
Install cat-6 cables through accessible ceiling to (2) ceiling mount people counter sensors. no cutting of building finishes necessary to install wiring as per 2017 nec
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Expired
Nov 23, 2021
Electrical Addition and/or Alteration
Install cat-6 cables through accessible ceiling to (2) ceiling mount people counter sensors. no cutting of building finishes necessary to install wiring as per 2017 nec
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Expired
Nov 23, 2021
General Antenna
For the installation of antennas and associated equipment apart of existing telecommunication equipment associated with existing airport. all work to be done per approved plans sealed by structural engineer. if field conditions vary contac
Status: Expired
Nov 18, 2021
Electrical Addition and/or Alteration
Install new conduits and electrical feeders for (11) new pc air units pm jet bridges. all work is to be done according to approved drawings.-2017 nec.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Nov 15, 2021
Fire Suppression New Construction
For the installation of new sprinklers tying to the existing four (4) inch cross main size. automatic fire suppression system to be as per nfpa 13. all work shall be done in accordance with approved plans/hydraulic calculations. separate pe
Contractor:
Harring Fire Protection, LLC
Status: Completed
Oct 21, 2021
Electrical Addition and/or Alteration
Furnish & install conduit, cabling, monitor mounts & supports; terminate, test & label all cabling; install owner supplied equipment; install 24x24 access panels as per approved drawings- 2017 nec.
Contractor:
ARMOUR & SONS ELECTRIC INC
Status: Completed
Oct 8, 2021
Mechanical Addition and/or Alterations
For the installation of hvac appliance, registers, diffusers and ductwork. appliances to be installed in accordance with manufactuer's specifications. all work to be done per approved plans. if field conditions vary contact design professi
Contractor:
Surety Mechanical Services Inc
Status: Expired
Sep 7, 2021
Building Addition and/or Alteration
Level ii interior alterations with partial change of occupancy to create a restaurant in space bc13 in the bc connector of an existing airport facility as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separa
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Expired
Aug 16, 2021
Mechanical Addition and/or Alterations
For mechanical alterations in existing bathrooms, to inclde the installation of three (3) eru's, registers/diffusers and associated ductwork, as per approved plans.
Contractor:
Surety Mechanical Services Inc
Status: Expired
Aug 14, 2021
Building New Construction
For the erection of a one (1) story detached structure (building "a") of construction type iib for use as an airport-related facility (groups b & a-3 use & occupancy classifications) by the philadelphia international airport pavement & grou
Contractor:
A P CONSTRUCTION INC
Status: Completed
Jul 28, 2021
Electrical Addition and/or Alteration
Removing and reinstalling in-pavement centerline lights. part of this project is in tinicum township (delaware county). as per 2017 nec
Contractor:
PALMAN ELECTRIC INC
Status: Expired
Jul 22, 2021
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for renovations to entrance doors departing terminals d and e within an existing airport facility as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separate permi
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
Jul 13, 2021
Electrical Addition and/or Alteration
Demolish and furnish and install new power, lighting, and fire alarm for (4) new vestibule doors for terminal e and terminal d as per approved drawings 2017 nec and 2018 phila fire code.
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Jul 9, 2021
Electrical Addition and/or Alteration
Install new lights, and power to electrically operated sliding doors and electric heaters and air curtains for renovated vestibules as per 2017 nec. install wiring for fire alarm tamper & flow switches as per 2016 nfpa 72.
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Jul 2, 2021
Mechanical Addition and/or Alterations
For alterations to an existing mechanical system to include new air handling units and condensing units, refrigerant piping, and associated ductwork.
Contractor:
Surety Mechanical Services Inc
Status: Expired
Jun 29, 2021
Electrical Addition and/or Alteration
Furnish and install new power and data for cash wrap, new floor receptacles, and extend existing lighting circuits for owner furnished lighting as per nec 2017
Contractor:
EAGLE I ELECTRIC INC
Status: Completed
Jun 11, 2021
Electrical Addition and/or Alteration
Install panels, transformers, feeders, lighting, wiring devices, hvac wiring, low voltage communication and fire alarm devices and wiring for restrooms renovations as per 2017 nec and nfpa 72
Contractor:
GOLDSMITH ASSOCIATES INC
Status: Completed
Jun 10, 2021
Fire Suppression Addition and/or Alterations
For the modification of existing sprinkler system including piping and srinkler heads per approved plans, hydraulic calculaiton and nfpa 13.
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
May 14, 2021
Building Addition and/or Alteration
For level 2 alterations for fitout of existing commercial tenant space (for a new kiehl's location) in space de-3 of concourse connector de at philadelphia international airport as per plans.
no additions. no change in gfa. no exterio
Contractor:
RUSS KELLY & ASSOCIATES, INC.
Status: Completed
May 13, 2021
Building Addition and/or Alteration
Replace 4 revolving doors with new entrance vestibules, replace 1 sliding door with new entrance vestibule, replace 2 sliding doors with new glazing system at grade level/ first floor as per approved plans.
Contractor:
SMITH CONSTRUCTION CO OF PHILADELPHIA
Status: Completed
May 5, 2021
Electrical Addition and/or Alteration
No alelectrical: new vfds and disconnect switches ,with new 3-pole breakers in mcc bucket all new conduit & wire for cooling tower fans, heat trace, and basin heaters. all work to be done according to approved drawings -2017 nec.
Contractor:
Camelot Contracting LLC
Status: Completed
May 4, 2021
Building Addition and/or Alteration
No alterations associated with scope of work, replacement of cooling tower, please see associated mechanical permit. appliances to be installed in accordance with manufacaturer's specificiations. if field conditions vary contact design engi
Contractor:
HARDESTY INC
Status: Completed
May 3, 2021
Mechanical Addition and/or Alterations
For the replacment of cool tower as shown per approved plans. appliances to be installed in accordance with manufacaturer's specificiations. if field conditions vary contact design engineer prior to the start of any work. separate permits t
Contractor:
HARDESTY INC
Status: Completed
May 3, 2021
Plumbing Alterations
New rough in for fixtures ,water piping , new fixtures
Contractor:
KASER MECHANICAL LLC
Status: Completed
Apr 13, 2021
Check permits at another Philadelphia address
Free instant lookup, no signup.
Search Philadelphia permits →
Disclaimer: Permit data comes from Philadelphia's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Philadelphia building department before buying, selling, or planning work.