Permit history for 6100 Universal Blvd
Orlando, FL · 500 permits on file · 2023–2026
500
Permits on file
2023
First permit
2026
Most recent
$92,011,419
Declared value (all work)
Permits on file (500)
Ordered most recent first. Data from the city's open data portal.
Electrical Alt
Spc: b244 spur building - rs-2404.01
Status: Open
May 26, 2026
Declared cost: $9,728
Mechanical Permit Alteration
Spc: b228-22 enhancements
Status: Open
May 26, 2026
Declared cost: $132,588
Building Permit New
Spc: project
Status: Open
May 18, 2026
Declared cost: $2,450,000
Electrical Repair
Spc b221 lighting rack upgrades
Status: Open
May 14, 2026
Declared cost: $5,340
Electrical Repair
Spc b227 lighting rack upgrades
Status: Open
May 14, 2026
Declared cost: $5,340
Electrical Repair
Spc b228 lighting rack upgrades
Status: Open
May 14, 2026
Declared cost: $5,340
Electrical Repair
Spc b285 lighting rack upgrades
Status: Open
May 14, 2026
Declared cost: $5,340
Electrical Repair
Spc b262 lighting rack upgrades
Status: Open
May 14, 2026
Declared cost: $5,340
Electrical Repair
Spc b255 lighting rack upgrades
Status: Open
May 14, 2026
Declared cost: $5,340
Electrical Alt
Spc: b228-22 enhancements
Status: Open
May 14, 2026
Declared cost: $253,400
Fire Permit FA
Spc: b228-22 enhancements
Status: Open
May 14, 2026
Declared cost: $37,100
Fire Permit FA
Spc: b254a facility upgrade - rs-2506
Status: Open
May 14, 2026
Declared cost: $218,500
Electrical LowVoltage
Spc: b254a facility upgrade - rs-2506
Status: Open
May 14, 2026
Declared cost: $218,500
Electrical LowVoltage
Spc: b228-22 enhancements
Status: Open
May 14, 2026
Declared cost: $37,100
Electrical Repair
Spc b286 lighting rack upgrades
Status: Open
May 14, 2026
Declared cost: $5,340
Electrical Repair
Spc b271 lighting rack upgrades
Status: Open
May 14, 2026
Declared cost: $5,340
Building Permit Alteration
Spc: b254b-rr renovation
Status: Open
May 12, 2026
Declared cost: $1,335,000
Building Permit Roof
Spc: b-253b renovation
Status: Open
May 12, 2026
Declared cost: $74,951
Building Permit Alteration
Spc: b254 facility upgrade
Status: Open
May 1, 2026
Declared cost: $200,000
Electrical Alt
Spc: special project p555
Status: Open
Apr 29, 2026
Declared cost: $7,500
Electrical Alt
Spc: special project p555
Status: Open
Apr 29, 2026
Declared cost: $2,500
Building Permit Repair
Spc: toon connex replacements
Status: Open
Apr 29, 2026
Declared cost: $11,686
Fire Permit FireSupp
Spc: b228-22 enhancements
Status: Open
Apr 28, 2026
Declared cost: $14,525
Building Permit Alteration
Spc: b261 interior enhancements
Status: Open
Apr 27, 2026
Declared cost: $6,000,000
Mechanical Permit Repair
Spc: b275 replace restroom as fan coil unit
Status: Open
Apr 22, 2026
Declared cost: $76,000
Fire Permit Undergrnd
Spc: project
Status: Open
Apr 20, 2026
Declared cost: $25,000
Electrical Alt
Spc: b-f53 kiosk sign lighting - pf-2503
Status: Open
Apr 9, 2026
Declared cost: $9,000
Electrical Alt
Spc: b-c-164 kiosk sign lighting
Status: Open
Apr 9, 2026
Declared cost: $8,500
Engineering SiteWO
Spc: project
Status: Open
Apr 2, 2026
Declared cost: $1,130,000
Mechanical Permit Alteration
Spc: b254a facility upgrade - rs-2506
Status: Open
Apr 1, 2026
Declared cost: $754,545
Building Permit Accessory
Spc: b228-22 enhancements
Status: Open
Mar 26, 2026
Declared cost: $1,000
Fire Permit FireSupp
Spc: b-253b renovation
Status: Open
Mar 23, 2026
Declared cost: $1,500
Plumbing Alteration
Spc: b254 facility upgrade - rs-2506
Status: Open
Mar 20, 2026
Declared cost: $28,516
Mechanical Permit Alteration
Spc: b244 spur building - rs-2404.01
Status: Open
Mar 19, 2026
Declared cost: $40,000
Fire Permit Undergrnd
Spc: b244 spur building - rs-2404.01
Status: Open
Mar 16, 2026
Declared cost: $17,500
Engineering Other
Spc: project
Status: Open
Mar 13, 2026
Declared cost: $200,000
Building Permit Alteration
Spc: b-227 equipment installation
Status: Open
Mar 12, 2026
Declared cost: $35,472
Fire Permit FireSupp
Spc: b254a facility upgrade - rs-2506
Status: Open
Mar 12, 2026
Declared cost: $302,000
Electrical Alt
Spc: b246d
Status: Open
Mar 9, 2026
Declared cost: $14,035
Plumbing Alteration
Spc: b-253b renovation
Status: Open
Feb 23, 2026
Declared cost: $65,000
Electrical New
Spc: b244 spur building - rs-2404.01
Status: Open
Feb 23, 2026
Declared cost: $67,300
Electrical LowVoltage
Spc: p185 low voltage upgrade
Status: Open
Feb 20, 2026
Declared cost: $400,000
Building Permit Fence
Spc: b228-22 enhancements
Status: Open
Feb 20, 2026
Declared cost: $1,000
Electrical LowVoltage
Spc: b208 interior enhancements
Status: Finaled
Feb 20, 2026
Declared cost: $36,684
Electrical Alt
Spc: b208 interior enhancements
Status: Finaled
Feb 18, 2026
Declared cost: $300,000
Plumbing Alteration
Spc: b208 interior enhancements
Status: Closed
Feb 18, 2026
Declared cost: $300,000
Plumbing Alteration
Spc: b208 interior enhancements
Status: Finaled
Feb 18, 2026
Declared cost: $300,000
Building Permit Roof
Spc: b254a facility upgrade - rs-2506
Status: Open
Feb 17, 2026
Declared cost: $959,000
Electrical LowVoltage
Spc: p185 low voltage
Status: Closed
Feb 17, 2026
Declared cost: $400,000
Engineering Other
Spc: baseline roadway modifications
Status: Open
Feb 6, 2026
Electrical Alt
Spc: b221 equipment installation
Status: Open
Jan 30, 2026
Declared cost: $31,147
Building Permit Alteration
Spc: b120a boh 3 pole addition 002
Status: Open
Jan 29, 2026
Declared cost: $50,000
Plumbing Alteration
Spc: ioa hippograff ts bldg
Status: Open
Jan 22, 2026
Declared cost: $62,000
Building Permit Sign
Spc: b-c164kiosk sign lighting - pf-2503
Status: Open
Jan 15, 2026
Declared cost: $12,000
Electrical Alt
Spc: b-f53 kiosk sign lighting - pf-2503
Status: Open
Jan 15, 2026
Declared cost: $12,000
Mechanical Permit Alteration
Spc: b-253b renovation
Status: Open
Jan 15, 2026
Declared cost: $300,000
Fire Permit FA
Spc: b221 mechanical improvements
Status: Open
Jan 14, 2026
Declared cost: $12,100
Electrical LowVoltage
Spc: b221 mechanical improvements
Status: Open
Jan 14, 2026
Declared cost: $12,100
Engineering Other
Spc: b254a facility upgrade - rs-2506
Status: Open
Jan 13, 2026
Building Permit Alteration
Spc: ioa b-289 controls and efu installation and
Status: Open
Jan 12, 2026
Declared cost: $279,875
Building Permit Alteration
Spc: ioa b-206 ev retractable charging stations
Status: Open
Jan 12, 2026
Declared cost: $80,000
Building Permit Fence
Spc: project
Status: Open
Jan 12, 2026
Declared cost: $100
Sewer Benefit Fees Comm
Spc: project
Status: Open
Jan 9, 2026
Building Permit Alteration
Spc: b228-22 enhancements
Status: Closed
Jan 6, 2026
Declared cost: $2,025,000
Engineering Other
Spc: b244 spur building - rs-2404.01
Status: Open
Dec 23, 2025
Building Permit Sign
Spc: b-f53 kiosk sign lighting - pf-2503
Status: Open
Dec 18, 2025
Declared cost: $12,000
Engineering Comm
Spc: b244 queue line retaining wall
Status: Open
Dec 15, 2025
Electrical Alt
Spc: b-253b renovation
Status: Open
Dec 15, 2025
Declared cost: $100,000
Building Permit Alteration
Spc: b228-22 enhancements
Status: Open
Dec 15, 2025
Declared cost: $2,025,000
Electrical Alt
Spc: b254a facility upgrade - rs-2506
Status: Open
Dec 15, 2025
Declared cost: $4,200,000
Electrical Repair
Spc: b254 equipment replacement
Status: Open
Dec 11, 2025
Declared cost: $55,000
Building Permit Alteration
Spc: pedestrian bridge #14 - gk-2503
Status: Open
Dec 11, 2025
Declared cost: $1,500,000
Engineering Other
Spc: b245 equipment install - rs-2404
Status: Finaled
Dec 11, 2025
Fire Permit FireSupp
Spc: b-253b renovation
Status: Open
Dec 10, 2025
Declared cost: $16,363
Fire Permit FA
Spc: b-253b renovation
Status: Open
Dec 8, 2025
Declared cost: $37,300
Electrical LowVoltage
Spc: b-253b renovation
Status: Open
Dec 8, 2025
Declared cost: $37,300
Fire Permit FireSupp
Spc: b244 spur building - rs-2404.01
Status: Open
Dec 8, 2025
Declared cost: $28,889
Building Permit Alteration
Spc: baseline roadway modifications
Status: Open
Dec 4, 2025
Declared cost: $250,000
Building Permit Alteration
Spc: b-204 exterior enhancements
Status: Open
Nov 25, 2025
Declared cost: $900,000
Building Permit Alteration
Spc: b-206 north exterior enhancements
Status: Open
Nov 25, 2025
Declared cost: $350,000
Building Permit Alteration
Spc: b-203 exterior enhancements
Status: Open
Nov 25, 2025
Declared cost: $250,000
Building Permit Alteration
Spc: b-206 north east exterior enhancements
Status: Open
Nov 25, 2025
Declared cost: $350,000
Mechanical Permit Alteration
Spc b221 mechanical improvements cith
Status: Open
Nov 24, 2025
Declared cost: $209,010
Building Permit Alteration
Spc b221 mechanical improvements cith
Status: Open
Nov 18, 2025
Declared cost: $1,000
Building Permit Alteration
Spc: b254c renovations
Status: Open
Nov 11, 2025
Declared cost: $1,000
Building Permit Alteration
Spc: b254c facility upgrade - rs-2506
Status: Open
Nov 11, 2025
Declared cost: $1,000
Building Permit Roof
Bld 254b roof
Status: Open
Nov 11, 2025
Declared cost: $1,000
Building Permit Alteration
Spc: b254 stucco repairs
Status: Open
Nov 11, 2025
Declared cost: $1,000
Electrical Alt
Spc: universal kings row water treatment
Status: Open
Nov 5, 2025
Declared cost: $15,324
Building Permit Alteration
Spc: b208 interior enhancements
Status: Finaled
Oct 28, 2025
Declared cost: $300,000
Building Permit Repair
Spc: b274 service windows replacement
Status: Open
Oct 23, 2025
Declared cost: $20,500
Engineering MassG
Spc: project
Status: Open
Oct 17, 2025
Declared cost: $10,000,000
Mechanical Permit Repair
Spc: kw-2509
Status: Finaled
Oct 8, 2025
Declared cost: $24,902
Sewer Benefit Fees Comm
Spc: b254 facility upgrade - rs-2506
Status: Open
Oct 7, 2025
Sewer Benefit Fees Comm
Spc: b244 spur building - rs-2404.01
Status: Open
Sep 30, 2025
Engineering Other
Spc: b-253b renovation
Status: Open
Sep 26, 2025
Plumbing Alteration
Spc: b278 equipment install
Status: Open
Sep 25, 2025
Declared cost: $249,454
Electrical LowVoltage
Spc: b245 equipment install - rs-2404
Status: Finaled
Sep 22, 2025
Declared cost: $6,750
Engineering SiteWO
Spc: project
Status: Open
Sep 22, 2025
Fire Permit FA
Spc: b245 equipment install - rs-2404
Status: Finaled
Sep 22, 2025
Declared cost: $6,750
Electrical Alt
Spc: b245 equipment install - rs-2404
Status: Finaled
Sep 18, 2025
Declared cost: $272,140
Building Permit Alteration
Spc: b278 equipment install
Status: Open
Sep 18, 2025
Declared cost: $10,000
Demolition Permit
Spc: project
Status: Open
Sep 16, 2025
Plumbing Alteration
Spc: kw-2425
Status: Finaled
Sep 12, 2025
Declared cost: $51,741
Demolition Permit
Spc: universal project 555
Status: Closed
Sep 10, 2025
Building Permit Fence
Spc: b244 queue line retaining wall
Status: Open
Sep 8, 2025
Declared cost: $463,800
Building Permit Fence
Spc: ioa perimeter fencing
Status: Finaled
Sep 8, 2025
Declared cost: $109,940
Building Permit Alteration
Spc: b254a facility upgrade - rs-2506
Status: Open
Sep 2, 2025
Declared cost: $15,000,000
Electrical LowVoltage
Spc: b289 ioa buttress building remediation
Status: Finaled
Sep 2, 2025
Declared cost: $5,239
Building Permit New
Spc: b244 spur building - rs-2404.01
Status: Open
Aug 26, 2025
Declared cost: $1,200,000
Electrical Alt
Spc: fear - 8'x8' temp fb structure
Status: Open
Aug 7, 2025
Declared cost: $16,439
Electrical Alt
Spc: b229 interior renovation
Status: Finaled
Jul 30, 2025
Declared cost: $20,837
Building Permit Alteration
Spc: b-245 interior improvements
Status: Finaled
Jul 28, 2025
Declared cost: $51,700
Mechanical Permit Alteration
Spc: b289 ioa buttress building remediation
Status: Finaled
Jul 17, 2025
Declared cost: $23,544
Building Permit Alteration
Spc: pedestrain bridge #10
Status: Open
Jul 16, 2025
Declared cost: $700,000
Mechanical Permit Alteration
Spc: usf b229 hpwh inst
Status: Finaled
Jul 16, 2025
Declared cost: $86,000
Plumbing Alteration
Spc: usf b229 hpwh inst
Status: Finaled
Jul 16, 2025
Declared cost: $79,000
Building Permit Alteration
Spc: b245 equipment install - rs-2404
Status: Finaled
Jul 15, 2025
Declared cost: $1,400,000
Building Permit Alteration
Spc: kw-2509
Status: Finaled
Jul 15, 2025
Declared cost: $133,266
Sewer Benefit Fees Comm
Spc: b-253b renovation
Status: Open
Jul 3, 2025
Engineering Other
Spc- p830 site trailer
Status: Open
Jun 12, 2025
Electrical New
Spc: p830 site trailer
Status: Open
Jun 12, 2025
Declared cost: $36,000
Plumbing New
Spc: universal 5 plex
Status: Finaled
Jun 9, 2025
Declared cost: $3,600
Building Permit Addition
Spc: b289 ioa buttress building remediation
Status: Finaled
Jun 5, 2025
Declared cost: $456,213
Building Permit Alteration
Spc: b-253b renovation
Status: Open
Jun 4, 2025
Declared cost: $3,000,000
Electrical Alt
Spc: b256 electrical addition
Status: Open
May 28, 2025
Declared cost: $4,000
Mechanical Permit Repair
Spc-b279 fan coil replacement
Status: Finaled
May 21, 2025
Declared cost: $18,360
Mechanical Permit Alteration
Spc: b205 restroom renovation
Status: Finaled
May 16, 2025
Declared cost: $8,296
Fire Permit FireSupp
Spc: universal ioa restroom reno
Status: Finaled
May 8, 2025
Declared cost: $10,360
Building Permit New
Spc: b252 electrical addition - uso north campus
Status: Open
May 8, 2025
Declared cost: $12,632
Building Permit Construct
Spc- p830 site trailer
Status: Open
May 7, 2025
Declared cost: $88,430
Building Permit Alteration
Spc: b206b strollers rental facade
Status: Finaled
Apr 28, 2025
Declared cost: $369,619
Electrical Alt
Spc: b-245 boiler kw-2425
Status: Finaled
Apr 24, 2025
Declared cost: $13,380
Fire Permit FA
Spc: b205 renovation
Status: Finaled
Apr 22, 2025
Declared cost: $17,190
Electrical LowVoltage
Spc: b205 renovation
Status: Finaled
Apr 22, 2025
Declared cost: $17,190
Plumbing Alteration
Spc: universal ioa restroom reno
Status: Finaled
Apr 20, 2025
Declared cost: $129,000
Fire Permit FA
Spc: b245 replace
Status: Finaled
Apr 19, 2025
Declared cost: $88,200
Mechanical Permit Alteration
Spc: b245
Status: Closed
Apr 19, 2025
Electrical LowVoltage
Spc: b245 replace
Status: Finaled
Apr 19, 2025
Declared cost: $88,200
Electrical Alt
Spc: b245
Status: Open
Apr 19, 2025
Declared cost: $40,000
Building Permit Alteration
Spc: b202 facade
Status: Finaled
Apr 17, 2025
Declared cost: $369,619
Electrical Alt
Spc: b205 restroom renovation
Status: Finaled
Apr 14, 2025
Declared cost: $59,270
Building Permit Alteration
Spc: b205 renovation
Status: Closed
Apr 3, 2025
Declared cost: $600,000
Building Permit Alteration
Spc: b258 shade structure
Status: Finaled
Mar 31, 2025
Declared cost: $113,474
Fire Permit FireSupp
Spc: b745b project 254
Status: Closed
Mar 25, 2025
Declared cost: $5,350
Mechanical Permit Repair
Spc: b287 replace refrigeration equipment
Status: Finaled
Mar 19, 2025
Declared cost: $49,725
Mechanical Permit Repair
Spc: b245 replace
Status: Open
Mar 11, 2025
Declared cost: $673,942
GAS Natural
Spc: b-245 boiler kw-2425
Status: Finaled
Feb 21, 2025
Declared cost: $164,375
Building Permit Tent
Spc: americheer 2025
Status: Finaled
Feb 21, 2025
Declared cost: $3,921
Building Permit Alteration
Spc: b241a
Status: Open
Feb 13, 2025
Declared cost: $8,491
Sewer Benefit Fees Comm
Spc: b205 renovation
Status: Open
Feb 12, 2025
Electrical Repair
Spc: b271 electrical upgrades
Status: Finaled
Jan 28, 2025
Declared cost: $344,100
Building Permit Alteration
Spc: 282 improvements
Status: Finaled
Jan 16, 2025
Declared cost: $35,160
Building Permit Alteration
Spc: b205 renovation
Status: Finaled
Jan 14, 2025
Declared cost: $600,000
Plumbing Alteration
Spc: ioa f&b kiosk
Status: Finaled
Jan 10, 2025
Declared cost: $2,300
Electrical LowVoltage
Spc: jp popcorn ioa kiosk
Status: Finaled
Jan 9, 2025
Declared cost: $10,000
Building Permit Alteration
Spc: ioa exterior installation second phase
Status: Finaled
Dec 12, 2024
Declared cost: $100
Electrical Alt
Spc: b241a
Status: Closed
Dec 11, 2024
Declared cost: $8,491
Mechanical Permit Repair
Spc: b254a ac replacement
Status: Open
Dec 9, 2024
Declared cost: $22,130
Plumbing Alteration
Spc: b245 waste disposal sink
Status: Finaled
Dec 9, 2024
Declared cost: $42,000
Electrical Alt
Spc: road monument replacement g102c
Status: Finaled
Dec 4, 2024
Declared cost: $18,000
Building Permit Repair
Spc: b-245 boiler kw-2425
Status: Finaled
Dec 3, 2024
Declared cost: $164,375
Building Permit Sign
Spc: road monument replacement g102c
Status: Finaled
Dec 3, 2024
Declared cost: $332,390
Building Permit Alteration
Spc: b229 heat pump installation
Status: Finaled
Nov 26, 2024
Declared cost: $4,996
Engineering Other
Spc: ioa exterior installation second phase
Status: Finaled
Nov 26, 2024
Engineering Other
Spc: ioa f&b kiosk
Status: Finaled
Nov 20, 2024
Building Permit Sign
Spc: b221 wait time board
Status: Finaled
Nov 6, 2024
Declared cost: $31,700
Mechanical Permit Repair
Spc: b-245 boiler kw-2425
Status: Finaled
Oct 22, 2024
Declared cost: $164,375
Building Permit Repair
Spc: b279 awning replacements
Status: Finaled
Oct 22, 2024
Declared cost: $59,387
Building Permit Alteration
Spc: b278 interior repairs
Status: Finaled
Oct 17, 2024
Declared cost: $30,000
Building Permit New
Spc: sculpture replacement
Status: Open
Oct 14, 2024
Declared cost: $375,000
Building Permit New
Spc: ioa exterior installation second phase
Status: Finaled
Oct 11, 2024
Declared cost: $58,320
Electrical Alt
Spc: b245 electrical addition
Status: Open
Oct 4, 2024
Declared cost: $7,500
Electrical Alt
Spc: 6100 universal blvd
Status: Finaled
Oct 3, 2024
Declared cost: $2,350
Building Permit Roof
Spc: univer4sal studios cathy's ice cream
Status: Finaled
Oct 3, 2024
Declared cost: $4,937
Plumbing Repair
Spc: b254d irrigation valve replacement
Status: Open
Oct 2, 2024
Declared cost: $34,926
Fire Permit FA
Spc: b242
Status: Finaled
Oct 1, 2024
Declared cost: $59,793
Mechanical Permit Repair
Spc: b271 ground water station
Status: Finaled
Oct 1, 2024
Declared cost: $125,223
Electrical LowVoltage
Spc: b242
Status: Finaled
Oct 1, 2024
Declared cost: $67,426
Electrical LowVoltage
Spc: b234f
Status: Finaled
Oct 1, 2024
Declared cost: $74,124
Fire Permit FA
Spc: b234f
Status: Finaled
Oct 1, 2024
Declared cost: $55,198
Fire Permit FA
Spc: b233
Status: Finaled
Sep 30, 2024
Declared cost: $45,227
Fire Permit FA
Spc: b232
Status: Finaled
Sep 30, 2024
Declared cost: $27,978
Electrical LowVoltage
Spc: b234b
Status: Finaled
Sep 30, 2024
Declared cost: $39,207
Fire Permit FA
Spc: b234b
Status: Finaled
Sep 30, 2024
Declared cost: $28,391
Electrical LowVoltage
Spc: b232
Status: Finaled
Sep 30, 2024
Declared cost: $24,811
Electrical LowVoltage
Spc: b233
Status: Finaled
Sep 30, 2024
Declared cost: $47,073
Electrical LowVoltage
Spc: b202 door holder
Status: Finaled
Sep 27, 2024
Declared cost: $4,953
Electrical Repair
Spc: b271 repair/replace
Status: Finaled
Sep 27, 2024
Declared cost: $6,300
Fire Permit FA
Spc: b202 fire alarm
Status: Finaled
Sep 27, 2024
Declared cost: $2,667
Building Permit Alteration
Spc: b279 awning replacements
Status: Finaled
Sep 23, 2024
Declared cost: $175,000
Building Permit Alteration
Spc: b286 concrete work
Status: Finaled
Sep 19, 2024
Declared cost: $55,269
Electrical LowVoltage
Spc: b272 elevator compliance improvements
Status: Finaled
Sep 16, 2024
Declared cost: $10,200
Fire Permit FA
Spc: b272 elevator compliance improvements
Status: Finaled
Sep 16, 2024
Declared cost: $10,200
Building Permit Sign
Spc: b203 canopy marquee
Status: Finaled
Sep 13, 2024
Declared cost: $26,125
Electrical Repair
Spc: b272 elevator compliance improvements
Status: Finaled
Sep 4, 2024
Declared cost: $19,250
Mechanical Permit Alteration
Spc: b272 elevator compliance improvements
Status: Finaled
Sep 4, 2024
Declared cost: $3,600
Building Permit Repair
Spc: b272 elevator compliance improvements
Status: Finaled
Sep 4, 2024
Declared cost: $105,167
Plumbing Alteration
Spc: b272 elevator compliance improvements
Status: Finaled
Sep 4, 2024
Declared cost: $6,610
Engineering Other
Spc: ioa hardscape replacement
Status: Finaled
Aug 7, 2024
Electrical Alt
Spc: b221 cat and hat
Status: Finaled
Aug 6, 2024
Declared cost: $2,340
Electrical LowVoltage
Spc: b271 electrical installation
Status: Open
Jul 31, 2024
Declared cost: $100,000
Building Permit Alteration
Spc: b271 electrical installation
Status: Open
Jul 31, 2024
Declared cost: $100,000
Electrical Repair
6100 universal blvd - b225
Status: Open
Jul 29, 2024
Declared cost: $1,493
Electrical LowVoltage
Spc: uso b286 124-042 dr doom acs
Status: Finaled
Jul 26, 2024
Declared cost: $13,916
Plumbing Alteration
Spc: b221 building enhancements
Status: Finaled
Jul 26, 2024
Declared cost: $5,000
Building Permit Alteration
Spc: ioa 277a sign repairs
Status: Finaled
Jul 23, 2024
Declared cost: $58,000
Engineering Other
Spc: b289 concrete installation
Status: Finaled
Jul 23, 2024
Building Permit Repair
Spc: stage deck replacement
Status: Finaled
Jul 22, 2024
Declared cost: $127,493
Electrical Alt
Spc: hw heater
Status: Finaled
Jul 12, 2024
Declared cost: $5,800
Electrical LowVoltage
Spc: b221 building enhancements
Status: Finaled
Jul 10, 2024
Declared cost: $3,200
Fire Permit FA
Spc: b221 building enhancements
Status: Finaled
Jul 10, 2024
Declared cost: $3,200
Sewer Benefit Fees Comm
Spc: ioa f&b kiosk
Status: Open
Jun 24, 2024
Building Permit Alteration
Spc: b289 concrete installation
Status: Finaled
Jun 21, 2024
Declared cost: $93,709
Building Permit Alteration
Spc: ioa hardscape replacement
Status: Finaled
Jun 18, 2024
Declared cost: $244,000
Building Permit Alteration
Spc: b271 electrical installation
Status: Open
Jun 14, 2024
Declared cost: $13,630
Plumbing Alteration
Spc: ioa hulk dump sink
Status: Finaled
Jun 11, 2024
Declared cost: $15,000
Electrical Addition
Spc- b245 electrical addition
Status: Open
Jun 10, 2024
Declared cost: $31,788
Building Permit Alteration
Spc: b229 mechanical alteration (hood controls)
Status: Open
Jun 10, 2024
Declared cost: $50,000
Electrical Repair
Spc-b261 mechanical replacement
Status: Finaled
May 30, 2024
Declared cost: $6,240
Fire Permit FA
Spc: b21 replacement
Status: Finaled
May 30, 2024
Declared cost: $2,300
Fire Permit FireSupp
Spc: thunder falls
Status: Finaled
May 30, 2024
Declared cost: $6,991
Electrical LowVoltage
Spc: b21 replacement
Status: Finaled
May 30, 2024
Declared cost: $2,300
Building Permit New
Spc: ioa f&b kiosk
Status: Finaled
May 29, 2024
Declared cost: $700,000
Building Permit Alteration
Spc: b258 exterior installation
Status: Finaled
May 22, 2024
Declared cost: $110,000
Sewer Benefit Fees Comm
Spc - ioa exterior installation
Status: Open
May 22, 2024
Mechanical Permit Repair
Spc:
Status: Finaled
May 21, 2024
Declared cost: $1,000
Building Permit Alteration
Spc: b286 electrical installation
Status: Finaled
May 20, 2024
Declared cost: $13,916
Electrical LowVoltage
B241 building addition
Status: Finaled
May 20, 2024
Declared cost: $7,000
Electrical LowVoltage
B241
Status: Finaled
May 17, 2024
Declared cost: $51,000
Fire Permit FA
Spc: b241 building addition
Status: Finaled
May 16, 2024
Declared cost: $51,000
Electrical LowVoltage
Spc: p576-p3 enhancements
Status: Finaled
May 8, 2024
Declared cost: $1,300
Fire Permit FA
Spc: p576-p3 enhancements
Status: Finaled
May 8, 2024
Declared cost: $1,300
Fire Permit FireSupp
Spc: b261 mechanical replacement
Status: Closed
May 6, 2024
Declared cost: $6,500
Plumbing Alteration
Spc: c199 - renovations
Status: Finaled
May 6, 2024
Declared cost: $3,200
Fire Permit FireSupp
Spc: b261 mechanical replacement
Status: Finaled
May 2, 2024
Declared cost: $12,000
Engineering Other
Ioa exterior installation
Status: Finaled
Apr 4, 2024
Engineering Other
B241 building addition
Status: Open
Mar 26, 2024
Declared cost: $57,506
Mechanical Permit Alteration
B241 usf p942rc
Status: Finaled
Mar 25, 2024
Declared cost: $130,000
Building Permit Alteration
Spc-b261 mechanical replacement
Status: Finaled
Mar 22, 2024
Declared cost: $437,841
Mechanical Permit Repair
B261 mechanical replacement
Status: Closed
Mar 22, 2024
Declared cost: $437,841
Electrical Alt
C199 - renovations
Status: Finaled
Mar 19, 2024
Declared cost: $21,000
Building Permit Alteration
Spc - b221 building enhancements
Status: Finaled
Mar 13, 2024
Declared cost: $54,592
Fire Permit FireSupp
B241 building addition
Status: Finaled
Mar 12, 2024
Declared cost: $72,000
Plumbing Alteration
B-241 interior alteration
Status: Finaled
Mar 8, 2024
Declared cost: $28,501
Plumbing Alteration
B-241 interior alteration
Status: Open
Mar 8, 2024
Declared cost: $28,501
Fire Permit FireSupp
B241 building addition
Status: Finaled
Mar 7, 2024
Declared cost: $7,230
Electrical LowVoltage
B241 building addition
Status: Finaled
Mar 5, 2024
Declared cost: $205,762
Engineering Other
B241 building addition
Status: Finaled
Feb 27, 2024
Mechanical Permit Repair
B254g ahu install and removal
Status: Closed
Feb 16, 2024
Declared cost: $26,000
Electrical LowVoltage
P-576-p3 enhancements
Status: Finaled
Feb 14, 2024
Declared cost: $6,248
Electrical LowVoltage
P540 enhancements b75b
Status: Finaled
Feb 14, 2024
Declared cost: $12,857
Mechanical Permit Repair
B254g ahu install and removal
Status: Finaled
Feb 13, 2024
Declared cost: $26,000
Electrical Alt
B255 exterior install and removal
Status: Open
Feb 2, 2024
Declared cost: $5,385
Electrical Repair
Kiosk power ioa
Status: Finaled
Jan 16, 2024
Declared cost: $2,400
Electrical LowVoltage
B-229 refresh
Status: Finaled
Jan 11, 2024
Declared cost: $10,000
Electrical Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Jan 8, 2024
Declared cost: $4,435
Mechanical Permit Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Jan 8, 2024
Declared cost: $4,650
Plumbing Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Jan 8, 2024
Declared cost: $2,625
Building Permit New
Spc - ioa exterior installation
Status: Finaled
Jan 4, 2024
Declared cost: $65,000
Building Permit Alteration
Spc- c199 - renovations
Status: Finaled
Dec 19, 2023
Declared cost: $825,000
Building Permit Repair
B271 building install and removal
Status: Finaled
Dec 18, 2023
Declared cost: $642,743
Electrical LowVoltage
B-229 refresh
Status: Finaled
Dec 18, 2023
Declared cost: $45,195
Electrical LowVoltage
B-229 refresh
Status: Finaled
Dec 14, 2023
Declared cost: $97,947
Electrical Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Dec 12, 2023
Declared cost: $4,435
Mechanical Permit Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Dec 12, 2023
Declared cost: $4,650
Building Permit Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Dec 12, 2023
Declared cost: $210
Plumbing Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Dec 12, 2023
Declared cost: $5,625
Electrical New
B229 exterior enhancements
Status: Finaled
Dec 11, 2023
Declared cost: $3,860
Electrical New
B283 exterior enhancements
Status: Finaled
Dec 11, 2023
Declared cost: $3,860
Electrical New
B204 exterior enhancements
Status: Finaled
Dec 11, 2023
Declared cost: $3,860
Electrical LowVoltage
B-229 refresh
Status: Open
Dec 8, 2023
Declared cost: $45,195
Electrical LowVoltage
B-229 refresh
Status: Closed
Dec 6, 2023
Declared cost: $45,195
Building Permit Sign
C561 - graphic install
Status: Finaled
Dec 5, 2023
Declared cost: $43,000
Electrical Alt
C561 - graphic install
Status: Finaled
Dec 5, 2023
Declared cost: $100
Plumbing Alteration
Usf p576 harry potter windows
Status: Finaled
Nov 22, 2023
Declared cost: $53,000
Electrical LowVoltage
B-229 refresh
Status: Finaled
Nov 20, 2023
Declared cost: $11,000
Mechanical Permit Repair
B-208a ahu-1 replacement
Status: Finaled
Nov 17, 2023
Declared cost: $68,711
Mechanical Permit Repair
B-282 ahu-1 replacement
Status: Finaled
Nov 17, 2023
Declared cost: $84,903
Mechanical Permit Repair
B-254b ahu-2 replacement
Status: Finaled
Nov 17, 2023
Declared cost: $70,702
Mechanical Permit Repair
B-54a ahu-1 replacement
Status: Open
Nov 17, 2023
Declared cost: $81,495
Fire Permit BDADAS
B-229 refresh
Status: Finaled
Nov 16, 2023
Declared cost: $27,700
Electrical Repair
B255 ioa
Status: Finaled
Nov 13, 2023
Declared cost: $1,000
Electrical Repair
B287 ioa
Status: Finaled
Nov 13, 2023
Declared cost: $1,000
Electrical Repair
B221 ioa
Status: Finaled
Nov 13, 2023
Declared cost: $1,000
Electrical Repair
B276 ioa
Status: Finaled
Nov 13, 2023
Declared cost: $1,000
Electrical Repair
B246 ioa
Status: Finaled
Nov 13, 2023
Declared cost: $1,000
Electrical LowVoltage
B282 ahu 1 install and removal
Status: Finaled
Nov 10, 2023
Declared cost: $7,643
Fire Permit FA
B282 ahu 1 install and removal
Status: Finaled
Nov 10, 2023
Declared cost: $7,643
Fire Permit FA
B254b ahu 2
Status: Finaled
Nov 9, 2023
Declared cost: $7,566
Electrical LowVoltage
B208 ahu 1
Status: Finaled
Nov 9, 2023
Declared cost: $7,307
Electrical LowVoltage
B254b ahu 2
Status: Finaled
Nov 9, 2023
Declared cost: $7,566
Electrical LowVoltage
B203 ahu 2
Status: Finaled
Nov 9, 2023
Declared cost: $7,915
Fire Permit FA
B208 ahu 1
Status: Finaled
Nov 9, 2023
Declared cost: $7,307
Fire Permit FA
B277 ahu 2
Status: Finaled
Nov 9, 2023
Declared cost: $7,809
Fire Permit FA
B236 ahu 5
Status: Finaled
Nov 9, 2023
Declared cost: $7,420
Fire Permit FA
B203 ahu 2
Status: Finaled
Nov 9, 2023
Declared cost: $7,915
Electrical LowVoltage
B277 ahu 1
Status: Finaled
Nov 9, 2023
Declared cost: $7,753
Electrical LowVoltage
B277 ahu 2
Status: Finaled
Nov 9, 2023
Declared cost: $7,809
Electrical LowVoltage
B277 ahu 3
Status: Finaled
Nov 9, 2023
Declared cost: $7,493
Electrical LowVoltage
B277 ahu 4
Status: Finaled
Nov 9, 2023
Declared cost: $7,299
Electrical LowVoltage
B236 ahu 5
Status: Finaled
Nov 9, 2023
Declared cost: $7,420
Electrical LowVoltage
B255 ahu 6
Status: Finaled
Nov 9, 2023
Declared cost: $7,550
Fire Permit FA
B255 ahu 6
Status: Finaled
Nov 9, 2023
Declared cost: $7,550
Fire Permit FA
B277 ahu 3
Status: Finaled
Nov 9, 2023
Declared cost: $7,493
Fire Permit FA
B277 ahu 4
Status: Finaled
Nov 9, 2023
Declared cost: $7,299
Fire Permit FA
B277 ahu 1
Status: Finaled
Nov 9, 2023
Declared cost: $7,753
Mechanical Permit Repair
B278 mechanical install and removal
Status: Finaled
Nov 7, 2023
Declared cost: $36,215
Engineering Other
B279 concrete replacement
Status: Finaled
Nov 7, 2023
Mechanical Permit Alteration
B-229 refresh
Status: Finaled
Nov 7, 2023
Declared cost: $7,650
Building Permit Alteration
B120 extrior alteration
Status: Finaled
Nov 6, 2023
Declared cost: $15,769
Building Permit New
P942q
Status: Open
Nov 3, 2023
Declared cost: $850,000
Electrical New
P942q
Status: Finaled
Nov 2, 2023
Declared cost: $58,325
Engineering Other
B287 exterior enhancements
Status: Finaled
Nov 2, 2023
Engineering Other
B204 exterior enhancements
Status: Finaled
Nov 2, 2023
Engineering Other
B261 exterior enhancements
Status: Finaled
Nov 2, 2023
Engineering Other
B229 exterior enhancements
Status: Finaled
Nov 2, 2023
Mechanical Permit Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Nov 2, 2023
Declared cost: $2,170
Plumbing Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Nov 2, 2023
Declared cost: $5,625
Electrical Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Nov 2, 2023
Declared cost: $9,435
Building Permit Alteration
B228 electrical installation
Status: Finaled
Nov 1, 2023
Declared cost: $7,685
Fire Permit FA
B-229 refresh universal studios
Status: Finaled
Oct 31, 2023
Declared cost: $97,947
Building Permit Alteration
B204 exterior installation
Status: Open
Oct 31, 2023
Declared cost: $32,974
Building Permit Addition
Spc-b241 building addition
Status: Finaled
Oct 27, 2023
Declared cost: $6,500,000
Electrical Alt
Delicious kebab
Status: Finaled
Oct 27, 2023
Declared cost: $800
Plumbing Alteration
P576 universal phase 2
Status: Finaled
Oct 24, 2023
Declared cost: $64,311
Electrical LowVoltage
B231 ahu 1 fad install and removal
Status: Finaled
Oct 23, 2023
Declared cost: $7,339
Fire Permit FA
B231 ahu 1 fad install and removal
Status: Finaled
Oct 23, 2023
Declared cost: $7,339
Fire Permit FA
B229.9 fad install and removal
Status: Finaled
Oct 23, 2023
Declared cost: $6,778
Fire Permit FA
B229.6 fad install and removal
Status: Finaled
Oct 23, 2023
Declared cost: $6,778
Fire Permit FA
B229.7 fad install and removal
Status: Finaled
Oct 23, 2023
Declared cost: $6,778
Electrical LowVoltage
B229.7 fad install and removal
Status: Finaled
Oct 23, 2023
Declared cost: $6,778
Fire Permit FA
B206.2 fad install and removal
Status: Finaled
Oct 23, 2023
Declared cost: $7,450
Electrical LowVoltage
B229.9 fad install and removal
Status: Finaled
Oct 23, 2023
Declared cost: $6,778
Electrical LowVoltage
B206.2 fad install and removal
Status: Finaled
Oct 23, 2023
Declared cost: $7,450
Electrical LowVoltage
B229.6 fad install and removal
Status: Finaled
Oct 23, 2023
Declared cost: $6,778
Fire Permit FA
B276 ahu 1 fad install and removal
Status: Finaled
Oct 19, 2023
Declared cost: $7,108
Electrical LowVoltage
B271.1 fad install and removal
Status: Finaled
Oct 19, 2023
Declared cost: $5,193
Fire Permit FA
B271 fad installation ahu-2
Status: Finaled
Oct 19, 2023
Declared cost: $5,192
Electrical LowVoltage
B271 fad installation ahu-2
Status: Finaled
Oct 19, 2023
Declared cost: $5,192
Electrical LowVoltage
B276 ahu 1 fad install and removal
Status: Finaled
Oct 19, 2023
Declared cost: $7,108
Fire Permit FA
B271.1 fad install and removal
Status: Finaled
Oct 19, 2023
Declared cost: $5,193
Fire Permit FA
B242 ahu-1 fad fad install and removal
Status: Finaled
Oct 19, 2023
Declared cost: $7,521
Electrical LowVoltage
B242 ahu-1 fad fad install and removal
Status: Finaled
Oct 19, 2023
Declared cost: $7,521
Electrical LowVoltage
B261.4 fad install and removal
Status: Finaled
Oct 19, 2023
Declared cost: $5,948
Fire Permit FA
B261.4 fad install and removal
Status: Finaled
Oct 19, 2023
Declared cost: $5,948
Mechanical Permit Repair
B255 ahu 6 replacement
Status: Finaled
Oct 18, 2023
Declared cost: $75,975
Mechanical Permit Repair
B236 ahu 5 replacement
Status: Finaled
Oct 18, 2023
Declared cost: $73,605
Mechanical Permit Repair
B727 ahu-2 replacement
Status: Finaled
Oct 18, 2023
Declared cost: $76,855
Mechanical Permit Repair
B277 ahu replacement (1-4)
Status: Finaled
Oct 18, 2023
Declared cost: $320,640
Mechanical Permit Repair
B203a ahu-2 replacement
Status: Finaled
Oct 18, 2023
Declared cost: $99,070
Electrical Alt
B252b electrical enhancements
Status: Finaled
Oct 16, 2023
Declared cost: $2,380
Electrical New
B254 oil separator
Status: Finaled
Oct 16, 2023
Declared cost: $3,425
Building Permit Alteration
B279 concrete replacement
Status: Finaled
Oct 16, 2023
Declared cost: $103,612
Electrical Repair
B30 - main site exterior repair
Status: Finaled
Oct 13, 2023
Declared cost: $182,000
Building Permit Roof
B286 building installation
Status: Finaled
Oct 13, 2023
Declared cost: $8,963
Plumbing Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Oct 12, 2023
Declared cost: $2,625
Mechanical Permit Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Oct 12, 2023
Declared cost: $2,170
Electrical Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Oct 12, 2023
Declared cost: $1,000
Building Permit Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Oct 12, 2023
Declared cost: $210
Plumbing Alteration
B234e building addition
Status: Finaled
Oct 9, 2023
Declared cost: $2,200
Electrical LowVoltage
B202 interior alteration
Status: Finaled
Oct 4, 2023
Declared cost: $2,950
Fire Permit FA
B202 interior alteration
Status: Finaled
Oct 4, 2023
Declared cost: $2,950
Electrical New
Ioa entry sign enhancements
Status: Finaled
Oct 2, 2023
Declared cost: $1,000
Electrical Alt
B279 electrical install and removal
Status: Finaled
Oct 2, 2023
Declared cost: $1,356
Building Permit Sign
Ioa entry sign enhancements
Status: Finaled
Oct 2, 2023
Declared cost: $198,500
Building Permit Dumpster
B204 exterior enhancements
Status: Finaled
Sep 28, 2023
Declared cost: $29,981
Building Permit Dumpster
B287 exterior enhancements
Status: Finaled
Sep 28, 2023
Declared cost: $29,981
Building Permit Dumpster
B229 exterior enhancements
Status: Finaled
Sep 28, 2023
Declared cost: $29,981
Building Permit Dumpster
B261 exterior enhancements
Status: Finaled
Sep 28, 2023
Declared cost: $29,981
Building Permit Dumpster
B287 exterior enhancements
Status: Open
Sep 28, 2023
Declared cost: $29,981
Mechanical Permit Alteration
B253c mechanical addition
Status: Finaled
Sep 26, 2023
Declared cost: $38,053
GAS Natural
B-229 refresh
Status: Finaled
Sep 26, 2023
Declared cost: $5,058
Electrical Repair
B279 electrical repair
Status: Finaled
Sep 26, 2023
Declared cost: $5,275
Electrical LowVoltage
B-54a refresh
Status: Finaled
Sep 25, 2023
Declared cost: $25,353
Building Permit Roof
B279 exterior install and removal
Status: Finaled
Sep 25, 2023
Declared cost: $142,584
Plumbing Alteration
Usf ioa marvel kiosk
Status: Finaled
Sep 22, 2023
Declared cost: $36,680
Building Permit New
B120 exterior enhancements
Status: Closed
Sep 21, 2023
Declared cost: $52,206
Electrical Alt
T220 electrical enhancements
Status: Open
Sep 21, 2023
Declared cost: $6,000
Electrical Alt
T250 electrical alteration
Status: Open
Sep 20, 2023
Declared cost: $4,000
Electrical Alt
T281 electrical alteration
Status: Open
Sep 20, 2023
Declared cost: $4,000
Building Permit Sign
B225 exterior install and removal
Status: Open
Sep 19, 2023
Declared cost: $250,000
Fire Permit FireSupp
B-229 refresh
Status: Finaled
Sep 14, 2023
Declared cost: $2,000
Electrical Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Sep 7, 2023
Declared cost: $1,435
Mechanical Permit Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Sep 7, 2023
Declared cost: $2,170
Plumbing Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Sep 7, 2023
Declared cost: $5,625
Electrical Alt
B202 interior alteration
Status: Finaled
Sep 7, 2023
Declared cost: $38,670
Electrical LowVoltage
B271 fad enhancements lv electrical
Status: Finaled
Sep 6, 2023
Declared cost: $97,825
Building Permit Roof
B206 exterior install and removal
Status: Open
Sep 6, 2023
Declared cost: $459,000
Fire Permit FireSupp
B-229 refresh
Status: Finaled
Aug 31, 2023
Declared cost: $80,004
Plumbing Alteration
B284 plumbing installation
Status: Finaled
Aug 31, 2023
Declared cost: $22,465
Plumbing Alteration
B227 plumbing installation
Status: Open
Aug 31, 2023
Declared cost: $16,185
Fire Permit FA
B205.1 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $6,896
Fire Permit FA
B261.3 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $5,948
Fire Permit FA
B261.5 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $5,948
Fire Permit FA
B284.1 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $6,983
Fire Permit FA
B261.1 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $5,948
Fire Permit FA
B284 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $6,983
Fire Permit FA
B204 ahu-2 fad
Status: Finaled
Aug 29, 2023
Declared cost: $7,283
Electrical LowVoltage
B205.1 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $6,896
Electrical LowVoltage
B284 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $6,983
Fire Permit FA
B227.2 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $7,749
Electrical LowVoltage
B204 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $7,283
Electrical LowVoltage
B284.1 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $6,983
Electrical LowVoltage
B227.2 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $7,749
Electrical LowVoltage
B261.1 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $5,948
Electrical LowVoltage
B261.5 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $5,948
Electrical LowVoltage
B261.3 fad install and removal
Status: Finaled
Aug 29, 2023
Declared cost: $5,948
Fire Permit FA
B202 fad
Status: Finaled
Aug 28, 2023
Declared cost: $7,610
Electrical LowVoltage
B202 fad
Status: Finaled
Aug 28, 2023
Declared cost: $7,610
Electrical LowVoltage
B203 fad
Status: Finaled
Aug 28, 2023
Declared cost: $7,868
Fire Permit FA
B203 fad
Status: Finaled
Aug 28, 2023
Declared cost: $7,868
Engineering SiteWO
P942q
Status: Finaled
Aug 23, 2023
Declared cost: $850,000
Building Permit Alteration
P942q
Status: Closed
Aug 23, 2023
Declared cost: $850,000
Electrical Alt
Ioa entry sign enhancements
Status: Finaled
Aug 22, 2023
Declared cost: $18,700
Electrical Alt
B-229 refresh
Status: Finaled
Aug 17, 2023
Declared cost: $1,500,000
Plumbing Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Aug 14, 2023
Declared cost: $5,625
Electrical Alt
T39 exterior alteration
Status: Finaled
Aug 4, 2023
Declared cost: $8,000
Building Permit Repair
B255 plumbing install and removal
Status: Finaled
Aug 1, 2023
Declared cost: $28,695
Fire Permit FireSupp
Ss22 fs work
Status: Finaled
Aug 1, 2023
Declared cost: $5,800
Electrical LowVoltage
B54a refresh
Status: Finaled
Aug 1, 2023
Declared cost: $4,364
Fire Permit FA
B54a refresh
Status: Finaled
Aug 1, 2023
Declared cost: $4,364
Mechanical Permit Alteration
B-229 refresh
Status: Finaled
Jul 31, 2023
Declared cost: $94,026
Electrical Alt
P576-p2 enhancements
Status: Finaled
Jul 31, 2023
Declared cost: $9,825
Electrical Alt
P576-p3 enhancements
Status: Finaled
Jul 31, 2023
Declared cost: $6,830
Plumbing Alteration
B253a plumbing installation
Status: Finaled
Jul 31, 2023
Declared cost: $17,905
Electrical Alt
B-54a refresh
Status: Finaled
Jul 31, 2023
Declared cost: $74,325
Building Permit Foundation
Ioa entry sign enhancements
Status: Finaled
Jul 27, 2023
Declared cost: $97,728
Plumbing Alteration
B-229 refresh
Status: Finaled
Jul 26, 2023
Declared cost: $161,598
Mechanical Permit Alteration
Usf mimo vault room
Status: Finaled
Jul 13, 2023
Declared cost: $10,897
Plumbing Alteration
Usf mimo vault room
Status: Finaled
Jul 13, 2023
Declared cost: $15,234
Mechanical Permit Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Jul 12, 2023
Declared cost: $2,170
Electrical Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Jul 12, 2023
Declared cost: $6,435
Plumbing Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Jul 12, 2023
Declared cost: $10,000
Mechanical Permit Alteration
B-54a refresh
Status: Finaled
Jul 7, 2023
Declared cost: $12,650
Plumbing Alteration
B-54a refresh
Status: Finaled
Jul 7, 2023
Declared cost: $93,715
Electrical Alt
B233 mechanical improvments
Status: Closed
Jul 5, 2023
Declared cost: $30,000
Electrical Addition
T220 electrical addition
Status: Open
Jun 30, 2023
Declared cost: $4,183
Fire Permit FireSupp
B54a refresh
Status: Finaled
Jun 28, 2023
Declared cost: $20,200
Engineering Other
B202 interior alteration
Status: Finaled
Jun 26, 2023
Building Permit Alteration
B286 building installation
Status: Finaled
Jun 23, 2023
Declared cost: $29,881
Building Permit Alteration
B229 exterior enhancements
Status: Finaled
Jun 21, 2023
Declared cost: $38,000
Engineering Other
B285 exterior addition
Status: Finaled
Jun 20, 2023
Mechanical Permit Alteration
B233 mechanical enhamcements
Status: Closed
Jun 15, 2023
Declared cost: $100,000
Electrical Repair
B278 sign replacement
Status: Finaled
Jun 15, 2023
Declared cost: $250
Building Permit Alteration
P576 - p3 enhancements
Status: Closed
Jun 13, 2023
Declared cost: $794,000
Building Permit Alteration
P576 - p2 enhancements
Status: Closed
Jun 13, 2023
Declared cost: $663,000
Electrical Repair
Ph-2231 b-284 ahu-1 ahu-2
Status: Finaled
Jun 7, 2023
Declared cost: $3,120
Electrical Repair
Ph-2231 b-261 ahu-1 ahu-3 ahu-4 ahu-5
Status: Finaled
Jun 7, 2023
Declared cost: $3,840
Electrical Repair
Ph-2231 b-275 ahu-1
Status: Finaled
Jun 7, 2023
Declared cost: $2,140
Electrical Repair
Ph: b-279 ahu-2
Status: Finaled
Jun 7, 2023
Declared cost: $3,125
Electrical Repair
Ph-2231 b-285 ahu-2 ahu-3 ahu-4 ahu-6 ahu-7
Status: Finaled
Jun 7, 2023
Declared cost: $4,985
Electrical Repair
Ph-2232, b-289
Status: Finaled
Jun 7, 2023
Declared cost: $3,125
Electrical Repair
Ph-2232 b-279
Status: Finaled
Jun 7, 2023
Declared cost: $3,125
Electrical Repair
Ph-2232, b-291
Status: Finaled
Jun 7, 2023
Declared cost: $3,125
Electrical Repair
Ph-2231 b-271a ahu-1 ahu-2
Status: Finaled
Jun 7, 2023
Declared cost: $3,140
Electrical Repair
Ph: b-274 ahu-1
Status: Finaled
Jun 7, 2023
Declared cost: $2,085
Electrical Repair
Ph-2231 b-242 ahu-1
Status: Finaled
Jun 6, 2023
Declared cost: $2,230
Electrical Repair
Ph-2223 b-255 ahu-4
Status: Finaled
Jun 6, 2023
Declared cost: $2,230
Electrical Repair
Ph-2223 b-255 ahu-1
Status: Finaled
Jun 6, 2023
Declared cost: $2,230
Electrical Repair
Ph-2231 b-255 ahu-3
Status: Finaled
Jun 6, 2023
Declared cost: $2,230
Electrical Repair
Ph-2223 b-255 ahu-2
Status: Finaled
Jun 6, 2023
Declared cost: $2,230
Electrical Repair
Ph-2223 b-255 ahu-5
Status: Finaled
Jun 6, 2023
Declared cost: $2,230
Electrical Repair
Ph-2231 b-203 ahu-1
Status: Open
Jun 5, 2023
Declared cost: $2,180
Electrical Repair
Ph-2231 b-285 ahu-2 ahu-3 ahu-4 ahu-5
Status: Finaled
Jun 5, 2023
Declared cost: $5,385
Electrical Repair
Ph-2231 b-206 ahu-2
Status: Finaled
Jun 5, 2023
Declared cost: $2,160
Electrical Repair
Ph-2231 b-227 ahu-2
Status: Finaled
Jun 5, 2023
Declared cost: $2,130
Electrical Repair
Ph-2231 b-205 ahu-1
Status: Finaled
Jun 5, 2023
Declared cost: $2,235
Electrical Repair
Ph-2231 b-204 ahu-2
Status: Finaled
Jun 5, 2023
Declared cost: $2,340
Electrical Repair
Ph-2231 b-233 ahu-1 ahu-2 ahu-3 ahu-4
Status: Finaled
Jun 5, 2023
Declared cost: $4,130
Electrical Repair
Ph-2231 b-229 ahu-4 ahu-5 ahu-6 ahu-7 ahu-8 ahu-9
Status: Finaled
Jun 5, 2023
Declared cost: $6,380
Plumbing Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Jun 2, 2023
Declared cost: $9,375
Electrical Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Jun 2, 2023
Declared cost: $5,000
Mechanical Permit Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Jun 2, 2023
Declared cost: $2,170
Building Permit Repair
Annual facility permit universal ioa/citywalk
Status: Finaled
Jun 2, 2023
Declared cost: $210
Electrical Repair
Ph-2231 b-202 ahu-1
Status: Finaled
Jun 2, 2023
Declared cost: $2,245
Electrical Repair
Ph: b-231 ahu-1
Status: Finaled
Jun 1, 2023
Declared cost: $3,125
Electrical Repair
Ph-2232, b-229 ahu-1, -2, -3
Status: Finaled
Jun 1, 2023
Declared cost: $3,125
Electrical Repair
B-227 ahu-1
Status: Finaled
Jun 1, 2023
Declared cost: $3,125
Electrical Repair
Ph: b-231 ahu-5
Status: Finaled
Jun 1, 2023
Declared cost: $3,125
Electrical Repair
Ph-2232 b-234e
Status: Finaled
Jun 1, 2023
Declared cost: $3,125
Electrical Repair
Ph-2232 b-234
Status: Finaled
Jun 1, 2023
Declared cost: $3,125
Electrical Repair
Ph-2232 b-208
Status: Finaled
May 31, 2023
Declared cost: $3,125
Building Permit Sign
B278 exterior install and removal
Status: Finaled
May 31, 2023
Declared cost: $46,930
Electrical LowVoltage
B221 fad installation
Status: Finaled
May 25, 2023
Declared cost: $7,031
Electrical LowVoltage
B221 fad installation ahu-3
Status: Finaled
May 25, 2023
Declared cost: $7,031
Fire Permit FA
B221 fad installation ahu-3
Status: Finaled
May 25, 2023
Declared cost: $7,031
Fire Permit FA
B221 fad installation afu-5
Status: Finaled
May 25, 2023
Declared cost: $7,031
Fire Permit FA
B233.1 fad installation ahu-1
Status: Finaled
May 25, 2023
Declared cost: $6,946
Electrical LowVoltage
B291 fad installation ahu-1
Status: Finaled
May 25, 2023
Declared cost: $7,108
Electrical LowVoltage
B233.1 fad installation ahu-1
Status: Finaled
May 25, 2023
Declared cost: $6,946
Electrical LowVoltage
B233.2 fad installation ahu-2
Status: Finaled
May 25, 2023
Declared cost: $6,946
Electrical LowVoltage
B233.3 fad installation ahu-3
Status: Finaled
May 25, 2023
Declared cost: $6,946
Electrical LowVoltage
B233.4 fad installation ahu-4
Status: Finaled
May 25, 2023
Declared cost: $6,946
Fire Permit FA
B291 fad installation ahu-1
Status: Finaled
May 25, 2023
Declared cost: $7,108
Electrical LowVoltage
B289 fad installation ahu-3
Status: Finaled
May 25, 2023
Declared cost: $7,554
Fire Permit FA
B221 fad installation ahu-4
Status: Finaled
May 25, 2023
Declared cost: $7,031
Electrical LowVoltage
B221 fad installation afu-5
Status: Finaled
May 25, 2023
Declared cost: $7,031
Fire Permit FA
B233.3 fad installation ahu-3
Status: Finaled
May 25, 2023
Declared cost: $6,946
Fire Permit FA
B289 fad installation ahu-3
Status: Finaled
May 25, 2023
Declared cost: $7,554
Disclaimer: Permit data comes from Orlando's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Orlando building department before buying, selling, or planning work.