Permit history for 601 E Rollins St
Orlando, FL · 500 permits on file · 2023–2026
500
Permits on file
2023
First permit
2026
Most recent
$436,886,019
Declared value (all work)
Permits on file (500)
Ordered most recent first. Data from the city's open data portal.
Electrical LowVoltage
Spc: gt hellocare orlando network installation
Status: Open
May 27, 2026
Declared cost: $4,545
Electrical LowVoltage
Spc: gt hellocare orlando network installation
Status: Open
May 27, 2026
Declared cost: $183,718
Plumbing Alteration
Spc: aho nutritional services warming tray
Status: Open
May 20, 2026
Declared cost: $43,810
Electrical Alt
Spc: ah morgan transformation
Status: Open
May 14, 2026
Declared cost: $64,980
Electrical Alt
Spc: ah morgan ph4 (nut storage)
Status: Open
May 13, 2026
Declared cost: $2,619
Electrical Alt
Spc: ah morgan ph1a ww connector
Status: Open
May 13, 2026
Declared cost: $2,619
Electrical LowVoltage
Spc: orlando tower transformation phase 1a
Status: Open
May 12, 2026
Declared cost: $3,500
Electrical Alt
Spc: orlando tower transformation phase 2
Status: Open
May 12, 2026
Declared cost: $5,000
Electrical Alt
Spc: orlando tower transformation phase 1b area 5
Status: Open
May 12, 2026
Declared cost: $12,000
Electrical Alt
Spc: aho orlando elevator 'c' replacement
Status: Open
May 11, 2026
Declared cost: $28,433
Electrical Alt
Spc: campus center - radiography lab upgrades
Status: Open
May 8, 2026
Declared cost: $204,500
Building Permit EQR
Spc: adventhealth orlando west tower
Status: Open
May 8, 2026
Electrical Alt
Spc: ah orlando / cath lab - codinics
Status: Open
May 7, 2026
Declared cost: $25,889
Building Permit Alteration
Spc: behavioral health courtyard
Status: Open
May 7, 2026
Declared cost: $1,354,029
Electrical Alt
Spc: ah orlando / outpatient dialysis
Status: Open
May 7, 2026
Declared cost: $3,736
Electrical Alt
Spc: ah morgan transformation
Status: Open
May 6, 2026
Declared cost: $64,680
Electrical Alt
Spc: ah morgan transformation
Status: Open
May 6, 2026
Declared cost: $39,672
Electrical Alt
Spc: ah morgan transformation
Status: Open
May 6, 2026
Declared cost: $64,680
Electrical Alt
Spc: ah morgan transformation
Status: Open
May 6, 2026
Declared cost: $64,680
Electrical Alt
Spc: ah morgan transformation
Status: Open
May 6, 2026
Declared cost: $11,500
Electrical Alt
Spc: ah orlando 7th floor phlebotomy
Status: Open
May 1, 2026
Declared cost: $2,043
Electrical Alt
Spc: xylem pump
Status: Open
Apr 30, 2026
Declared cost: $5,655
Electrical LowVoltage
Spc: advent health orlando traiage pediatric
Status: Open
Apr 30, 2026
Declared cost: $20,741
Mechanical Permit Alteration
Spc: aho morgan transformation - phase 1b workroom
Status: Open
Apr 30, 2026
Declared cost: $4,000
Mechanical Permit Alteration
Spc: aho morgan transformation - phase 2 ander cor
Status: Open
Apr 30, 2026
Declared cost: $5,000
Mechanical Permit Alteration
Spc: aho morgan transformation - phase 2 ander cor
Status: Open
Apr 30, 2026
Declared cost: $3,500
Building Permit Alteration
Spc: aho facilities projects 3-morgan office reno
Status: Open
Apr 28, 2026
Declared cost: $4,500
Building Permit Alteration
Spc: adventhealth orlando transformation / demo 1b
Status: Open
Apr 27, 2026
Declared cost: $1,000
Building Permit Alteration
Spc: adventhealth orlando transformation / demo 3b
Status: Open
Apr 27, 2026
Declared cost: $1,000
Building Permit Alteration
Spc: adventhealth orlando transformation / demo
Status: Open
Apr 27, 2026
Declared cost: $1,000
Fire Permit FireSupp
Spc: spect equipment replacement
Status: Open
Apr 21, 2026
Declared cost: $7,700
Electrical Alt
Spc: adventhealth orlando smart room tech - ginsbu
Status: Open
Apr 21, 2026
Declared cost: $197,000
Electrical Alt
Spc: ah morgan stem cell
Status: Open
Apr 20, 2026
Declared cost: $5,001
Electrical Alt
Spc:
Status: Open
Apr 17, 2026
Declared cost: $38,100
Electrical LowVoltage
Spc: 9th floor staff respite room
Status: Open
Apr 16, 2026
Declared cost: $7,750
Building Permit Alteration
Spc: adventhealth orlando smart room tech
Status: Open
Apr 14, 2026
Declared cost: $650,000
GAS Medical
Spc: vacuum system #8
Status: Open
Apr 14, 2026
Declared cost: $5,000
Electrical Alt
Spc: ah orlando med vac pump #8 replacement
Status: Open
Apr 13, 2026
Declared cost: $22,000
Electrical Alt
Spc: aho nutritional center
Status: Open
Apr 13, 2026
Declared cost: $8,603
Electrical Alt
Spc: ah orlando med vac pump #3 replacement
Status: Open
Apr 13, 2026
Declared cost: $40,000
Building Permit Addition
Spc: aho womens tower ambulance canopy
Status: Open
Apr 9, 2026
Declared cost: $825,000
Electrical Alt
Spc: ah orlando - spd modification
Status: Open
Apr 9, 2026
Declared cost: $24,120
Electrical Alt
Spc: ah orlando - spd modification
Status: Open
Apr 9, 2026
Declared cost: $1,800
Electrical Repair
Spc: aho ups replacement - phase 2
Status: Open
Apr 8, 2026
Declared cost: $166,000
Electrical Alt
Spc: advent health orlando cvor breakroom reno
Status: Open
Apr 8, 2026
Declared cost: $19,800
Electrical Alt
Spc: aho specialty pharmacy workstation
Status: Open
Apr 8, 2026
Declared cost: $17,000
Plumbing Alteration
Spc: advent health
Status: Open
Apr 3, 2026
Declared cost: $5,000
Building Permit Alteration
Spc: aho nutritional services warming tray
Status: Open
Apr 1, 2026
Declared cost: $5,000
Building Permit Repair
Spc: ah orlando med vac pump #3 replacement
Status: Open
Mar 31, 2026
Declared cost: $12,008
Building Permit Repair
Spc: ah orlando med vac pump #8 replacement
Status: Open
Mar 31, 2026
Declared cost: $12,008
Electrical LowVoltage
Spc: adventist health systems
Status: Finaled
Mar 26, 2026
Declared cost: $2,000
Building Permit Tent
Spc: advent health annual family day
Status: Open
Mar 19, 2026
Declared cost: $4,680
Electrical LowVoltage
Spc: advent health orlando ats controls relocation
Status: Open
Mar 18, 2026
Declared cost: $100
Electrical LowVoltage
Spc: advent health orlando ats controls relocation
Status: Open
Mar 18, 2026
Declared cost: $100
Electrical LowVoltage
Spc: advent health orlando ats controls relocation
Status: Open
Mar 18, 2026
Declared cost: $100
Electrical LowVoltage
Spc: advent health orlando ats controls relocation
Status: Open
Mar 18, 2026
Declared cost: $270,000
Electrical LowVoltage
Spc: advent health orlando ats controls relocation
Status: Open
Mar 18, 2026
Declared cost: $10
Electrical Alt
Spc: spect equipment replacement
Status: Open
Mar 17, 2026
Declared cost: $185,900
Electrical Alt
Spc: adventhealth orlando or's 25 & 26 laser upgra
Status: Open
Mar 17, 2026
Declared cost: $74,700
GAS Medical
Spc: advent health orlando pediatric renovation
Status: Open
Mar 17, 2026
Declared cost: $1,000
Mechanical Permit Alteration
Spc: adventhealth orlando barkers kitchen
Status: Open
Mar 16, 2026
Declared cost: $10,350
Mechanical Permit Alteration
Spc: adventhealth orlando barkers kitchen ph1
Status: Open
Mar 16, 2026
Declared cost: $16,650
Fire Permit FireSupp
Spc: advent health orlando stem cell
Status: Open
Mar 11, 2026
Declared cost: $2,200
GAS Medical
Spc: postpartum bedrooms renovation
Status: Open
Mar 11, 2026
Declared cost: $5,000
Plumbing Alteration
Spc: postpartum bedrooms renovation
Status: Open
Mar 11, 2026
Declared cost: $5,000
Electrical LowVoltage
Spc: aho peds reno
Status: Open
Mar 9, 2026
Declared cost: $1,500
Electrical LowVoltage
Spc' adventist health systems
Status: Open
Mar 5, 2026
Declared cost: $8,000
Fire Permit FA
Spc: advent health orlando pediatric renovation
Status: Open
Mar 3, 2026
Declared cost: $10,340
Electrical LowVoltage
Spc: advent health orlando pediatric renovation
Status: Open
Mar 3, 2026
Declared cost: $10,340
Electrical LowVoltage
Spc: advent health orlando barkers kitchen
Status: Open
Feb 26, 2026
Declared cost: $13,275
Electrical Alt
Spc: advent health orlando ats controls relocation
Status: Open
Feb 26, 2026
Declared cost: $100
Building Permit Alteration
Spc: outpatient dialysis dual bay expansion
Status: Closed
Feb 26, 2026
Declared cost: $250,000
Electrical Alt
Spc: advent health orlando ats controls relocation
Status: Open
Feb 26, 2026
Declared cost: $100
Electrical Alt
Spc: advent health orlando ats controls relocation
Status: Open
Feb 26, 2026
Declared cost: $100
Electrical Alt
Spc: advent health orlando ats controls relocation
Status: Open
Feb 26, 2026
Declared cost: $100
Building Permit Alteration
Outpatient dialysis dual bay expansion
Status: Open
Feb 26, 2026
Declared cost: $250,000
Electrical Alt
Spc: advent health orlando ats controls relocation
Status: Open
Feb 26, 2026
Declared cost: $100
Electrical Alt
Spc: smart room technology - womens
Status: Open
Feb 25, 2026
Declared cost: $645,000
Electrical LowVoltage
Spc: aho narker's kitchen phase 1
Status: Open
Feb 25, 2026
Declared cost: $15,000
Electrical LowVoltage
Spc: aho narker's kitchen phase 2
Status: Open
Feb 25, 2026
Declared cost: $15,000
Fire Permit FireSupp
Spc: advent health orlando pediatric renovation
Status: Open
Feb 24, 2026
Declared cost: $11,454
Electrical LowVoltage
Spc: adventhealth orlando postpartum bedrooms reno
Status: Open
Feb 24, 2026
Declared cost: $19,385
Transportation Impact Fees Comm
Spc: adventhealth orlando west tower
Status: Open
Feb 20, 2026
Sewer Benefit Fees Comm
Spc: adventhealth orlando west tower
Status: Open
Feb 20, 2026
Electrical LowVoltage
Spc: advent health orlando barkers kitchen
Status: Open
Feb 20, 2026
Declared cost: $13,275
Electrical Alt
Spc: site utilities relocation
Status: Open
Feb 18, 2026
Declared cost: $27,000
Plumbing Alteration
Spc: advent health orlando pediatric renovation
Status: Open
Feb 17, 2026
Declared cost: $10,884
Mechanical Permit Alteration
Spc: advent health orlando pediatric renovation
Status: Open
Feb 17, 2026
Declared cost: $77,000
Fire Permit FireSupp
Spc: adventhealth orlando transformation / demo
Status: Open
Feb 17, 2026
Declared cost: $39,100
Building Permit Alteration
Spc: adventhealth orlando ats control switch reloc
Status: Open
Feb 16, 2026
Declared cost: $1,000
Building Permit Alteration
Spc: adventhealth orlando ats controls relocation
Status: Open
Feb 16, 2026
Declared cost: $1,000
Building Permit Alteration
Spc: adventhealth orlando ats controls relocation
Status: Open
Feb 16, 2026
Declared cost: $1,000
Building Permit Alteration
Spc: adventhealth orlando ats controls switch
Status: Open
Feb 16, 2026
Declared cost: $1,000
GAS Medical
Spc: aho transformation / demolition
Status: Open
Feb 12, 2026
Declared cost: $25,000
GAS Natural
Spc: adventhealth barkers kitchen
Status: Open
Feb 11, 2026
Declared cost: $10,000
Building Permit Alteration
Spc: anderson ambulance canopy relocation
Status: Open
Feb 10, 2026
Declared cost: $850,000
Electrical Alt
Spc: advent health orlando ats controls relocation
Status: Open
Feb 9, 2026
Declared cost: $2,163,000
Building Permit Tent
Spc: apav solutions
Status: Open
Feb 9, 2026
Declared cost: $1,950
Electrical LowVoltage
Spc: advnt health orlando pediatric renovation
Status: Open
Feb 9, 2026
Declared cost: $10,194
Electrical LowVoltage
Spc: aho souh wing refeed
Status: Finaled
Feb 4, 2026
Declared cost: $7,620
Fire Permit FA
Spc: aho souh wing refeed
Status: Finaled
Feb 4, 2026
Declared cost: $7,620
Electrical Alt
Spc: advent health orlando dishwash room
Status: Open
Jan 29, 2026
Declared cost: $72,000
Building Permit Alteration
Spc: adventhealth orlando smart room tech - ginsbu
Status: Open
Jan 28, 2026
Declared cost: $645,000
Electrical LowVoltage
Spc: advent health orlando pediatric renovation
Status: Open
Jan 28, 2026
Declared cost: $134,000
Electrical LowVoltage
Spc: postpartum bedrooms renovation
Status: Open
Jan 26, 2026
Declared cost: $131,200
Electrical LowVoltage
Spc: aho women/main/gt len boad
Status: Open
Jan 23, 2026
Declared cost: $9,076
Building Permit Alteration
Spc: adventhealth orlando transformation / demo
Status: Open
Jan 23, 2026
Building Permit Alteration
Spc: adventhealth orlando transformation / demo
Status: Open
Jan 23, 2026
Building Permit Alteration
Spc: adventhealth orlando transformation / demo
Status: Open
Jan 23, 2026
Building Permit Alteration
Spc: cvor breakroom renovation
Status: Open
Jan 22, 2026
Declared cost: $80,000
Mechanical Permit Alteration
Spc: advent health orlando dishwash room
Status: Open
Jan 16, 2026
Declared cost: $60,000
Electrical Alt
Spc: lakeside cafe microwave outlets
Status: Finaled
Jan 15, 2026
Declared cost: $4,756
Fire Permit FA
Spc:hr office remodel
Status: Open
Jan 14, 2026
Declared cost: $250
Electrical LowVoltage
Spc:hr office remodel
Status: Finaled
Jan 14, 2026
Declared cost: $250
Building Permit Alteration
Spc: spect equipment replacement
Status: Open
Jan 12, 2026
Declared cost: $650,000
Electrical LowVoltage
Spc: advent health orlando barkers kitchen
Status: Open
Jan 9, 2026
Declared cost: $12,000
Building Permit Alteration
Spc: behavioral health courtyard
Status: Open
Jan 9, 2026
Declared cost: $1,203,993
Fire Permit FireSupp
Spc: adventhealth orlando barkers kitchen
Status: Open
Jan 7, 2026
Declared cost: $27,227
Fire Permit FireSupp
Spc: adventhealth orlando barkers kitchen
Status: Open
Jan 7, 2026
Declared cost: $108,906
Fire Permit FireSupp
Spc: advent health orlando dishwash room
Status: Open
Jan 7, 2026
Declared cost: $9,000
Electrical Alt
Spc: aho womens tower len board/len board main tow
Status: Open
Dec 29, 2025
Declared cost: $36,500
Engineering SiteWO
Spc: aho transformation / demolition
Status: Open
Dec 26, 2025
Electrical LowVoltage
Spc: aho women/main/gt len boad
Status: Open
Dec 23, 2025
Declared cost: $9,076
Building Permit Alteration
Spc: 9th floor staff respite room
Status: Open
Dec 19, 2025
Declared cost: $50,000
Plumbing Alteration
Spc: advent health orlando dishwash room
Status: Open
Dec 18, 2025
Declared cost: $53,894
Electrical LowVoltage
Spc: ah orl barkers ph2
Status: Open
Dec 17, 2025
Declared cost: $13,426
Electrical LowVoltage
Spc: ah orl barkers ph1
Status: Open
Dec 17, 2025
Declared cost: $47,000
Plumbing Alteration
Spc: adventhealth barkers kitchen ph 2
Status: Closed
Dec 17, 2025
Declared cost: $100
Plumbing Alteration
Spc: adventhealth barkers kitchen
Status: Open
Dec 17, 2025
Declared cost: $100
Building Permit New
Spc: adventhealth orlando west tower
Status: Open
Dec 16, 2025
Declared cost: $340,864,774
Engineering Comm
Spc: adventhealth orlando transformation / demo
Status: Open
Dec 15, 2025
Electrical Repair
Spc: aho ups replacement phase 1
Status: Open
Dec 15, 2025
Declared cost: $26,000
Mechanical Permit Alteration
Spc: adventhealth barkers kitchen
Status: Open
Dec 10, 2025
Declared cost: $100
Plumbing Alteration
Spc: adventhealth barkers kitchen
Status: Open
Dec 10, 2025
Declared cost: $465,000
Mechanical Permit Alteration
Spc: adventhealth barkers kitchen
Status: Open
Dec 10, 2025
Declared cost: $1,147,500
Mechanical Permit Alteration
Spc: adventhealth barkers kitchen
Status: Open
Dec 10, 2025
Declared cost: $100
Fire Permit FA
Spc: adventhealth orlando barkers kitchen
Status: Open
Dec 8, 2025
Declared cost: $62,600
Electrical LowVoltage
Spc: adventhealth orlando barkers kitchen
Status: Open
Dec 8, 2025
Declared cost: $62,600
Fire Permit FA
Spc: phase 2 for the stem projects
Status: Open
Dec 4, 2025
Declared cost: $1,000
Electrical LowVoltage
Spc: phase 2 for the stem projects
Status: Finaled
Dec 4, 2025
Declared cost: $1,000
Electrical Alt
Spc: adventhealth orlando stem cell lab renovation
Status: Open
Dec 2, 2025
Declared cost: $399,418
Building Permit Alteration
Spc: smart room technology - womens
Status: Open
Nov 25, 2025
Declared cost: $645,000
Sewer Benefit Fees Comm
Spc: advent health orlando pediatric renovation
Status: Open
Nov 21, 2025
Fire Permit FA
Spc: cvor 32 equipment replacement
Status: Open
Nov 20, 2025
Declared cost: $4,540
Electrical LowVoltage
Spc: cvor 32 equipment replacement
Status: Open
Nov 20, 2025
Declared cost: $4,540
Electrical LowVoltage
Spc: aho ed bh pod relocation phase 3
Status: Closed
Nov 19, 2025
Declared cost: $1,000
Electrical LowVoltage
Spc: aho ed bh pod relocation phase 2
Status: Closed
Nov 19, 2025
Declared cost: $1,000
Fire Permit FA
Spc: adventhealth orlando pharmacy residence reno
Status: Finaled
Nov 18, 2025
Declared cost: $2,790
Electrical LowVoltage
Spc: adventhealth orlando pharmacy residence reno
Status: Finaled
Nov 18, 2025
Declared cost: $2,790
Electrical Alt
Spc: advent health orlando inr lab reno
Status: Finaled
Nov 7, 2025
Declared cost: $80,000
Building Permit Alteration
Spc: adventhealth orlando barkers kitchen ph 1
Status: Open
Nov 6, 2025
Declared cost: $1,000
Fire Permit FireSupp
Spc: cvor 32 equipment replacement
Status: Open
Oct 31, 2025
Declared cost: $6,100
Electrical LowVoltage
Spc: adventist health systems
Status: Open
Oct 31, 2025
Declared cost: $22,000
Building Permit Alteration
Spc: adventhealth orlando stem cell lab renovation
Status: Open
Oct 30, 2025
Declared cost: $1,000
Electrical LowVoltage
Spc: adventhealth orlando pharmacy residence reno
Status: Finaled
Oct 30, 2025
Declared cost: $15,346
Electrical LowVoltage
Spc: advent health orlando pharmacy reno
Status: Closed
Oct 28, 2025
Declared cost: $94,199
Building Permit Fence
Spc: adventhealth sims
Status: Open
Oct 27, 2025
Declared cost: $20,693
Electrical LowVoltage
Spc: ah orl behavior health ph3
Status: Open
Oct 24, 2025
Declared cost: $1,000
Electrical LowVoltage
Spc: ah orl behavior health ph2
Status: Open
Oct 24, 2025
Declared cost: $1,000
Electrical LowVoltage
Spc: aho behavioral health
Status: Finaled
Oct 24, 2025
Declared cost: $44,958
Electrical LowVoltage
Spc: ah orl behavior health
Status: Finaled
Oct 24, 2025
Declared cost: $1,000
Electrical Alt
Spc: aho cvor 32 equipment replacement
Status: Open
Oct 21, 2025
Declared cost: $178,750
GAS Medical
Spc: cvor 32 equipment replacement
Status: Finaled
Oct 21, 2025
Declared cost: $22,107
Fire Permit FA
Spc: aho ed bh pod relocation phase 1
Status: Finaled
Oct 20, 2025
Declared cost: $4,000
Electrical Alt
Spc: cvor 32 equipment replacement
Status: Closed
Oct 20, 2025
Declared cost: $22,107
Electrical LowVoltage
Spc: aho ed bh pod relocation phase 2
Status: Open
Oct 20, 2025
Declared cost: $4,000
Plumbing Alteration
Spc: cvor 32 equipment replacement
Status: Closed
Oct 20, 2025
Declared cost: $22,107
Electrical LowVoltage
Spc: aho ed bh pod relocation phase 1
Status: Finaled
Oct 20, 2025
Declared cost: $4,000
Mechanical Permit Alteration
Spc: cvor 32 equipment replacement
Status: Open
Oct 20, 2025
Declared cost: $155,117
Electrical LowVoltage
Spc: aho ed bh pod relocation phase 3
Status: Open
Oct 20, 2025
Declared cost: $4,000
Fire Permit FA
Spc: aho ed bh pod relocation phase 2
Status: Open
Oct 20, 2025
Declared cost: $4,000
Fire Permit FA
Spc: aho ed bh pod relocation phase 3
Status: Open
Oct 20, 2025
Declared cost: $4,000
Fire Permit FA
Spc: aho ed bh pod relocation
Status: Open
Oct 20, 2025
Declared cost: $4,000
Electrical LowVoltage
Spc: aho ed bh pod relocation
Status: Open
Oct 20, 2025
Declared cost: $4,000
Building Permit Alteration
Spc: advent health orlando pediatric renovation
Status: Open
Oct 17, 2025
Declared cost: $930,000
Building Permit Alteration
Spc: postpartum bedrooms renovation
Status: Open
Oct 17, 2025
Declared cost: $500,000
Mechanical Permit Alteration
Spc: adventhealth orlando pharmacy residence reno
Status: Finaled
Oct 15, 2025
Declared cost: $8,500
Mechanical Permit Alteration
Spc: adventhealth orlando evs renovation
Status: Finaled
Oct 14, 2025
Declared cost: $200,000
Fire Permit FireSupp
Spc: adventhealth orlando pharmacy residence reno
Status: Finaled
Oct 13, 2025
Declared cost: $9,473
Electrical LowVoltage
Spc: advent health orlando barkers kitchen
Status: Open
Oct 13, 2025
Declared cost: $1,403,000
Electrical Alt
Spc: adventhealth orlando pharmacy residence reno
Status: Finaled
Oct 9, 2025
Declared cost: $78,600
Electrical LowVoltage
Spc: cvor 32 equipment replacement
Status: Open
Oct 6, 2025
Declared cost: $44,219
Sewer Benefit Fees Comm
Spc: advent health orlando dishwash room
Status: Open
Sep 25, 2025
Electrical LowVoltage
Spc: ed bh pod relocation phase 2
Status: Open
Sep 16, 2025
Declared cost: $12,790
Electrical LowVoltage
Spc: ed bh pod relocation phase 3
Status: Open
Sep 16, 2025
Declared cost: $7,280
Electrical LowVoltage
Spc: ed bh pod relocation phase 1
Status: Finaled
Sep 16, 2025
Declared cost: $34,390
Electrical LowVoltage
Schweizer audion health system
Status: Finaled
Sep 15, 2025
Declared cost: $69,359
Electrical LowVoltage
Spc: advent health orlando ed bh pod relocation
Status: Open
Sep 12, 2025
Declared cost: $23,985
Electrical LowVoltage
Spc: advent health orlando behavioral health rehab
Status: Finaled
Sep 12, 2025
Declared cost: $18,495
Building Permit Repair
Spc: 404 e king street garage
Status: Open
Sep 9, 2025
Declared cost: $386,000
Electrical LowVoltage
Spc: advent health equipment upgrade
Status: Closed
Sep 8, 2025
Declared cost: $2,500
Plumbing Alteration
Spc: aho ed pod relocation - phase 3
Status: Open
Sep 5, 2025
Declared cost: $100
GAS Medical
Spc: aho ed pod relocation - phase 3
Status: Open
Sep 5, 2025
Declared cost: $100
Mechanical Permit Alteration
Spc: aho ed pod relocation - phase 1
Status: Finaled
Sep 5, 2025
Declared cost: $100
GAS Medical
Spc: aho ed pod relocation - phase 1
Status: Finaled
Sep 5, 2025
Declared cost: $100
Plumbing Alteration
Spc: aho ed pod relocation - phase 1
Status: Finaled
Sep 5, 2025
Declared cost: $100
Mechanical Permit Alteration
Spc: aho ed pod relocation - phase 2
Status: Open
Sep 5, 2025
Declared cost: $100
Mechanical Permit Alteration
Spc: aho ed pod relocation - phase 3
Status: Open
Sep 5, 2025
Declared cost: $100
Plumbing Alteration
Spc: aho ed pod relocation - phase 2
Status: Open
Sep 5, 2025
Declared cost: $100
GAS Medical
Spc: aho ed pod relocation - phase 2
Status: Open
Sep 5, 2025
Declared cost: $100
Building Permit Alteration
Spc: advent health orlando dishwash room
Status: Open
Aug 29, 2025
Declared cost: $464,622
Electrical LowVoltage
Spc: aho ed bh pod relocation phase 3
Status: Open
Aug 28, 2025
Declared cost: $337,650
Electrical LowVoltage
Spc: aho ed bh pod relocation phase 1
Status: Finaled
Aug 28, 2025
Declared cost: $337,650
Electrical LowVoltage
Spc: aho ed bh pod relocation phase 2
Status: Open
Aug 28, 2025
Declared cost: $337,650
Fire Permit FireSupp
Spc: aho behavioral pods phase 1
Status: Finaled
Aug 25, 2025
Declared cost: $7,215
Fire Permit FireSupp
Spc: aho behavioral pods phase 2
Status: Open
Aug 25, 2025
Declared cost: $4,329
Fire Permit FireSupp
Spc: aho behavioral pods phase 3
Status: Open
Aug 25, 2025
Declared cost: $7,216
Electrical LowVoltage
Spc: orl outpatient dialysis
Status: Finaled
Aug 22, 2025
Declared cost: $3,373
Electrical LowVoltage
Spc: ah orl behavior health phase 1
Status: Finaled
Aug 20, 2025
Declared cost: $136,049
Fire Permit
Spc: adventhealth oralndo outpatient dialysis
Status: Closed
Aug 19, 2025
Fire Permit FireSupp
Spc: adventhealth orlando outpatient dialysis
Status: Finaled
Aug 19, 2025
Declared cost: $2,500
Fire Permit FireSupp
Spc: adventhealth orlando fluoroscopy rm 5
Status: Finaled
Aug 19, 2025
Declared cost: $4,000
Fire Permit FA
Spc: adventhealth oralndo outpatient dialysis
Status: Finaled
Aug 18, 2025
Declared cost: $22,770
Electrical LowVoltage
Spc: adventhealth oralndo outpatient dialysis
Status: Finaled
Aug 18, 2025
Declared cost: $22,770
Electrical LowVoltage
Spc: risk management tv power and data
Status: Open
Aug 14, 2025
Declared cost: $1,958
Electrical LowVoltage
Spc: ah orlando mri 3rd floor
Status: Open
Aug 14, 2025
Declared cost: $5,453
Mechanical Permit Repair
Spc: aho mri replacement
Status: Open
Aug 12, 2025
Declared cost: $101,875
GAS Medical
Spc: aho mri replacement
Status: Open
Aug 12, 2025
Declared cost: $26,355
Building Permit Alteration
Spc: aho ed bh pod relocation phase 1
Status: Finaled
Aug 11, 2025
Declared cost: $400,000
Electrical LowVoltage
Spc: evs renovation security 101 cabling
Status: Finaled
Aug 11, 2025
Declared cost: $6,750
Building Permit Alteration
Spc: aho ed bh pod relocation phase 3
Status: Open
Aug 11, 2025
Declared cost: $400,000
Building Permit Alteration
Spc: aho ed bh pod relocation phase 2
Status: Open
Aug 11, 2025
Declared cost: $400,000
Electrical Alt
Spc:
Status: Finaled
Aug 7, 2025
Declared cost: $97,600
Electrical LowVoltage
Spc: ah orl
Status: Finaled
Aug 7, 2025
Declared cost: $4,359
Electrical LowVoltage
Spc: ah hr badging
Status: Open
Aug 6, 2025
Declared cost: $6,378
GAS Medical
Spc: aho ed bh pod relocation
Status: Finaled
Aug 5, 2025
Declared cost: $60,000
Plumbing Alteration
Spc: aho ed bh pod relocation
Status: Open
Aug 5, 2025
Declared cost: $360,000
Mechanical Permit Alteration
Spc: aho ed bh pod relocation
Status: Open
Aug 5, 2025
Declared cost: $150,000
GAS Medical
Spc: aho cie procedure room upgrades rm
Status: Finaled
Aug 1, 2025
Declared cost: $20,222
Electrical Alt
Spc:
Status: Finaled
Aug 1, 2025
Declared cost: $155,900
Electrical LowVoltage
260211.0 ah orl outpatient
Status: Finaled
Jul 29, 2025
Declared cost: $24,399
Building Permit Fence
Spc: aho transformation / demolition
Status: Open
Jul 28, 2025
Declared cost: $100
Electrical LowVoltage
Spc: advent health cvor 35
Status: Finaled
Jul 28, 2025
Declared cost: $32,107
Demolition Permit
Spc: aho transformation / demolition
Status: Open
Jul 28, 2025
Building Permit Alteration
Spc: inr lab 14 upgrades
Status: Finaled
Jul 15, 2025
Declared cost: $374,283
Building Permit Alteration
Spc: cvor 32 equipment replacement
Status: Open
Jul 15, 2025
Declared cost: $1,768,771
Fire Permit FireSupp
Spc: aho south wing refeed
Status: Finaled
Jul 11, 2025
Declared cost: $35,765
Building Permit Roof
Spc: adventhealth orlando south wing refeed
Status: Finaled
Jul 10, 2025
Declared cost: $57,385
Building Permit Alteration
Spc: adventhealth orlando pharmacy residence reno
Status: Finaled
Jul 8, 2025
Declared cost: $200,000
Building Permit Alteration
Spc: advent health orlando 11th floor
Status: Closed
Jul 8, 2025
Declared cost: $15,000
Electrical Alt
Spc:
Status: Finaled
Jul 1, 2025
Declared cost: $285,000
Electrical LowVoltage
Spc: adventhealth orlando behavioral health rehab
Status: Finaled
Jun 23, 2025
Declared cost: $68,953
Plumbing Alteration
Spc: adventhealth orlando spd di water system
Status: Finaled
Jun 16, 2025
Declared cost: $5,000
GAS Medical
Spc: ah orlando women's tower medical air compress
Status: Finaled
Jun 11, 2025
Declared cost: $5,000
Electrical Alt
Spc: ah orlando women's tower medical air compress
Status: Finaled
Jun 10, 2025
Declared cost: $14,350
Plumbing Alteration
Spc: advent health orlando outpatient dialysis
Status: Finaled
Jun 6, 2025
Declared cost: $159,167
Mechanical Permit Alteration
Spc: advent health orlando outpatient dialysis
Status: Finaled
Jun 6, 2025
Declared cost: $18,850
Fire Permit TankIns
Spc: adventhealth orlando stem cell lab renovation
Status: Finaled
Jun 3, 2025
Declared cost: $150,000
GAS Medical
Spc: adventhealth orlando stem cell lab renovation
Status: Finaled
Jun 3, 2025
Declared cost: $150,000
Electrical Alt
Spc: advent health orlando outpatient dialysis
Status: Finaled
Jun 3, 2025
Declared cost: $120,000
Building Permit Alteration
Spc: adventhealth orlando ats controls relocation
Status: Open
Jun 2, 2025
Declared cost: $1,000
Building Permit Alteration
Spc: adventhealth orlando or's 25 & 26 laser upgra
Status: Open
May 27, 2025
Declared cost: $250,000
Electrical LowVoltage
Spc: aho-cvor renovation
Status: Finaled
May 21, 2025
Declared cost: $3,100
Mechanical Permit Alteration
Spc: ah orlando 11th floor reheat coil
Status: Finaled
May 20, 2025
Declared cost: $34,913
Mechanical Permit Repair
Spc: aho south wing refeed
Status: Finaled
May 16, 2025
Declared cost: $135,142
Plumbing Repair
Spc: aho south wing refeed
Status: Finaled
May 16, 2025
Declared cost: $65,000
Plumbing Alteration
Spc: ah orlando women's tower medical air compress
Status: Finaled
May 15, 2025
Declared cost: $33,198
Electrical LowVoltage
Spc: adventhealth orlando stem cell renovation
Status: Finaled
May 14, 2025
Declared cost: $10,850
Electrical LowVoltage
Spc: adventhealth orlando evs renovation
Status: Finaled
May 9, 2025
Declared cost: $7,775
Electrical LowVoltage
Spc: adventhealth orlando behavioral health rehab
Status: Finaled
May 9, 2025
Declared cost: $10,250
Electrical LowVoltage
Spc: adventhealth orlando evs renovation
Status: Finaled
May 9, 2025
Declared cost: $8,100
Building Permit Alteration
Spc: adventhealth orlando ats controls relocation
Status: Open
May 8, 2025
Declared cost: $5,093,700
Mechanical Permit Alteration
Spc: aho-cvor renovation
Status: Finaled
May 7, 2025
Declared cost: $3,000
GAS Medical
Spc: aho-cvor renovation
Status: Finaled
May 7, 2025
Declared cost: $2,800
Electrical New
Spc: welch cafeteria finish upgrades
Status: Open
May 7, 2025
Declared cost: $39,000
Electrical LowVoltage
Spc- 241194.0 ah orl stem
Status: Finaled
May 7, 2025
Declared cost: $44,186
Electrical LowVoltage
Spc: adventhealth orlando biomed renovation
Status: Finaled
May 6, 2025
Declared cost: $31,300
Electrical Alt
Spc: advent health orlando mr-or renovation
Status: Open
Apr 30, 2025
Declared cost: $372,000
Fire Permit FireSupp
Spc: advent health orlando cvor 35 reno
Status: Finaled
Apr 28, 2025
Declared cost: $6,100
Electrical Alt
Spc: site utilities relocation
Status: Finaled
Apr 24, 2025
Declared cost: $103,000
Building Permit Alteration
Spc: adventhealth orlando barkers kitchen ph 2
Status: Open
Apr 22, 2025
Declared cost: $7,135,527
Fire Permit FireSupp
Spc: advent health orlando stem cell
Status: Finaled
Apr 21, 2025
Declared cost: $39,600
Fire Permit FA
Spc: adventhealth orlando stem cell renovation
Status: Finaled
Apr 15, 2025
Declared cost: $35,270
Electrical LowVoltage
Spc: adventhealth orlando stem cell renovation
Status: Finaled
Apr 15, 2025
Declared cost: $35,270
Fire Permit FA
Spc: adventhealth orlando behavioral health rehab
Status: Finaled
Apr 15, 2025
Declared cost: $20,880
Building Permit Alteration
Spc: adventhealth orlando transformation / demo
Status: Open
Apr 15, 2025
Declared cost: $6,753,000
Electrical Alt
Spc: ah orl behavior health
Status: Finaled
Apr 15, 2025
Declared cost: $99,201
Electrical LowVoltage
Spc: adventhealth orlando behavioral health rehab
Status: Finaled
Apr 15, 2025
Declared cost: $20,880
Mechanical Permit Alteration
Spc: aho suite utilities
Status: Open
Apr 14, 2025
Declared cost: $1,940,025
Electrical LowVoltage
Spc: aho-cvor renovation
Status: Finaled
Apr 10, 2025
Declared cost: $219,100
Electrical LowVoltage
Spc: advent health orlando south wing refeed
Status: Finaled
Apr 9, 2025
Declared cost: $1,078,610
Building Permit Alteration
Spc: ah orlando women's tower medical air compress
Status: Finaled
Apr 7, 2025
Declared cost: $145,000
Mechanical Permit Alteration
Spc: advent health biomed
Status: Finaled
Apr 1, 2025
Declared cost: $21,500
Electrical Alt
Spc: miscellaneous projects
Status: Open
Apr 1, 2025
Declared cost: $10,000
GAS Medical
Spc: advent health orlando behavioral relocation
Status: Finaled
Apr 1, 2025
Declared cost: $33,000
Plumbing Alteration
Spc: advent health orlano behavioral health reloca
Status: Finaled
Apr 1, 2025
Declared cost: $9,275
Electrical LowVoltage
Spc: advent health orlando 3rd fl stem cell reno
Status: Finaled
Apr 1, 2025
Declared cost: $61,432
Electrical LowVoltage
Spc: adventhealth orlando behavioral health rehab
Status: Finaled
Mar 28, 2025
Declared cost: $729,100
GAS Medical
Spc: advent health orlando evs biomed
Status: Finaled
Mar 19, 2025
Declared cost: $200,000
Fire Permit FA
Spc: adventhealth orlando evs renovation
Status: Finaled
Mar 19, 2025
Declared cost: $26,000
Electrical LowVoltage
Spc: adventhealth orlando evs renovation
Status: Finaled
Mar 19, 2025
Declared cost: $26,000
Fire Permit FA
Spc: adventhealth orlando evs renovation
Status: Finaled
Mar 19, 2025
Declared cost: $26,000
Electrical LowVoltage
Spc: adventhealth orlando biomed renovation
Status: Finaled
Mar 19, 2025
Declared cost: $32,250
Electrical LowVoltage
Spc: adventhealth orlando evs renovation
Status: Finaled
Mar 19, 2025
Declared cost: $26,000
Fire Permit FA
Spc: adventhealth orlando biomed renovation
Status: Finaled
Mar 19, 2025
Declared cost: $32,250
Building Permit Alteration
Spc: adventhealth orlando spd di water system
Status: Finaled
Mar 18, 2025
Declared cost: $75,000
Electrical Alt
Spc: aho eob
Status: Finaled
Mar 18, 2025
Declared cost: $333,161
Building Permit Alteration
Spc: adventhealth orlando fluoroscopy rm 5
Status: Finaled
Mar 18, 2025
Declared cost: $200,000
Mechanical Permit Alteration
Spc: adventhealth orlando stem cell renovation
Status: Closed
Mar 18, 2025
Declared cost: $215,000
Mechanical Permit Repair
Spc: advent health orlando behavioral health reloc
Status: Finaled
Mar 17, 2025
Declared cost: $164,325
Plumbing Repair
Adventhealth orlando annual facility permit
Status: Open
Mar 14, 2025
Declared cost: $100
Mechanical Permit Repair
Adventhealth orlando annual facility permit
Status: Open
Mar 14, 2025
Declared cost: $100
Electrical Repair
Adventhealth orlando annual facility permit
Status: Open
Mar 14, 2025
Declared cost: $100
Building Permit Alteration
Spc: adventhealth orlando outpatient dialysis
Status: Finaled
Mar 12, 2025
Declared cost: $850,000
Building Permit Tent
Spc: advent health orlando family day
Status: Open
Mar 11, 2025
Declared cost: $2,200
Building Permit Alteration
Spc: welch cafeteria finish upgrades
Status: Open
Mar 10, 2025
Declared cost: $298,887
Mechanical Permit Alteration
Spc: advent health orlando biomed
Status: Finaled
Mar 4, 2025
Declared cost: $261,000
GAS Medical
Spc: advent health orlando biomed
Status: Finaled
Mar 4, 2025
Declared cost: $7,109
Plumbing Alteration
Spc: advent health orlando biomed
Status: Finaled
Mar 4, 2025
Declared cost: $26,810
Plumbing Alteration
Spc: advent health orlando biomed
Status: Closed
Mar 4, 2025
Declared cost: $26,810
Plumbing Alteration
Spc: advent health orlando biomed
Status: Finaled
Mar 4, 2025
Declared cost: $9,275
Building Permit Facility
Adventhealth orlando annual facility permit
Status: Open
Feb 28, 2025
Declared cost: $1
Engineering Other
Spc: adventhealth orlando stem cell renovation
Status: Finaled
Feb 28, 2025
Fire Permit FireSupp
Spc: adventhealth orlando behavioral health rehab
Status: Finaled
Feb 26, 2025
Declared cost: $67,216
Fire Permit FireSupp
Spc: adventhealth orlando biomed renovation
Status: Finaled
Feb 20, 2025
Declared cost: $44,030
Electrical LowVoltage
Spc: advent health - orlando evs renovation
Status: Finaled
Feb 18, 2025
Declared cost: $80,110
Electrical LowVoltage
Spc: advent health biomed renovation
Status: Finaled
Feb 17, 2025
Declared cost: $56,915
Fire Permit FireSupp
Spc: adventhealth orlando evs renovation
Status: Finaled
Feb 12, 2025
Declared cost: $15,071
Building Permit Alteration
Spc: aho-cvor renovation
Status: Finaled
Feb 11, 2025
Declared cost: $1,000,000
Electrical LowVoltage
Spc: medical plaza 3rd fl renovation
Status: Finaled
Feb 10, 2025
Declared cost: $4,603
Fire Permit FireSupp
Spc: adventhealth orlando evs renovation
Status: Finaled
Feb 10, 2025
Declared cost: $24,054
Electrical LowVoltage
Spc: biomed
Status: Finaled
Feb 5, 2025
Declared cost: $200,000
Fire Permit FireSupp
Spc: aho-mr or
Status: Open
Feb 5, 2025
Declared cost: $9,000
Electrical LowVoltage
Spc: evs phase 1
Status: Finaled
Feb 5, 2025
Declared cost: $350,000
Electrical LowVoltage
Spc: evs phase 2
Status: Finaled
Feb 5, 2025
Declared cost: $200,000
Fire Permit FireSupp
Spc: adventhealth orlando evs renovation
Status: Closed
Feb 1, 2025
Declared cost: $24,054
Building Permit Alteration
Spc: aho ed bh pod relocation
Status: Open
Jan 31, 2025
Declared cost: $1,200,000
Electrical LowVoltage
Spc: adventhealth orlando evs renovation
Status: Finaled
Jan 27, 2025
Declared cost: $20,645
Electrical LowVoltage
Spc: ah orl
Status: Finaled
Jan 23, 2025
Declared cost: $16,800
Mechanical Permit Repair
Spc: adventhealth orlando microbiology
Status: Finaled
Jan 23, 2025
Declared cost: $4,700
Electrical Alt
Spc: adventhealth orlando stem cell renovation
Status: Finaled
Jan 14, 2025
Declared cost: $399,418
Fire Permit FireSupp
Spc: adventhealth orlando microbiology walk in ren
Status: Finaled
Jan 14, 2025
Declared cost: $4,000
Mechanical Permit Alteration
Spc: adventhealth orlando evs renovation
Status: Finaled
Jan 13, 2025
Declared cost: $250,000
Plumbing Alteration
Spc: advnt health orlando engineering
Status: Finaled
Jan 9, 2025
Declared cost: $50,000
Plumbing Alteration
Spc: advnt health orlando evs bio med engineering
Status: Finaled
Jan 9, 2025
Declared cost: $150,000
Plumbing Alteration
Spc: advnt health orlando evs pha-2
Status: Finaled
Jan 9, 2025
Declared cost: $75,000
Electrical Alt
Obstetrics emergency
Status: Open
Jan 9, 2025
Declared cost: $2,250
Plumbing Alteration
Spc: advnt health orlando biomed
Status: Finaled
Jan 9, 2025
Declared cost: $200,000
Electrical LowVoltage
Spc: adventhealth orlando evs renovation
Status: Finaled
Jan 7, 2025
Declared cost: $6,700
Building Permit Alteration
Spc: site utilities relocation
Status: Open
Jan 3, 2025
Declared cost: $3,219,095
Building Permit Alteration
Spc: adventhealth orlando evs renovation
Status: Finaled
Dec 12, 2024
Declared cost: $100
Electrical Alt
Spc: ah orlando ambulance cord reels
Status: Finaled
Nov 27, 2024
Declared cost: $80,965
Electrical LowVoltage
Spc: adventhealth orlando endoscopy 5 renovation
Status: Finaled
Nov 22, 2024
Declared cost: $2,100
Building Permit Alteration
Spc: adventhealth orlando behavioral health rehab
Status: Finaled
Nov 12, 2024
Declared cost: $6,877,835
Building Permit Alteration
Spc: advent health orlando south wing refeed
Status: Finaled
Nov 1, 2024
Declared cost: $3,219,095
Electrical Alt
Spc: adventist health refeed
Status: Open
Oct 21, 2024
Declared cost: $252,000
Electrical LowVoltage
Spc: adventhealth orlando cie procedure room
Status: Finaled
Oct 21, 2024
Declared cost: $1,500
Sewer Benefit Fees Comm
Spc: adventhealth orlando stem cell renovation
Status: Open
Oct 1, 2024
Electrical LowVoltage
Spc: adventhealth orlando microbiology walk in re
Status: Finaled
Oct 1, 2024
Declared cost: $3,040
Electrical LowVoltage
Spc: adventhealth orlando women's tower 9th
Status: Finaled
Oct 1, 2024
Declared cost: $2,923
Fire Permit FA
Spc: adventhealth orlando microbiology walk in re
Status: Finaled
Oct 1, 2024
Declared cost: $3,040
Electrical Alt
Spc: adventhealth orlando microbiology walk in ren
Status: Finaled
Sep 20, 2024
Declared cost: $29,800
GAS Medical
Spc: aho cie procedure room upgrades rm
Status: Finaled
Sep 16, 2024
Declared cost: $15,000
Plumbing Alteration
Spc: aho cie procedure room #5 upgrades
Status: Finaled
Sep 16, 2024
Declared cost: $8,000
Building Permit Alteration
Spc: adventhealth orlando evs renovation
Status: Finaled
Sep 10, 2024
Declared cost: $2,000,000
Building Permit Alteration
Spc: adventhealth orlando biomed renovation
Status: Finaled
Sep 4, 2024
Declared cost: $2,000,000
Building Permit Alteration
Spc: adventhealth orlando stem cell renovation
Status: Finaled
Sep 3, 2024
Declared cost: $3,289,821
Electrical LowVoltage
Spc: adventhealth orlando women's tower 9th
Status: Finaled
Aug 26, 2024
Declared cost: $3,500
Electrical LowVoltage
Spc: adventhealth orlando endoscopy 5 renovation
Status: Finaled
Aug 23, 2024
Declared cost: $4,500
Fire Permit FA
Spc: adventhealth orlando endoscopy 5 renovation
Status: Finaled
Aug 23, 2024
Declared cost: $4,500
Electrical LowVoltage
Spc: adventhealth orlando cie procedure room
Status: Finaled
Aug 20, 2024
Declared cost: $159,500
Electrical LowVoltage
Spc: adventhealth orlando endoscopy 5 renovation
Status: Finaled
Aug 19, 2024
Declared cost: $2,616
Building Permit Alteration
Spc: adventhealth orlando microbiology walk in ren
Status: Finaled
Jul 31, 2024
Declared cost: $150,000
Building Permit Alteration
Spc: adventhealth orlando cie procedure room
Status: Finaled
Jul 25, 2024
Declared cost: $350,000
Building Permit Roof
Spc: adventhealth anderson build (711 winyah dr)
Status: Finaled
Jul 11, 2024
Declared cost: $46,492
Electrical LowVoltage
Spc:
Status: Finaled
Jul 1, 2024
Declared cost: $9,833
Building Permit Alteration
Spc: adventhealth orlando mr or renovation
Status: Open
Jun 24, 2024
Declared cost: $4,000,000
Fire Permit FireSupp
Spc: adventhealth orlando endoscopy 5 renovation
Status: Finaled
Jun 24, 2024
Declared cost: $6,600
Sewer Benefit Fees Comm
Spc-adventhealth orlando donor care center
Status: Open
Jun 14, 2024
GAS Medical
Spc: advent health orlando endoscopy room 5
Status: Finaled
Jun 10, 2024
Declared cost: $25,795
Mechanical Permit Alteration
Spc: advent health orlando endoscopy room 5
Status: Finaled
Jun 10, 2024
Declared cost: $57,642
Plumbing Alteration
Spc: advent health orlando endoscopy room 5
Status: Finaled
Jun 10, 2024
Declared cost: $19,092
Electrical LowVoltage
Spc:adventhealth orlando endoscopy 5 renovation
Status: Finaled
Jun 3, 2024
Declared cost: $100,100
Building Permit Alteration
Spc: adventhealth orlando women's tower 9th
Status: Finaled
May 17, 2024
Declared cost: $50,000
Plumbing Alteration
Aho mass spectrometer
Status: Finaled
May 10, 2024
Declared cost: $10,180
Mechanical Permit Alteration
Starbucks renovation - advent health
Status: Finaled
Apr 30, 2024
Declared cost: $85,000
Plumbing Alteration
Starbucks renovation - advent health
Status: Finaled
Apr 29, 2024
Declared cost: $47,500
Electrical LowVoltage
Adventhealth orlando spd main capacity expansion
Status: Finaled
Apr 24, 2024
Declared cost: $11,639
Fire Permit FA
Spc-adventhealth orlando donor care center
Status: Finaled
Apr 17, 2024
Declared cost: $20,540
Electrical LowVoltage
Adventhealth orlando donor care center
Status: Finaled
Apr 17, 2024
Declared cost: $20,540
Plumbing Alteration
Advent health spd main capacity
Status: Finaled
Apr 3, 2024
Declared cost: $85,000
Electrical LowVoltage
601 e rollins
Status: Finaled
Mar 27, 2024
Declared cost: $22,097
Electrical Alt
Aho spd main capacity expansion
Status: Finaled
Mar 18, 2024
Declared cost: $82,650
Electrical LowVoltage
Adventhealth orlando mass spectrometer and molecul
Status: Finaled
Mar 18, 2024
Declared cost: $6,000
Electrical Alt
Aho ct or
Status: Finaled
Mar 15, 2024
Declared cost: $122,956
Electrical Alt
Aho mass spec molecular lab
Status: Finaled
Mar 15, 2024
Declared cost: $26,500
Mechanical Permit Alteration
Aho mass spectrometer & molecular renovation
Status: Finaled
Mar 14, 2024
Declared cost: $88,000
Mechanical Permit Alteration
Advent health orl ct or renovations
Status: Finaled
Mar 12, 2024
Declared cost: $6,750
Building Permit Alteration
Spc-adventhealth orlando endoscopy 5 renovation
Status: Finaled
Mar 12, 2024
Declared cost: $1,000,000
Building Permit Tent
Corporate event
Status: Finaled
Mar 12, 2024
Declared cost: $21,000
Electrical LowVoltage
Ah orlando - cie rm #3
Status: Finaled
Mar 8, 2024
Declared cost: $14,630
Mechanical Permit Alteration
Advent health orlando ct or renovations
Status: Closed
Mar 5, 2024
Declared cost: $6,750
Building Permit Alteration
Adventhealth orlando cie procedure room upgrades
Status: Finaled
Mar 4, 2024
Declared cost: $1,000
GAS Medical
Aho donor care center
Status: Finaled
Mar 1, 2024
Declared cost: $7,279
Mechanical Permit Repair
Aho pediatric infusion renovation
Status: Finaled
Mar 1, 2024
Declared cost: $19,426
Plumbing Repair
Aho donor care center
Status: Finaled
Mar 1, 2024
Declared cost: $38,002
Electrical Alt
Aho donor care
Status: Finaled
Feb 22, 2024
Declared cost: $169,000
Electrical LowVoltage
Ah orlando donor center
Status: Finaled
Feb 16, 2024
Declared cost: $16,722
Transportation Impact Fees Comm
Starbucks orlando
Status: Open
Feb 8, 2024
Transportation Impact Fees Comm
Starbucks orlando
Status: Open
Feb 8, 2024
Electrical LowVoltage
Aho cvor reno
Status: Finaled
Feb 8, 2024
Declared cost: $2,104
Electrical LowVoltage
Aho cvor reno
Status: Finaled
Feb 8, 2024
Declared cost: $2,104
Sewer Benefit Fees Comm
Starbucks orlando
Status: Open
Feb 8, 2024
Electrical LowVoltage
Adventhealth orl office space
Status: Finaled
Feb 7, 2024
Declared cost: $2,000
Fire Permit FA
Adventhealth orlando
Status: Finaled
Feb 7, 2024
Declared cost: $9,890
Fire Permit FA
Adventhealth orl office space
Status: Finaled
Feb 7, 2024
Declared cost: $2,000
Electrical LowVoltage
Adventhealth cvor orlando
Status: Finaled
Feb 7, 2024
Declared cost: $9,890
Fire Permit FireSupp
Aho donor care
Status: Finaled
Feb 6, 2024
Declared cost: $46,250
Electrical LowVoltage
Aho cvor 34
Status: Finaled
Jan 30, 2024
Declared cost: $4,250
Electrical LowVoltage
Aho cvor 30
Status: Finaled
Jan 30, 2024
Declared cost: $4,250
Building Permit Roof
Ah ac shop
Status: Finaled
Jan 29, 2024
Declared cost: $38,500
Mechanical Permit Alteration
Adventhealth - behavior health office reno level 2
Status: Finaled
Jan 16, 2024
Declared cost: $10,000
Building Permit Sign
Starbucks orlando
Status: Open
Jan 12, 2024
Declared cost: $30,000
Electrical Alt
Adventhealth orlando office space renovation
Status: Finaled
Jan 11, 2024
Declared cost: $16,148
Mechanical Permit Repair
Aho patient dish waster machine renovation
Status: Finaled
Dec 28, 2023
Declared cost: $40,000
Plumbing Alteration
Aho patient dish machine renovation
Status: Finaled
Dec 28, 2023
Declared cost: $20,500
Building Permit Alteration
Adventhealth orlando spd main capacity expansion
Status: Finaled
Dec 21, 2023
Declared cost: $600,000
Building Permit Alteration
Spc-adventhealth orlando ct or renovation
Status: Finaled
Dec 21, 2023
Declared cost: $350,000
Mechanical Permit Alteration
Advent health ph1 cvor 34 & office / equip
Status: Finaled
Dec 7, 2023
Declared cost: $99,940
Mechanical Permit Alteration
Advent health ph2 cvor 30
Status: Finaled
Dec 7, 2023
Declared cost: $49,035
Electrical LowVoltage
Aho cvor renovation breakout for or34
Status: Finaled
Dec 6, 2023
Declared cost: $175,249
Electrical LowVoltage
Aho cvor renovations
Status: Finaled
Dec 6, 2023
Declared cost: $137,480
Electrical LowVoltage
Ah orlando 2nd fl cvor phase 2
Status: Finaled
Dec 1, 2023
Declared cost: $20,000
Electrical LowVoltage
Ah orlando 2nd fl cvor phase 1
Status: Finaled
Dec 1, 2023
Declared cost: $41,541
Electrical Repair
Welch escalators
Status: Open
Nov 30, 2023
Declared cost: $25,663
Building Permit Alteration
Adventhealth orlando office space renovation
Status: Finaled
Nov 15, 2023
Declared cost: $100,000
Plumbing Alteration
Aho cvor
Status: Finaled
Nov 15, 2023
Declared cost: $5,289
GAS Medical
Aho cvor
Status: Finaled
Nov 14, 2023
Declared cost: $12,246
Building Permit Alteration
Spc-adventhealth orlando donor care center
Status: Finaled
Nov 14, 2023
Declared cost: $2,800,000
GAS Medical
Aho cvor
Status: Finaled
Nov 14, 2023
Declared cost: $11,054
Fire Permit FireSupp
Aho cvor phase 2
Status: Finaled
Nov 2, 2023
Declared cost: $5,900
Fire Permit FireSupp
Aho cvor phase 1
Status: Finaled
Nov 2, 2023
Declared cost: $9,200
Building Permit Alteration
Adventhealth orlando cvor renovation
Status: Finaled
Nov 1, 2023
Declared cost: $1,000
Building Permit Alteration
Adventhealth orlando cvor renovations
Status: Finaled
Nov 1, 2023
Declared cost: $1,000
Fire Permit FA
Adventhealth orlando ahu g2
Status: Finaled
Oct 24, 2023
Declared cost: $4,000
Electrical LowVoltage
Adventhealth mri upgrade
Status: Finaled
Oct 24, 2023
Declared cost: $5,000
Fire Permit FA
Adventhealth mri upgrade
Status: Finaled
Oct 24, 2023
Declared cost: $5,000
Fire Permit FA
Adventhealth orlando ahu g3
Status: Finaled
Oct 24, 2023
Declared cost: $4,000
Electrical LowVoltage
Adventhealth orlando
Status: Finaled
Oct 24, 2023
Declared cost: $4,000
Electrical LowVoltage
Adventhealth orlando ahu g2
Status: Finaled
Oct 24, 2023
Declared cost: $4,000
Electrical LowVoltage
Adventhealth orlando ahu g 3
Status: Finaled
Oct 24, 2023
Declared cost: $4,000
Fire Permit FA
Adventhealth orlando
Status: Finaled
Oct 24, 2023
Declared cost: $4,000
Fire Permit
Adventhealth orlando cie procedure room upgrades
Status: Closed
Oct 2, 2023
Fire Permit FA
Adventhealth orlando
Status: Finaled
Oct 2, 2023
Declared cost: $1,500
Electrical LowVoltage
Adventhealth orlando cie procedure room upgrades
Status: Finaled
Oct 2, 2023
Declared cost: $1,500
Electrical Alt
197021.2 ah orlando
Status: Finaled
Sep 29, 2023
Declared cost: $1,271
Plumbing Alteration
Aho cie work room
Status: Finaled
Sep 15, 2023
Declared cost: $2,500
GAS Medical
Aho cie procedure room upgrades
Status: Finaled
Sep 15, 2023
Declared cost: $5,000
Mechanical Permit Alteration
Cie prodecure room upgrade / work room
Status: Finaled
Sep 15, 2023
Declared cost: $2,500
Building Permit Alteration
Adventhealth orlando cvor renovation
Status: Finaled
Sep 12, 2023
Declared cost: $1,100,000
Building Permit Alteration
Adventhealth orlando mass spectrometer and molecul
Status: Finaled
Sep 12, 2023
Declared cost: $250,000
Mechanical Permit Repair
Aho mri equipment upgrades
Status: Finaled
Aug 29, 2023
Declared cost: $155,835
Electrical Alt
Aho mri
Status: Finaled
Aug 29, 2023
Declared cost: $146,200
Electrical Alt
Aho dish room power
Status: Finaled
Aug 29, 2023
Declared cost: $43,900
Electrical Alt
Ed - access control door
Status: Finaled
Aug 29, 2023
Declared cost: $96
Electrical Alt
Advent health orlando cie fellows dictation
Status: Finaled
Aug 25, 2023
Declared cost: $1,000
Electrical LowVoltage
Advent health orlando fellows dictation
Status: Finaled
Aug 25, 2023
Declared cost: $1,569
Fire Permit FireSupp
Ah cie room fellows dictation
Status: Finaled
Aug 25, 2023
Declared cost: $4,117
Electrical LowVoltage
Advent health orlando procedure room 4
Status: Finaled
Aug 25, 2023
Declared cost: $4,045
Fire Permit FireSupp
Ah cie room workroom
Status: Finaled
Aug 25, 2023
Declared cost: $4,000
Electrical Alt
Advent health orlando cie workroom
Status: Finaled
Aug 25, 2023
Declared cost: $3,500
Electrical LowVoltage
Advent health orlando workroom
Status: Finaled
Aug 25, 2023
Declared cost: $3,845
Electrical LowVoltage
Orlando cie
Status: Finaled
Aug 24, 2023
Declared cost: $3,200
Building Permit Alteration
Adventhealth orlando cie procedure room upgrades
Status: Finaled
Aug 23, 2023
Declared cost: $1,000
Building Permit Alteration
Adventhealth orlando cie procedure room upgrades
Status: Finaled
Aug 23, 2023
Declared cost: $1,000
Mechanical Permit Repair
Ah orlando ahu g-3 replacement
Status: Finaled
Aug 7, 2023
Declared cost: $125,000
Mechanical Permit Repair
Ah orlando ahu g-2 replacement
Status: Finaled
Aug 7, 2023
Declared cost: $140,000
Mechanical Permit Repair
Ah orlando dr. cole ahu1-2 replacement
Status: Finaled
Aug 7, 2023
Declared cost: $120,000
Electrical Alt
Ahu g-2 replacement
Status: Finaled
Aug 2, 2023
Declared cost: $46,550
Electrical Alt
Ahu 1-2 replacement
Status: Finaled
Aug 2, 2023
Declared cost: $32,588
Electrical Alt
Ahu g-3 replacement
Status: Finaled
Aug 2, 2023
Declared cost: $32,289
Electrical LowVoltage
Adventhealth orlando cie procedure room upgrades
Status: Finaled
Jul 24, 2023
Declared cost: $9,010
Fire Permit FA
Adventhealth orlando cie procedure room upgrades
Status: Finaled
Jul 24, 2023
Declared cost: $9,010
Electrical Alt
Aho eob
Status: Finaled
Jul 24, 2023
Declared cost: $230,000
Mechanical Permit Alteration
Cie procedure room upgrade/ equipment clean
Status: Finaled
Jul 20, 2023
Declared cost: $37,000
Plumbing Alteration
Cie procedure room upgrade/ equipment clean
Status: Finaled
Jul 20, 2023
Declared cost: $25,000
GAS Medical
Aho cie procedure room upgrades rm#4
Status: Finaled
Jul 20, 2023
Declared cost: $65,000
Electrical Alt
Aho eob
Status: Finaled
Jul 13, 2023
Declared cost: $226,500
Fire Permit FireSupp
Ah cie room 4
Status: Finaled
Jul 12, 2023
Declared cost: $12,300
Electrical LowVoltage
Equipment clean storage
Status: Finaled
Jul 7, 2023
Declared cost: $30,000
Electrical LowVoltage
Procedure room
Status: Finaled
Jul 7, 2023
Declared cost: $60,000
Building Permit Alteration
Adventhealth orlando cie procedure room upgrades
Status: Finaled
Jul 5, 2023
Declared cost: $1,000
Electrical LowVoltage
Aho lighting replacement
Status: Finaled
Jul 3, 2023
Declared cost: $1,600
Building Permit Alteration
Advent health orlando cie procedure room upgrades
Status: Finaled
Jun 29, 2023
Declared cost: $1,000
Building Permit Alteration
Ed - access control door
Status: Finaled
Jun 20, 2023
Declared cost: $3,000
Electrical LowVoltage
Ah orlando behavioral health west 1 phase 2
Status: Finaled
May 31, 2023
Declared cost: $100,000
Electrical LowVoltage
Advent health orlando
Status: Finaled
May 19, 2023
Declared cost: $14,210
Fire Permit FA
Advent health orlando
Status: Finaled
May 19, 2023
Declared cost: $14,210
Electrical LowVoltage
Ah orlando 193766.3
Status: Finaled
May 19, 2023
Declared cost: $30,247
Building Permit Alteration
Aho patient dish machine renovation
Status: Finaled
May 11, 2023
Declared cost: $100,000
Fire Permit FireSupp
Aho peds cv cath lab reno
Status: Finaled
May 10, 2023
Declared cost: $12,500
Electrical Alt
Adventhealth orlando acsu conversion to peds
Status: Finaled
Apr 13, 2023
Declared cost: $8,100
Electrical LowVoltage
Aho acsu conterxion
Status: Finaled
Mar 30, 2023
Declared cost: $7,655
Engineering Other
Adventhealth orlando behavioral health reno
Status: Finaled
Mar 27, 2023
Electrical LowVoltage
Ah orlando 3rd floor ped cath lab renovation
Status: Finaled
Mar 24, 2023
Declared cost: $18,494
Plumbing Alteration
Advent health orlando acsu conversion to peds
Status: Finaled
Mar 23, 2023
Declared cost: $59,399
Electrical LowVoltage
Advent health orlando acsu conversion to peds
Status: Finaled
Mar 23, 2023
Declared cost: $480,950
GAS Medical
Advent health orlando acsu conversion to peds
Status: Finaled
Mar 22, 2023
Declared cost: $29,330
Mechanical Permit Alteration
Adventhealth orlando acsu conversion to peds
Status: Finaled
Mar 21, 2023
Declared cost: $242,945
Electrical LowVoltage
Adventhealth - orlando gt
Status: Finaled
Feb 20, 2023
Declared cost: $5,000