Permit history for 1 Manhattan Plaza

New York City, NY · 410 permits on file

410
Permits on file
35
Unique contractors
$17,148,820
Declared value (all work)

Permits on file (410)

Ordered most recent first. Data from the city's open data portal.

General Construction Initial Permit
Temporary tent on the sidewalk for a premiere at the dga theater. removed at the end of the programing. no changes to existing structures, use or egress. moftb permit #45952
Contractor: ACE RENTAL CORP
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install of temp platform and frame structure, no alt to exist structures for masters at msp. a tpa not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Contractor: EVENTPERMITS, LLC
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install temporary structure-greenhouse. no alteration to existing structures. tpa permit not required. producer responsible to monitor safety & implement hwap.
Status: Permit Issued
Declared cost: $7,500
General Construction Initial Permit
Temporary structures for ouai shower sculpture gansevoort plaza. removed at the end of the programing. no changes to existing structures, use or egress. sapo# 919885
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event chili's facade. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Permit Issued
Declared cost: $5,000
Structural Renewal Permit Without Changes
Application filed for installation of temporary bleachers that will be set up on a city sidewalk on 5th avenue at 64th street for the temporary event, st. patrick's day parade. no change in use, egress or occupancy.
Status: Permit Issued
Declared cost: $24,990
General Construction Initial Permit
Temporary installations to be used on a temporary event project hail mary. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Proposed general construction as per plans
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $1,100,000
Mechanical Systems Renewal Permit Without Changes
Proposed mechanical work in conjunction with nb application m00648045.
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $101,000
General Construction Initial Permit
Temporary installations to be used on a temporary event survivor 50. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Installation of temporary bleachers at central park west and 71st st.no alt to exist structures for japan day paradea tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Proposed foundation and structural work in conjunction with application m00652446
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $844,100
General Construction Renewal Permit Without Changes
Proposed foundation and structural work in conjunction with application m00652446
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $844,100
Structural Renewal Permit Without Changes
Proposed foundation and structural work in conjunction with application m00652446
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $844,100
General Construction Initial Permit
Temporary tent for a film premiere red carpet on the sidewalk adjacent to the sva theater. removed at the end of the programing. no changes to existing structures, use or egress. mome id # 912801
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event mercy premier. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install & remove temp speaker towers for times square new years eve 2026 plaza partner event, no alteration to existing structures. tpa not required. sapo permit #905936. producer responsible to monitor event weather/implement appropriate a
Status: Signed-off
Declared cost: $5,500
General Construction Initial Permit
Install & remove temp staging structures & car display for tsq new years eve 2026 plaza partner event, no alteration to existing structures. tpa not required. sapo permit #905936. producer responsible to monitor event weather/implement appr
Status: Signed-off
Declared cost: $20,500
General Construction Initial Permit
Install & remove temp cable camera line w. supporting towers for new years eve 2026 plaza partner event, no alteration to existing structures. sapo permit #905936. producer responsible to monitor event weather/implement appropriate actions.
Status: Signed-off
Declared cost: $8,000
General Construction Initial Permit
Install & remove temp tent structure for times square new years eve 2026 plaza partner event, no alteration to existing structures. tpa not required. sapo permit #905936. producer responsible to monitor event weather/implement appropriate a
Status: Signed-off
Declared cost: $10,000
General Construction Initial Permit
Temporary platform for nye broadcast. military sq pedestrian plaza, 7th ave &44th street. sapo req. removed at the end of the programing. no changes to existing structures, use or egress.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event fifa world cup draw viewing. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent(s)/s&r wall(s)/equip. in/on walk/curb./st. in front of the amc 13 lincoln sq. theater, 1998 broadway., ny, ny 10023. producer to monitor weather conditions & implement appropriate action plan. no alt. to exist. struct(s).
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure on the sidewalk for chamet. removed at the end of the programing. corner of bowery&kenmare st.no changes to existing structures, use or egress. sapo event id 895743.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event gisou holiday pup pop-up. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event. all the installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event seaport christmas tree . all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for the bowery mission thanksgiving on the bowery. sapo # 894846.removed after the programming. no changes to the existing structures, use or egress.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install of temp exterior scenic walls, no alt to exist structures for nbcu thanksgiving marquee. tpa not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Permit Issued
Declared cost: $5,000
Plumbing Renewal Permit Without Changes
Proposed plumbing work in conjunction with application m00652446.
Status: Permit Issued
Declared cost: $448,000
General Construction Initial Permit
Temporary installations to be used on a temporary event columbus circle holiday market. all the installations are to be removed upon completion the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent(s)/s&r wall(s)/equip. in/on walk/curb./st. in front of the school of visual arts, 333 west 23rd st., ny, ny 10011. producer to monitor weather conditions & implement appropriate action plan. no alt. to exist. struct(s). m
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for 2025 macy's thanksgiving parade. no alterations to existing structures. producer is responsible to monitor site safety & implement appropriate actions. all equipment removed upon event completion.
Contractor: MACY'S INC
Status: Permit Issued
Declared cost: $30,000
General Construction Initial Permit
Install temp platform, trussing, tents no alt to exist structures for annual thanksgiving parade tv production, herald sq. tpa not required. producer responsible to monitor site safety & implement hwap. production equip removed at event com
Status: Permit Issued
Declared cost: $17,500
General Construction Initial Permit
Temporary structures for an outdoor event on jersey street. removed at the end of the programing. no changes to existing structures, use or egress. sapo 887776
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event grayscale. all the installations are to be removed upon completion the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent(s)/s&r wall(s)/equip. in/on walk/curb./st. in front of the amc lincoln square 13, 1998 broadway, ny, ny 10023. producer to monitor weather conditions & implement appropriate action plan. no alt. to exist. struct(s). moftb
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event baccarat chandelier. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event rivian nasdaq. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Install temp tents, platform, truss, no alt to exist structures for annual bloomingdale's window 2024 holiday reveal. tpa permit not required. producer responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $7,500
General Construction Initial Permit
Temporary installations to be used on a temporary event nyc wine and food - outdoor campus. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent(s)/s&r wall(s)/equip. in/on walk/curb./st. in front of the amc lincoln square 13, 1998 broadway, ny, ny 10023. producer to monitor weather conditions & implement appropriate action plan. no alt. to exist. struct(s). moftb
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event nordvpn. all the installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary platform and prod equipment, no alt to the exist structure, for athlos at times square. no tpa reqd. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event completion
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event marshall's activation. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary red carpet partition on the sidewalk for a movie screening at cinema village. moftb permits 44587.removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used for temporary event grasshopper 2025. all installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tent, platforms and trussing, no alt to exist structures for annual macy's fashion week. tpa required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event complet
Status: Permit Issued
Declared cost: $7,500
General Construction Initial Permit
Temporary structures on the sidewalk, entry tent for a gala adjacent to 99 e52 street . removed at the end of the programing. no changes to existing structures, use or egress. sapo permit required.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent(s)/s&r wall(s)/equip. in/on walk/curb./st. in front of the school of visual arts; 333 west 23rd street, ny, ny 10011. producer to monitor weather conditions & implement appropriate action plan. no alt. to exist. struct(s)
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Install of temp tent, platforms, finish line truss, no alt to exist structures for annual 5th ave mile. tpa not required. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event complete
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent(s)/s&r wall(s)/equip. in/on walk/curb./st. in front of the school of visual arts; 333 west 23rd street, ny, ny 10011. producer to monitor weather conditions & implement appropriate action plan. no alt. to exist. struct(s)
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install of temp scenic truss structure, no alt to exist structures for unstoppables on exist sidewalk. tpa not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Install of temp tent, platforms, finish line truss, no alt to exist structures for annual 5th ave mile. tpa not required. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event complete
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
The scope of work to include temporary structure located at washington street closure (between w 13th street and w 14th street) for breitling event schedule on 8/27/25. all temporary installation to be removed upon completion of event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent(s)/s&r wall(s)/equip. in/on sidewalk/curbside/street in front of amc lincoln sq. 13 at 1998 broadway, n.y., n.y. 10023. producer to monitor weather conditions & implement appropriate action. no alt. to exist. struct.(s).
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary entry structure for an event at gotham hall, on the sidewalk and broadway. sapo id #878798.removed at the end of the programing. no changes to existing structures, use or egress.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
The scope of work to include temporary structure located at gansevoort plaza for o positive event schedule on 8/23/25. all temporary installation to be removed upon completion of event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Installation of temp platform for vip seating w/ shade canopy, no alt to exist structures for annual german-american steuban parade. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Contractor: ACE RENTAL CORP
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary tents, inflatable screen, platform, amusement, no alt to the exist structure. tpa by others. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event completion
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent(s)/arch in/on sidewalk/curbside/street in front of amc lincoln square 13 located at 1998 broadway, n.y., n.y. 10023. producer to monitor weather conditions & implement appropriate action. no alt. to exist. structure(s). m
Status: Signed-off
Declared cost: $5,000
Structural Initial Permit
Prefabricated temporary structure for 3 day event.
Status: Signed-off
Declared cost: $50,000
General Construction Initial Permit
Install of temp inflatable screen, no alt to exist structures for seasonal movies at gansevoort plaza. tpa not reqd. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event complete
Contractor: EVENTPERMITS, LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent/s&r wall in/on sidewalk/curbside/street in front of school of visual arts located at 333 w 23rd st, ny, ny 10011. producer to monitor weather conditions & implement appropriate action. no alteration to exist. structures.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used for a temporary event heaven book launch. all installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event sl green press conference. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event megan 2.0 premier. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp platform, no alt to exist structures for america onchain. a tpa permit not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install of temp inflatables, no alt to exist structures for netflix squid games adjacent paris theater. tpa not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event complete
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for f1 the movie premiere in times square, broadway plz/f.duffy sq. sapo permit #819331. removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $13,000
General Construction Initial Permit
Temporary tents accessory to a tff event at 145w broadway. sapo# required. removed at the end of the programing. no changes to existing structures, use or egress
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tent, platform, no alt to exist structures for world pride at worth square. a tpa permit is required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completi
Status: Permit Issued
Declared cost: $7,500
General Construction Initial Permit
Temporary installations to be used on a temporary event coinbase. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent/s&r wall in/on sidewalk/curbside/street in front of amc lincoln square 13 located at 1998 broadway, ny, ny 10023. producer to monitor weather conditions & implement appropriate action. no alteration to exist. structures.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary platform for steps on broadway event on 74th st, between broadway and west end. to be removed at the end of the programing. no changes to existing structures, use or egress. sapo#848998
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for bloomberg relay 2025 fulton st and fronts st. all structures removed after the programming. sapo permit required. no changes to existing structures, use or egress.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary tent in front of the hard rock hotel w48th st. removed at the end of the programing. no changes to existing structures, use or egress. sapo 850905
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent/s&r wall in/on sidewalk/curbside/street in front of amc lincoln square 13 located at 1998 broadway, ny, ny 10023. producer to monitor weather conditions & implement appropriate action. no alteration to exist. structures.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary platform for a tetelestai ministries event on father duffy sq 7ave and 47st. sapo #835522. removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $3,000
General Construction Initial Permit
Install temp. tent/s&r wall in/on sidewalk/curbside/street in front of amc lincoln square 13 located at 1998 broadway, ny, ny 10023. producer to monitor weather conditions & implement appropriate action. no alteration to exist. structures.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event fatal fury. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Installation of temporary bleachers at central park west and 71st st.no alt to exist structures for japan day paradea tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Installation of temporary bleachers at central park west and 71st st.no alt to exist structures for japan day paradea tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event 9/11 memorial and museum 5k annual run. all installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event daredevil film shoot. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Installation of temp inflatable arch, no alt to exist structures for aha wall street run. tpa permit not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Permit Issued
Declared cost: $2,500
General Construction Initial Permit
Temporary installations to be used on a temporary event grounded in the stars. all the installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/equip. in/on sidewalk in front of the school of visual arts at 333 w. 23rd st. on 04/02/25. tent/equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to exist
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install of temp platform, truss & prod equip., no alt to exist structures for lucid gravity at gansevoort plaza. tpa not reqd. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event complete
Contractor: EVENTPERMITS, LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/equip. at curb/street in front of amc lincoln square theater at 1998 broadway on 04/03/25. tent/equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to existin
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/equip. in/on sidewalk in front of the school of visual arts at 333 w. 23rd st. on 03/31/25. tent/equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to exist
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event glossier. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Proposed general construction as per plans
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $1,100,000
Mechanical Systems Renewal Permit Without Changes
Proposed mechanical work in conjunction with nb application m00648045.
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $101,000
General Construction Initial Permit
Install of temp inflatable and ancillary structures, no alt to exist structures for skims launch on the street. tpa not required. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event complete
Status: Signed-off
Declared cost: $10,000
General Construction Initial Permit
Temporary installations to be used on a temporary event event million gold launch pop-up. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/equip. at curb/street in front of amc lincoln square 13 located at 1998 broadway on 03/09/25. tent/equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to exis
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary walkway tent the sidewalk for a memorial at the apollo theater on 126th street. removed at the end of the programing. no changes to existing structures, use or egress. sapo id # 834370
Status: Signed-off
Declared cost: $5,000
Structural Renewal Permit Without Changes
Application filed for installation of temporary bleachers that will be set up on a city sidewalk on 5th avenue at 64th street for the temporary event, st. patrick's day parade. no change in use, egress or occupancy.
Status: Permit Issued
Declared cost: $24,990
General Construction Initial Permit
Temporary exhibit container for an event by gradient on the plaza at 7th ave and 43rd street. sapo#.820405removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Proposed foundation and structural work in conjunction with application m00652446
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $844,100
Structural Renewal Permit Without Changes
Proposed foundation and structural work in conjunction with application m00652446
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $844,100
Structural Renewal Permit Without Changes
Proposed foundation and structural work in conjunction with application m00652446
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $844,100
General Construction Initial Permit
Temporary installation to be used on a temporary event. all the installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install & remove temp speaker towers for times square new years eve 2025 plaza partner event, no alteration to existing structures. tpa not required. sapo permit #825733. producer responsible to monitor event weather/implement appropriate a
Status: Signed-off
Declared cost: $5,500
General Construction Initial Permit
Install & remove temp tent structure for times square new years eve 2025 plaza partner event, no alteration to existing structures. tpa not required. sapo permit #825733. producer responsible to monitor event weather/implement appropriate a
Status: Signed-off
Declared cost: $10,000
General Construction Initial Permit
Install & remove temp staging structures & car display for tsq new years eve 2025 plaza partner event, no alteration to existing structures. tpa not required. sapo permit #825733. producer responsible to monitor event weather/implement appr
Status: Signed-off
Declared cost: $20,500
General Construction Initial Permit
Install & remove temp cable camera line w. supporting towers for new years eve 2025 plaza partner event, no alteration to existing structures. sapo permit #825733. producer responsible to monitor event weather/implement appropriate actions.
Status: Signed-off
Declared cost: $8,000
General Construction Initial Permit
Install & remove temp video tower for new years eve 2025 plaza partner event, no alteration to existing structures. sapo permit #825733. producer responsible to monitor event weather/implement appropriate actions.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/equip. at curb/street of the school of visual arts located at 333 w. 23rd st. on 12/13/24. tent/equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to existi
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/equip. at curb/street of the school of visual arts located at 333 w. 23rd st. on 12/11/24. tent/equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to existi
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Temporary platform for abc nye broadcasters. tsq pedestrian plaza broadway btwn 43-44th streets. removed at the end of the programing. no changes to existing structures, use or egress. sapo # 677860
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary event structures. no change to use, egress, or occupancy.
Status: Signed-off
Declared cost: $985
General Construction Initial Permit
Temporary installations to be used on a temporary event telfar retail opening event event. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure application to be used on a temporary event seaport holiday tree. all the installations shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for the bowery mission thanksgiving on the bowery. sapo # 809127. removed after the programming. no changes to the existing structures, use or egress.
Status: Permit Issued
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Install temp platform, trussing, tents, no alt to exist structures for macy's annual thanksgiving parade tv production, herald sq. tpa permit not required. producer responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $15,000
General Construction Initial Permit
Install of temporary truss structure supporting scenic wall flat facade.
Status: Signed-off
Declared cost: $5,500
General Construction Initial Permit
Install temp tents, platform, truss, no alt to exist structures for annual bloomingdale's window 2024 holiday reveal. tpa permit not required. producer responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $7,500
General Construction Initial Permit
Temporary structures for 2024 macy's thanksgiving parade. no alterations to existing structures. producer is responsible to monitor site safety & implement appropriate actions. all production equipment removed upon event completion.
Contractor: MACY'S INC
Status: Permit Issued
Declared cost: $30,000
General Construction Initial Permit
Install temp truss, platforms, inflatables, no alt to exist structures for annual nordstrom holiday decorations sidewalk of 225w57 & 235w57annual sapo permits pending. producer responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $10,000
General Construction Initial Permit
Temporary holiday market booths on 40th street south side of bryant park. removed at the end of the programing. no changes to existing structures, use or egress. requires a sapo # by operator.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Installation of temp platforms with inflatable, kiosk, no alt to exist structures for netflix boxing inflatables. sapo 809291tpa permit not required. producer responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $4,500
General Construction Initial Permit
Temporary installations to be used on a temporary event klin. all the installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for the loudest bell at military island & plaza 7th ave-43 to 45st. sapo id 813735removed at the end of the programing. no changes to existing structures, use or egress.
Contractor: PRODUCTION GLUE LLC
Status: Signed-off
Declared cost: $40,000
General Construction Initial Permit
Temporary structure installation for mls trophy event. all installation shall be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for a home goods event at madison square park. removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary dome and arches for a meibo event on the plaza at 7th ave and 43rd street. sapo#798724. removed at the end of the programing. no changes to existing structures, use or egress
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for an h&m event on mercer street. removed at the end of the programing. no changes to existing structures, use or egress. sapo 799415
Contractor: TCE PRESENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for an ogilvy event at flatiron plaza. removed at the end of the programing. no changes to existing structures, use or egress. sapo 782806
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure installation for event. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary tent on the sidewalk for an event at the apollo theater on 126th street. removed at the end of the programing. no changes to existing structures, use or egress. mome permit 41444
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install temp tents, platforms, scenic elements, prod equip., no alt to exist structures for times square ny fashion week. tpa required. producer responsible to monitor site safety & implement hwap.
Contractor: EVENTPERMITS, LLC
Status: Permit Issued
Declared cost: $10,500
General Construction Initial Permit
Temp. tent/equip. at curb/street of the amc lincoln sq. theatre located at 1998 broadway on 09/17/24. tent/equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to existi
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures on the sidewalk, entry tent for a gala adjacent to 99 e52 street . removed at the end of the programing. no changes to existing structures, use or egress. sapo#803929.
Status: Permit Issued
Declared cost: $5,000
General Construction Renewal Permit with Changes
Install of temp tent, platforms, finish line truss, no alt to exist structures for annual 5th ave mile. tpa not required. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event complete
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event oktoberfest. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp inflatable sapo #802841for americans for contraception traveling inflatable exhibit. tpa permit not required. producer responsible to monitor site safety & implement hwap. production equipment removed upon event complet
Status: Permit Issued
Declared cost: $2,500
General Construction Initial Permit
Temporary installation to be used on a temporary event marshalls. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/equip. at curb/street of the village theatre located at 181-189 2nd avenue on 08/20/24. tent/equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to existing s
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Installation of temp platform for vip seating w/ shade canopy, no alt to exist structures for annual german-american steuban parade. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Contractor: ACE RENTAL CORP
Status: Permit Issued
Declared cost: $5,000
Plumbing Renewal Permit Without Changes
Proposed plumbing work in conjunction with application m00652446.
Status: Permit Issued
Declared cost: $448,000
General Construction Initial Permit
Install temp. tent/equip. at curb/street of the amc lincoln square theater located at 1998 broadway; removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to exist. structure
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for a puma event on the street, 49th street near 5th avenue. removed at the end of the programing. no changes to existing structures, use or egress. sapo 779330.
Status: Signed-off
Declared cost: $8,000
General Construction Initial Permit
Temporary structure on the sidewalk, for hourglass launch, adjacent to 14 prince street. sapo#795240. removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation, to be used on a temporary event jack links. all the installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary stage & tent located between broadway and 5th avenue flatiron public plaza. all installation shall be removed upon completion of the event as indicated on plans. no change, occupancy, or egress.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
Plumbing Renewal Permit Without Changes
Proposed plumbing work in conjunction with application m00652446.
Status: Permit Issued
Declared cost: $448,000
General Construction Renewal Permit Without Changes
Temporary tent on the street, accessory to an event in the cooper hewitt, e91st and 5th ave. sapo id#770748removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent/equip. at curb/street of the amc lincoln square theater located at 1998 broadway; removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to exist. structure
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary tent canopy for ghost.exp. event at flatiron plaza. removed at the end of the programing. no changes to existing structures, use or egress. sapo#781369
Contractor: NY TENT, LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure installation for webtoon activation event. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp rain contingency tent, no alt to exist structures for fresh beauty activation. tpa permit not required. producer responsible to monitor site safety & implement hwap. all production equipment removed upon event completio
Status: Permit Issued
Declared cost: $3,500
General Construction Initial Permit
Install temp. tent/equip. at curb/street of the amc lincoln square theater located at 1998 broadway; removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to exist. structure
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure installation for l'occitane almond shower oil 20th anniversary event. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp platform and rain contingency tents, no alt to exist structures for stonewall visitors center opening tpa not required. producer responsible to monitor site safety & implement hwap. production equipment removed upon eve
Status: Permit Issued
Declared cost: $3,000
General Construction Initial Permit
Temporary structures for bloomberg relay 2024 at fulton st and fronts st. all structures removed after the programming. sapo permit required. no changes to existing structures, use or egress.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Installation of temp truss system, no alt to exist structures for, whatsapp activation. tpa permit not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Permit Issued
Declared cost: $6,000
General Construction Initial Permit
Temporary tents accessory to a chanel event a adjacent to 145 w. broadway. sapo# 779659. removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tents, bleachers, stairs, ramps, prod equip.no alt to exist structures for sail gp 2024 governors is. tpa permit required. producer is responsible to monitor site safety & implement hwap. production equip removed upon e
Status: Permit Issued
Declared cost: $65,000
General Construction Initial Permit
Temporary outdoor exhibit structure for alexander wang. adjacent to 103 grand street. sapo#783845. removed at the end of the programing.no changes to existing structures, use or egress
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation, to be used on a temporary event. all the temporary constructions are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tents, no alt to exist structures for the bridgerton promenade. tpa permit required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Signed-off
Declared cost: $6,000
General Construction Initial Permit
Temp structure for the five boro bike tour. on street. franklin st. and 6th ave. removed at the end of the programing. no changes to existing structures, use or egress. sapo #769415
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary tent on the street, accessory to an event in the cooper hewitt, e91st and 5th ave. sapo id#770748removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Filing for temporary gen. const. work to be conducted including but not limited to concrete paving, installation of fence and gates, and installation of temporary structure / stage, trailer, and containers. no change in egress, use, or occu
Status: Signed-off
Declared cost: $1,152,785
General Construction Initial Permit
Installation of temp scenic archway on sidewalk, no alt to exist structures for 5th ave blooms. tpa not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary structure installation for 911 memorial and museum 5k annual run. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure installation for world's largest hotdog. all installation shall be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
Plumbing Initial Permit
Proposed plumbing work in conjunction with application m00652446.
Status: Permit Issued
Declared cost: $448,000
General Construction Initial Permit
Temporary tent at curb/street of the amc lincoln square theater located at 1998 broadway on 04/15/24. tent removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to existing struc
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Installation of temporary lighting truss, no alt to exist structures for, gq awards, outside of 175 water st. a tpa permit not required. producer is responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $4,000
General Construction Initial Permit
Installation of temp tents, no alt to exist structures for annual time100 media red carpet guest pass through. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Contractor: NY TENT, LLC
Status: Permit Issued
Declared cost: $4,000
General Construction Initial Permit
Proposed foundation and structural work in conjunction with application m00652446
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $844,100
Structural Initial Permit
Proposed foundation and structural work in conjunction with application m00652446
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $844,100
Structural Initial Permit
Proposed foundation and structural work in conjunction with application m00652446
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $844,100
General Construction Renewal Permit Without Changes
Installation of temporary bleachers at central park west and 71st st.no alt to exist structures for japan day paradea tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Proposed general construction as per plans
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $1,100,000
Mechanical Systems Initial Permit
Proposed mechanical work in conjunction with nb application m00648045.
Contractor: JOHN P PICONE INC
Status: Permit Issued
Declared cost: $101,000
General Construction Initial Permit
Temporary structure installation for event. all installation shall be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/pltf. at curb/st/walk of directors guild of america located at 110 west 57th st. on 03/12/24. tent/pltf. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to exist
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Installation of temp inflatable arch, no alt to exist structures for aha wall street run. tpa permit not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Permit Issued
Declared cost: $2,500
General Construction Initial Permit
Temp. tent at curb/street of the amc lincoln sq. theater located at 1998 broadway on 03/14/24. tent removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to existing structures.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary stage & tent located in the broadway pedestrian plaza, between 46th & 47st. street. all installation shall be removed upon completion of the event as indicated on plans. no change, occupancy, or egress.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install of temp scenic scaffold installation on sidewalk, no alt to exist structures for netflix. tpa not reqd. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event complete
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Installation of temp scenic clock sculpture and graphic pylons. no alt to exist structures for black history month february launch sapo# 757048tpa permit not required. producer responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $7,000
General Construction Initial Permit
Installation of temp tent, no alt to exist structures for ordinary angels movie premiere red carpet tent. mome permit #39461tpa not required. producer responsible to monitor site safety & implement hwap. remove all production equipment at e
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary tent at curb/street of the paris theater located at 4 west 58th street on 02/15/24. tent removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to existing structures. m
Status: Signed-off
Declared cost: $5,000
Structural Renewal Permit Without Changes
Application filed for installation of temporary bleachers that will be set up on a city sidewalk on 5th avenue at 64th street for the temporary event, st. patrick's day parade. no change in use, egress or occupancy.
Status: Permit Issued
Declared cost: $24,990
General Construction Initial Permit
Install & remove temp cable camera line w. supporting towers for new years eve 2024 plaza partner event, no alteration to existing structures. sapo permit #745943. producer responsible to monitor event weather/implement appropriate actions.
Status: Signed-off
Declared cost: $8,000
General Construction Initial Permit
Install & remove temp tent structure for times square new years eve 2024 plaza partner event, no alteration to existing structures. tpa not required. sapo permit #745943. producer responsible to monitor event weather/implement appropriate a
Status: Signed-off
Declared cost: $10,000
General Construction Initial Permit
Install & remove temp speaker towers for times square new years eve 2024 plaza partner event, no alteration to existing structures. tpa not required. sapo permit #745943. producer responsible to monitor event weather/implement appropriate a
Status: Signed-off
Declared cost: $5,500
General Construction Initial Permit
Temporary platform for abc nye broadcasters. tsq pedestrian plaza broadway btwn 43-44th streets. removed at the end of the programing. no changes to existing structures, use or egress. sapo # 677860
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/platform at curb/street of amc lincoln square theater located at 1998 broadway. on 01/08/24. tent/pltf. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to exist.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure installation for holiday tree event. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/platform at curb/street of directors guild of america located at 110 west 57th st. on 12/06/23. tent/pltf. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alteration to exi
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for the bowery mission thanksgiving on the bowery. removed after the programming. no changes to the existing structures, use or egress. sapo 736877.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary entry gold post marker.no alt to exist structures for the american express event at gansevoort st & ninth ave. nov 25, 2023a tpa permit not required. producer is responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $1,000
General Construction Initial Permit
Temporary structures for dior x saks event on 5th ave. removed at the end of the programing. sapo/cecm# 741043. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary dome for an event on the plaza. broadway between 45-46th streets. sapo#744780removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tents, platform, truss, no alt to exist structures for annual bloomingdale's window 2023 holiday reveal. a tpa permit not required. producer is responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $7,500
General Construction Renewal Permit Without Changes
Installation of temp platform, no alt to exist structures for cbs tv broadcasting of thanksgiving parade, w53rd and 6th ave a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for 2023 macy's thanksgiving parade. no alterations to existing structures. producer is responsible to monitor site safety & implement appropriate actions. all production equipment removed upon event completion.
Contractor: MACY'S INC
Status: Permit Issued
Declared cost: $27,000
General Construction Initial Permit
Temporary installation to be used on a temporary event marta minujin inflatable. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp platform, trussing, tents, no alt to exist structures for macy's annual thanksgiving parade tv production, herald sq. tpa permit not required. producer responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $15,000
General Construction Initial Permit
Temporary installation to be used on a temporary event tsx hilton. all the installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary art installation
Status: Signed-off
Declared cost: $5,000
Structural Initial Permit
Installation of temporary sculpture on gansevoort plaza in meat packing district.
Status: Signed-off
Declared cost: $50,000
General Construction Initial Permit
Temporary installation to be used on a temporary event birkenstock activation. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation for temporary burberry fragrance launch event located on gansevoort plaza. all installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/production equip. across the street from the paris theater located at 4 west 58th street. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to exis
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event unicef. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures on the sidewalk, entry tent for a gala adjacent to 99 e52 street . removed at the end of the programing. no changes to existing structures, use or egress. sapoid734467
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event, curtain up, located on the broadway pedestrian plaza, between 45th & 47th street. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp platform for vip seating w/ shade canopy, no alt to exist structures for annual german-american steuban parade. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Contractor: ACE RENTAL CORP
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install of temp tent, platforms, finish line truss, no alt to exist structures for annual 5th ave mile. tpa not required. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event complete
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on the temporary event waterdrop, located on the broadway pedestrian plaza, between 43-44st. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event cintas. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/production equip. at curb/street of amc lincoln square theater located at 1998 broadway. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to exist
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event ciroc. all the installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Temporary installation to be used on a temporary event tsq photo booth, located between streets 46th & 47th. all the installations are to be removed upon completion of the event
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used for a temporary event. netflix nyc, located on sidewalk, amc lincoln 1998 broadway. installations are to be removed upon compeletion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/platform/arch at curb/street of amc lincoln square theater located at 1998 broadway. tent/platform/arch removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to exist. struct
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event, pop in the city 2023, located in greeley square park, between 32nd and 33rd streets, broadway and, 6th ave, new york, ny 10001. installations are to be removed upon completion of the
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for bloomberg square mile relay 2023 all structures removed after the programming. no changes to existing structures, use or egress. sapo#691897
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tent and platforms, no alt to exist structures for tony awards media and after party 2023 broadway and 176th st. a tpa permit is required. producer is responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $25,000
General Construction Initial Permit
Installation of temp inflatable at 5th ave & 23rd st. no alt to exist structures for the ikea big blue bag exhibit. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Contractor: EVENTPERMITS, LLC
Status: Signed-off
Declared cost: $4,500
General Construction Initial Permit
Temporary installation to be used on a temporary event aston marin, located in front of 450 park avenue. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for the turkish day parade. 47th st, between 1st and 2nd ave. removed at the end of the programing. no changes to existing structures, use or egress. sapo permit required
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Temporary structure installation for the movie transformers. all installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/production equip. at curb/street of paris theater located at 4 west 58th street. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to exist. struct
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Installation of temp inflatable arch, no alt to exist structures for aha wall street run. tpa permit not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Permit Issued
Declared cost: $2,500
General Construction Initial Permit
Temporary structure installation for the movie transformers. all installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/production equip. at curb/street of school of visual arts theater located at 333 west 23rd st. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary wood frame & foam handbag sculpture no alt to exist structures for coach bag exhibit. a tpa permit not required. producer is responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $4,000
General Construction Initial Permit
Install of temp tent & platform, no alt to exist structures for book club premiere. tpa required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Permit Issued
Declared cost: $5,500
General Construction Initial Permit
Temporary installation, located on the flatiron plaza: 23rd street - fifth avenue & broadway, to be used on a temporary event. the installation is to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp structure for the five boro bike tour. on street. franklin st. and 6th ave. removed at the end of the programing. no changes to existing structures, use or egress. parade permit #699646 sapo #700144
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary tent & inflatable, no alt to exist structures for armani beauty pop up gansevoort plaza -9th ave & gansevoort st. a tpa permit not required. producer is responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $7,500
General Construction Initial Permit
Temporary installations to be used on a temporary event nyu weekend on the square. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event tsq photo booth, located between streets 46th & 47th. all the installations are to be removed upon completion of the event
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary lighting truss, no alt to exist structures for, gq awards, outside of 175 water st. a tpa permit not required. producer is responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $4,000
General Construction Initial Permit
Installation of temp tents, no alt to exist structures for time100 media red carpet guest pass through. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon eve
Contractor: PRODUCTION GLUE LLC
Status: Signed-off
Declared cost: $4,000
General Construction Initial Permit
Temp. tent/production equip. at curb/street of amc lincoln square 13 theater located at 1998 broadway. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to ex
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tent no alt to exist structures for premiere screening of the power. curb lane at 110 w 57tha tpa permit is not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed
Status: Signed-off
Declared cost: $4,500
Structural Initial Permit
Application filed for installation of temporary bleachers that will be set up on a city sidewalk on 5th avenue at 64th street for the temporary event, st. patrick's day parade. no change in use, egress or occupancy.
Status: Permit Issued
Declared cost: $24,990
General Construction Initial Permit
Temp. tent/production equip. at curb/street of amc lincoln square 13 theater located at 1998 broadway. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to ex
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/production equip. curbside across from paris theater located at 4 west 58th street. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to exist. str
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/production equip. at curb/street of amc lincoln square 13 theater located at 1998 broadway. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to ex
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit Without Changes
Installation of temporary bleachers at central park west and 71st st.no alt to exist structures for japan day paradea tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installation from january 23rd to january 26th of 2023, of geodome enclouses at open space as per plans filed herewith. no change to use, egress or occupancy.
Status: Permit Issued
Declared cost: $165,000
General Construction Initial Permit
Install & remove temp structure for tsq nye 12/31, no alteration to exist structures. tpa not required. sapo permit #677855. producer responsible to monitor event weather conditions & implement appropriate actions. all prod equip removed up
Status: Signed-off
Declared cost: $25,000
General Construction Initial Permit
Install & remove temp structures for tsq nye 12/31, no alteration to exist structures. tpa not required. sapo permit #677855. producer responsible to monitor event weather conditions & implement appropriate actions. all prod equip removed u
Status: Signed-off
Declared cost: $15,000
General Construction Initial Permit
Install & remove temp structures for tsq nye 12/31, no alteration to exist structures. tpa not required. sapo permit #677855. producer responsible to monitor event weather conditions & implement appropriate actions. all prod equip removed u
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install & remove temp structures for abc nye 12/31, no alteration to exist structures. tpanot required. sapo permit #677855. producer responsible to monitor event weather conditions & implement appropriate actions. all prod equip removed up
Status: Signed-off
Declared cost: $10,000
Structural Renewal Permit Without Changes
Temporary holiday structures on the sidewalk accessory to the mark hotel. removed at the end of the programing. no changes to existing structures, use or egress. sapo# 677797
Status: Signed-off
Declared cost: $50,000
General Construction Initial Permit
Temp. tent/production equip. curb/street of amc lincoln square 13 theater located at 1998 broadway. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to exist
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary tent for an exhibit in the chelsea triangle. 9th ave & w14st. sapo#677867.removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tent & platform, sapo #678540,no alt to exist structures for spoiler alert movie premiere outside 566 laguardia pl a tpa permit is required. producer responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for the bowery mission thanksgiving on the bowery. removed after the programming. sapo# 669598no changes to the existing structures, use or egress.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used for the temporary event madame tussauds cr unveil. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation located on times square, for a temporary event salvation army. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install temp platform, trussing, tents, no alt to exist structures for macy's thanksgiving parade tv production, herald sq. tpa permit not required. producer responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $10,000
General Construction Initial Permit
Installation of temporary modified shipping container. no alt to exist structures for 2022 sephora holiday activation. sapo# 677867tpa permit not required. producer is responsible to monitor site safety & implement hwap. all production equi
Status: Permit Issued
Declared cost: $5,000
Structural Initial Permit
Temporary holiday structures on the sidewalk accessory to the mark hotel. removed at the end of the programing. no changes to existing structures, use or egress. sapo# 677797
Status: Signed-off
Declared cost: $50,000
General Construction Initial Permit
Installation of temp platform, no alt to exist structures for cbs tv broadcasting of thanksgiving parade, w53rd and 6th ave a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tents, platform, truss, no alt to exist structures for annual bloomingdale's window holiday reveal. a tpa permit not required. producer is responsible to monitor site safety & implement hwap.
Contractor: A.M.A. HOLDINGS INC
Status: Signed-off
Declared cost: $5,500
General Construction Initial Permit
Temporary structure installation for holiday tree event. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/production equip. curbside of amc lincoln square theater located at 1998 broadway. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to exist. s
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary tent for visit savannah event in gansevoort plaza. removed at the end of the programing. no changes to existing structures, use or egress. sapo# 674748
Contractor: NY TENT, LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary low rise seating bleachers, camera platforms, temporary marquee supporting inflatable at herald square for 2022 macy's thanksgiving parade. a tpa permit is not required.
Contractor: MACY'S INC
Status: Signed-off
Declared cost: $26,865
General Construction Initial Permit
Temporary structure installation for candy crush event. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Open space temporary structure for the event courageous morgan stanley galaxy room. all structure shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/production equip. curbside across from paris theater located at 4 west 58th street. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to exist.
Status: Signed-off
Declared cost: $5,000
Mechanical Systems Renewal Permit with Changes
Initial filing with mechanical systems work type(s)
Contractor: JA& LLC
Status: Permit Issued
Declared cost: $1,000
General Construction Initial Permit
Install & remove temp tent, no alteration to exist. structures. tpa permit not required. film office id #35982. producer is responsible to monitor event weather conditions & implement appropriate actions. all prod equip to be removed upon c
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tents, no alt to exist structures for fete street fair 26th st b/w park & madison. tpa permit is not required. producer responsible to monitor site safety & implement hwap. all production equipment removed upon event co
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation for a temporary event black adam. all installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for an event for hermes. 62st & madison ave sapo#663972removed at the end of the programing. no changes to existing structures, use or egress.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. tent/production equip. installed in/on father duffy square-7th ave. bet. 47th & 46th streets. tent/production equip. removed upon event completion. producer to monitor weather conditions & implement appropriate action. no alt to ex
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for an event located at greeley square plaza. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation for a temporary event curtains up located on broadway between 45th and 48th streets. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tents, entry trusses and signage pillars, no alt to exist structures for paley weekend street fair. tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $6,500
General Construction Initial Permit
Installation of temporary tent w54 st b/w 6th & 7th ave, no alt to exist structures for catapult -usa productions. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Scope of work to include installation of temporary structure for rise up nyc times square event on 09/19/2022. all installations to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary tents, sapo permit provided, no alt to exist structures for catapult -usa productions. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary tent structure located at open space in battery park for gmr marketing. all installation shall be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary structure trusses for boo hoo fashion show event on 09/13/2022. all temp. structures to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp platform & scaffold scenic elements no alt to exist structures for theory fashion presentation b/w hudson & ninth avea tpa permit not required. producer is responsible to monitor site safety & implement hwap. all produc
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for a vogue fashion week event. all the installations to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit with Changes
Installation of temp platform for vip seating w/ shade canopy, no alt to exist structures for annual german-american steuban parade. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Contractor: ACE RENTAL CORP
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Installation of temp platform for vip seating w/ shade canopy, no alt to exist structures for annual german-american steuban parade. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary installations for the rise up concert - harlem event, located on west 135 st btw st. nicholas ave and frederick douglass blvd. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp truss truss no alt to exist structures for prada paradox exhibit. a tpa permit not required. producer is responsible to monitor site safety & implement hwap.
Status: Signed-off
Declared cost: $4,750
General Construction Initial Permit
Temporary structure for an event located at greeley square plaza. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary tents for an event located at governors island in governors island play lawn & colonels row. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for the roots event. all the structures are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary tent and platform, no alt to exist structures for 2022 tony awards pass through press area, a tpa permit is required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,500
General Construction Initial Permit
Temporary installation for an nft sea event, located on fulton st. between frons street and south street. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure application for jeep - nyc pride. all installations shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp tent, no alt to exist structures for tribeca film festival media red carpet pass thought a tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $3,000
General Construction Initial Permit
Installation of temporary tent for spiderhead premiere arrivals at paris theater located curbside of 4 west 58th street on 6/15/22. no alteration to existing structures. equipment removed upon event removal. moftb # 35057.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for yves saint laurent exhibition, no alteration to exist structures.
Status: Signed-off
Declared cost: $60,000
General Construction Initial Permit
Temporary installation consisting of a stage and a tent for a boston consulting group event. all the installations to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary tent for premiere arrivals for ny film festival halftime located curbside of united palace theater at 4140 broadway, on 6-8-22. no alteration to existing structures. moftb# 645640. equipment removed upon event comp
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp a inflatable finish line, award platform deck, no alt to exist structures for annual bloomberg square mile run. a tpa permit is required. producer is responsible to monitor site safety & implement hwap
Status: Permit Issued
Declared cost: $4,000
General Construction Initial Permit
Installation of temp tents, no alt to exist structures for time100 media red carpet guest pass through. tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Contractor: PRODUCTION GLUE LLC
Status: Permit Issued
Declared cost: $4,000
General Construction Initial Permit
Temporary structures for northwell event in flatiron plaza areas. structures removed at the end of the programing. no changes to existing structures, use or egress. a sapo permit is required.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp inflatable arch, no alt to exist structures for aha wall street run. tpa permit not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion
Status: Signed-off
Declared cost: $2,500
General Construction Initial Permit
Installation of temporary tent structure for balenciaga event on 05/22/22. all structures to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary bleachers at central park west and 71st st.no alt to exist structures for japan day paradea tpa permit is not required. producer is responsible to monitor site safety & implement hwap.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Scope of work to include installation of temporary structure at bryant park event scheduled between 5/14/22-10/1/22. temporary installation to be removed upon completion of an event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary construction for atomica amnesia event. all the structures to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary cookie monster inflatable, no alterations to existing structures. a tpa permit is not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completio
Status: Permit Issued
Declared cost: $3,500
General Construction Initial Permit
Temporary construction / riser (28'w x 14'd x 8h) for london mayor press event. structure to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
Structural Initial Permit
Installation of a temporary free-standing steel sculpture.
Status: Signed-off
Declared cost: $13,185
General Construction Initial Permit
Installation of temporary tent for tehran season 2 premiere arrivals located curbside of the robin williams center at 246 w 54th street on 5/4/22. no change to existing structures. equipment removed upon event completion. moftb# 641967.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install & remove temp structure, no alteration to exist. structures. tpa permit not required. sapo event id #624267. producer is responsible to monitor event weather conditions & implement appropriate actions. all prod equip to be removed u
Status: Signed-off
Declared cost: $30,800
General Construction Initial Permit
Install of temp. structur and foam sculpture, no alt to exist structure, . tpa not req. producer is resp to monitor sculpture & implement approp actions, if nec. all prod equip removed upon event completion
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for overlook art project, located at times square. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary tents for ozark premiere arrivals at paris theater located curbside of 4 west 58th street on 4/21/22. no alteration to existing structures. equipment removed upon event completion. moftb # 34433.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install & remove temp. tent, no alteration to exist. structures. tpa permit not required. mome event id #632614. producer is responsible to monitor event weather conditions & implement appropriate actions. all prod equip to be removed upon
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Dobtesting456@gmail.com 2323 qwqwqwwwwwwwwwwwwwwwwwwwwwwwwwwwww eweweeeeeeeeeeeeeeee qeweweeeeeeeee qwqwqw qeqwqq qewqwq qeqwewew qeqweqeqeeq 4343 werewrer werewrewrwerwe ewrwerewrewr werewrerewrew werewrewre werewrewrerewr
Contractor: QAZ3
Status: Permit Issued
Declared cost: $100
General Construction Initial Permit
Application filed for installation of temporary bleachers that will be set up on a city sidewalk on 5th avenue at 64th street for the temporary event, st. patrick's day parade. no change in use, egress or occupancy.
Status: Signed-off
Declared cost: $24,990
General Construction Initial Permit
Installation of temporary tent for premiere arrivals at school of visual arts located curbside of 333 west 23rd street, new york on 3/16/22. no alteration to existing structures. moftb project # 34195, order # co46e1hd. equipment removed at
Status: Signed-off
Declared cost: $5,000
Foundation Renewal Permit Without Changes
Test
Contractor: JA& LLC
Status: Signed-off
Declared cost: $1,000
General Construction Initial Permit
Install & remove temp. tent, no alteration to exist. structures. tpa permit not required. mome event id #622933. producer is responsible to monitor event weather conditions & implement appropriate actions. all prod equip to be removed upon
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temp sculptures at herald sq and flatiron sq no alt to exist structures for godiva activation a tpa permit not required.producer is responsible to monitor site safety & implement hwap. all production equipment removed upon e
Status: Signed-off
Declared cost: $4,500
General Construction Initial Permit
Temporary tent for an event (to be removed once the action is finished).no change in occupancy or egress.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install & remove temp structures for abc nye 12/31, no alteration to exist structures. tpa not required. sapo permit #610431. producer responsible to monitor event weather conditions & implement appropriate actions. all prod equip removed u
Status: Signed-off
Declared cost: $10,000
General Construction Initial Permit
Install & remove temp structure for tsq nye 12/31, no alteration to exist structures. tpa not required. sapo permit #610431. producer responsible to monitor event weather conditions & implement appropriate actions. all prod equip removed up
Status: Signed-off
Declared cost: $25,000
General Construction Initial Permit
Install & remove temp structures for tsq nye 12/31, no alteration to exist structures. tpa not required. sapo permit #610431. producer responsible to monitor event weather conditions & implement appropriate actions. all prod equip removed u
Status: Signed-off
Declared cost: $12,500
General Construction Initial Permit
Install & remove temp structures for tsq nye 12/31, no alteration to exist structures. tpa not required. sapo permit #610431. producer responsible to monitor event weather conditions & implement appropriate actions. all prod equip removed u
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary modified shipping container for the nbc sports once in a lifetime video booth activation at herald square broadway and w 35th street. a tpa permit is not required.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Scope of work to include installment of tent as temporary structure for unicef event scheduled between 12/07/21 to 12/11/21. all installation to be removed upon completion of event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary snow globe exhibit for netflix witcher promotion. no alterations to existing structures. a tpa permit is not required.
Status: Signed-off
Declared cost: $3,500
General Construction Initial Permit
Scope of work to include installation of temporary structure consisted of tents for an event scheduled between 12/08/21 to 12/22/21. all installation to be removed upon completion of event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Scope of work to include temporary structure for an event scheduled between 12/05/21 to 12/09/21. all installation to be removed upon completion of event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Scope of work to include temporary structure for salvation army event scheduled on 12/15/21 to 12/19/21. all installation to be removed upon the completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Scope of work to include temporary structure for salvation army event scheduled on 12/10/21 to 12/14/21. all installation to be removed upon the completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Scope of work to include temporary structure for salvation army event scheduled on 11/30/21 to 12/04/21. all installation to be removed upon the completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary tv broadcasting platform for production technicians only for 2021 thanksgiving day parade. a tpa permit is not required.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for the bowery mission thanksgiving, on the bowery and rivington st. removed after the programming. sapo# 597341no changes to the existing structures, use or egress
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary self-standing holiday fabricated tree decorations, set in an array of three trees at ten locations along fifth avenue sidewalks. sapo permit app #591022 holiday on fifth avenue
Status: Signed-off
Declared cost: $50,000
General Construction Initial Permit
Installation of temporary tents for power book 2 ghost movie premiere arrivals located curbside of the school of visual arts at 333 west 23rd street on 11-17-21. no alterations to existing buildings. equipment removed upon event completion.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Sanity test
Contractor: JA& LLC
Status: Permit Issued
Declared cost: $100
General Construction Initial Permit
Installation of temporary tents for premiere arrivals for ghostbusters located curbside of amc lincoln square 13 at 1998 broadway on november 15, 2021. moftg project id: 33413. a tpa is required, associated job number m00621867.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
The scope of work to include temporary structure located at gansevoort plaza for disney event schedule on 11/8/21. all temporary installation to be removed upon completion of event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
The scope of work to include temporary structure located at broadway plaza for wilscott event schedule on 11/8/21. all temporary installation to be removed upon completion of event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary low rise seating bleachers, camera platforms, temporary marquee supporting inflatable at herald square for 2021 macy's thanksgiving parade. a tpa permit is not required.
Contractor: MACY'S INC
Status: Signed-off
Declared cost: $27,000
General Construction Initial Permit
Installation of temporary truss/deck tv production camera platform with temporary rain canopies for the 2021 macy's thanksgiving parade for nbc television productions. no alterations to existing structures.
Status: Signed-off
Declared cost: $10,000
General Construction Initial Permit
Temporary christmas tree structure located in fulton st (between water st and south st). all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for the harder they fall event, located in gansevoort plaza. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for nordstrom block party on broadway between 57 and 59 st. sapo# 591655removed after the event.no changes to existing structures, use or egress
Status: Signed-off
Declared cost: $10,000
Standpipe Initial Permit
Initial filing with standpipe,sprinklers,plumbing work type(s)
Contractor: PLUMBER TESTER
Status: Permit Issued
Declared cost: $3,000
Plumbing Initial Permit
Initial filing with standpipe,sprinklers,plumbing work type(s)
Contractor: PLUMBER TESTER
Status: Permit Issued
Declared cost: $3,000
General Construction Initial Permit
Temporary fountain structure to be located at duffy square, new york. all installation shall be removed upon completion of event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for film shoot on crosby st between broome and spring. removed at the end of the shoot. no changes to existing structures, use or egress. producer requires film permit by oftb.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for audible: sleepless in the city at chelsea triangle plaza. removed at the end of the programing. no changes to existing structures, use or egress. sapo event id #: 597601
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for audible: sleepless in the city at flatiron plaza. removed at the end of the programing. no changes to existing structures, use or egress. sapo event id #: 597600
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install of temp tents located curbside of beacon theater on amsterdam ave. for premiere arrivals for the many saints of newark on 9-22-21. no alteration of existing structures. producer to monitor weather & implement necessary actions. mof
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Vip parade viewing platform for german-american steuban parade. no alterations to existing structures. no change to use, egress, or occupancy.
Status: Signed-off
Declared cost: $5,000
General Construction Renewal Permit with Changes
Vip parade viewing platform for german-american steuban parade. no alterations to existing structures. no change to use, egress, or occupancy.
Contractor: ACE RENTAL CORP
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install of temp tents and platform, no alterations to exist structures, for theater fundraiser event. a tpa and sapo are required. all equipment removed upon event completion. producer responsible for monitoring site safety and hwap.
Status: Signed-off
Declared cost: $5,500
General Construction Initial Permit
Temporary delay towers located in the broadway pedestrian plaza, between 45th & 48st. street. all installation shall be removed upon completion of the event as indicated on plans. no change, occupancy, or egress.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structure for a grubhub & seamless event located by 33rd street @ 8th ave . all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary tents and media riser for a tory burch fashion event located at southside west houston in manhattan. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary podiums and statues for a dior event located in the sidewalks on 59th st. between 5th ave. and madison ave. all installation shall be removed upon completion of the event as indicated on plans . no change, occupancy or egress.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for a fashion show on washington st, between w13 &w14. structures removed at the end of the programing. no changes to existing structures, use or egress. sapo# 586054
Status: Signed-off
Declared cost: $15,000
General Construction Initial Permit
Structure for the dior exhibit
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary trussing for the 5 boro bike tour finish line.
Status: Signed-off
Declared cost: $3,500
General Construction Initial Permit
Temporary structure consisting of prefabricated performance equipment. no change of use, egress or occupancy.
Status: Signed-off
Declared cost: $2,500
General Construction Initial Permit
Install of temporary tents for free guy premiere arrivals located curbside of amc lincoln square 13 theatre on 8/3/21. no alteration of existing structures. producer is responsible to monitor weather & implement action as necessary. moftb #
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation of 20' high temporary soap bottle structure scheduled july 15th (one day event) located broadway pedestrian plaza between 43rd & 44th street. all installation to be removed after completion to event.
Status: Signed-off
Declared cost: $4,950
Structural Initial Permit
Installation of temporary tents and finish line arch truss for the annual nyc triathlon event finish line and sponsor area.
Status: Signed-off
Declared cost: $7,500
General Construction Initial Permit
Install of temp tent for boss baby 2 premiere located at school of visual arts curbside of 333 west 23rd st. on 6-22-21. no alteration of existing structures. producer is responsible to monitor weather & implement action as necessary. moftb
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation of 11 flagpoles for flag day artist event scheduled from june 13th to august 31st located at broadway pedestrian plaza between 45th and 46th street. all installation shall be removed after completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $4,900
General Construction Initial Permit
Temporary structure in the nyse plaza for the organon launch. structures removed at the end of the event. no changes to existing structures, use or egress. sapo# 578758
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary structures for the new 42nd street event on the street. structures removed at the end of the event. no changes to existing structures, use or egress. sapo# 561371
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Scope of work will be installation of a temporary stage roof and stage deck for bryant park stage event scheduled until october 21st 2021. all installation shall be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $4,950
General Construction Initial Permit
Installation of a temporary truss and scenic structure as a photo back drop for the public to promote nbc sports and the indy 500
Status: Signed-off
Declared cost: $6,500
Foundation Initial Permit
Test
Contractor: JA& LLC
Status: Signed-off
Declared cost: $1,000
General Construction Initial Permit
Temporary installation of trussing/ platform for kia auto reveal
Status: Signed-off
Declared cost: $5,000
Protection and Mechanical Methods Initial Permit
Test
Contractor: JA& LLC
Status: Signed-off
Declared cost: $1,000
General Construction Initial Permit
Three (3) temporary archway structures to be erected over the entrances listed above and decorated with plant material.
Contractor: MACY'S INC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Installation of temporary inflatable, no alt to exist structures for inflatable butts at flatiron plaza. tpa permit not req. producer responsible to monitor site safety & implement hwap. production equip removed upon event completion.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install temp platforms, truss, scenic elements, prod equipment ,no alt to exist structures for cdc times square. tpa not required. producer responsible to monitor site safety & implement hwap. production equipment removed upon event complet
Status: Permit Issued
Declared cost: $7,500
General Construction Initial Permit
Temporary installation to be used on a temporary event facebook road trip. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installation to be used on a temporary event gisou holiday pop-up. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event herald holiday market. all the installations are to be removed upon completion the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event union square holiday market. all the installations are to be removed upon completion the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install of temp platform, scenic exhibit and led wall, no alt to exist structures for us open at madison sq park. tpa not reqd. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event complete
Contractor: EVENTPERMITS, LLC
Status: Signed-off
Declared cost: $7,500
General Construction Initial Permit
Temporary installations to be used for a temporary event dunkin igloo. all installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temp. structure for the fiveboro bike tour 2024 on the street. franklin st.&6th ave. removed at the end of the programing. no changes to exist. structures, use or egress. sapo permit required.
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install of temp modified shipping container. no alt to exist structures for drunk elephant c-luma global launch vitamin c product. gansevoort plaza, gansevoort & ninth ave. tpa not required. producer responsible to monitor site safety & i
Status: Permit Issued
Declared cost: $6,500
General Construction Initial Permit
Install of temp scenic scaffolds and platform, no alt to exist structures for nyse event. sapo 875632. tpa not reqd. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event complete
Contractor: EVENTPERMITS, LLC
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Install & remove temp staging structures & car display for tsq new years eve 2024 plaza partner event, no alteration to existing structures. tpa not required. sapo permit #745943. producer responsible to monitor event weather/implement appr
Status: Signed-off
Declared cost: $20,500
General Construction Initial Permit
Temporary installation to be used on a temporary event vestis bell ringing. all the installations are to be removed upon completion of the event.
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary tent(s)/production equipment installation in/on sidewalk/curbside/street fronting 1998 broadway, 10023. tent(s)/production equipment removed upon event completion. producer to monitor weather conditions and implement appropriate
Status: Signed-off
Declared cost: $5,000
General Construction Initial Permit
Temporary installations to be used on a temporary event new york jets draft party. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install of temp truss arch, production equip, no alt to exist structure for annual 5 boro bike tour start arch. tpa not req. producer is responsible to monitor site safety & implement hwap. all production equip removed upon event complete.
Status: Permit Issued
Declared cost: $7,000
General Construction Initial Permit
Install temp. tent(s)/s&r wall(s)/stage/plat./equip. in/on walk/curb./st. in the rear of beacon theatre; 2124 broadway, ny, ny 10023. producer to monitor weather conditions & implement appropriate action plan. no alt. to exist. struct(s).
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install of temp custom structure, no alt to exist structures for sephora times square. a tpa is not required. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event completion.
Status: Permit Issued
Declared cost: $7,000
General Construction Initial Permit
Install of temp tent, scenic flats, prod equip no alt to exist structures for annual fox upfront red carpet arrivals. tpa not req. producer is responsible to monitor site safety & implement hwap. all production equipment removed upon event
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install temp. tent(s)/s&r wall(s)/stage/plat./equip. in/on walk/curb./st. in front of amc lincoln square 13; 1998 broadway, ny, ny 10023. producer to monitor weather conditions & implement appropriate action plan. no alt. to exist. struct(
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install of temp inflatable arches, platforms, no alt to exist structures for annual aha wall street run. a tpa is not required. producer is responsible to monitor site safety & implement hwap. all prod equipment removed upon event completio
Status: Permit Issued
Declared cost: $3,500
General Construction Initial Permit
Temporary installation to be used on a temporary event nasdaq wise. all the installations are to be removed upon completion of the event.
Contractor: NYFF EVENTS LLC
Status: Permit Issued
Declared cost: $5,000
General Construction Initial Permit
Install of temp trussing, scenic walls, riser, no alt to exist structures for silk harbor on broadway b/n 46 & 48 st. tpa is required. producer is responsible to monitor site safety & implement hwap. all prod equip removed upon event comple
Status: Permit Issued
Declared cost: $12,000
General Construction Initial Permit
Pre-engineered structure temporary installation of an exhibit (less than 60 days)
Status: Permit Issued
Declared cost: $59,600
Construction Fence Initial Permit
Temporary construction fence for mantling and dismantling of temp structure lexus event.
Status: Permit Issued
Declared cost: $5,000