Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002668
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 21, 2026
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002672
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 21, 2026
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002686
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 21, 2026
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002781
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 21, 2026
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002669
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 21, 2026
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002685
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 21, 2026
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002779
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 21, 2026
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002780
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 21, 2026
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002777
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 21, 2026
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002782
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 21, 2026
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002664
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002666
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002664
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002656
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002663
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002656
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002658
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002665
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002657
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002658
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002665
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002657
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002666
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002663
Contractor: PLUMB-TECH LLC
Status: Issued
Apr 13, 2026
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with a new 2” fire service and existing 4" backflow prevention assembly and fire pump approved under fp-2024-001118. all work sha
Status: Issued
Apr 6, 2026
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with a new 2” fire service and existing 4" backflow prevention assembly and fire pump approved under fp-2024-001118. all work sha
Status: Issued
Apr 6, 2026
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with a new 2” fire service and existing 4" backflow prevention assembly and fire pump approved under fp-2024-001118. all work sha
Status: Issued
Apr 6, 2026
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Issued
Apr 6, 2026
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with a new 2” fire service and existing 4" backflow prevention assembly and fire pump approved under fp-2024-001118. all work sha
Status: Issued
Apr 6, 2026
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with a new 2” fire service and existing 4" backflow prevention assembly and fire pump approved under fp-2024-001118. all work sha
Status: Issued
Apr 6, 2026
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with a new 2” fire service and existing 4" backflow prevention assembly and fire pump approved under fp-2024-001118. all work sha
Status: Issued
Apr 6, 2026
Electrical New Construction
Electrical permit for combo rp-2024-002663
Contractor: FRED DINARDO JR
Status: Issued
Mar 27, 2026
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002665
Contractor: FRED DINARDO JR
Status: Issued
Mar 20, 2026
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002656
Contractor: FRED DINARDO JR
Status: Issued
Mar 20, 2026
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002664
Contractor: FRED DINARDO JR
Status: Issued
Mar 20, 2026
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002663
Contractor: FRED DINARDO JR
Status: Issued
Mar 20, 2026
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002658
Contractor: FRED DINARDO JR
Status: Issued
Mar 20, 2026
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002666
Contractor: FRED DINARDO JR
Status: Issued
Mar 20, 2026
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002657
Contractor: FRED DINARDO JR
Status: Issued
Mar 20, 2026
Electrical New Construction
Electrical permit for combo rp-2024-002656
Contractor: FRED DINARDO JR
Status: Issued
Mar 12, 2026
Electrical New Construction
Electrical permit for combo rp-2024-002664
Contractor: FRED DINARDO JR
Status: Issued
Mar 12, 2026
Electrical New Construction
Electrical permit for combo rp-2024-002666
Contractor: FRED DINARDO JR
Status: Issued
Mar 12, 2026
Electrical New Construction
Electrical permit for combo rp-2024-002657
Contractor: FRED DINARDO JR
Status: Issued
Mar 12, 2026
Electrical New Construction
Electrical permit for combo rp-2024-002658
Contractor: FRED DINARDO JR
Status: Issued
Mar 12, 2026
Electrical New Construction
Electrical permit for combo rp-2024-002665
Contractor: FRED DINARDO JR
Status: Issued
Mar 12, 2026
Electrical New Construction
Electrical permit for combo rp-2024-002796
Contractor: FRED DINARDO JR
Status: Completed
Jan 6, 2026
Electrical New Construction
Electrical permit for combo rp-2024-002650
Contractor: FRED DINARDO JR
Status: Issued
Jan 6, 2026
Electrical New Construction
Electrical permit for combo rp-2024-002792
Contractor: FRED DINARDO JR
Status: Completed
Jan 6, 2026
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002796
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002793
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002596
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002799
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002794
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002792
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002596
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002799
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002798
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002793
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002790
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002798
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002796
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002792
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002790
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002794
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 30, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002794
Contractor: FRED DINARDO JR
Status: Completed
Dec 29, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002790
Contractor: FRED DINARDO JR
Status: Completed
Dec 29, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002596
Contractor: FRED DINARDO JR
Status: Completed
Dec 29, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002792
Contractor: FRED DINARDO JR
Status: Completed
Dec 29, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002798
Contractor: FRED DINARDO JR
Status: Completed
Dec 29, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002796
Contractor: FRED DINARDO JR
Status: Completed
Dec 29, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002799
Contractor: FRED DINARDO JR
Status: Completed
Dec 29, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002793
Contractor: FRED DINARDO JR
Status: Completed
Dec 29, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002647
Contractor: PLUMB-TECH LLC
Status: Issued
Dec 22, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002650
Contractor: PLUMB-TECH LLC
Status: Issued
Dec 22, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002648
Contractor: PLUMB-TECH LLC
Status: Issued
Dec 22, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002654
Contractor: PLUMB-TECH LLC
Status: Issued
Dec 22, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002655
Contractor: PLUMB-TECH LLC
Status: Issued
Dec 22, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002651
Contractor: PLUMB-TECH LLC
Status: Issued
Dec 22, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002652
Contractor: PLUMB-TECH LLC
Status: Issued
Dec 22, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002649
Contractor: PLUMB-TECH LLC
Status: Issued
Dec 22, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002653
Contractor: PLUMB-TECH LLC
Status: Issued
Dec 22, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002794
Contractor: FRED DINARDO JR
Status: Completed
Dec 18, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002790
Contractor: FRED DINARDO JR
Status: Completed
Dec 18, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Completed
Nov 12, 2025
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphi
Status: Completed
Nov 12, 2025
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphi
Status: Completed
Nov 12, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Completed
Nov 12, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Completed
Nov 12, 2025
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphi
Status: Completed
Nov 12, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Completed
Oct 27, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Completed
Oct 27, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002635
Contractor: FRED DINARDO JR
Status: Completed
Oct 16, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002640
Contractor: FRED DINARDO JR
Status: Completed
Oct 10, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002636
Contractor: FRED DINARDO JR
Status: Completed
Oct 6, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002641
Contractor: FRED DINARDO JR
Status: Completed
Oct 3, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002553
Contractor: FRED DINARDO JR
Status: Completed
Oct 1, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Completed
Sep 23, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Completed
Sep 23, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Completed
Sep 23, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Completed
Sep 23, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service line connected to a four (4) inch fire service main, 4" backflow prevention assembly and a fire pump complyi
Status: Completed
Sep 23, 2025
Fire Suppression New Construction
For the installation of a 2-inch fire service line for an automatic fire suppression sprinkler system in accordance with nfpa 13r. all work shall be done in accordance with approved plans/hydraulic calculations. **see fp-2024-001118 for the
Status: Completed
Sep 23, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002638
Contractor: FRED DINARDO JR
Status: Completed
Sep 19, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002799
Contractor: FRED DINARDO JR
Status: Completed
Sep 19, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002793
Contractor: FRED DINARDO JR
Status: Completed
Sep 19, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002596
Contractor: FRED DINARDO JR
Status: Completed
Sep 19, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002798
Contractor: FRED DINARDO JR
Status: Completed
Sep 19, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002646
Contractor: FRED DINARDO JR
Status: Completed
Sep 19, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002640
Contractor: FRED DINARDO JR
Status: Completed
Sep 17, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002635
Contractor: FRED DINARDO JR
Status: Completed
Sep 17, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002641
Contractor: FRED DINARDO JR
Status: Completed
Sep 17, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002646
Contractor: FRED DINARDO JR
Status: Completed
Sep 17, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002636
Contractor: FRED DINARDO JR
Status: Completed
Sep 17, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002638
Contractor: FRED DINARDO JR
Status: Completed
Sep 17, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002658
Contractor: PLUMB-TECH LLC
Status: Issued
Sep 12, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002664
Contractor: PLUMB-TECH LLC
Status: Issued
Sep 12, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002663
Contractor: PLUMB-TECH LLC
Status: Issued
Sep 12, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002657
Contractor: PLUMB-TECH LLC
Status: Issued
Sep 12, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002656
Contractor: PLUMB-TECH LLC
Status: Issued
Sep 12, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002666
Contractor: PLUMB-TECH LLC
Status: Issued
Sep 12, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002665
Contractor: PLUMB-TECH LLC
Status: Issued
Sep 12, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002612
Contractor: FRED DINARDO JR
Status: Completed
Aug 8, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002612
Contractor: FRED DINARDO JR
Status: Completed
Jul 30, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002607
Contractor: FRED DINARDO JR
Status: Completed
Jul 30, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002553
Contractor: FRED DINARDO JR
Status: Completed
Jul 30, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002607
Contractor: FRED DINARDO JR
Status: Completed
Jul 28, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002794
Contractor: PLUMB-TECH LLC
Status: Completed
Jul 24, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002790
Contractor: PLUMB-TECH LLC
Status: Completed
Jul 24, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002792
Contractor: PLUMB-TECH LLC
Status: Completed
Jul 24, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002596
Contractor: PLUMB-TECH LLC
Status: Completed
Jul 24, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002796
Contractor: PLUMB-TECH LLC
Status: Completed
Jul 24, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002798
Contractor: PLUMB-TECH LLC
Status: Completed
Jul 24, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002793
Contractor: PLUMB-TECH LLC
Status: Completed
Jul 24, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002799
Contractor: PLUMB-TECH LLC
Status: Completed
Jul 24, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002827
Contractor: FRED DINARDO JR
Status: Completed
Jul 23, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002601
Contractor: FRED DINARDO JR
Status: Completed
Jul 9, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002818
Contractor: FRED DINARDO JR
Status: Completed
Jun 24, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002601
Contractor: FRED DINARDO JR
Status: Completed
Jun 24, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002823
Contractor: FRED DINARDO JR
Status: Completed
Jun 24, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002817
Contractor: FRED DINARDO JR
Status: Completed
Jun 24, 2025
Fire Suppression New Construction
Install new fire suppression system and 1” combined service in accordance with nfpa 13d throughout the entire building. all work shall comply with the approved plans. all work shall be performed by a fire suppression contractor licensed b
Status: Completed
Jun 20, 2025
Fire Suppression New Construction
For the installation of an automatic fire suppression system in accordance with nfpa 13d throughout three story building to include 1-inch combined water service line as per approved plans. all work shall be done in accordance with approved
Status: Completed
Jun 20, 2025
Fire Suppression New Construction
Install new fire suppression system and 1” combined service in accordance with nfpa 13d throughout the entire building. all work shall comply with the approved plans. all work shall be performed by a fire suppression contractor licensed b
Status: Completed
Jun 20, 2025
Fire Suppression New Construction
For the installation of an automatic wet sprinkler system throughout a three (3) story single-family dwelling (unit #82) to include a one (1) inch combined domestic & fire service line. all work to be done per approved plans and in accordan
Status: Completed
Jun 20, 2025
Fire Suppression New Construction
For installation of a one-inch combined fire/domestic water service and fire suppression system in accordance with approved plans, hydraulic calculations and nfpa 13d.
Status: Completed
Jun 20, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002817
Contractor: FRED DINARDO JR
Status: Completed
Jun 19, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002818
Contractor: FRED DINARDO JR
Status: Completed
Jun 19, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002824
Contractor: FRED DINARDO JR
Status: Completed
Jun 19, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002825
Contractor: FRED DINARDO JR
Status: Completed
Jun 19, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002823
Contractor: FRED DINARDO JR
Status: Completed
Jun 19, 2025
Fire Suppression New Construction
For the installation of a new fire suppression system and 1” combined service in accordance with nfpa 13d throughout the entire building. all work shall comply with the approved plans. all work shall be performed by a fire suppression con
Status: Completed
Jun 18, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002807
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002623
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002616
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002818
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002609
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002607
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002802
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002802
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002817
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002624
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002806
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002635
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002805
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002627
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002646
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002819
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002622
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002823
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002825
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002601
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002826
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002818
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002827
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002623
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002807
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002622
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002624
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002823
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002638
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002635
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002617
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002614
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002614
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002801
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002638
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002808
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002641
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002805
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002553
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002612
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002827
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002640
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002821
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002806
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002616
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002613
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002636
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002613
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002601
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002607
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002822
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002819
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002553
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002611
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002821
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002824
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002617
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002641
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002826
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002817
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002801
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002636
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002640
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002824
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002822
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002611
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002646
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002627
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002825
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002612
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002808
Contractor: PLUMB-TECH LLC
Status: Issued
Jun 10, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002609
Contractor: PLUMB-TECH LLC
Status: Completed
Jun 10, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service, 4" backflow prevention assembly and a fire pump complying with nfpa 20. see fp-2024-001118 for the installa
Status: Completed
Jun 9, 2025
Fire Suppression New Construction
For the installation of a 2-inch fire service line for an automatic fire suppression sprinkler system with a 4 inch ames colt 200 backflow prevention assembly in accordance with nfpa 13r and fire pump located at unit 14 complying per nfpa 2
Status: Completed
Jun 9, 2025
Fire Suppression New Construction
For the installation of an automatic wet sprinkler system throughout a four (4) story two-family dwelling (unit #3) to include a two (2) inch fire service line connected to a four (4) inch on-site fire service main. system served by a fire
Status: Completed
Jun 9, 2025
Fire Suppression New Construction
For installation of a two-inch fire service line and fire suppression system in accordance with approved plans, hydraulic calculations and nfpa 13r (system connected to common 4-inch fire service line, four-inch backflow preventer and fire
Status: Completed
Jun 9, 2025
Fire Suppression New Construction
For installation of a two-inch fire service line and fire suppression system in accordance with approved plans, hydraulic calculations and nfpa 13r (system connected to common 4-inch fire service line, four-inch backflow preventer and fire
Status: Completed
Jun 9, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002611
Contractor: FRED DINARDO JR
Status: Completed
Jun 6, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002609
Contractor: FRED DINARDO JR
Status: Completed
Jun 6, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002614
Contractor: FRED DINARDO JR
Status: Completed
Jun 6, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002613
Contractor: FRED DINARDO JR
Status: Completed
Jun 6, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002609
Contractor: FRED DINARDO JR
Status: Completed
Jun 5, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002614
Contractor: FRED DINARDO JR
Status: Completed
Jun 5, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002613
Contractor: FRED DINARDO JR
Status: Completed
Jun 5, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002611
Contractor: FRED DINARDO JR
Status: Completed
May 29, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002616
Contractor: FRED DINARDO JR
Status: Completed
May 29, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002808
Contractor: PLUMB-TECH LLC
Status: Issued
May 23, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002801
Contractor: PLUMB-TECH LLC
Status: Issued
May 23, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002807
Contractor: PLUMB-TECH LLC
Status: Issued
May 23, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002802
Contractor: PLUMB-TECH LLC
Status: Issued
May 23, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002806
Contractor: PLUMB-TECH LLC
Status: Issued
May 23, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002805
Contractor: PLUMB-TECH LLC
Status: Issued
May 23, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002825
Contractor: FRED DINARDO JR
Status: Completed
May 14, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002822
Contractor: FRED DINARDO JR
Status: Completed
May 14, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002822
Contractor: FRED DINARDO JR
Status: Completed
May 13, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002827
Contractor: FRED DINARDO JR
Status: Completed
May 13, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002819
Contractor: FRED DINARDO JR
Status: Completed
May 13, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002821
Contractor: FRED DINARDO JR
Status: Completed
May 13, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002826
Contractor: FRED DINARDO JR
Status: Completed
May 13, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002821
Contractor: FRED DINARDO JR
Status: Completed
May 7, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002819
Contractor: FRED DINARDO JR
Status: Completed
May 7, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002826
Contractor: FRED DINARDO JR
Status: Completed
May 7, 2025
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line with a 4" ames colt backflow prevention assembly as per approved plans. all work shall be performed by a fire suppressi
Status: Completed
Apr 24, 2025
Fire Suppression New Construction
Install new fire suppression system and 1” combined service in accordance with nfpa 13d throughout the entire building. all work shall comply with the approved plans. all work shall be performed by a fire suppression contractor licensed b
Status: Completed
Apr 24, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service, 4" backflow prevention assembly and a fire pump complying with nfpa 20. see fp-2024-001118 for the installa
Status: Completed
Apr 24, 2025
Fire Suppression New Construction
For installation of a two-inch fire service line and fire suppression system in accordance with approved plans, hydraulic calculations and nfpa 13r (system connected to common 4-inch fire service line, four-inch backflow preventer and fire
Status: Completed
Apr 24, 2025
Fire Suppression New Construction
For the installation of a new fire suppression system and 1” combined service in accordance with nfpa 13d throughout the entire building. all work shall comply with the approved plans. all work shall be performed by a fire suppression con
Status: Completed
Apr 24, 2025
Fire Suppression New Construction
For the installation of an automatic wet sprinkler system throughout a three (3) story single-family dwelling (unit #87) to include a one (1) inch combined domestic & fire service line. all work to be done per approved plans and in accordan
Status: Completed
Apr 24, 2025
Fire Suppression New Construction
For installation of a one-inch combined fire/domestic water service and fire suppression system in accordance with approved plans, hydraulic calculations and nfpa 13d.
Status: Completed
Apr 24, 2025
Fire Suppression New Construction
For the installation of an automatic wet sprinkler system throughout a three (3) story single-family dwelling (unit #88) to include a one (1) inch combined domestic & fire service line. all work to be done per approved plans and in accordan
Status: Completed
Apr 24, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002624
Contractor: FRED DINARDO JR
Status: Completed
Apr 23, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002622
Contractor: FRED DINARDO JR
Status: Completed
Apr 23, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002617
Contractor: FRED DINARDO JR
Status: Completed
Apr 23, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002616
Contractor: FRED DINARDO JR
Status: Completed
Apr 23, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002623
Contractor: FRED DINARDO JR
Status: Completed
Apr 23, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002627
Contractor: FRED DINARDO JR
Status: Completed
Apr 23, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002638
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 18, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002641
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 18, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002646
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 18, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002635
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 18, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002640
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 18, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002636
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 18, 2025
Fire Suppression New Construction
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line with a 4" ames colt backflow prevention assembly as per approved plans. all work shall be performed by a fire suppressi
Status: Completed
Apr 17, 2025
Fire Suppression New Construction
For the installation of an automatic wet sprinkler system throughout a four (4) story two-family dwelling (unit #10) to include a two (2) inch fire service line connected to a four (4) inch on-site fire service main. system served by a fire
Status: Completed
Apr 17, 2025
Fire Suppression New Construction
For installation of a two-inch fire service line and fire suppression system in accordance with approved plans, hydraulic calculations and nfpa 13r (system connected to common 4-inch fire service line, four-inch backflow preventer and fire
Status: Completed
Apr 17, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service, 4" backflow prevention assembly and a fire pump complying with nfpa 20. see fp-2024-001118 for the installa
Status: Completed
Apr 17, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service, 4" backflow prevention assembly and a fire pump complying with nfpa 20. see fp-2024-001118 for the installa
Status: Completed
Apr 16, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002617
Contractor: FRED DINARDO JR
Status: Completed
Apr 16, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002627
Contractor: FRED DINARDO JR
Status: Completed
Apr 16, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002622
Contractor: FRED DINARDO JR
Status: Completed
Apr 16, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002623
Contractor: FRED DINARDO JR
Status: Completed
Apr 16, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002624
Contractor: FRED DINARDO JR
Status: Completed
Apr 16, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002823
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 15, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002601
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 15, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002817
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 15, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002818
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002838
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002837
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002836
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002836
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002831
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002829
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002830
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002830
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002824
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002837
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002831
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002829
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002838
Contractor: PLUMB-TECH LLC
Status: Completed
Apr 2, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002825
Contractor: PLUMB-TECH LLC
Status: Completed
Mar 21, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002826
Contractor: PLUMB-TECH LLC
Status: Completed
Mar 21, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002819
Contractor: PLUMB-TECH LLC
Status: Completed
Mar 21, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002822
Contractor: PLUMB-TECH LLC
Status: Completed
Mar 19, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002821
Contractor: PLUMB-TECH LLC
Status: Completed
Mar 19, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002827
Contractor: PLUMB-TECH LLC
Status: Completed
Mar 19, 2025
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002634
Contractor: PLUMB-TECH LLC
Status: Completed
Mar 10, 2025
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002634
Contractor: PLUMB-TECH LLC
Status: Completed
Mar 10, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002831
Contractor: FRED DINARDO JR
Status: Completed
Mar 5, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002838
Contractor: FRED DINARDO JR
Status: Completed
Mar 5, 2025
Fire Suppression New Construction
For the installation of an automatic fire suppression system in accordance with nfpa 13d throughout three story building to include 1-inch combined water service line as per approved plans. all work shall be done in accordance with approved
Status: Completed
Mar 5, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance witn nfpa 13d, with a one-inch combined fire service line, as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadel
Status: Completed
Mar 5, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002837
Contractor: FRED DINARDO JR
Status: Completed
Mar 4, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002830
Contractor: FRED DINARDO JR
Status: Completed
Mar 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002607
Contractor: PLUMB-TECH LLC
Status: Completed
Mar 3, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002838
Contractor: FRED DINARDO JR
Status: Completed
Feb 27, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002837
Contractor: FRED DINARDO JR
Status: Completed
Feb 27, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002831
Contractor: FRED DINARDO JR
Status: Completed
Feb 27, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002824
Contractor: FRED DINARDO JR
Status: Completed
Feb 24, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002830
Contractor: FRED DINARDO JR
Status: Completed
Feb 24, 2025
Fire Suppression New Construction
For the installation of an automatic wet sprinkler system throughout a three (3) story single-family dwelling (unit #97) to include a one (1) inch combined domestic & fire service line. all work to be done per approved plans and in accordan
Status: Completed
Feb 21, 2025
Fire Suppression New Construction
Install new fire suppression system and 1” combined service in accordance with nfpa 13d throughout the entire building. all work shall comply with the approved plans. all work shall be performed by a fire suppression contractor licensed b
Status: Completed
Feb 21, 2025
Electrical New Construction
Install one 320 amp single phase house meter and one 200 amp panel for the fire pump and one 200 amp panel for the jockey pump acccording to the 2017 nec and per plans.
Contractor: FRED DINARDO JR
Status: Completed
Feb 21, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002613
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002614
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002609
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002624
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002616
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002622
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002617
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002623
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002611
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002627
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002553
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002612
Contractor: PLUMB-TECH LLC
Status: Completed
Feb 4, 2025
Fire Suppression New Construction
For the installation of a one-inch combined fire/domestic water service line and fire sprinkler system in accordance with approved plans, hydraulic calculations and nfpa 13d.
Status: Completed
Jan 29, 2025
Fire Suppression New Construction
Install new fire suppression system and 1” combined service in accordance with nfpa 13d throughout the entire building. all work shall comply with the approved plans. all work shall be performed by a fire suppression contractor licensed b
Status: Completed
Jan 24, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002833
Contractor: FRED DINARDO JR
Status: Completed
Jan 13, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002836
Contractor: FRED DINARDO JR
Status: Completed
Jan 13, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002829
Contractor: FRED DINARDO JR
Status: Completed
Jan 13, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service, 4" backflow prevention assembly and a fire pump complying with nfpa 20. see fp-2024-001118 for the installa
Status: Completed
Jan 8, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service, 4" backflow prevention assembly and a fire pump complying with nfpa 20. see fp-2024-001118 for the installa
Status: Completed
Jan 8, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service, 4" backflow prevention assembly and a fire pump complying with nfpa 20. see fp-2024-001118 for the installa
Status: Completed
Jan 8, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service, 4" backflow prevention assembly and a fire pump complying with nfpa 20. see fp-2024-001118 for the installa
Status: Completed
Jan 8, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 4” fire service, 4" backflow prevention assembly, and fire pump complying with nfpa 20. all work shall comply with the appro
Status: Completed
Jan 8, 2025
Fire Suppression New Construction
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service, 4" backflow prevention assembly and a fire pump complying with nfpa 20. see fp-2024-001118 for the installa
Status: Completed
Jan 8, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002833
Contractor: FRED DINARDO JR
Status: Completed
Jan 7, 2025
Fire Suppression New Construction
For the installation of an automatic fire suppression system in accordance with nfpa 13d throughout three story building (unit 93) to include 1-inch combined water service line as per approved plans. all work shall be done in accordance w
Status: Completed
Jan 7, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002829
Contractor: FRED DINARDO JR
Status: Completed
Jan 7, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002828
Contractor: FRED DINARDO JR
Status: Completed
Jan 7, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002836
Contractor: FRED DINARDO JR
Status: Completed
Jan 7, 2025
Fire Suppression New Construction
For the installation of an automatic fire suppression system in accordance with nfpa 13d throughout three story building (unit 92) to include 1-inch combined water service line as per approved plans. all work shall be done in accordance w
Status: Completed
Jan 7, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002632
Contractor: FRED DINARDO JR
Status: Completed
Jan 7, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002832
Contractor: FRED DINARDO JR
Status: Completed
Jan 7, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002629
Contractor: FRED DINARDO JR
Status: Completed
Jan 7, 2025
Fire Suppression New Construction
For the installation of an automatic fire suppression system in accordance with nfpa 13d throughout three story building (unit 91) to include 1-inch combined water service line as per approved plans. all work shall be done in accordance w
Status: Completed
Jan 7, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002631
Contractor: FRED DINARDO JR
Status: Completed
Jan 7, 2025
Electrical New Construction
Electrical permit for combo rp-2024-002628
Contractor: FRED DINARDO JR
Status: Completed
Jan 7, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002828
Contractor: FRED DINARDO JR
Status: Completed
Jan 6, 2025
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002832
Contractor: FRED DINARDO JR
Status: Completed
Jan 6, 2025
Fire Suppression Rough-In
Rough-in permit for fp-2024-002616 install a fire sprinkler system in accordance with nfpa 13r
Status: Completed
Dec 20, 2024
Fire Suppression Rough-In
Rough-in permit for fp-2024-002617 install a fire sprinkler system in accordance with nfpa 13r
Status: Completed
Dec 20, 2024
Fire Suppression Rough-In
Rough-in permit for fp-2024-002621 install a fire sprinkler system in accordance with nfpa 13r
Status: Completed
Dec 20, 2024
Fire Suppression Rough-In
Rough-in permit for fp-2024-002618 install a fire sprinkler system in accordance with nfpa 13r
Status: Completed
Dec 20, 2024
Fire Suppression Rough-In
Rough-in permit for fp-2024-002619 install a fire sprinkler system in accordance with nfpa 13r
Status: Completed
Dec 20, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002630
Contractor: FRED DINARDO JR
Status: Completed
Dec 18, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002631
Contractor: FRED DINARDO JR
Status: Completed
Dec 18, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002632
Contractor: FRED DINARDO JR
Status: Completed
Dec 18, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002629
Contractor: FRED DINARDO JR
Status: Completed
Dec 18, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002628
Contractor: FRED DINARDO JR
Status: Completed
Dec 18, 2024
Mechanical New Construction
Mechanical / fuel gas permit for combo rp-2024-002634
Contractor: FRED DINARDO JR
Status: Completed
Dec 18, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002830
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 13, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002837
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 13, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002831
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 13, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002838
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 13, 2024
Electrical New Construction
Electrical permit for combo rp-2024-002630
Contractor: FRED DINARDO JR
Status: Completed
Dec 12, 2024
Electrical New Construction
Electrical permit for combo rp-2024-002634
Contractor: FRED DINARDO JR
Status: Completed
Dec 12, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002836
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 9, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002829
Contractor: PLUMB-TECH LLC
Status: Completed
Dec 9, 2024
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002828
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 25, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002832
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 25, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002833
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 25, 2024
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002833
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 25, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002828
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 25, 2024
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002832
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 25, 2024
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002828
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 25, 2024
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002832
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 25, 2024
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002833
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 25, 2024
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002628
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 21, 2024
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002629
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 21, 2024
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002632
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 21, 2024
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002631
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 21, 2024
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002630
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 21, 2024
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002630
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 21, 2024
Plumbing New Construction or Additions
Plumbing permit (water distribution) for combo rp-2024-002631
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 21, 2024
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002628
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 21, 2024
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002629
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 21, 2024
Plumbing New Construction or Additions
Plumbing permit (exterior building drainage) for combo rp-2024-002632
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 21, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002632
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 17, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002634
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 17, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002629
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 17, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002631
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 17, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002628
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 17, 2024
Plumbing New Construction or Additions
Plumbing permit (interior) for combo rp-2024-002630
Contractor: PLUMB-TECH LLC
Status: Completed
Nov 17, 2024
Fire Suppression New Construction
Fire suppression system permit for combo sp-2024-000544
Status: Issued
Oct 24, 2024
Plumbing New Construction or Additions
Plumbing permit for combo sp-2024-000544
Contractor: PLUMB-TECH LLC
Status: Issued
Oct 22, 2024
Electrical New Construction
Install temporary 200amp electrical service with approximately (10) gfi receptacles.
Contractor: FRED DINARDO JR
Status: Cancelled
Oct 4, 2024
Site / Utility Permit Sitework with Onsite Utility Services
**amendment: amendment to correct permit language for site work only no utility work. see fp-2024-001113, and pp-2024-007550.** for the installation of all underground pvc sanitary drainage piping, hdpe storm drainage piping, plastic domes
Contractor: MV Homes, Inc
Status: Issued
May 24, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 irc and approved plans
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 irc and approved plans
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 irc and approved plans
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with basement, roof deck, and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. bu
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 irc and approved plans
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 irc and approved plans
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a three (3) story light-wood-framed structure with mat foundation of type v-b construction with garage, roof deck, and roof deck access structure for use as a single-family dwelling (group r-3) in accordance with 2018 ir
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Issued
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure with mat foundation of type v-b construction with roof deck and roof deck access structure for use as a two-family dwelling (group r-3) in accordance with 2018 ibc and approve
Status: Completed
Mar 28, 2024
Residential Building New Construction
For the erection of a four (4) story light wood-framed structure of type v-b construction with roof deck and roof deck access structure for use as two-family dwelling (group r-3) in accordance with 2018 ibc and approved plans. building to b
Status: Completed
Mar 28, 2024