Permit history for 161 W Allegheny Ave
Philadelphia, PA · 270 permits on file · 2021–2025
270
Permits on file
2021
First permit
2025
Most recent
8
Unique contractors
Permits on file (270)
Ordered most recent first. Data from the city's open data portal.
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st. floor.
replace all light fixtures located in 2nd. floor.
replace all light fixtures located in 3rd. floor.
replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Oct 22, 2025
Electrical Addition and/or Alteration
Install new light fixtures on the first, second and third floor. install new branch circuit for kitchen. all work to be done according to the 2017 nec.
Contractor:
BERNARD RIVERA
Status: Completed
Oct 17, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures in 1st floor.
Contractor:
BERNARD RIVERA
Status: Completed
Oct 14, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Oct 14, 2025
Electrical Addition and/or Alteration
Install lighting on the first, second and third floor. replace circuits for the kitchen. all work to be done according to the 2017 nec.
Contractor:
BERNARD RIVERA
Status: Completed
Oct 6, 2025
Mechanical Addition and/or Alterations
For installing new return box on existing unit #3029a ,no new ductwork no new diffusers.
Contractor:
Oleksandr Ganchii
Status: Completed
Oct 3, 2025
Plumbing Alterations
Fixture replacment without piping for 6 fixtures. all work performed in compliance with 2018 ppc and ez standard
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Oct 2, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Oct 1, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Oct 1, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Oct 1, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Oct 1, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st-3rd floors.
replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Sep 16, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st-3rd floors.
replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Sep 16, 2025
Electrical Addition and/or Alteration
Will replace all lights located in 1st floor.
will replace all lights located in 2nd floor.
will replace all lights located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Sep 15, 2025
Electrical Addition and/or Alteration
Will replace all lights located in 1st floor.
will replace all lights located in 2nd floor.
will replace all lights located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Sep 15, 2025
Electrical Addition and/or Alteration
Will replace all lights located in 1st floor.
will replace all lights located in 2nd floor.
will replace all lights located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Sep 15, 2025
Plumbing Alterations
Fixture replacement with piping
6 fixtures
(2) water closets
(2) lavatories
(1) kitchen sink
(1) shower/tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Sep 14, 2025
Plumbing Alterations
Fixture replacement with piping
6 fixtures
(2) water closets
(2) lavatories
(1) kitchen sink
(1) shower/tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Sep 14, 2025
Plumbing Alterations
Fixture replacement without piping
4 fixtures
(1) water closets
(1) lavatories
(1) kitchen sink
(1) shower/tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Sep 14, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Sep 9, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Sep 9, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Sep 9, 2025
Plumbing Alterations
Fixture replacement with piping
(2) vanities
(2) water closets
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jul 31, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Jul 29, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st-3rd floors.
Contractor:
BERNARD RIVERA
Status: Completed
Jul 26, 2025
Plumbing Alterations
Fixture replacement without piping
(7) fixtures total
(2) water closets
(2) vanities
(2) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jul 23, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st floor.
Contractor:
BERNARD RIVERA
Status: Completed
Jul 11, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st-3rd floor.
Contractor:
BERNARD RIVERA
Status: Completed
Jul 10, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures total
(2) water closets
(2) vanities
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jul 9, 2025
Plumbing Alterations
Fixture replacement without piping
(6) fixtures total
(2) water closets
(2) vanities
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jul 9, 2025
Plumbing Alterations
Fixture replacement without piping
(7) fixtures total
(2) water closets
(2) vanities
(2) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jul 9, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures total
(2) water closets
(2) vanities
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jul 9, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures total
(2) water closets
(2) vanities
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jul 8, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures total
(2) water closets
(2) vanities
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jul 8, 2025
Plumbing Alterations
Fixture replacement with piping
(6) fixtures total
(2) water closets
(2) vanities
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jul 8, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st-3rd floor.
replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Jul 8, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st-3rd floor.
replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Jul 8, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st-3rd floors.
Contractor:
BERNARD RIVERA
Status: Completed
Jul 8, 2025
Plumbing Alterations
Fixture replacement without piping
(4) fixtures total
(1) water closets
(1) vanities
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jul 8, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st-3rd floor.
replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Jul 3, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located on the 1st-3rd floor.
replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Jul 2, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located on the 1st-3rd floor.
replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Jul 2, 2025
Plumbing Alterations
Fixture replacement without piping
(1) kitchen sink
(2) water closet
(2) lavatory
(1) shower/tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
May 14, 2025
Plumbing Alterations
(6) new fixtures with piping
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
May 14, 2025
Plumbing Alterations
(6) new fixtures with piping
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
May 14, 2025
Plumbing Alterations
(7) fixture replacements without piping
(2) water closets
(2) lavatories
(2) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
May 14, 2025
Plumbing Alterations
(6) new fixtures with piping
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
May 14, 2025
Plumbing Alterations
(6) new fixtures with piping
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Apr 24, 2025
Plumbing Alterations
(6) new fixtures with piping
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Apr 24, 2025
Plumbing Alterations
(6) new fixtures with piping
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Apr 24, 2025
Plumbing Alterations
(6) new fixtures with piping
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Apr 24, 2025
Plumbing Alterations
(6) new fixtures with piping
(2) water closets
(2) lavatories
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Apr 24, 2025
Mechanical Addition and/or Alterations
For relocation of diffusers/registers per approved plans.
Contractor:
Oleksandr Ganchii
Status: Completed
Apr 23, 2025
Electrical Addition and/or Alteration
Will replace all light fixturex located in 1st floor.
will replace all light fixturex located in 2nd floor.
will replace all light fixturex located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Apr 17, 2025
Electrical Addition and/or Alteration
Will replace all light fixturex located in 1st floor.
will replace all light fixturex located in 2nd floor.
will replace all light fixturex located in 3rd floor.
Contractor:
BERNARD RIVERA
Status: Completed
Apr 17, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Apr 16, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Apr 16, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Apr 15, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Apr 15, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Apr 15, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor,
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Apr 14, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Apr 14, 2025
Mechanical Addition and/or Alterations
Installation of return on an existing unit hvac unit, no other work permitted on this permit. no penetrations to fire rated assemblies or work proposed on duct work or common areas
Contractor:
Oleksandr Ganchii
Status: Completed
Apr 11, 2025
Mechanical Addition and/or Alterations
For the installation of appliances with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact design engineer prior to the
Contractor:
Oleksandr Ganchii
Status: Completed
Apr 11, 2025
Mechanical Addition and/or Alterations
For the installation of appliances with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact design engineer prior to the
Contractor:
Oleksandr Ganchii
Status: Completed
Mar 26, 2025
Plumbing Alterations
New fixtures with piping
(6) fixtures
(2) water closets
(2) lavatories
(1) kitchen sink
(1) tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Mar 13, 2025
Plumbing Alterations
Fixture replacement without piping
(2) lavatories
(2) water closets
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Mar 13, 2025
Plumbing Alterations
Fixture replacement without piping
(1) kitchen sink
(1) water closet
(1) lavatory
(1) tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Mar 13, 2025
Plumbing Alterations
Fixture replacement without piping
(1) kitchen sink
(1) water closet
(1) lavatory
(1) tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Mar 13, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
Contractor:
BERNARD RIVERA
Status: Completed
Mar 12, 2025
Plumbing Alterations
Fixture replacement without piping
(4) fixtures
(1) water closet
(1) tub
(1) lavatory
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Feb 25, 2025
Plumbing Alterations
Fixture replacement without piping
(7) fixtures
(2) water closets
(2) tubs
(2) lavatories
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Feb 25, 2025
Plumbing Alterations
New fixtures with piping
(6) fixtures
(2) lavatories
(2) water closets
(1) tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Feb 24, 2025
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Feb 24, 2025
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Feb 24, 2025
Plumbing Alterations
New fixtures with piping
fixtures
(2) water closets
(2) vanities
(1) tub/shower
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Feb 24, 2025
Plumbing Alterations
New fixtures with piping
(6) fixtures
(2) water closets
(2) vanities
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Feb 24, 2025
Plumbing Alterations
New fixtures with piping
fixtures
(2) water closets
(2) vanities
(1) tub/shower
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Feb 24, 2025
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Feb 24, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor
Contractor:
BERNARD RIVERA
Status: Completed
Feb 11, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 11, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located on the 1st thru 3rd floors.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 7, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located on the 1st thru 3rd floors.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 7, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st. floor.
will replace all light fixtures located in 2nd. floor.
will replace all light fixtures located in 3rd. floor.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 6, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st. floor.
will replace all light fixtures located in 2nd. floor.
will replace all light fixtures located in 3rd. floor.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 6, 2025
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Feb 5, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st. floor.
replace all light fixtures located in 2nd. floor.
replace all light fixtures located in 3rd. floor.
replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 5, 2025
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st.floor.
replace all light fixtures located in 2nd. floor.
replace all light fixtures located in 3rd. floor.
replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 5, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 4, 2025
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Feb 3, 2025
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 3, 2025
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Feb 3, 2025
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Jan 30, 2025
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Jan 14, 2025
Plumbing Alterations
Replacement without piping
(1) kitchen sink
(1) water closet
(1) lavatory
(1) tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Dec 13, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Dec 10, 2024
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor.
will replace all light fixtures located in 2nd floor.
will replace all light fixtures located in 3rd floor.
Contractor:
BERNARD RIVERA
Status: Completed
Dec 10, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Dec 10, 2024
Plumbing Alterations
Replacement without piping
(1) kitchen sink
(1) water closet
(1) lavatory
(1) tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Dec 9, 2024
Plumbing Alterations
Replacement without piping
(1) kitchen sink
(1) water closet
(1) lavatory
(1) tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Dec 9, 2024
Plumbing Alterations
New fixtures with piping 6 fixtures
(2) water closets
(2) vanities
(1) shower/tub
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Dec 9, 2024
Plumbing Alterations
New fixtures with piping 6 fixtures
(2) water closets
(2) lavatories
(1) tub/shower
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Dec 9, 2024
Plumbing Alterations
Fixture replacement without piping
(7) fixtures
(2) water closets
(2) tubs
(2) lavatories
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Dec 9, 2024
Plumbing Alterations
Replacement without piping
(1) kitchen sink
(1) water closet
(1) lavatory
(1) tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Dec 9, 2024
Plumbing Alterations
New fixtures with piping 6 fixtures
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Dec 9, 2024
Plumbing Alterations
Fixture replacement without piping
(6) fixtures
(1) tub
(1) kitchen sink
(2) lavatories
(2) water closets
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Dec 9, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Dec 6, 2024
Plumbing Alterations
New fixtures with piping 6 fixtures
(2) water closets
(2) vanities
(1) tub/shower
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Dec 4, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Dec 2, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Dec 2, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Dec 2, 2024
Mechanical Addition and/or Alterations
Installation of 1 return on an existing unit hvac unit, no other work permitted on this permit. no penetrations to fire-rated assemblies or work proposed on duct work or common areas
Contractor:
Oleksandr Ganchii
Status: Completed
Dec 2, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Dec 2, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Dec 2, 2024
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st fl.
will replace all light fixtures located in 2nd fl.
will replace all light fixtures located in 3rd fl.
will replace kitchen circuits.
Contractor:
BERNARD RIVERA
Status: Completed
Nov 26, 2024
Mechanical Addition and/or Alterations
Installation of return on an existing unit hvac unit, no other work permitted on this permit. no penetrations to fire rated assemblies or work proposed on duct work or common areas
Contractor:
Oleksandr Ganchii
Status: Completed
Oct 14, 2024
Mechanical Addition and/or Alterations
Installation of return on an existing unit hvac unit, no other work permitted on this permit. no penetrations to fire rated assemblies or work proposed on duct work or common areas
Contractor:
Oleksandr Ganchii
Status: Completed
Oct 14, 2024
Mechanical Addition and/or Alterations
Install new return box under unit.
no duck work
Contractor:
Oleksandr Ganchii
Status: Completed
Oct 14, 2024
Mechanical Addition and/or Alterations
Installation of return on an existing unit hvac unit, no other work permitted on this permit. no penetrations to fire rated assemblies or work proposed on duct work or common areas
Contractor:
Oleksandr Ganchii
Status: Completed
Oct 14, 2024
Mechanical Addition and/or Alterations
Installation of new return box, no duct work
Contractor:
Oleksandr Ganchii
Status: Completed
Oct 14, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Oct 3, 2024
Electrical Addition and/or Alteration
Replace all light fixtures located in 1st floor.
Contractor:
BERNARD RIVERA
Status: Completed
Oct 3, 2024
Plumbing Alterations
Fixture replacement without piping
(7) fixtures
(2) water closets
(2) tubs
(2) lavatories
(1) kitchen sink
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Oct 3, 2024
Plumbing Alterations
Fixture replacement without piping
(6) fixtures
(1) tub
(1) kitchen sink
(2) lavatories
(2) water closets
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Oct 2, 2024
Plumbing Alterations
Fixture replacement without piping
(4) fixtures
(1) kitchen sink
(1) water closet
(1) lavatory
(1) tub
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Oct 2, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Sep 24, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Sep 23, 2024
Plumbing Alterations
Fixture replacement without piping 4 fixtures
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Sep 23, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Sep 23, 2024
Plumbing Alterations
New fixtures with piping 6 fixtures
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Sep 19, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Sep 16, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Sep 16, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Sep 16, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Sep 9, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Sep 9, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Jul 31, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pl
Contractor:
Oleksandr Ganchii
Status: Completed
Jun 28, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pl
Contractor:
Oleksandr Ganchii
Status: Completed
Jun 28, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pl
Contractor:
Oleksandr Ganchii
Status: Completed
Jun 28, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pl
Contractor:
Oleksandr Ganchii
Status: Completed
Jun 28, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Jun 26, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Jun 19, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances- for the installation if new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require the submission of construction and site
Contractor:
Oleksandr Ganchii
Status: Completed
Jun 19, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Jun 18, 2024
Plumbing Alterations
Fixture replacement unit 3217c
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jun 14, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
Jun 14, 2024
Plumbing Alterations
6 fixtures
fixture replacement
kitchen relocation
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jun 12, 2024
Plumbing Alterations
7 fixtures
fixture replacement
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jun 12, 2024
Plumbing Alterations
4 fixtures
changing fixtures
relocating kitchen
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jun 12, 2024
Plumbing Alterations
4 fixtures
fixture replacement
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jun 12, 2024
Plumbing Alterations
6 fixtures
fixture replacement
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jun 12, 2024
Plumbing Alterations
6 fixtures
changing fixtures
relocating kitchen
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jun 12, 2024
Plumbing Alterations
6 fixtures
fixture replacement
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jun 12, 2024
Plumbing Alterations
4 fixtures
fixture replacement
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jun 12, 2024
Plumbing Alterations
6 fixtures
fixture replacement
kitchen relocation
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jun 12, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
May 31, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
May 31, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
May 17, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
May 17, 2024
Electrical Addition and/or Alteration
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall
Contractor:
BERNARD RIVERA
Status: Completed
May 17, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Mar 18, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Mar 18, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Mar 18, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Mar 18, 2024
Mechanical Addition and/or Alterations
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site pla
Contractor:
Oleksandr Ganchii
Status: Completed
Mar 18, 2024
Zoning Change of Use
Residential - household living - multi-family
Contractor:
CORNERSTONE CONSULTING
Status: Issued
Feb 29, 2024
Electrical Addition and/or Alteration
Replace all light fixtures located in 2nd floor and 3rd floor.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 22, 2024
Electrical Addition and/or Alteration
Will replace all light fixtures in 1st floor, 2nd floor and 3rd floor.
will replace kitchen circuits. (unit 3222 (mascher st,)
as per nec 2017
Contractor:
BERNARD RIVERA
Status: Completed
Feb 8, 2024
Electrical Addition and/or Alteration
Replace all light fixtures
Contractor:
BERNARD RIVERA
Status: Completed
Feb 7, 2024
Electrical Addition and/or Alteration
Replace all light fixtures located in 2nd floor and in 3rd floor.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 6, 2024
Electrical Addition and/or Alteration
Replace all light fixtures located in 2nd floor and in 3rd floor.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 6, 2024
Electrical Addition and/or Alteration
Replace all light fixtures located in 2nd floor.
replace all light fixtures located in 3rd floor.
Contractor:
BERNARD RIVERA
Status: Completed
Feb 5, 2024
Plumbing Alterations
Replace 4 fixtures in 1 apartment unit.
**without piping**
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jan 26, 2024
Plumbing Alterations
Replace 4 fixtures in 1 apartment unit.
**without piping**
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jan 26, 2024
Plumbing Alterations
Replaceing 6 fixtures without piping.
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jan 26, 2024
Plumbing Alterations
Changing seven fixtures
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jan 25, 2024
Plumbing Alterations
Changing six fixtures
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jan 25, 2024
Plumbing Alterations
Changing six plumbing fixtures
rerouting plumbing in kitchen area
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jan 25, 2024
Plumbing Alterations
Changing six fixtures and rerouting plumbing in kitchen area
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jan 25, 2024
Plumbing Alterations
Changing six fixtures and rerouting plumbing in kitchen area
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jan 25, 2024
Plumbing Alterations
Changing four fixtures
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jan 25, 2024
Plumbing Alterations
Changing four fixtures
Contractor:
Mezzaroba Plumbing and Heating LLC
Status: Completed
Jan 25, 2024
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor, 2nd floor and 3rd floor.
will replace kitchen circuits.
as per nec 2017
Contractor:
BERNARD RIVERA
Status: Completed
Sep 28, 2023
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st floor,2nd floor and 3rd floor
will replace kitchen circuits.
as per nec 2017
Contractor:
BERNARD RIVERA
Status: Completed
Sep 28, 2023
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st. floor, 2nd floor and 3rd floor.
will replace kitchen circuits as per 2017 nec
Contractor:
BERNARD RIVERA
Status: Completed
Sep 27, 2023
Electrical Addition and/or Alteration
Will replace all light fixtures located in 1st. floor, 2nd floor and 3rd floor.
will replace kitchen circuits.
as per nec 2017
Contractor:
BERNARD RIVERA
Status: Completed
Sep 26, 2023
Plumbing New Construction or Additions
Install 3 kitchen sinks, 3 water closets, 3 lavatories, 1 urinal, 1 mop sink, 1 water bottle filler and 1 hot water heater according to the 2018 ppc.
Contractor:
AK SCORPION INC
Status: Completed
Oct 14, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3215) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3223) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 164) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate perm
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3217d) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate pe
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3219d) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate pe
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3225) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3203) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3221) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 165) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate perm
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3238) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3211) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3217e) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate pe
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3219f) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate pe
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 163) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate perm
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3209b of an existing three (3) family dwelling (3209 n hancock st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002463 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
level ii alterations (no change of occupancy) for interior and exter
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3205) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3213) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3227) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3217f) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate pe
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 176) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate perm
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3219e) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate pe
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 3229) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 2, 2022
Residential Building Addition and/or Alteration
Amend permit 9/18/2023- exterior insulated finishing system (efis) will no longer be installed on this project. the address has been updated to 161 w allegheny ave.
unit 174 description of work: exterior and interior rehab of an existing
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 1, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 171a) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate per
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 1, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 169) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate perm
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Aug 1, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002465 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
original: level ii alterations (no change of occupancy) for interior
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3219a of an existing three (3) family dwelling (3219 n hancock st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002465 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
original: level ii alterations (no change of occupancy) for interior
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3228a of an existing three (3) family dwelling (3228 n mascher st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002465 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
original: level ii alterations (no change of occupancy) for interior
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3217c of an existing three (3) family dwelling (3217 n hancock st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3217b of an existing three (3) family dwelling (3217 n hancock st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002465 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
original: level ii alterations (no change of occupancy) for interior
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3219c of an existing three (3) family dwelling (3219 n hancock st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3231b of an existing three (3) family dwelling (3231 n hancock st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3240 of an existing three (3) family dwelling as per approved plans. existing building not required to be sprinklered. *2018 iebc review*
**separat
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3217a of an existing three (3) family dwelling (3217 n hancock st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 28, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3209 c of an existing mult-family dwelling (3209 n hancock st) as per approved plans. existing building not required to be sprinklered. *2018 iebc r
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3226c of an existing three (3) family dwelling (3226 n mascher st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002465 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
original: level ii alterations (no change of occupancy) for interior
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002465 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
original: level ii alterations (no change of occupancy) for interior
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002465 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
original: level ii alterations (no change of occupancy) for interior
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3219b of an existing three (3) family dwelling (3219 n hancock st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3207 c of an existing mult-family dwelling (3207 n hancock st) as per approved plans. existing building not required to be sprinklered. *2018 iebc r
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002465 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
original: level ii alterations (no change of occupancy) for interior
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002509 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
level ii alterations (no change of occupancy) for interior and exter
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002465 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
original: level ii alterations (no change of occupancy) for interior
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3228c of an existing three (3) family dwelling (3228 n mascher st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3228b of an existing three (3) family dwelling (3228 n mascher st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Building Addition and/or Alteration
Amendment: for the amendment of previously approved permit cp-2022-002473 to document correct address. address changed from 167 w allegheny ave to 161 w allegheny ave.
original: level ii alterations (no change of occupancy) for interior
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 27, 2022
Residential Building Addition and/or Alteration
Amend permit 9/18/2023- exterior insulated finishing system (efis) will no longer be installed on this project. the address has been updated to 161 w allegheny ave.
unit 168 description of work: exterior and interior rehab of an existing
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Residential Building Addition and/or Alteration
Amend permit 9/18/2023- exterior insulated finishing system (efis) will no longer be installed on this project. the address has been updated to 161 w allegheny ave.
unit 3214 description of work: exterior and interior rehab of an existin
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Residential Building Addition and/or Alteration
Amend permit 9/18/2023- exterior insulated finishing system (efis) will no longer be installed on this project. the address has been updated to 161 w allegheny ave.
unit 3222 description of work: exterior and interior rehab of an existin
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 166) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate perm
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Residential Building Addition and/or Alteration
Amend permit 9/18/2023- exterior insulated finishing system (efis) will no longer be installed on this project. the address has been updated to 161 w allegheny ave.
unit 172 description of work: exterior and interior rehab of an existing
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3226b of an existing three (3) family dwelling (3226 n mascher st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Residential Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to an existing single family dwelling (unit 178) as per approved plans. existing building not required to be sprinklered. *2015 irc review*
**separate perm
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Residential Building Addition and/or Alteration
Amend permit 9/18/2023- exterior insulated finishing system (efis) will no longer be installed on this project. the address has been updated to 161 w allegheny ave.
unit 3220 description of work: exterior and interior rehab of an existin
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Residential Building Addition and/or Alteration
Amend permit 9/18/2023- exterior insulated finishing system (efis) will no longer be installed on this project. the address has been updated to 161 w allegheny ave.
unit 3212 description of work: exterior and interior rehab of an existin
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Residential Building Addition and/or Alteration
Exterior and interior rehab of an existing three story building. exterior work includes a new eifs system, new asphalt and epdm roof. interior work includes the reconfiguration of the kitchen area. new kitchen, no structural repairs on this
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 26, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3200 of an existing three (3) family dwelling (3200 n mascher st) as per approved plans. existing building not required to be sprinklered. *2018 ieb
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 25, 2022
Building Addition and/or Alteration
Level ii alterations (no change of occupancy) for interior and exterior renovations to unit 3226a of an existing three (3) family dwelling (3226 n mascher st) as per approved plans. existing building not required to be sprinklered. *2018 ie
Contractor:
JBL CONSTRUCTION SERVICE INC
Status: Completed
Jul 25, 2022
Mechanical Addition and/or Alterations
For alterations to an existing hvac mechanical system, to include new rooftop mechanical units, fire dampers, exhaust fans, grilles/registers/diffusers, and associated ductwork.
Contractor:
S & S HEATING AND AIR CONDITIONING INC
Status: Completed
Sep 13, 2021
Building Addition and/or Alteration
For interior alterations to existing structure to include the creation of office space and conference room and elevation changes from previously approved permit # cp-2020-006698. **all other work is under permit #cp-2020-006698.
Contractor:
PROGRESSIVE CONSTRUCTION GROUP INC
Status: Expired
Sep 2, 2021
Building Addition and/or Alteration
For the erection of an addition with deck to an existing structure with level ii alteration with no change of occupancy classification within the existing structure used as a business & professional office with accessory storage & maintenan
Contractor:
PROGRESSIVE CONSTRUCTION GROUP INC
Status: Completed
Apr 28, 2021
Check permits at another Philadelphia address
Free instant lookup, no signup.
Search Philadelphia permits →
Disclaimer: Permit data comes from Philadelphia's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Philadelphia building department before buying, selling, or planning work.