Permit history for 270 Park Avenue

New York City, NY · 383 permits on file

383
Permits on file
29
Unique contractors
$1,445,069,767
Declared value (all work)

Permits on file (383)

Ordered most recent first. Data from the city's open data portal.

Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $519,925
Protection and Mechanical Methods Initial Permit
Use of building maintenance unit (bmu) #3, as per plans filed herewith. this application is filed in conjunction with nb-121205604.
Status: Permit Issued
Declared cost: $1,000
Protection and Mechanical Methods Initial Permit
Use of building maintenance unit (bmu) #2, as per plans filed herewith. this application is filed in conjunction with nb-121205604.
Status: Permit Issued
Declared cost: $1,000
Protection and Mechanical Methods Initial Permit
Use of building maintenance unit (bmu) #4, as per plans filed herewith. this application is filed in conjunction with nb-121205604.
Status: Permit Issued
Declared cost: $1,000
Sidewalk Shed Initial Permit
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $2,000
Construction Fence Renewal Permit Without Changes
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed on sidewalk/roadway.
Status: Permit Issued
Declared cost: $3,000
Structural Renewal Permit Without Changes
As per hub consultation in conjunction with nb #121205604 (slab removal, interconnecting stair structure and stair support, interconnecting stair detailing, guard rail support, smoke baffle support - beam reinforcement, existing connection
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $573,630
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary overhead protection during nb const, filed sep. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of suspended quik deck access platform as per drawings. quik deck access platform shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $50,000
Supported Scaffold Renewal Permit Without Changes
Temporary system scaffold as per drawings. system scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $50,000
Protection and Mechanical Methods Renewal Permit Without Changes
Temporary work platforms as per drawings. work platforms shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $10,000
Protection and Mechanical Methods Renewal Permit Without Changes
South loading dock @ park ave: temporary loading dock as per drawings. loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application
Status: Permit Issued
Declared cost: $6,000
Sidewalk Shed Renewal Permit Without Changes
Phase 3b: installation of heavy duty sidewalk shed during new building construction, filed separately. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $10,000
Protection and Mechanical Methods Renewal Permit Without Changes
Temporary quik deck platform system as per drawings. quik deck platform system shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $10,000
Supported Scaffold Renewal Permit Without Changes
Temporary supported scaffold platform as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $5,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 13&14: installation of dual 10250# capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Cars 7, 8, 9, 10, 11, 12, 13 & 14: temporary hoist run-back structure during nb const, filed sep. hoist run-back structure shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appl. hoist & elevator appl.
Status: Permit Issued
Declared cost: $25,000
Sidewalk Shed Renewal Permit Without Changes
Installation of heavy duty sidewalk shed for nb construction, filed sep under app # 121205604. sidewalk shed shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this application. dot permit by others for shed
Status: Permit Issued
Declared cost: $65,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 7&8: installation of dual 7500 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl su
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 9&10: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl s
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 11&12: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary loading dock as per drawings. temporary loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $20,000
Standpipe Renewal Permit Without Changes
As per hub consultation filed in conjunction to nb 121205604. modification to existing sd system (scope of work submitted under this application extends existing core and shell wet sp scope to support new fit-out wet sp scope) as per plans
Status: Permit Issued
Declared cost: $14,000
Standpipe Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler and standpipe system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $734,000
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler and standpipe system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $734,000
General Construction Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for installation of interior nonbearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $6,471,369
General Construction Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. interior fit-out, floors 3-6
Status: Signed-off
Declared cost: $78,458,378
General Construction Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. interior fit-out, floors 7-10
Status: Signed-off
Declared cost: $78,458,378
Supported Scaffold Initial Permit
Temporary haki system scaffold as per drawings. haki system scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $4,000
Protection and Mechanical Methods Initial Permit
Mini-crane
Status: Signed-off
Declared cost: $5,000
Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $2,196,712
Mechanical Systems Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution
Status: Permit Issued
Declared cost: $1,089,790
Protection and Mechanical Methods Initial Permit
Upper ground floor artwallinstallation gantry
Status: Signed-off
Declared cost: $200,000
Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $152,731
Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $519,925
Mechanical Systems Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope submitted under this application entails interior fitout work for office space.the systeminclude: ductwork, distribution and commercial cooking & venti
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $11,757,606
General Construction Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for installation of interior nonbearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $31,199,320
Standpipe Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing standpipe system as per plans filed herewith.
Status: Permit Issued
Declared cost: $14,100
Structural Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. partition wall support. general construction. no change in egress, use, or occupancy.
Status: Permit Issued
Declared cost: $1,956,025
Structural Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. partition wall support. general construction. no change in egress, use, or occupancy.
Status: Permit Issued
Declared cost: $1,956,025
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $190,000
Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $1,622,678
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $717,585
Protection and Mechanical Methods Renewal Permit Without Changes
Use of building maintenance unit as per plans filed herewith. this application is filed in conjunction with nb-121205604.
Status: Permit Issued
Declared cost: $1,000
Curb Cut Initial Permit
Proposed curb cut for access to sub cellar parking and loading for a new office building.
Status: Permit Issued
Declared cost: $1,000
Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Contractor: MAC FELDER INC
Status: Permit Issued
Declared cost: $194,125
Plumbing Renewal Permit with Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Contractor: MAC FELDER INC
Status: Permit Issued
Declared cost: $347,582
Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Contractor: MAC FELDER INC
Status: Permit Issued
Declared cost: $147,553
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution
Status: Permit Issued
Declared cost: $2,817,054
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $463,065
Sprinklers Renewal Permit Without Changes
Installation of new sprinkler and standpipe system in conjunction to new building application 121205604.
Status: Permit Issued
Declared cost: $2,000
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $680,928
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $959,867
Protection and Mechanical Methods Initial Permit
Installation of a temporary adt access system on the 1st floor as per plans. no change in use, egress or occupancy under this application. scaffold to comply with chapter 33 of nyc building code of 2022.
Contractor: GREG LOGISTICS LLC
Status: Permit Issued
Declared cost: $10,000
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $673,005
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $963,207
Plumbing Renewal Permit with Changes
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing plumbing fixtures as per plans filed herewith
Status: Permit Issued
Declared cost: $3,009,725
Plumbing Renewal Permit with Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $577,250
Plumbing Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. tenant fitout of office space pantries, mothers rooms, and hydration stations.
Contractor: MAC FELDER INC
Status: Permit Issued
Declared cost: $984,029
Plumbing Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. tenant fitout of office space pantries, mothers rooms, and hydration stations.
Contractor: MAC FELDER INC
Status: Permit Issued
Declared cost: $984,029
Mechanical Systems Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution
Status: Permit Issued
Declared cost: $8,657,943
General Construction Renewal Permit Without Changes
As per hub consultation this interior tenant renovation of non interior partitions and related finishes ot application is filed in conjunction with nb application 121205604 and related finishes as per plans filed herewith. no change in use
Status: Permit Issued
Declared cost: $6,589,977
Mechanical Systems Renewal Permit Without Changes
As per hub consultation in conjunction with nb #121205604 the work is to extends existing core and shell outside airductwork, chilled and hot water piping, cold condensate piping to new terminal units for space ventilation and conditioning
Status: Permit Issued
Declared cost: $5,798,163
General Construction Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $9,341,162
Mechanical Systems Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution
Status: Permit Issued
Declared cost: $14,142,395
Protection and Mechanical Methods Initial Permit
Temporary quik deck platform system as per drawings. quik deck platform system shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $10,000
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $1,305,610
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $680,958
General Construction Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $17,025,242
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $1,356,783
Protection and Mechanical Methods Initial Permit
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $4,590
Sprinklers Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing sprinkler system as per plans filed herewith.
Status: Permit Issued
Declared cost: $781,675
Protection and Mechanical Methods Initial Permit
Installation of temporary work platform as per plans in conjunction with nb construction. no change in use, egress or occupancy. work platform shall comply with chapter 33 of nyc building code of 2022.
Status: Signed-off
Declared cost: $5,000
Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $323,972
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for installation of interior nonbearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $27,586,775
Sprinklers Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing sprinkler system and standpipe system as per plans filed herewith.
Status: Permit Issued
Declared cost: $1,712,499
Sprinklers Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing sprinkler system and standpipe system as per plans filed herewith.
Status: Permit Issued
Declared cost: $1,712,499
Standpipe Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing sprinkler system and standpipe system as per plans filed herewith.
Status: Permit Issued
Declared cost: $1,712,499
Sprinklers Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing sprinkler system and standpipe system as per plans filed herewith.
Status: Permit Issued
Declared cost: $1,712,499
Plumbing Renewal Permit Without Changes
As per hub consultation in conjunction with nb #121205604. modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $560,123
Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $164,646
Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $152,731
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Contractor: PACE PLUMBING CORP
Status: Permit Issued
Declared cost: $577,250
Mechanical Systems Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution
Status: Permit Issued
Declared cost: $10,536,637
Supported Scaffold Renewal Permit Without Changes
Temporary supported scaffold platform as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $5,000
Protection and Mechanical Methods Renewal Permit Without Changes
Temporary suspended quik deck platform as per drawings. quick deck platform shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $15,000
General Construction Renewal Permit Without Changes
As per hub consultation this interior ot application is filed in conjunction with nb application 121205604 for construction of non interior partitions and related finishes as per plans filed herewith. no change in use, egress or use undr
Status: Permit Issued
Declared cost: $20,514,570
Mechanical Systems Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution. no change in use, e
Status: Signed-off
Declared cost: $7,173,768
General Construction Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. removal and installation of interior nonbearing partitions as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $35,365,614
Mechanical Systems Renewal Permit Without Changes
As per hub consultation in conjunction with nb #121205604 the work is to extends existing core and shell outside airductwork, chilled and hot water piping, cold condensate piping to new terminal units for space ventilation and conditioning
Status: Signed-off
Declared cost: $9,481,720
Mechanical Systems Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution
Status: Signed-off
Declared cost: $14,388,276
General Construction Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $10,963,477
General Construction Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $8,463,073
General Construction Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. interior fit-out, floors 7-10
Status: Signed-off
Declared cost: $78,458,378
General Construction Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $15,442,445
General Construction Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $8,411,009
General Construction Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. interior fit-out, floors 3-6
Status: Signed-off
Declared cost: $78,458,378
Mechanical Systems Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing hvac system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $6,279,206
Mechanical Systems Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing hvac system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $6,279,206
Structural Initial Permit
Miscellaneous structural support steel related to pops art walls on madison avenue related to new building 121205604
Status: Signed-off
Declared cost: $2,898,074
Structural Initial Permit
As per hub consultation in conjunction with nb #121205604 (slab removal, interconnecting stair structure and stair support, interconnecting stair detailing, guard rail support, smoke baffle support - beam reinforcement, existing connection
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $573,630
General Construction Initial Permit
Removal of existing interior partitions and finishes. no change in use, egress, or occupancy under this application: installation of temporary field office for 50th floor use during nb construction filed separately under 121205604
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $1,000
Suspended Scaffold Initial Permit
Temporary suspended scaffold as per drawings during nb const, filed sep. suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for interior construction of non-load bearing interior partitions, related finishes and interconnecting stair from level 46 to 48 as per plans. no change in use, egress or occu
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $31,198,721
Boiler Equipment Initial Permit
New installation of new electric boilers as per plans filed herewith in conjuction with new building 121205604.
Status: Permit Issued
Declared cost: $1,000
Boiler Equipment Initial Permit
New installation of new electric boilers as per plans filed herewith in conjuction with new building 121205604.
Status: Permit Issued
Declared cost: $1,000
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $8,737,568
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary loading dock as per drawings. temporary loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 11&12: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Cars 7, 8, 9, 10, 11, 12, 13 & 14: temporary hoist run-back structure during nb const, filed sep. hoist run-back structure shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appl. hoist & elevator appl.
Status: Permit Issued
Declared cost: $25,000
Sidewalk Shed Renewal Permit Without Changes
Phase 3b: installation of heavy duty sidewalk shed during new building construction, filed separately. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Supported Scaffold Renewal Permit Without Changes
Temporary system scaffold as per drawings. system scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $50,000
Protection and Mechanical Methods Renewal Permit Without Changes
South loading dock @ park ave: temporary loading dock as per drawings. loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application
Status: Permit Issued
Declared cost: $6,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of suspended quik deck access platform as per drawings. quik deck access platform shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $50,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 13&14: installation of dual 10250# capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 9&10: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl s
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Temporary work platforms as per drawings. work platforms shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $10,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary overhead protection during nb const, filed sep. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Sidewalk Shed Renewal Permit Without Changes
Installation of heavy duty sidewalk shed for nb construction, filed sep under app # 121205604. sidewalk shed shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this application. dot permit by others for shed
Status: Permit Issued
Declared cost: $65,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 7&8: installation of dual 7500 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl su
Status: Permit Issued
Declared cost: $20,000
Construction Fence Renewal Permit Without Changes
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed on sidewalk/roadway.
Status: Permit Issued
Declared cost: $3,000
Structural Initial Permit
As per hub consultation in conjunction with nb #121205604 for structural modifications as per plans filed herewith (connecting steel stairs between floors, reinforcing existing beams for stairs loads). no change in use, eg
Status: Signed-off
Declared cost: $290,500
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler and standpipe system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $734,000
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler and standpipe system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $734,000
Standpipe Initial Permit
As per hub consultation filed in conjunction to nb 121205604. modification to existing sd system (scope of work submitted under this application extends existing core and shell wet sp scope to support new fit-out wet sp scope) as per plans
Status: Permit Issued
Declared cost: $14,000
General Construction Initial Permit
As per hub consultation this interior ot application is filed in conjunction with nb 121205604 for construction of non interior partitions and related finishes as per plans filed herewith. no change in use, egress or use undr this applica
Status: Permit Issued
Declared cost: $5,100,385
Plumbing Initial Permit
As per hub consultation in conjunction with nb #121205604. modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $168,350
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $385,600
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for installation of interior nonbearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $6,553,014
Protection and Mechanical Methods Initial Permit
Temporary suspended work platform as per drawings. suspended work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for installation of interior nonbearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $6,471,369
Structural Initial Permit
As per hub consultation in conjunction with nb #121205604 for structural modifications as per plans filed herewith (connecting steel stairs between floors, railing around floors openings, reinforcing existing beams for stairs loads). no ch
Status: Permit Issued
Declared cost: $217,840
Structural Initial Permit
As per hub consultation in conjunction with nb #121205604 for structural modifications as per plans filed herewith (connecting steel stairs between floors, reinforcing existing beams for stairs loads). no change in use, eg
Status: Permit Issued
Declared cost: $795,897
Structural Initial Permit
As per hub consultation in conjunction with nb #121205604 for structural modifications as per plans filed herewith (connecting steel stairs between floors, railing around floors openings, reinforcing existing beams for stairs loads). no ch
Status: Permit Issued
Declared cost: $13,888
Structural Initial Permit
As per hub consultation in conjunction with nb #121205604 for structural modifications as per plans filed herewith (connecting steel stairs between floors, reinforcing existing beams for stairs loads). no change in use, egress or occupancy
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $310,900
Structural Initial Permit
As per hub consultation in conjunction with nb #121205604 for structural modifications as per plans filed herewith (connecting steel stairs between floors, railing around floors openings, reinforcing existing beams for stairs loads). no ch
Status: Permit Issued
Declared cost: $116,850
Supported Scaffold Initial Permit
Temporary supported scaffold platform as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $5,000
Structural Initial Permit
As per hub consultation in conjunction with nb #121205604 for structural modifications as per plans filed herewith (connecting steel stairs between floors, railing around floors openings, reinforcing existing beams for stairs loads). no ch
Status: Permit Issued
Declared cost: $261,995
Structural Initial Permit
As per hub consultation this structural application is for modifications as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $130,998
Structural Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for structural modifications as per plans filed (cast-in-place isolated topping slab, raised concrete slab, field beam penetration, folding partition support, new slab opening
Status: Permit Issued
Declared cost: $218,912
Structural Initial Permit
As per hub consultation in conjunction with nb #121205604 for structural modifications as per plans filed herewith (connecting steel stairs between floors, railing around floors openings, reinforcing existing beams for stairs loads). no ch
Status: Permit Issued
Declared cost: $9,188
Structural Initial Permit
As per hub consultation in conjunction with nb #121205604 for structural modifications as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $130,998
Protection and Mechanical Methods Initial Permit
Use of temporary mini crane construction equipment during new building construction, filed separately under 121205604.
Contractor: MONUMENTAL INC
Status: Signed-off
Declared cost: $7,650
General Construction Initial Permit
Installation of nonload bearing partitions & related finishes in support of a temporary construction field office; all temporary partitions erected shall be removed at the time of project completion. there is no change to occupancy, use or
Status: Signed-off
Declared cost: $199,980
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of telehandler during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $350,000
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution
Status: Permit Issued
Declared cost: $1,089,790
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution
Status: Permit Issued
Declared cost: $1,293,998
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $519,925
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $361,179
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $346,327
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $2,196,712
General Construction Initial Permit
Installation of multiple shanties within building for use during new building construction filed separately under 121205604.
Status: Signed-off
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of telehandler during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $350,000
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Signed-off
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
General Construction Renewal Permit Without Changes
Installation of multiple shanties and temporary bathroom structures within building for use during new building construction filed separately under 121205604.
Status: Permit Issued
Declared cost: $1,067,000
Standpipe Initial Permit
As per hub consultation filed in conjunction to nb 121205604. modification to existing standpipe system as per plans filed herewith.
Status: Signed-off
Declared cost: $15,057
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $1,622,678
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $717,585
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $269,522
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for installation of interior nonbearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $31,199,320
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope submitted under this application entails interior fitout work for office space.the systeminclude: ductwork, distribution and commercial cooking & venti
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $11,757,606
Structural Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. partition wall support. general construction. no change in egress, use, or occupancy.
Status: Permit Issued
Declared cost: $1,956,025
Structural Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. partition wall support. general construction. no change in egress, use, or occupancy.
Status: Permit Issued
Declared cost: $1,956,025
Standpipe Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing standpipe system as per plans filed herewith.
Status: Permit Issued
Declared cost: $14,100
Supported Scaffold Renewal Permit Without Changes
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Contractor: RAD & D'APRILE INC
Status: Signed-off
Declared cost: $9,000
Supported Scaffold Renewal Permit Without Changes
Installation of temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Contractor: RAD & D'APRILE INC
Status: Signed-off
Declared cost: $50,000
General Construction Renewal Permit Without Changes
Concrete construction loads imposed during the construction sequence. all other required permits will be filed as part of the new building (nb) application.
Status: Signed-off
Declared cost: $5,000
Standpipe Renewal Permit Without Changes
Installation of new sprinkler and standpipe system in conjunction to new building application 121205604.
Status: Permit Issued
Declared cost: $2,000
Mechanical Systems Initial Permit
As per hub consultation in conjunction with nb #121205604 the work is to extends existing core and shell outside airductwork, chilled and hot water piping, cold condensate piping to new terminal units for space ventilation and conditioning
Status: Permit Issued
Declared cost: $5,798,163
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Contractor: MAC FELDER INC
Status: Permit Issued
Declared cost: $194,125
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Contractor: MAC FELDER INC
Status: Permit Issued
Declared cost: $347,582
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution
Status: Permit Issued
Declared cost: $8,657,943
Protection and Mechanical Methods Initial Permit
Temporary suspended quik deck platform as per drawings. quick deck platform shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $15,000
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $959,867
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $9,341,162
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $1,305,610
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $463,065
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $680,928
General Construction Initial Permit
As per hub consultation this interior tenant renovation of non interior partitions and related finishes ot application is filed in conjunction with nb application 121205604 and related finishes as per plans filed herewith. no change in use
Status: Permit Issued
Declared cost: $6,589,977
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution
Status: Permit Issued
Declared cost: $14,142,395
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $673,005
Protection and Mechanical Methods Initial Permit
Temporary trolley beam system as per drawings. trolley beam shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Boiler Equipment Renewal Permit with Changes
Installation of fuel oil storage tanks serving new emergency generator filing in conjunction to new building 121205604. fuel oil storage tanks are located on sub cellar#2.
Status: Signed-off
Declared cost: $1,000
Protection and Mechanical Methods Initial Permit
Use of building maintenance unit as per plans filed herewith. this application is filed in conjunction with nb-121205604.
Status: Permit Issued
Declared cost: $1,000
Plumbing Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. tenant fitout of office space pantries, mothers rooms, and hydration stations.
Contractor: MAC FELDER INC
Status: Permit Issued
Declared cost: $984,029
Plumbing Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. tenant fitout of office space pantries, mothers rooms, and hydration stations.
Contractor: MAC FELDER INC
Status: Permit Issued
Declared cost: $984,029
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $323,972
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $680,958
Standpipe Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing sprinkler system and standpipe system as per plans filed herewith.
Status: Permit Issued
Declared cost: $1,712,499
Sprinklers Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing sprinkler system and standpipe system as per plans filed herewith.
Status: Permit Issued
Declared cost: $1,712,499
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $1,356,783
Sprinklers Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing sprinkler system and standpipe system as per plans filed herewith.
Status: Permit Issued
Declared cost: $1,712,499
Standpipe Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing sprinkler system and standpipe system as per plans filed herewith.
Status: Permit Issued
Declared cost: $1,712,499
Sprinklers Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing sprinkler system as per plans filed herewith.
Status: Permit Issued
Declared cost: $781,675
Sprinklers Renewal Permit Without Changes
Installation of new sprinkler and standpipe system in conjunction to new building application 121205604.
Status: Permit Issued
Declared cost: $2,000
Sprinklers Initial Permit
As per hub consultation filed in conjunction with nb #121205604 modification to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $963,207
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $152,731
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $164,646
Plumbing Initial Permit
As per hub consultation in conjunction with nb #121205604. modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $560,123
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution
Status: Permit Issued
Declared cost: $10,536,637
Structural Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. partition wall support. general construction. no change in egress, use, or occupancy.
Status: Permit Issued
Declared cost: $2,912,885
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution. no change in use, e
Status: Signed-off
Declared cost: $7,173,768
Protection and Mechanical Methods Initial Permit
Temporary access platform for park ave hoists as per drawings, hoists filed under separate application. access platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $4,000
General Construction Initial Permit
As per hub consultation this interior ot application is filed in conjunction with nb application 121205604 for construction of non interior partitions and related finishes as per plans filed herewith. no change in use, egress or use undr
Status: Permit Issued
Declared cost: $20,514,570
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution
Status: Signed-off
Declared cost: $14,388,276
General Construction Initial Permit
Shoring system on 56th floor to support formwork for 58th floor concrete beams. all other required permits will be filed as part of the new building (nb) application.
Status: Signed-off
Declared cost: $5,000
Mechanical Systems Initial Permit
As per hub consultation in conjunction with nb #121205604 the work is to extends existing core and shell outside airductwork, chilled and hot water piping, cold condensate piping to new terminal units for space ventilation and conditioning
Status: Signed-off
Declared cost: $9,481,720
General Construction Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. interior fit-out, floors 7-10
Status: Signed-off
Declared cost: $78,458,378
Mechanical Systems Initial Permit
Modification to existing hvac system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $1,000,000
General Construction Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. removal and installation of interior nonbearing partitions as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $35,365,614
Mechanical Systems Renewal Permit with Changes
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing hvac system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $7,367,846
General Construction Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. interior fit-out, floors 3-6
Status: Signed-off
Declared cost: $78,458,378
Mechanical Systems Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing hvac system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $6,279,206
Mechanical Systems Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing hvac system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $6,279,206
Mechanical Systems Initial Permit
As per hub consultation this mh application is to extend existing core and shell outside airductwork, chilled/hot water piping, cold condensate piping to new terminal units for space ventilation/conditioning of meeting spaces, pantries/mult
Status: Signed-off
Declared cost: $3,200,000
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $17,025,242
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $10,963,477
Mechanical Systems Initial Permit
As per hub consultation in conjunction with nb #121205604 the work is to extends existing core and shell outside airductwork, chilled and hot water piping, cold condensate piping to new terminal units for space ventilation and conditioning
Status: Permit Issued
Declared cost: $15,750,000
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $15,442,445
Mechanical Systems Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing hvac system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $7,367,846
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $8,411,009
General Construction Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $8,463,073
Protection and Mechanical Methods Initial Permit
Temporary work platforms as per drawings. work platforms shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $10,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $10,000
Supported Scaffold Initial Permit
Temporary pipe scaffold at truck hoistway as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Contractor: RAD & D'APRILE INC
Status: Signed-off
Declared cost: $25,000
Protection and Mechanical Methods Initial Permit
Installation of suspended quik deck access platform as per drawings. quik deck access platform shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $50,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 7&8: installation of dual 7500 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl su
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary loading dock as per drawings. temporary loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $20,000
Sidewalk Shed Renewal Permit Without Changes
(phase 4: madison avenue): installation of heavy duty sidewalk shed on madison avenue as per drawings. no change in use, occupacy or egress under this application.
Status: Signed-off
Declared cost: $3,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary overhead protection at (stair o) as per drawings. temporary overhead protection shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $180,000
Sidewalk Shed Renewal Permit Without Changes
Installation of heavy duty sidewalk shed on madison avenue as per plans filed herewith. (phase 4) no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $3,000
Sidewalk Shed Renewal Permit Without Changes
Phase 3b: installation of heavy duty sidewalk shed during new building construction, filed separately. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Sidewalk Shed Renewal Permit Without Changes
Installation of heavy duty sidewalk shed for nb construction, filed sep under app # 121205604. sidewalk shed shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this application. dot permit by others for shed
Status: Permit Issued
Declared cost: $65,000
Protection and Mechanical Methods Renewal Permit Without Changes
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $2,000
Protection and Mechanical Methods Renewal Permit Without Changes
Temporary shoring at cellar level as per drawings. shoring shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $5,000
Protection and Mechanical Methods Renewal Permit Without Changes
Park ave hoist, north cars 3&4: installation of dual 7500# capacity personnel/material hoists during nb const filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app. elevator applicati
Status: Signed-off
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Park ave hoist, south cars 5&6: installation of dual 7500# capacity personnel/material hoists during nb const filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app. elevator applicati
Status: Signed-off
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary overhead protection as per drawings. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Park avenue loading dock: temporary loading dock as per drawings. loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $10,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary overhead protection during nb const, filed sep. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $8,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 13&14: installation of dual 10250# capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 11&12: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 9&10: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl s
Status: Permit Issued
Declared cost: $20,000
Construction Fence Renewal Permit Without Changes
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed on sidewalk/roadway.
Status: Permit Issued
Declared cost: $3,000
Protection and Mechanical Methods Renewal Permit Without Changes
South loading dock @ park ave: temporary loading dock as per drawings. loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application
Status: Permit Issued
Declared cost: $6,000
Protection and Mechanical Methods Renewal Permit Without Changes
Cars 7, 8, 9, 10, 11, 12, 13 & 14: temporary hoist run-back structure during nb const, filed sep. hoist run-back structure shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appl. hoist & elevator appl.
Status: Permit Issued
Declared cost: $25,000
Supported Scaffold Renewal Permit Without Changes
Temporary system scaffold as per drawings. system scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $50,000
Supported Scaffold Renewal Permit Without Changes
Truck elevator scaffold: installation of temporary truck elevator scaffold as per drawings. truck elevator scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $10,000
Supported Scaffold Renewal Permit Without Changes
Installation of temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Contractor: RAD & D'APRILE INC
Status: Signed-off
Declared cost: $15,000
Protection and Mechanical Methods Initial Permit
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $2,000
Protection and Mechanical Methods Initial Permit
Use of telehandler during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $350,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $8,000
Supported Scaffold Initial Permit
Temporary system scaffold as per drawings. system scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $50,000
Mechanical Systems Initial Permit
The mh scope of work extends existing core and shell outside airductwork, chilled water piping, hot water piping and cold condensate piping to new terminal units for space ventilation and conditioning of office and meeting spaces.
Status: Permit Issued
Declared cost: $18,500,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary overhead protection as per drawings. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $20,000
Protection and Mechanical Methods Initial Permit
South loading dock @ park ave: temporary loading dock as per drawings. loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application
Status: Permit Issued
Declared cost: $6,000
Protection and Mechanical Methods Initial Permit
Cars 7, 8, 9, 10, 11, 12, 13 & 14: temporary hoist run-back structure during nb const, filed sep. hoist run-back structure shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appl. hoist & elevator appl.
Status: Permit Issued
Declared cost: $25,000
General Construction Initial Permit
Installation of interior partitions and raised floor related to temporary mock-up offices space. all construction to be removed after the mock-up period
Status: Signed-off
Declared cost: $730,000
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of telehandler during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $10,120
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Signed-off
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Initial Permit
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Initial Permit
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Supported Scaffold Initial Permit
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Contractor: RAD & D'APRILE INC
Status: Signed-off
Declared cost: $9,000
Supported Scaffold Renewal Permit Without Changes
Installation of temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Contractor: RAD & D'APRILE INC
Status: Signed-off
Declared cost: $50,000
Supported Scaffold Renewal Permit Without Changes
Installation of temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Contractor: RAD & D'APRILE INC
Status: Signed-off
Declared cost: $15,000
Supported Scaffold Renewal Permit Without Changes
Installation of temporary scaffold for hoist erection only. hoist filed separately. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $1,500
Protection and Mechanical Methods Initial Permit
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Signed-off
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of telehandler during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $10,120
Protection and Mechanical Methods Initial Permit
Park avenue loading dock: temporary loading dock as per drawings. loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $10,000
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
General Construction Renewal Permit Without Changes
Concrete construction loads imposed during the construction sequence. all other required permits will be filed as part of the new building (nb) application.
Status: Signed-off
Declared cost: $5,000
Protection and Mechanical Methods Initial Permit
Installation and use of temporary material platforms as per plans filed herewith. no change in use, egress or occupancy.
Status: Permit Issued
Declared cost: $1,000
Protection and Mechanical Methods Renewal Permit Without Changes
Park ave hoist, south cars 5&6: installation of dual 7500# capacity personnel/material hoists during nb const filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app. elevator applicati
Status: Signed-off
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Park ave hoist, north cars 3&4: installation of dual 7500# capacity personnel/material hoists during nb const filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app. elevator applicati
Status: Signed-off
Declared cost: $20,000
General Construction Initial Permit
Installation of multiple shanties and temporary bathroom structures within building for use during new building construction filed separately under 121205604.
Status: Permit Issued
Declared cost: $1,067,000
Supported Scaffold Initial Permit
Installation of temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Contractor: RAD & D'APRILE INC
Status: Signed-off
Declared cost: $15,000
Supported Scaffold Initial Permit
Installation of temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Contractor: RAD & D'APRILE INC
Status: Signed-off
Declared cost: $50,000
Sprinklers Renewal Permit Without Changes
Installation of new sprinkler and standpipe system in conjunction to new building application 121205604.
Status: Permit Issued
Declared cost: $2,000
Sprinklers Renewal Permit Without Changes
Installation of new sprinkler and standpipe system in conjunction to new building application 121205604.
Status: Permit Issued
Declared cost: $2,000
Protection and Mechanical Methods Initial Permit
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Initial Permit
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Initial Permit
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
General Construction Initial Permit
Shoring system on 14th floor to support formwork for 17th floor concrete beams between gridlines tj & tk. all other required permits will be filed as part of the new building (nb) application.
Status: Signed-off
Declared cost: $5,000
Supported Scaffold Initial Permit
Installation of temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Contractor: RAD & D'APRILE INC
Status: Signed-off
Declared cost: $15,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary overhead protection during nb const, filed sep. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary overhead protection at (stair o) as per drawings. temporary overhead protection shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $180,000
Construction Fence Renewal Permit Without Changes
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed on sidewalk/roadway.
Status: Permit Issued
Declared cost: $3,000
Sidewalk Shed Renewal Permit Without Changes
(phase 4: madison avenue): installation of heavy duty sidewalk shed on madison avenue as per drawings. no change in use, occupacy or egress under this application.
Status: Signed-off
Declared cost: $3,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary suspended quikdeck platforms as per drawings. suspended quikdeck platforms shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $2,000
Protection and Mechanical Methods Renewal Permit Without Changes
Temporary shoring at cellar level as per drawings. shoring shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $5,000
Sidewalk Shed Renewal Permit Without Changes
Installation of heavy duty sidewalk shed on madison avenue as per plans filed herewith. (phase 4) no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $3,000
Sidewalk Shed Renewal Permit Without Changes
Phase 3b: installation of heavy duty sidewalk shed during new building construction, filed separately. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Sidewalk Shed Renewal Permit Without Changes
Installation of heavy duty sidewalk shed for nb construction, filed sep under app # 121205604. sidewalk shed shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this application. dot permit by others for shed
Status: Permit Issued
Declared cost: $65,000
Supported Scaffold Initial Permit
Installation of the temporary scaffold on the sub.cel-2, sub.cel-1 and ground floor. no change in use, egress, or occupancy under this application.
Status: Permit Issued
Declared cost: $8,000
Protection and Mechanical Methods Initial Permit
Use of telehandler during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $10,120
Boiler Equipment Renewal Permit Without Changes
Installation of fuel oil storage tanks serving new emergency generator filing in conjunction to new building 121205604. fuel oil storage tanks are located on sub cellar#2.
Contractor: S.J. FUEL CO., INC
Status: Signed-off
Declared cost: $1,000
Plumbing Initial Permit
Installation of underground plumbing in conjunction to new building application 121205604.
Contractor: PACE PLUMBING CORP
Status: Signed-off
Declared cost: $1,000
Supported Scaffold Initial Permit
Installation of temporary folding scaffolding approximately 45 feet in height within building of lobby floor slab.
Status: Signed-off
Declared cost: $5,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary loading dock as per drawings. temporary loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Initial Permit
Use of mini crane at 270 park avenue during major alteration, filed separately under 123656640
Contractor: BEACH ERECTORS INC
Status: Permit Issued
Declared cost: $10,400
Supported Scaffold Renewal Permit Without Changes
Truck elevator scaffold: installation of temporary truck elevator scaffold as per drawings. truck elevator scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $10,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $10,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 9&10: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl s
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 13&14: installation of dual 10250# capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 7&8: installation of dual 7500 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl su
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
48th st hoist cars 11&12: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Initial Permit
Installation of temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $8,000
Protection and Mechanical Methods Initial Permit
Installation of temporary overhead protection as per drawings. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $20,000
Boiler Equipment Initial Permit
Installation of fuel oil storage tanks serving new emergency generator filing in conjunction to new building 121205604. fuel oil storage tanks are located on sub cellar#2.
Contractor: S.J. FUEL CO., INC
Status: Signed-off
Declared cost: $1,000
Supported Scaffold Initial Permit
Installation of temporary scaffold for hoist erection only. hoist filed separately. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $1,500
General Construction Initial Permit
Concrete construction loads imposed during the construction sequence. all other required permits will be filed as part of the new building (nb) application.
Status: Signed-off
Declared cost: $5,000
Protection and Mechanical Methods Renewal Permit Without Changes
Park ave hoist, south cars 5&6: installation of dual 7500# capacity personnel/material hoists during nb const filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app. elevator applicati
Status: Signed-off
Declared cost: $20,000
Protection and Mechanical Methods Renewal Permit Without Changes
Park ave hoist, north cars 3&4: installation of dual 7500# capacity personnel/material hoists during nb const filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app. elevator applicati
Status: Signed-off
Declared cost: $20,000
Structural Initial Permit
In conjunction with nb 121205604; temporary material delivery truck access to existing building & plaza after partial demolition. steel ramps span from gct structure to building property line girders then concrete bridging slabs to buildin
Status: Signed-off
Declared cost: $1,020
Protection and Mechanical Methods Initial Permit
Installation of temporary overhead protection during nb const, filed sep. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Protection and Mechanical Methods Renewal Permit Without Changes
Installation of temporary overhead protection at (stair o) as per drawings. temporary overhead protection shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $180,000
Sidewalk Shed Renewal Permit Without Changes
Phase 3b: installation of heavy duty sidewalk shed during new building construction, filed separately. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Protection and Mechanical Methods Renewal Permit Without Changes
Temporary shoring at cellar level as per drawings. shoring shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $5,000
Protection and Mechanical Methods Initial Permit
Installation of temporary suspended quikdeck platforms as per drawings. suspended quikdeck platforms shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $2,000
Construction Fence Initial Permit
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed on sidewalk/roadway.
Status: Permit Issued
Declared cost: $3,000
Sidewalk Shed Initial Permit
(phase 4: madison avenue): installation of heavy duty sidewalk shed on madison avenue as per drawings. no change in use, occupacy or egress under this application.
Status: Signed-off
Declared cost: $3,000
Sidewalk Shed Renewal Permit Without Changes
Installation of heavy duty sidewalk shed for nb construction, filed sep under app # 121205604. sidewalk shed shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this application. dot permit by others for shed
Status: Permit Issued
Declared cost: $65,000
Supported Scaffold Renewal Permit Without Changes
Installation of pipe scaffold in elevator pit as per drawings. scaffold shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application
Status: Signed-off
Declared cost: $10,000
Sidewalk Shed Renewal Permit Without Changes
Installation of heavy duty sidewalk shed on madison avenue as per plans filed herewith. (phase 4) no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $3,000
Protection and Mechanical Methods Initial Permit
48th st hoist cars 7&8: installation of dual 7500 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl su
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Initial Permit
48th st hoist cars 9&10: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl s
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Initial Permit
48th st hoist cars 11&12: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Initial Permit
48th st hoist cars 13&14: installation of dual 10250# capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator appl
Status: Permit Issued
Declared cost: $20,000
Standpipe Initial Permit
Installation of new sprinkler and standpipe system in conjunction to new building application 121205604.
Status: Permit Issued
Declared cost: $2,000
Sprinklers Initial Permit
Installation of new sprinkler and standpipe system in conjunction to new building application 121205604.
Status: Permit Issued
Declared cost: $2,000
Plumbing Renewal Permit Without Changes
Filing temporary plumbing application as shown on drawings filed herewith.
Contractor: PACE PLUMBING CORP
Status: Signed-off
Declared cost: $1,176,205
Protection and Mechanical Methods Initial Permit
Installation of temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $10,000
Supported Scaffold Initial Permit
Truck elevator scaffold: installation of temporary truck elevator scaffold as per drawings. truck elevator scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $10,000
Plumbing Renewal Permit Without Changes
Filing temporary plumbing application as shown on drawings filed herewith.
Contractor: PACE PLUMBING CORP
Status: Signed-off
Declared cost: $1,176,205
Construction Fence Renewal Permit Without Changes
Installation of temporary construction fence. no change to use, egress or occupancy.
Status: Signed-off
Declared cost: $3,000
Protection and Mechanical Methods Initial Permit
Installation of temporary loading dock as per drawings. temporary loading dock shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $20,000
Protection and Mechanical Methods Initial Permit
Park ave hoist, south cars 5&6: installation of dual 7500# capacity personnel/material hoists during nb const filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app. elevator applicati
Status: Signed-off
Declared cost: $20,000
Protection and Mechanical Methods Initial Permit
Park ave hoist, north cars 3&4: installation of dual 7500# capacity personnel/material hoists during nb const filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app. elevator applicati
Status: Signed-off
Declared cost: $20,000
Supported Scaffold Initial Permit
Installation of scaffold stair tower as per drawings. scaffold stair tower shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Signed-off
Declared cost: $10,000
Protection and Mechanical Methods Initial Permit
Use of building maintenance unit (bmu) #1, as per plans filed herewith. this application is filed in conjunction with nb-121205604.
Status: Permit Issued
Declared cost: $1,000
General Construction Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for interior construction of non-load bearing interior partitions, related finishes and interconnecting stair from level 46 to 48 as per plans. no change in use, egress or occu
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $31,198,721
Mechanical Systems Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $8,737,568
Structural Renewal Permit Without Changes
As per hub consultation this structural application is for modifications as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $130,998
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Signed-off
Declared cost: $346,327
Sprinklers Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $361,179
Plumbing Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $269,522
Structural Renewal Permit Without Changes
As per hub consultation in conjunction with nb #121205604 for structural modifications as per plans filed herewith (connecting steel stairs between floors, reinforcing existing beams for stairs loads). no change in use, egress or occupancy
Contractor: STRUCTURE TONE, LLC
Status: Permit Issued
Declared cost: $310,900
Standpipe Renewal Permit Without Changes
Installation of new sprinkler and standpipe system in conjunction to new building application 121205604.
Status: Permit Issued
Declared cost: $2,000
Protection and Mechanical Methods Renewal Permit Without Changes
Temporary trolley beam system as per drawings. trolley beam shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Status: Permit Issued
Declared cost: $3,000
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $461,450
Mechanical Systems Initial Permit
As per hub consultation in conjunction with nb #121205604 the work is to extends existing core and shell outside airductwork, chilled and hot water piping, cold condensate piping to new terminal units for space ventilation and conditioning
Status: Permit Issued
Declared cost: $3,485,685
Structural Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for structural modifications as per plans filed herewith. no change in use, egress or occupancy under this application.
Status: Permit Issued
Declared cost: $114,150
Plumbing Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for modification to existing plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy under this application.
Contractor: MAC FELDER INC
Status: Permit Issued
Declared cost: $147,553
Plumbing Initial Permit
To be assigned to development hub; filed in conjunction to nb 121205604. modification to existing plumbing fixtures as per plans filed herewith
Contractor: PACE PLUMBING CORP
Status: Permit Issued
Declared cost: $3,009,725
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of telehandler during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $350,000
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Protection and Mechanical Methods Renewal Permit Without Changes
Use of mini crane during new building construction, filed separately under 121205604.
Contractor: CORE ERECTORS,LLC
Status: Permit Issued
Declared cost: $74,340
Mechanical Systems Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution
Status: Permit Issued
Declared cost: $1,293,998
Mechanical Systems Renewal Permit Without Changes
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution. no change in use, e
Status: Permit Issued
Declared cost: $7,147,400
Mechanical Systems Initial Permit
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution. no change in use, e
Status: Permit Issued
Declared cost: $7,147,400
General Construction Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. interior fit-out, floors 3-6
Status: Permit Issued
Declared cost: $78,458,378
General Construction Renewal Permit Without Changes
To be assigned to development hub; filed in conjunction to nb 121205604. interior fit-out, floors 7-10
Status: Permit Issued
Declared cost: $78,458,378

Check permits at another New York City address

Free instant lookup, no signup.

Search New York City permits →
Disclaimer: Permit data comes from New York City's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the New York City building department before buying, selling, or planning work.