Permit history for 650 Fairmount Ave

Philadelphia, PA · 298 permits on file · 2021–2026

298
Permits on file
2021
First permit
2026
Most recent
15
Unique contractors

Permits on file (298)

Ordered most recent first. Data from the city's open data portal.

Electrical New Construction
Install new service ,new meters, panels ,outlets , switches and lights ,smoke/co alarms ,em.lighting ,fire alarm throughout per approved drawings-2017 nec .
Contractor: Arber Sulaj
Status: Issued
May 22, 2026
Mechanical New Construction
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans
Contractor: Bedri Allaraj
Status: Issued
May 15, 2026
Mechanical New Construction
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans
Contractor: Bedri Allaraj
Status: Issued
May 13, 2026
Zoning Signs (Accessory / Non-Accessory)
For the installation of one (1) non-illuminated directional sign. size and location as shown on plans.
Status: Issued
Mar 23, 2026
Mechanical New Construction
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. all work to be done per approved plans. if field conditions vary conta
Status: Issued
Jan 30, 2026
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 20, 2026
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 20, 2026
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 20, 2026
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 20, 2026
Electrical New Construction
Install new electrical services, meters, and circuit breaker panels with proper grounding and bonding. install generators with automatic transfer switches (ats) to provide emergency power. provide feeders and subpanels to serve commercial s
Contractor: Arber Sulaj
Status: Issued
Jan 16, 2026
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 14, 2026
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 14, 2026
Electrical New Construction
Temp power during construction
Contractor: Arber Sulaj
Status: Issued
Sep 2, 2025
Zoning Fences Only
For the installation of 4 ft. high fence (no more than 50% opaque). size and location as shown on plans.
Status: Issued
Jul 18, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained w
Contractor: Bedri Allaraj
Status: Issued
Jul 10, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained w
Contractor: Bedri Allaraj
Status: Issued
Jul 10, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained w
Contractor: Bedri Allaraj
Status: Issued
Jul 10, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained w
Contractor: Bedri Allaraj
Status: Issued
Jul 10, 2025
Electrical New Construction
Install fire pump according to the 2016 nfpa 20 and per plans.
Contractor: Arber Sulaj
Status: Completed
Jun 13, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained w
Contractor: Bedri Allaraj
Status: Completed
May 20, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained w
Contractor: Bedri Allaraj
Status: Issued
May 20, 2025
Fire Suppression New Construction
For the installation of an automatic wet sprinkler system throughout a four (4) story two-family dwelling to include a two (2) inch fire service line connected to an on-site fire service main. system served by a four (4) inch backflow preve
Status: Completed
May 13, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained w
Contractor: Bedri Allaraj
Status: Completed
Apr 14, 2025
Mechanical New Construction
Ez ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-containe
Contractor: Bedri Allaraj
Status: Completed
Apr 7, 2025
Mechanical New Construction
Ez ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-containe
Contractor: Bedri Allaraj
Status: Completed
Apr 3, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained w
Contractor: Bedri Allaraj
Status: Completed
Apr 3, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained w
Contractor: Bedri Allaraj
Status: Completed
Apr 3, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained w
Contractor: Bedri Allaraj
Status: Completed
Apr 3, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013251
Contractor: Arber Sulaj
Status: Completed
Jan 31, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013304
Contractor: Arber Sulaj
Status: Issued
Jan 30, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013297
Contractor: Arber Sulaj
Status: Issued
Jan 30, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013296
Contractor: Arber Sulaj
Status: Issued
Jan 30, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013252
Contractor: Arber Sulaj
Status: Completed
Jan 30, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013288
Contractor: Arber Sulaj
Status: Issued
Jan 30, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013195
Contractor: Arber Sulaj
Status: Completed
Jan 29, 2025
Electrical New Construction
Electrical permit for combo rp-2020-012386
Contractor: Arber Sulaj
Status: Completed
Jan 29, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013241
Contractor: Arber Sulaj
Status: Completed
Jan 29, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013254
Contractor: Arber Sulaj
Status: Completed
Jan 29, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013290
Contractor: Arber Sulaj
Status: Issued
Jan 29, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013306
Contractor: Arber Sulaj
Status: Issued
Jan 29, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013248
Contractor: Arber Sulaj
Status: Completed
Jan 29, 2025
Electrical New Construction
Electrical permit for combo rp-2020-013202
Contractor: Arber Sulaj
Status: Completed
Jan 29, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 14, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 14, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 14, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 14, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 14, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Issued
Jan 14, 2025
Mechanical New Construction
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor: Bedri Allaraj
Status: Completed
Jan 14, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-012296
Contractor: Bedri Allaraj
Status: Completed
Dec 19, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013198
Contractor: Bedri Allaraj
Status: Issued
Dec 13, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013286
Contractor: Arber Sulaj
Status: Completed
Oct 30, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013293
Contractor: Arber Sulaj
Status: Completed
Oct 30, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013192
Contractor: Arber Sulaj
Status: Completed
Oct 30, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013291
Contractor: Arber Sulaj
Status: Completed
Oct 30, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013287
Contractor: Arber Sulaj
Status: Completed
Oct 30, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013188
Contractor: Arber Sulaj
Status: Completed
Oct 30, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013302
Contractor: Arber Sulaj
Status: Completed
Oct 30, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013298
Contractor: Arber Sulaj
Status: Completed
Oct 30, 2024
Electrical New Construction
Electrical permit for combo rp-2020-012296
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-012887
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013303
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-012901
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013295
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013198
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013191
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-012905
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-012379
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-012909
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-013194
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Electrical New Construction
Electrical permit for combo rp-2020-012908
Contractor: Arber Sulaj
Status: Completed
Oct 25, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013248
Contractor: ALL SHORE INC
Status: Issued
Jan 18, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013202
Contractor: ALL SHORE INC
Status: Completed
Jan 18, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013195
Contractor: ALL SHORE INC
Status: Issued
Jan 18, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013199
Contractor: ALL SHORE INC
Status: Completed
Jan 18, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013241
Contractor: ALL SHORE INC
Status: Completed
Jan 18, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013247
Contractor: ALL SHORE INC
Status: Issued
Jan 18, 2024
Electrical Rough-In
Rough-in permit for ep-2024-000231 electric rough in of new work, including all new wiring and trimming of outlets switches smoke detectors new panel as pre nec 2017 code
Contractor: Arber Sulaj
Status: Expired
Jan 11, 2024
Electrical Rough-In
Rough-in permit for ep-2024-000234 rough-in permit for ep-2024-000234 electric rough in of new work, including all new wiring and trimming of outlets switches smoke detectors new panel as pre nec 2017 code
Contractor: Arber Sulaj
Status: Expired
Jan 11, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-012911
Contractor: ALL SHORE INC
Status: Issued
Jan 4, 2024
Electrical New Construction
Electrical permit for combo rp-2020-012911
Contractor: Arber Sulaj
Status: Issued
Dec 19, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013268
Contractor: Arber Sulaj
Status: Issued
Dec 19, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013270
Contractor: Arber Sulaj
Status: Issued
Dec 19, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013266
Contractor: Arber Sulaj
Status: Completed
Dec 19, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013269
Contractor: Arber Sulaj
Status: Completed
Dec 19, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013199
Contractor: Arber Sulaj
Status: Completed
Dec 18, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013270
Contractor: ALL SHORE INC
Status: Issued
Dec 11, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013266
Contractor: ALL SHORE INC
Status: Issued
Dec 8, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013280
Contractor: ALL SHORE INC
Status: Issued
Dec 8, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013268
Contractor: ALL SHORE INC
Status: Issued
Dec 8, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013274
Contractor: ALL SHORE INC
Status: Issued
Dec 8, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013276
Contractor: ALL SHORE INC
Status: Issued
Dec 8, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013281
Contractor: ALL SHORE INC
Status: Issued
Dec 8, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013269
Contractor: ALL SHORE INC
Status: Issued
Dec 8, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013282
Contractor: ALL SHORE INC
Status: Issued
Dec 8, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013282
Contractor: Arber Sulaj
Status: Completed
Nov 29, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013274
Contractor: Arber Sulaj
Status: Completed
Nov 28, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013281
Contractor: Arber Sulaj
Status: Completed
Nov 28, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013276
Contractor: Arber Sulaj
Status: Completed
Nov 28, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013280
Contractor: Arber Sulaj
Status: Completed
Nov 28, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system serviced by a four (4) inch fire service line and a four (4) inch dcv ames 200ss backflow prevention assembly as per approved plans and in accordance with the 2016 nfpa 13. for the insta
Status: Issued
Sep 15, 2023
Plumbing New Construction or Additions
Install 207 washing machine boxes, 207 kitchen sinks, 10 roof drains, 32 trench drains, 8 garage drains, 2 ejector sump pumps, 399 floor drains, 3 sump pumps, 1 booster pump, 3 hose bibbs, 4 wall hyrants, 233 shower/tubs, 233 lavatoris, 233
Status: Issued
Sep 15, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans.**sta
Status: Issued
Sep 15, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013197
Contractor: Arber Sulaj
Status: Completed
Sep 13, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013247
Contractor: Arber Sulaj
Status: Completed
Sep 13, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013256
Contractor: Arber Sulaj
Status: Completed
Sep 13, 2023
Electrical New Construction
Install new meter install new panel install new service install disconnects install switches install outlets terminate switches, outlets as per neec 2017
Contractor: Arber Sulaj
Status: Completed
Sep 12, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013252
Contractor: ALL SHORE INC
Status: Completed
Sep 12, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013256
Contractor: ALL SHORE INC
Status: Completed
Sep 12, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013251
Contractor: ALL SHORE INC
Status: Completed
Sep 12, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013250
Contractor: ALL SHORE INC
Status: Completed
Sep 12, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013254
Contractor: ALL SHORE INC
Status: Completed
Sep 12, 2023
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2020-013197
Contractor: ALL SHORE INC
Status: Issued
Sep 12, 2023
Electrical New Construction
Install new meter install new panel install new service install disconnects install switches install outlets as per nec 2017
Contractor: Arber Sulaj
Status: Issued
Sep 7, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphi
Status: Issued
Sep 6, 2023
Electrical New Construction
Electrical permit for combo rp-2020-013250
Contractor: Arber Sulaj
Status: Completed
Aug 31, 2023
Electrical New Construction
Install 200 amp electrical service with proper grounding and circuit breaker panel. rewire house throughout and install lighting, switches and receptacle outlets. install interconnected smoke alarm according to the 2017 nec.
Contractor: Arber Sulaj
Status: Completed
Aug 31, 2023
Electrical New Construction
Install 200 amp electrical service with proper grounding and circuit breaker panel. rewire house throughout and install lighting, switches and receptacle outlets. install interconnected smoke alarm according to the 2017 nec.
Contractor: Arber Sulaj
Status: Completed
Aug 31, 2023
Electrical New Construction
Install 200 amp electrical service with proper grounding and circuit breaker panel. rewire house throughout and install lighting, switches and receptacle outlets. install interconnected smoke alarm according to the 2017 nec.
Contractor: Arber Sulaj
Status: Completed
Aug 31, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" private fire service line as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadel
Status: Issued
Aug 30, 2023
Electrical New Construction
Install new meter install new panels install new service install disconnects install switches install new outlets aas per nec 2017
Contractor: Arber Sulaj
Status: Completed
Aug 29, 2023
Electrical New Construction
Install new meter install new panels install new service install disconnects install switches install outlets
Contractor: Arber Sulaj
Status: Completed
Aug 29, 2023
Electrical New Construction
Install new meter install new panels install new service install disconnects install switches install outlets as per nec 2017
Contractor: Arber Sulaj
Status: Completed
Aug 29, 2023
Electrical New Construction
Install new meters install new panels install new service install disconnects install switches install outlets
Contractor: Arber Sulaj
Status: Issued
Aug 29, 2023
Electrical New Construction
Install new meter install new panels install new service install disconnects install switches install outlets as per nec 2017
Contractor: Arber Sulaj
Status: Issued
Aug 29, 2023
Electrical New Construction
Install new meter install new panel install new service install disconnects install switches install outlets as per nec 2017
Contractor: Arber Sulaj
Status: Completed
Aug 29, 2023
Site / Utility Permit Sitework with Onsite Utility Services
For sitework for the installation of plumbing lines per approved plan.
Status: Issued
Aug 22, 2023
Fire Suppression New Construction
For installation of sprinkler system per nfpa 13r with 2-inch private fire service line as per approved plans.
Status: Issued
Aug 15, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphi
Status: Issued
Aug 11, 2023
Fire Suppression New Construction
For the installation of an automatic wet sprinkler system throughout a four (4) story single-family dwelling (bar j unit j 6) to be served by a four (4) inch fire service line and a four (4) inch backflow preventer and fire pump located in
Status: Issued
Aug 10, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Aug 1, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 31, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 28, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout an existing structure. installation to include 2" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all work shall be perf
Status: Completed
Jul 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13r throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 26, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jul 25, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 25, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Completed
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Completed
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13r throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Completed
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Completed
Jul 24, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line with existing 4" backflow prevention assembly , as per approved plans. all work shall be performed by a fire suppressio
Status: Completed
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 24, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 14, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt200 backflow prevention assembly as per approved plans. all work shall be perf
Status: Completed
Jul 12, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt200 backflow prevention assembly as per approved plans. all work shall be perf
Status: Issued
Jul 12, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt200 backflow prevention assembly as per approved plans. all work shall be perf
Status: Issued
Jul 12, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13r throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt200 backflow prevention assembly as per approved plans. all
Status: Completed
Jul 12, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 12, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt 200 backflow prevention assembly as per approved plans. all
Status: Issued
Jul 12, 2023
Fire Suppression New Construction
For the installation new fire suppression system complying with nfpa 13 throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt200 backflow prevention assembly as per approved plans. all work s
Status: Completed
Jul 12, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Completed
Jun 28, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 28, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 28, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line with existing 4" backflow prevention assembly and fire pump (installed in building i unit 16), as per approved plans. a
Status: Completed
Jun 28, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 28, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 28, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 28, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 28, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 28, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 28, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Completed
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Completed
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Completed
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Completed
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 27, 2023
Fire Suppression New Construction
For the installation of a new fire suppression system designed per nfpa 13r standard with a 4 inch fire service line and sprinkler layout as per plans.
Status: Issued
Jun 27, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout an existing structure. installation to include 4" fire service line and 4." dcv ames colt200 backflow prevention assembly as per approved plans. all work shall be perfo
Status: Issued
Jun 22, 2023
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line with existing 4" backflow prevention assembly (installed in building i unit 16), as per approved plans. all work shall
Status: Completed
Jun 7, 2023
Plumbing New Construction or Additions
Install md, ct, fai & 1" wdp install 26 fixtures
Status: Issued
May 15, 2023
Site / Utility Permit Foundation
For site excavation and support of excavation per approved plans and code bulletin b-0503-r2.
Contractor: Pelco Builders Inc.
Status: Issued
Dec 5, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drains
Status: Completed
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drains
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drain
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drains
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drains
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drain
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drain
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drains
Status: Completed
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drains
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drains
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drain
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drain
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drain
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drains
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drain
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drains
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drains
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area drain
Status: Issued
Oct 17, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet 8 water closets, 2 sump pumps, 4 shower/tubs, 4 roof drains, 12 lavatories, 2 kitchen sinks, 2 hot water heaters, 4 hose bibs, 2 area drains
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 14, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Completed
Oct 13, 2022
Plumbing New Construction or Additions
Instalation of 1" water distribution, house drain, curb trap, fresh air inlet new main drain and waterlines. new water closets, sump pumps, shower/tubs, roof drains, lavatories, kitchen sinks, hot water heaters, hose bibs, area dr
Status: Issued
Oct 13, 2022
Plumbing New Construction or Additions
New plumbing water and sewer lines and fixture
Status: Completed
Aug 18, 2022
Electrical Addition and/or Alteration
Provide (1) 200a, 240/120v, single-phase service for temporary job trailer as per 2017 nec
Status: Completed
Apr 11, 2022
Demolition Major Demolition
For the complete demolition of ten (10) existing apartment structures. all structures are in good standing condition. for use of mechanical means of method for demolition. all structures are within site safety zone parameters. all safety
Status: Completed
Mar 16, 2022
Zoning Full Demolition
For the complete demolition of ten (10) detached structures on site; see dp-2022-000201 for all plans and documents related to demolition work.
Status: Completed
Feb 16, 2022
Plumbing Alterations
Seal sewer lateral
Status: Completed
Feb 11, 2022
Plumbing Alterations
Seal sewer lateral
Status: Completed
Feb 11, 2022
Plumbing Alterations
Seal sewer lateral
Status: Completed
Feb 11, 2022
Plumbing Alterations
Seal sewer lateral
Status: Completed
Feb 11, 2022
Plumbing Alterations
Seal sewer latera
Status: Expired
Feb 10, 2022
Plumbing Alterations
Seal sewer lateral
Status: Completed
Feb 9, 2022
Plumbing Alterations
Seal sewer lateral
Status: Completed
Feb 9, 2022
Plumbing Alterations
Seal sewer lateral
Status: Completed
Feb 9, 2022
Plumbing Alterations
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Status: Completed
Feb 8, 2022
Plumbing Alterations
Seal sewer lateral
Status: Completed
Feb 8, 2022
Building New Construction
**amendment dated 10/24/2024 to submit wood truss submittal package and revised statement of special inspection schedule.** amendment: for the amendment of previously approved permit cp-2021-008550 to document change in fire suppression
Status: Issued
Dec 20, 2021
Building New Construction
Amendment ii: for the amendment of previously approved permit cp-2021-008552 to document change in special inspection agency. all work to be done per approved plans and documenation. amendment i: for the amendment of previously approved
Status: Issued
Dec 20, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Completed
Dec 10, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Issued
Dec 10, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Completed
Dec 6, 2021
Building New Construction
For new construction of a six-story, semi-detached podium building with cellar, roof deck and roof deck access structures per approved plans. building to be fully sprinklered with nfpa 13 and standpipes per nfpa 14. separate permits requi
Contractor: Frank Ciminelli
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Completed
Dec 6, 2021
Building New Construction
For new construction of a six-story, semi-detached podium building with cellar, roof deck and roof deck access structures per approved plans. building to be fully sprinklered with nfpa 13 and standpipes per nfpa 14. separate permits requi
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Completed
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Amendment Application Incomplete
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof decks, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, rated fire partitions, rat
Status: Issued
Dec 6, 2021
Residential Building New Construction
For the erection of an attached light-framed structure to include roof deck, access pilot house, private garage separation assemblies, engineered stud bearing wall and bracing configuration, rated exterior walls, batt & closed-cell spray fo
Status: Issued
Dec 6, 2021