May 27, 2026
Electrical Addition and/or Alteration
Install receptacles, lights & lighting controls as per approved drawings-2017 nec.
**no fire alarm on this permit**
Contractor:
HATZEL & BUEHLER INC
Status: Issued
May 12, 2026
Electrical Addition and/or Alteration
Furnish & install (53) category 6 cmp cables.
Contractor:
MJR TECHNOLOGIES, INC dBA: GT TELECOM
Status: Issued
May 11, 2026
Building Addition and/or Alteration
For level ii alterations to include new partitions, fixtures, furnishings, doors, finishes, millwork as per approved plans. separate permits required for mep and fire suppression work. *iebc 2018*
Contractor:
STRUCTURE TONE LLC
Status: Issued
May 5, 2026
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2026-001101
Contractor:
HUNTER MECHANICAL INC
Status: Issued
May 1, 2026
Electrical Addition and/or Alteration
Provide misc. demolition, temp. light & power from on-site power source, tie-in to existing panels, new lights & controls, receptacles, tele/data - empty box & stub-up's, power to hvac equipment, and empty box and stub-ups for door access a
Contractor:
ANMAR ELECTRICAL CONTRACTOR INC
Status: Amendment Requested
Apr 30, 2026
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (35) sprinkler heads, per nfpa 13
Contractor:
A & S SPRINKLER CO INC
Status: Issued
Apr 27, 2026
Plumbing Alterations
Furnish and install (1) kitchen sink, connecting to existing plumbing.
Contractor:
TKELLY INC
Status: Issued
Apr 20, 2026
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (8) sprinkler heads, per nfpa 13
Contractor:
A & S SPRINKLER CO INC
Status: Issued
Apr 17, 2026
Building Addition and/or Alteration
For level ii interior alterations to an existing tenant space on the 39th floor level of an existing structure for use as a business occupancy. alterations to include the selective demolition of existing partitions and the erection of parti
Contractor:
PATRIOT CONSTRUCTION
Status: Issued
Apr 15, 2026
Electrical Addition and/or Alteration
Install 463 light fixture, 22 exit, 183 switch, 90 power pack, 268 receptacle, 8 furniture power, 11 floor receptacle, 15 motorized shade power, 1 ground bar, 45 equipment power, 1 400 amp disconnect switch, refeed existing panels through e
Contractor:
NEW LIGHT ELECTRIC INC
Status: Issued
Apr 8, 2026
General Permit Minor EZ Interior Non-Load-Bearing Wall Demo.
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Status: Issued
Apr 3, 2026
Electrical Addition and/or Alteration
Furnish & install (240) category 6a, plenum cables for data
furnish & install (13) composite, plenum cables for card access
furnish & install (21) category 6, plenum cables for cctv
Contractor:
MJR TECHNOLOGIES, INC dBA: GT TELECOM
Status: Issued
Mar 31, 2026
Plumbing Alterations
Install new domestic water, sanitary, vent & small waste to connect to building existing
install new plumbing fixtures.
other-ewc
Contractor:
keegan&cunnius plumbing and mechanical
Status: Issued
Mar 30, 2026
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to existing 30th floor office space in an existing high-rise building as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separate permits r
Contractor:
LAKASH CONSTRUCTORS INC
Status: Issued
Mar 25, 2026
Mechanical Addition and/or Alterations
For the installation of registers, diffusers and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. **all work to be done per approved plans. **if field conditions vary co
Contractor:
HUNTER MECHANICAL INC
Status: Issued
Mar 18, 2026
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (133) sprinkler heads on the 26th floor,
Contractor:
A & S SPRINKLER CO INC
Status: Issued
Feb 24, 2026
Plumbing Alterations
Remove and replace (15) plumbing fixtures, (6) lavatories, (7) water closets and (2) urinals, connecting to existing piping.
**without piping**
Contractor:
TKELLY INC
Status: Issued
Feb 9, 2026
Electrical Addition and/or Alteration
Provide and install 202 cat6 plenum cables at 175' average.
provide and install 5 ea. 55" displays and 1 ea. 85" display in the conference rooms, 02 ea. 98" displays in the training rooms and 05 ea. 65" displays in the team rooms.
all work
Contractor:
LANCONNECT INC
Status: Completed
Jan 29, 2026
Building Addition and/or Alteration
For level ii alterations to the restrooms on 21st floor of an existing structure. alterations for partial demo and the erection of partition walls, provide finishes/furnishings and accessibility improvments throughout restroom. for use as p
Contractor:
STRUCTURE TONE LLC
Status: Issued
Jan 9, 2026
Electrical Addition and/or Alteration
Electrical permit for combo cp-2025-005267
amendment: install new fire alarm for fitout to existing system in building.
Contractor:
Madden Electric Associates, Inc
Status: Issued
Dec 23, 2025
Plumbing Alterations
Remove and reinstall new in same location with no new roughin
6-urinals
18-lav sinks
18 water closets
work performed in compliance with ez standard and 2018 ppc
Contractor:
keegan&cunnius plumbing and mechanical
Status: Issued
Dec 22, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (133) sprinkler heads as per nfpa 13
Contractor:
A & S SPRINKLER CO INC
Status: Issued
Dec 17, 2025
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2025-005267
Contractor:
HUNTER MECHANICAL INC
Status: Issued
Dec 16, 2025
Plumbing Alterations
Plumbing permit (interior) for combo cp-2025-005267
Contractor:
TKELLY INC
Status: Issued
Dec 16, 2025
Building Addition and/or Alteration
For level ii interior alterations to an existing structure. work to be located on the 26th floor of an existing structure. alterations to include the erection of partition walls, provide finishes/furnishings, and accessibility improvements
Contractor:
INTECH CONSTRUCTION LLC
Status: Issued
Dec 15, 2025
Building Addition and/or Alteration
For level ii alterations to the 21st floor of an existing structure. alterations for partial demo and the erection of partition walls, provide finishes/furnishings and accessibility improvments throughout to include the installation of regi
Contractor:
STRUCTURE TONE LLC
Status: Issued
Dec 15, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate 18 heads on floors 22 & 23
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
Dec 9, 2025
General Permit Minor EZ Interior Non-Load-Bearing Wall Demo.
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Status: Issued
Dec 5, 2025
Electrical Addition and/or Alteration
Install 81 light fixture, 12 switch, 24 receptacles, 6 hand dryer power.
Contractor:
NEW LIGHT ELECTRIC INC
Status: Issued
Dec 3, 2025
Plumbing Alterations
Provide labor and material to extend from nearest sanitary, vent and domestic cold water, provide labor and material to relocate (1) water filter, ice maker and water dispenser, and furnish and install (1) new open site drain
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
Nov 26, 2025
Building Addition and/or Alteration
For a level ii interior alterations to an existing structure. alterations to include restrooms upgrade on the 45th,46th and 47th floor . building is fully sprinklered. ** all work to be done per approved plans.** if field conditions vary co
Contractor:
LAKASH CONSTRUCTORS INC
Status: Issued
Nov 24, 2025
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact des
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
Nov 19, 2025
Electrical Addition and/or Alteration
Floor 23
lighting and receptacles
Contractor:
J.W. Carrigan
Status: Completed
Nov 18, 2025
Electrical Addition and/or Alteration
Install telecommunication wiring to tenant space. all work to be done according to the 2017 nec.
Contractor:
LANCONNECT INC
Status: Issued
Oct 24, 2025
Building Addition and/or Alteration
For a level ii interior alterations to a portion of the level 22 & 23 of an existing of an existing structure. alterations to include the selective demolition of existing partitions and the erection of partition walls, provide finishes/f
Contractor:
ERICKSON C & SONS INC
Status: Completed
Oct 1, 2025
General Permit Minor EZ Interior Non-Load-Bearing Wall Demo.
Ez interior non-load-bearing wall demolition - for the interior demolition on non-load-bearing partition walls and ceilings as per attached standard. deviations from these standards require submission of construction and site plans. structu
Status: Issued
Sep 11, 2025
Electrical Addition and/or Alteration
Install 2 exit, 1 switch, 18 receptacles, 2 equipment power. relocate 5 switches.
fire alarm: install 2 duct smoke detector with remote test switches and relay modules.all work is to be done according to approved drawings-2017 nec,2016 nfp
Contractor:
NEW LIGHT ELECTRIC INC
Status: Completed
Aug 28, 2025
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact des
Contractor:
HUNTER MECHANICAL INC
Status: Issued
Aug 26, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. **cp-2025-003602**
relocate (7) sprinkler head
Contractor:
A & S SPRINKLER CO INC
Status: Issued
Jul 25, 2025
Building Addition and/or Alteration
For level ii interior alterations without a change in use & occupancy classification to a group b prepared food shop at the 1st floor. existing building is fully sprinklered. all work to be done per approved plans and in accordance with 201
Contractor:
INTECH CONSTRUCTION LLC
Status: Issued
Jul 23, 2025
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Jul 8, 2025
Electrical Addition and/or Alteration
Install 96 light fixture, 24 switch, 24 receptacle.
fire alarm is not included.
Contractor:
NEW LIGHT ELECTRIC INC
Status: Completed
Jun 26, 2025
Plumbing Alterations
Direct fixture replacement in bathrooms. remove and install new toilets, lavs and urinals. no piping to be included.
Contractor:
keegan&cunnius plumbing and mechanical
Status: Completed
Jun 17, 2025
Building Addition and/or Alteration
For level ii alterations to the restrooms at floors 49th, 50th and 51st of an existing business occupancy. alterations to include the erection of partition walls, provide finishes/ furnishings and accessibility improvments throughout. all w
Contractor:
LAKASH CONSTRUCTORS INC
Status: Completed
Jun 12, 2025
Electrical Addition and/or Alteration
Furnish & install 16/2 plenum cables to (201) ceiling mounted operating sound masking speaker locations
Contractor:
MJR TECHNOLOGIES, INC dBA: GT TELECOM
Status: Completed
Jun 6, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. *cp-2024-006471*
relocate (6) sprinkler heads
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
Jun 5, 2025
Building Addition and/or Alteration
For level ii alterations to an existing tenant space. for use as a business occupancy. alterations to include the erection of partition walls, the installation of doors, and accessibility improvments throughout. all work to be done per appr
Contractor:
VERICON CONSTRUCTION CO LLC
Status: Completed
May 27, 2025
Electrical Addition and/or Alteration
Provide and install 03 ea. 65" displays, 02 ea. 75" displays, 03 ea. 85" display and 01 ea. 98" display.
all work will be completed per current nec.
no rescue systems work.
Contractor:
LANCONNECT INC
Status: Completed
May 22, 2025
Plumbing Alterations
Interior alterations to office space. installation of drainage, waste, vent, and water supply for listed fixtures connecting to existing metallic piping. metallic pipeing shall be utilized with approved joining methods. venting shall be des
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
May 6, 2025
Electrical Addition and/or Alteration
Renovate fire alarm system on 34th, 35th, and 36th floors as per 2016 nfpa 72.
Contractor:
Madden Electric Associates, Inc
Status: Completed
Apr 18, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate 52 heads
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
Apr 9, 2025
Electrical Addition and/or Alteration
Provide temporary power for welding and spraying. install conduit, wiring, lighting, switches and receptacle outlets. provide power for mechanical and plumbing equipment. install new circuit breakers to existing panels. install tele
Contractor:
Madden Electric Associates, Inc
Status: Completed
Apr 7, 2025
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Mar 28, 2025
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (426) sprinkler heads as per nfpa 13
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Mar 21, 2025
Building Addition and/or Alteration
For level ii alterations to the 34th, 35th, and 36th floors of an existing structure. alterations to include the erection of partition walls, provide finishes/furnishings and accessibility improvments throughout. for use as previously appro
Contractor:
HUNTER ROBERTS HOLDINGS LLC
Status: Completed
Mar 17, 2025
Mechanical Addition and/or Alterations
For an alteration to an existing mechanical system. wor to include the installation of registers, diffusers and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. all wor
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Mar 5, 2025
Electrical Addition and/or Alteration
Install light fixtures normal & emergency, switches & sensors. install receptacle outlets & floor box receptacles. provide boxes & pull strings for the low voltage wiring. provide power for the new & relocated hvac & mechanical equipment. i
Contractor:
SHORELINE ELECTRIC INC
Status: Completed
Feb 20, 2025
Electrical Addition and/or Alteration
Install telecommunication wiring according to the 2017 nec.
Contractor:
TEL DAT COMMUNICATIONS INC
Status: Completed
Feb 20, 2025
General Sign
For the replacement of an existing sign (no structural or electrical additions/ changes to sign content) per approved plans.
Status: Completed
Feb 12, 2025
General Sign
For the erection of two (2) static illuminated accessory projecting signs (double-sided, 28” w x 24” h) accessory to an existing transit station. all work to be done per approved plans. if field conditions vary contact design engineer p
Status: Completed
Feb 5, 2025
Plumbing Alterations
Remove and replace (2) kitchen sinks and (2) hot water heaters, connecting to existing piping.
Contractor:
TKELLY INC
Status: Completed
Jan 23, 2025
Building Addition and/or Alteration
For level ii alterations to the 31st floor of an existing structure. alterations to include the erection of partition walls, provide finishes/furnishings and accessibility improvments throughout. for use as previously approved. all work to
Contractor:
PATRIOT CONSTRUCTION
Status: Completed
Jan 20, 2025
Electrical Addition and/or Alteration
Install (12) cat 6 cables
(17) tv room monitors
18/2 speaker wiring
Contractor:
THOMAS J MALKOWSKI JR
Status: Completed
Jan 9, 2025
Electrical Addition and/or Alteration
Furnish & install (30) new cat 6 plenum cables for voice/data
Contractor:
MJR TECHNOLOGIES, INC dBA: GT TELECOM
Status: Completed
Dec 19, 2024
Zoning Signs (Accessory / Non-Accessory)
For the erection of two (2) accessory projecting signs (double-sided, 28” w x 24” h) accessory to an existing transit station with all other signs in the same structure as previously approved; size and location as shown in the plan
Contractor:
Klehr Harrison Harvey Branzburg LLP
Status: Completed
Dec 12, 2024
Electrical Addition and/or Alteration
Provide cat6 & rg-6 coaxial low voltage telecom cable for the following:
- 3 each wall phone (1x cat6 per) wall mounted eos.
- 20 each single (lx cat6 per) eos mounted at ceilings.
- 2 each single av camera (1x cat6 per) ceiling mount
Contractor:
MCGOLDRICK ELECTRIC INC
Status: Completed
Nov 8, 2024
Electrical Addition and/or Alteration
Furnish & install power and lighting per plans and 2017 nec.
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Oct 25, 2024
Electrical Addition and/or Alteration
Furnish & install power and lighting per plans.-2017 nec.
amendment: install fire alarm .
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Oct 24, 2024
Mechanical Addition and/or Alterations
Furnish and install one (1) exhaust fan and duct for new bathroom as per approved plans.
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Oct 22, 2024
Electrical Addition and/or Alteration
Relocate existing power for new furniture layout. furnish and install (3) new circuits for general purpose receptacles . all work is to be done according to approved drawings-2017 nec.
amendment : install fire alarm .
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Oct 11, 2024
Fire Suppression Addition and/or Alterations
For the reconfiguration of sprinkler heads and piping in an existing structure (floor 29) including the addition of a pre-action sprinkler system (to be installed as per the manufactures instructions) as shown on application/plans. all work
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Oct 8, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, (8) registers/grilles/diffusers are to be relocated as per the attached standards. deviations from these standards require the submission of construction and s
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Oct 7, 2024
Plumbing Alterations
Replace (1) sink & (1) faucet utilizing existing rough in fixture replacement without piping 1 fixture
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Oct 7, 2024
Plumbing Alterations
Replacing (2) electric water coolers fixture replacement without piping 2 fixtures
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Oct 7, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, 11 diffusers (relocating) as per attached standards. deviations from these standards require the submission of construction and site plans.
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Oct 7, 2024
Electrical Addition and/or Alteration
5 jb's for signs
feed new motor with existing feed
6 type l2 light fixtures
10 type l1-4 light fixtures
relocate existing camera
Contractor:
SHORELINE ELECTRIC INC
Status: Completed
Oct 7, 2024
Plumbing Alterations
39th floor - goldman sachs• furnish and install [2] water closets, [2] lavatories, [2] sinks, [2] floor drain, [2] hub drain, [1] drinking fountain, [4] electric water heaters
• provide labor and materials to extend from existing sanit
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
Oct 4, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (26) sprinkler heads in 11th floor com
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Oct 4, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (28) sprinkler heads on the 11th floor
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Oct 2, 2024
Building Addition and/or Alteration
Interior alteration to part of 11th floor of an existing structure. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work.
Contractor:
D LAURO & RODGERS INC
Status: Completed
Oct 2, 2024
Electrical Addition and/or Alteration
Install 51 light fixture and 12 switch
Contractor:
NEW LIGHT ELECTRIC INC
Status: Completed
Oct 1, 2024
Electrical Addition and/or Alteration
Furnish and install 90 duplex receptacles, 11 dedicated duplex receptacles,7 gfci receptacles, 10 duplex quad receptacles, 55 rings and strings, 22 jb's for shades, 19 furniture floor cores, 11 floor core devices, 6 l6 20r receptacles, feed
Contractor:
SHORELINE ELECTRIC INC
Status: Completed
Sep 25, 2024
Plumbing Alterations
34th floor/ remove 6 lavatory's,2 urinals, 7 water closets . install new to existing plumbing .
35th floor /remove 6 lavatory's ,2 urinals , 7 water closets , 1 drinking fountain. replace with new to existing plumbing
36th floor/ remove
Contractor:
Thomas Arnold
Status: Completed
Sep 19, 2024
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2024-003398
[amendment 4/4/2025 for hvac system design revisions to address layout changes per amended building permit.]
Contractor:
AERDUX INC
Status: Completed
Sep 13, 2024
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for renovations to existing below grade parking garage to include new direction and identification signage as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separ
Contractor:
PATRIOT CONSTRUCTION
Status: Completed
Sep 12, 2024
Building Addition and/or Alteration
For level ii alterations to an existing structure. alterations to include the erection of partition walls, provide finishes/furnishings and accessibility improvments throughout. all work to be done per approved plans. if field conditions va
Contractor:
D LAURO & RODGERS INC
Status: Completed
Sep 5, 2024
Electrical Addition and/or Alteration
Furnish and install 1 light, 1 gfi receptacle, 1 switch, power for flushometer and fire alarm device . all work is to be done according to approved drawings-2017 nec,2016 nfpa-72,2018 phila fire code.
Contractor:
SHORELINE ELECTRIC INC
Status: Completed
Sep 3, 2024
Electrical Addition and/or Alteration
Remove and replace lighting in lobby according to the 2017 nec.
Contractor:
SHORELINE ELECTRIC INC
Status: Completed
Aug 22, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (2) sprinkler heads in 49th floor rest
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Aug 20, 2024
Plumbing Alterations
Furnish and install (3) new plumbing fixtures, (1) water closet, (1) lavatory and (1) water heater, connecting to existing piping.
Contractor:
TKELLY INC
Status: Completed
Aug 8, 2024
Building Addition and/or Alteration
For level ii interior alterations with no change to existing group b use & occupancy classification at the 29th floor. all work to be done per approved plans and in accordance with 2018 iebc. separate permits required for mechanical, electr
Contractor:
STRUCTURE TONE LLC
Status: Completed
Aug 7, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate 21 sprinkler heads
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
Aug 5, 2024
General Permit Minor EZ Interior Non-Load-Bearing Wall Demo.
Ez interior demolition - for the interior demolition on non-bearing partition wall and ceilings as per attached standard. deviations from these standards require submission of construction and site plans.
interior demolition of non load
Status: Expired
Jul 10, 2024
Building Addition and/or Alteration
For level i alterations at partial 49th floor of an existing business occupancy. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for a
Contractor:
LAKASH CONSTRUCTORS INC
Status: Completed
Jul 8, 2024
Building Addition and/or Alteration
For interior renovations to existing restrooms on 34th, 35th and 36th floors of an existing high rise building as per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be ob
Contractor:
PATRIOT CONSTRUCTION
Status: Completed
Jun 24, 2024
General Permit Minor EZ Interior Non-Load-Bearing Wall Demo.
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Status: Issued
Jun 19, 2024
General Permit Minor EZ Interior Non-Load-Bearing Wall Demo.
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Status: Expired
Jun 7, 2024
Building Addition and/or Alteration
For repairs to concrete deck of existing parking garage as per plans.
Contractor:
PD CONSTRUCTION GROUP LLC
Status: Expired
May 30, 2024
Mechanical Addition and/or Alterations
For the installation of hvac ductwork and registers/diffusers per approved plans.
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
May 14, 2024
Electrical Addition and/or Alteration
Install audio visual equipment including video monitors, room scheduler, ceiling speakers, ceiling microphones, touch panels.
Contractor:
MICHAEL GITLIN
Status: Completed
May 14, 2024
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate 92 sprinkler heads
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
May 3, 2024
Electrical Addition and/or Alteration
Furnish and install 230 duplex receptacles, 2 dedicated receptacles, 19 wall furniture feeds, 50 floor boxes, 24 wall dimmers, 23 ceiling occupancy sensors, 26 wireless room controllers, install 100 new lights, relocate 54 lights as per 201
Contractor:
SHORELINE ELECTRIC INC
Status: Completed
Apr 17, 2024
Building Addition and/or Alteration
For a level ii interior alterations (no change in occupancy ). alterations to include selective demolition of existing partions, and the installation of new wall partitions, provide finishes and furnishings throughout ** work to be limited
Contractor:
STRUCTURE TONE LLC
Status: Completed
Feb 7, 2024
General Permit Minor EZ Interior Non-Load-Bearing Wall Demo.
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Status: Expired
Jul 17, 2023
Electrical Addition and/or Alteration
Install 40 lights, 2 quads, 6 dedicated quads, 4 ceiling receptacles, and 4 junction boxes
Contractor:
SHORELINE ELECTRIC INC
Status: Completed
Jun 1, 2023
Electrical Addition and/or Alteration
Provide and install 11 ea. cat6 plenum cables at 175' average for camera locations and install cameras.
provide and install 08 ea. low voltage composite cables at 175' average to 08 door locations and install door hardware.
all cabling wi
Contractor:
LANCONNECT INC
Status: Completed
May 25, 2023
Building Addition and/or Alteration
For alterations in addition to work performed on cp-2022-000076. work as shown on application/plan and to be performed in accordance with the 2018 iebc. separate permit required for mep and any fire suppression work.
Contractor:
ROBERT BATTISTA
Status: Completed
May 24, 2023
Electrical Addition and/or Alteration
Furnish and install low voltage telecommunications category 7 cabling, server room build out, optical and 25 pair risers between mpoe and 44th floor server room, overhead paging and discreet sound masking throughout the floor as per 2017 ne
Contractor:
SHORELINE ELECTRIC INC
Status: Completed
May 1, 2023
Mechanical Addition and/or Alterations
For alteration to the existing hvac system to accommodate new office floor layout as per approved plans.
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
Apr 26, 2023
Electrical Addition and/or Alteration
New light fixtures and receptacles in mostly existing location of existing restrooms. fire alarm . all work is to be done according to approved drawings-2017 nec,2016 nfpa-72,2018 phila fire code.
Contractor:
Liberty Integrated Solutions, Inc.
Status: Completed
Apr 13, 2023
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances
for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plan
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Mar 31, 2023
Fire Suppression Addition and/or Alterations
For the alteration to an existing fire suppression system complying with nfpa 13 throughout work area as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphia.
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
Mar 24, 2023
Electrical Rough-In
Rough-in permit for ep-2023-001872 new light fixtures and receptacles in mostly existing location of existing restrooms. fire alarm drawings will be uploaded when received by the engineer. as per nec 2017
Contractor:
Liberty Integrated Solutions, Inc.
Status: Completed
Mar 17, 2023
Plumbing Alterations
Remove and replace existing plumbing fixtures with new, (8) water closets, (2) urinals and (6) lavatories, connecting to existing piping.
Contractor:
TKELLY INC
Status: Completed
Mar 13, 2023
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate 4 heads
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
Mar 8, 2023
Building Addition and/or Alteration
For level ii alterations to existing restroom to include the accessibility improvements on the 44th floor of an existing building. building is fully sprinklered. all work to be done per approved plans. if field conditions vary contact desig
Contractor:
PATRIOT CONSTRUCTION
Status: Completed
Feb 22, 2023
Electrical Addition and/or Alteration
Installation of general receptacles, panel work, furniture hook-ups, mechanical hook-ups, lighting fixtures/controls, mechanical monitoring/security low voltage wiring, and expanded fire alarm as part of a renovation to existing office spac
Contractor:
JANUS ASSOCIATES INC DBA COBRA ELECTRIC
Status: Completed
Feb 22, 2023
Electrical Addition and/or Alteration
F&i 103 new category 6 plenum cables as designated on plans.
f&i 3 new racks and ground all racks according to local codes
terminate, test and label all new cabling.
support all cabling to comply with local codes.
as per nec 2017
Contractor:
BLUESTONE COMMUNICATIONS INC
Status: Completed
Feb 15, 2023
Zoning Change of Use
Business support
Status: Issued
Feb 14, 2023
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. (cp-2022-005554)
relocate 120 sprinkler heads
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
Feb 14, 2023
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate 45 sprinkler heads
Status: Expired
Feb 14, 2023
Electrical Addition and/or Alteration
Statement of work:
small conference room single display zoom room non-integrated (37-041):
• walkthrough, setup and trash removal.
• install one (1) 65" display and one (1) pull out wall mount.
• install one (1) poly e70 smart
Contractor:
BLUESTONE COMMUNICATIONS INC
Status: Completed
Feb 7, 2023
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to an existing office space on the 31st floor of an existing high-rise office building as per approved plans. existing building fully sprinklered. *2018 iebc review*
**
Contractor:
BITTENBENDER CONSTRUCTION LP
Status: Completed
Feb 1, 2023
Electrical Addition and/or Alteration
Install 8 new 8" sound masking speakers and 3 transducer units as per 2017 nec
Contractor:
SHORELINE ELECTRIC INC
Status: Completed
Jan 26, 2023
Electrical Addition and/or Alteration
Electrical permit for combo cp-2022-005554
for the amendment of page e-200 only.
quantity of ld-1 fixtures were reduced. changes are in the clouded areas.
Contractor:
Liberty Integrated Solutions, Inc.
Status: Completed
Jan 18, 2023
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2022-005554
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Jan 11, 2023
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact des
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Dec 30, 2022
Plumbing Alterations
Plumbing permit (interior) for combo cp-2022-005554
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
Dec 29, 2022
Electrical Addition and/or Alteration
Install new light fixtures, lighting controls, receptacles, tele/data cabling and hvac power wiring utilizing existing panels and circuits. all tele/data cabling to be plenum rated less then 200' drops. all panels are existing to remain. fi
Contractor:
Liberty Integrated Solutions, Inc.
Status: Completed
Dec 15, 2022
Plumbing Alterations
Remove and replace existing fixtures with new, (1) kitchen sink and (1) water heater, connecting to existing piping.
Contractor:
TKELLY INC
Status: Completed
Dec 14, 2022
Electrical Addition and/or Alteration
• install two (2) 12 strand single mode armor jacketed fiber cables.
• install two (2) category 3 25 pair copper cables
• install approximately two hundred fifty (250) data cables, as follows:
• install security cable (composite
Contractor:
Ford Brothers Electric
Status: Completed
Dec 13, 2022
Building Addition and/or Alteration
For a level ii interior alterations to an existing tenant space on the 44th floor level of an existing structure. for use as a business occupancy. alterations to include the erection of partition walls, provide finishes/furnishings, and ac
Contractor:
James E. Fitzgerald, Inc.
Status: Completed
Dec 9, 2022
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for the removal and infill of an interconnecting stairway between the 35th and 36th floors of an existing high-rise office building as per approved plans. existing building fully sprink
Contractor:
James E. Fitzgerald, Inc.
Status: Expired
Dec 7, 2022
Electrical Addition and/or Alteration
Install receptacles and replace existing lights and occupancy sensors with new as per 2017 nec.
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Nov 28, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (27) sprinkler heads on the 22nd & 23r
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Nov 23, 2022
Electrical Addition and/or Alteration
Furnish and install lighting, power and gear per plans as per 2017 nec
amendment: install fire alarm wiring and devices as noted on plans. fire alarm value is already noted in fully executed contract value.
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Nov 15, 2022
Plumbing Alterations
Demo piping & fixtures.
install 1 new electric water cooler, 7 lavs, 3 sinks, 1 water closet
Contractor:
CHADWICK SERVICE COMPANY
Status: Completed
Nov 9, 2022
Mechanical Addition and/or Alterations
For the installation of registers, diffusers, and appliances with associated ductwork for a previously approved business use. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plan
Contractor:
CHADWICK SERVICE COMPANY
Status: Completed
Nov 7, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. *cp-2022-005270*
relocate (167) sprinklers hea
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Nov 2, 2022
Electrical Addition and/or Alteration
Statement of work:
horizontal cabling:
cabling will be systimax category 6 plenum rated 4-pair and belden rg6 quad shield plenum rated coax.
• provide labor to demo existing low voltage station cabling.
• provide and install
Contractor:
BLUESTONE COMMUNICATIONS INC
Status: Completed
Oct 25, 2022
Building Addition and/or Alteration
For level ii interior alterations at the 22nd and 23rd floors of the existing high-rise building. partial demo and alterations to include the erection of partition walls, provide finishes, and furnishings throughout. building is fully spri
Contractor:
ERICKSON C & SONS INC
Status: Completed
Oct 24, 2022
Electrical Addition and/or Alteration
Fire alarm: install 2 smoke detectors, 9 strobe, 7 speaker/strobe, 2 relays. all work is to be done according to approved drawings-2017 nec,2016 nfpa-72,2018 phila fire code.
Contractor:
NEW LIGHT ELECTRIC INC
Status: Completed
Oct 24, 2022
Building Addition and/or Alteration
For level ii interior alterations at the 37th floor of the existing high rise building. partial demo and alterations to include
the erection of partition walls, provide finishes, and furnishings throughout. building is fully sprinklered.
Contractor:
GILBANE BUILDING COMPANY
Status: Completed
Oct 21, 2022
Plumbing Alterations
Remove and replace (4) existing plumbing fixtures with new, (2) kitchen sinks and (2) electric hot water heaters, connecting to existing piping.
Contractor:
TKELLY INC
Status: Completed
Oct 14, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate 7 concealed pendents
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
Oct 4, 2022
Mechanical Addition and/or Alterations
For the installation of registers & diffusers with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact design engineer pr
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Oct 4, 2022
Plumbing Alterations
Remove and replace (5) existing fixtures, (3) kitchen sinks and (2) electric water heaters, connecting to existing piping.
Contractor:
TKELLY INC
Status: Completed
Sep 29, 2022
Electrical Addition and/or Alteration
01 – existing smoke detector to retain
01 – new smoke detector
01 – existing pull station to retain
05 – new speaker/strobe
10 – relocate speaker/strobe
03 – relocate strobe
01 – test & recertification of f/a system
as
Contractor:
METRO ELECTRIC CO INC
Status: Completed
Sep 24, 2022
Building Addition and/or Alteration
Interior alteraiton to suite 3000 of an existing structure as per approved plan.
Contractor:
LAKASH CONSTRUCTORS INC
Status: Completed
Sep 20, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
modifying 54 sprinklers
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Aug 30, 2022
Electrical Addition and/or Alteration
1 demo existing
1 temporary lighting
7 relocate existing 2x4 light fixture/s
47 relocate existing downlights
9 relocate existing exit lights
24 8' linear pendant fixtures led
2 exit lights - double face
23 sosw - wall mounted occupan
Contractor:
METRO ELECTRIC CO INC
Status: Completed
Aug 10, 2022
Mechanical Addition and/or Alterations
For the installation of a new hvac systems, associated duct work, vavs, and registers/diffusers as per approved plans. separate permit required for electrical, plumbing, fire suppression
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Aug 10, 2022
Electrical Addition and/or Alteration
Install (138) light fixture, (6) exit, (79) switch, (71) receptacle, (22) equipment power, (3) 208/120 volt panel according to the 2017 nec.
Contractor:
NEW LIGHT ELECTRIC INC
Status: Completed
Aug 8, 2022
Mechanical Addition and/or Alterations
For alterations to an existing mechanical hvac system including all registers, diffusers, and appliances (installed in accordance with manufacturer’s specifications), with associated ductwork (all ductwork self-contained within story; no
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Aug 2, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (92) sprinkler heads.
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Jul 12, 2022
Building Addition and/or Alteration
For level ii interior alterations to an existing group b office occupancy at the 44th through 46th floors of the existing high rise structure to include removal and infill of an enclosed interconnecting stair within the tenant space (no cha
Contractor:
LAKASH CONSTRUCTORS INC
Status: Completed
Jul 8, 2022
Building Addition and/or Alteration
For level ii interior alterations at the 30th floor of the existing high rise building to include office fit-out and expansion of space # 3020 into adjacent vacant suite. all work to be done per approved plans and in accordance with 2018 ie
Contractor:
ERICKSON C & SONS INC
Status: Completed
Jun 22, 2022
Electrical Addition and/or Alteration
Install (qty. 2) fire alarm manual pull stations to the existing fire alarm system as per 2016 nfpa 72
Contractor:
LYNDEE CORPORATION
Status: Completed
May 2, 2022
Electrical Addition and/or Alteration
Clean and re-lamp 38 existing fixtures to remain. rework 3 existing to remain wall switches. disconnect and reconnect ac-1 and wshp-1 with existing circuits. utilizing existing panel as per 2017 nec
Contractor:
Liberty Integrated Solutions, Inc.
Status: Completed
Feb 23, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocate (1) sprinkler head on 53rd fl. (cp-2021
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
Feb 16, 2022
Electrical Addition and/or Alteration
Furnish and install 4 duplex receptacles, 6 wall furniture feeds and 1 floor box as per 2017 nec.
Contractor:
SHORELINE ELECTRIC INC
Status: Completed
Feb 15, 2022
Electrical Addition and/or Alteration
Furnish and install (10) category 6 cables as per 2017 nec
Contractor:
MJR TECHNOLOGIES, INC dBA: GT TELECOM
Status: Completed
Feb 3, 2022
Mechanical Addition and/or Alterations
For the installation of hvac appliance and related duct transitions/equipment. appliance to be installed in accordance with approved plan and manufacturer's specifications. if field conditions vary contact design engineer prior to the sta
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Feb 3, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate 1 head
Contractor:
INDEPENDENCE FIRE SPRINKLER COMPANY
Status: Completed
Feb 1, 2022
Electrical Rough-In
Rough-in permit for ep-2022-000810 clean and re-lamp 38 existing fixtures to remain. rework 3 existing to remain wall switches. disconnect and reconnect ac-1 and wshp-1 with existing circuits. utilizing existing panel as per 2017 nec
Contractor:
Liberty Integrated Solutions, Inc.
Status: Completed
Feb 1, 2022
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances
for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plan
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
Jan 24, 2022
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) for renovations to 53rd floor office space in an existing high-rise building as per approved plans. existing building fully sprinklered. *2018 iebc review*
**separate permits required
Contractor:
Rycon Construction, Inc.
Status: Completed
Jan 18, 2022
Building Addition and/or Alteration
For level ii alterations to an existing mercantile space for change to existing layout. alterations to include the erection of partition walls, provide finishes, and furnishings throughout. building is fully sprinklered. all work to be done
Contractor:
PATRIOT CONSTRUCTION
Status: Completed
Jan 10, 2022
Electrical Addition and/or Alteration
Electrical permit for combo cp-2021-009040
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Jan 6, 2022
Mechanical Addition and/or Alterations
Mechanical / fuel gas permit for combo cp-2021-009040
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Jan 5, 2022
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocate (4) heads on 43rd floor as per nfpa 13
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Jan 3, 2022
Building Addition and/or Alteration
Level ii interior alterations (no change of occupancy) to a portion of the 43rd floor (room#4337) of an existing building. alterations to provide finishes and furnishings throughout . all work to be done per approved plans.**building is f
Contractor:
HAASPETERS CONSTRUCTION GROUP INC
Status: Completed
Dec 28, 2021
Electrical Addition and/or Alteration
Installation of new light fixtures, snow melt system, electric unit heaters, ada push plates to include wiring and terminations per electrical drawings as in accordance with the 2017 nec.
Contractor:
LYNDEE CORPORATION
Status: Completed
Nov 24, 2021
Mechanical Addition and/or Alterations
For a new mechanical installation to accommodate the south building entrance of an existing building. work to include the installation of registers, diffusers and appliances with associated ductwork. appliances to be installed in accordanc
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Expired
Nov 15, 2021
Electrical Addition and/or Alteration
Extend new wiring and add fire alarm devices to existing facp.
all work is to be done according to approved draings-2108 phila fire code.2017 nec,2016 nfpa-72.
Contractor:
INDEPENDENCE ELECTRIC INC
Status: Completed
Nov 8, 2021
Plumbing Alterations
F&i (1) wall hydrant and connect 5 rain gutters
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Expired
Oct 25, 2021
Mechanical Addition and/or Alterations
For the installation of hvac equipment, ductwork and registers/diffusers per manufacturer's specifications and approved plans.
Contractor:
HUNTER MECHANICAL INC
Status: Completed
Oct 20, 2021
Electrical Rough-In
Rough-in permit for ep-2021-011965 extend new wiring and add fire alarm devices to existing facp.
electrical portion of contract included in ep-2021-005213 in the amount of $710,000. this fa permit application is $47,800 of total contract
Contractor:
INDEPENDENCE ELECTRIC INC
Status: Completed
Oct 19, 2021
Electrical Addition and/or Alteration
Alteration to existing electrical systems. installation of lighting fixtures, receptacles and one panel as per approved drawings-2017 nec.
**separate fire alarm permit req'd**
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Oct 14, 2021
Fire Suppression Addition and/or Alterations
Permit sprinkler relocation (nfpa 13)- for the relocation of 20 sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. fire suppression system permit for combo cp-2021-0
Contractor:
MK FIRE PROTECTION & SUPPLY, LLC
Status: Expired
Oct 12, 2021
Plumbing Alterations
Scope of proposed work does not require review. issue ez-permit.
Contractor:
NAGEL LAVIN INC
Status: Completed
Oct 8, 2021
Electrical Rough-In
Rough-in permit for ep-2021-011238 alteration to existing electrical systems. replacement of lighting fixtures, receptacles and one panel as per 2017 nec
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Oct 7, 2021
Electrical Addition and/or Alteration
Furnish and install (3) cat 6 and cat 6a cables on 43
furnish and install (34) cat 6 and cat 6a cables on 42
average cable pull is 125 feet
reroute all existing category 6 cable from existing server room to a new server room as per 2017
Contractor:
BELLES ELECTRICAL CONTRACTORS LLC
Status: Completed
Oct 1, 2021
Fire Suppression Addition and/or Alterations
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans.
relocate (63) sprinklers at pfm financial advisor
Contractor:
Oliver Sprinkler Co., Inc.
Status: Completed
Sep 29, 2021
Electrical Addition and/or Alteration
Install monitors, speakers, mics, tele conference cameras as per nec 2014
Contractor:
MICHAEL GITLIN
Status: Completed
Sep 20, 2021
Fire Suppression Addition and/or Alterations
For the demolition and reinstallation of nfpa 13 sprinkler system on 33rd floor as per approved plan. no work on existing riser/back-flow preventor
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Sep 16, 2021
Electrical Addition and/or Alteration
Install new fire alarm devices as per drawings and nfpa 72
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Sep 13, 2021
Building Addition and/or Alteration
For prescriptive alterations (w/o a change of occupancy) for renovations to the ground floor main entrance of an existing attached high-rise structure, as per plans; see sub-permits for associated mep/fsp work; building is fully sprinklered
Contractor:
HUNTER ROBERTS HOLDINGS LLC
Status: Expired
Sep 10, 2021
Building Addition and/or Alteration
Evel ii interior alterations (no change of occupancy) to the 42nd floor of an existing high-rise building. alterations to include the erection of partition walls, provide finishes and furnishings throughout the designated floor. all work to
Contractor:
STRUCTURE TONE LLC
Status: Completed
Sep 1, 2021
Plumbing Alterations
Install piping, (1) mop sink, (1) water filter, (1) drinking fountain, (1) stainless steel sink w. faucet, (1) 19 gal wh
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Aug 26, 2021
Electrical Addition and/or Alteration
Provide and install seventeen (17) flush mount dual locations.
provide and install three (3) floor mount dual locations.
provide and install three (3) surface mount single wireless access point locations.
provide labor to install three (
Contractor:
FRANK JR SHARP
Status: Completed
Aug 25, 2021
Fire Suppression Addition and/or Alterations
Relocate (21) sprinkler heads on the 39th floor see cp-2021 003578
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Aug 24, 2021
Electrical Addition and/or Alteration
Install additional fire alarm equipment, remove and replace smoke detectors, add notification devices to the existing fire alarm system on the 32nd & 33rd floors.
all work in accordance with the 2017 nec & 20116 nfpa-72.
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Aug 23, 2021
Fire Suppression Addition and/or Alterations
For the alterations to an existing fire suppression system in accordance with nfpa 2016, standard 13, with sprinkler head installations to connect to the existing pressure relief valve and fire pump installation.
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Aug 20, 2021
Mechanical Addition and/or Alterations
For the removal and installation of an hvac mechanical system to include air conditioning unit, grilles/registers/diffusers, and associated ductwork.
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
Aug 20, 2021
Electrical Addition and/or Alteration
Relocate (23) light fixtures, (2) switches. install (4) switches, (25) receptacles, (11) data cables as per 2017 nec
Contractor:
NEW LIGHT ELECTRIC INC
Status: Completed
Aug 17, 2021
Electrical Addition and/or Alteration
Install receptacles, light fixtures, switches & occupancy sensors in accordance with 2017 nec cc district.
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Aug 16, 2021
Mechanical Addition and/or Alterations
For the installation of hvac system including demo, install ductwork, condenser water pump - relocate (4) existing wshps. controls. (20 new grds) as per plans.
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Completed
Aug 13, 2021
Fire Suppression Addition and/or Alterations
Relocate (22) sprinkler heads on the 1st floor
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Jul 29, 2021
Plumbing Alterations
Alterations: interior plumbing. all proposed work to be done in accordance with philadelphia plumbing code 2018.
Contractor:
LOR-MAR MECHANICAL SERVICES
Status: Completed
Jul 29, 2021
Electrical Addition and/or Alteration
Provide and install lenel/s2 access control cable as required to each of the following locations:
(4) single doors consisting of:
? card reader (1)
? door contacts (1)
? request to exit or push-button request to exit (1)
? mag lock (1)
Contractor:
FRANK JR SHARP
Status: Completed
Jul 23, 2021
Building Addition and/or Alteration
For alterations to an existing space to include interior wall partitions and wall/floor/ceiling finishing. (iebc 2018, work-area method, lvl ii alterations) **separate permits to be required for any electrical, mechanical or fire suppressio
Contractor:
Rycon Construction, Inc.
Status: Completed
Jul 22, 2021
Electrical Addition and/or Alteration
Lighting, power, data stubs and gear per plans and specs as per approved drawings-2017 nec.
**separate fire alarm permit req'd**
Contractor:
HATZEL & BUEHLER INC
Status: Completed
Jul 22, 2021
Fire Suppression Rough-In
Rough-in permit for fp-2021-001938 32nd floor: demo existing sprinkler piping and heads. install new wet sprinkler piping and heads to accommodate new tenant layout and ceilings. tie into existing floor control valve assembly in stair tower
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Jul 15, 2021
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pl
Contractor:
DWD MECHANICAL CONTRACTOR INC
Status: Expired
Jul 14, 2021
Fire Suppression Rough-In
Rough-in permit for fp-2021-001917 demo existing sprinkler piping and heads. install new wet sprinkler piping and heads to accommodate new tenant layout and ceilings as per nfpa 13 and philadelphia fire code. tie into existing floor control
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Jul 13, 2021
Building Addition and/or Alteration
For level ii alteration without change of occupancy classification to the existing office space as per approved plans. building is fully sprinklered. separate permits required for m.e.p.s work.
Contractor:
Rycon Construction, Inc.
Status: Completed
Jun 29, 2021
Building Addition and/or Alteration
For level ii alterations to an existing building for use as a business professional office on the 32nd and 33rd floor of an existing building. alterations to include the erection of partition walls. provide finishes/furnishings and accessib
Contractor:
STRUCTURE TONE LLC
Status: Completed
Jun 23, 2021
Mechanical Addition and/or Alterations
For the installation of a hvac system throughout offices at the 12th floor of an existing high rise structure to include new appliances, registers, diffusers, and associated ductwork. all work to be done per approved plans and in accordance
Contractor:
LOR-MAR MECHANICAL SERVICES LLC
Status: Completed
Jun 17, 2021
Electrical Addition and/or Alteration
New receptacles, floor boxes, modular furniture, auto shades and hvac equipment fed from existing panels. new lighting fixtures and local controls. raceway and back boxes for tele/ data, a/v and security as per 2017 nec.
will apply for a
Contractor:
INDEPENDENCE ELECTRIC INC
Status: Completed
Jun 15, 2021
Electrical Rough-In
Rough-in permit for ep-2021-005213 new receptacles, floor boxes, modular furniture, auto shades and hvac equipment fed from existing
panels. new lighting fixtures and local controls. raceway and back boxes for tele/ data, a/v and security.
Contractor:
INDEPENDENCE ELECTRIC INC
Status: Completed
Jun 10, 2021
Fire Suppression Addition and/or Alterations
For alterations to an existing fire suppression system including demolition of existing branch lines and sprinkler heads on the 12th floor back to sprinkler main and install new sprinkler heads and branch lines to accommodate new tenant fit
Contractor:
A & S SPRINKLER CO INC
Status: Completed
Jun 2, 2021
Zoning Signs (Accessory / Non-Accessory)
For the removal and erection of two (2) double-faced, internally-illuminated freestanding sign. size and location as per plans.
Contractor:
OBERMAYER REBMANN MAXWELL & HIPPEL LLP
Status: Issued
May 28, 2021
Plumbing Alterations
Furnish and install new [4] pantry sinks, [1] water closet, [1] lavatory, [1] floor drain, [3] water heater, [1] mop sink. extend from existing sanitary, vent and domestic cold water stacks and risers.
remove and replace [7] water close
Contractor:
LOR-MAR MECHANICAL SERVICES
Status: Completed
May 25, 2021
Check permits at another Philadelphia address
Free instant lookup, no signup.
Search Philadelphia permits →
Disclaimer: Permit data comes from Philadelphia's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Philadelphia building department before buying, selling, or planning work.