Permit history for 200 Henry Clay Ave

New Orleans, LA · 30 permits on file · 2021–2026

30
Permits on file
2021
First permit
2026
Most recent

Permits on file (30)

Ordered most recent first. Data from the city's open data portal.

Renovation (Non-Structural)
Interior, non-structural buildout of 4th floor shell space into a new neonatal intensive care unit.
Status: Permit Issued
Mar 31, 2026
Permit fee: $72,060
Renovation (Non-Structural)
Interior, non-structural buildout of 4th floor shell space into a new neonatal intensive care unit.
Status: Permit Issued
Mar 31, 2026
Permit fee: $72,060
Renovation (Non-Structural)
Interior, non-structural buildout of 4th floor shell space into a new neonatal intensive care unit.
Status: Permit Issued
Mar 31, 2026
Permit fee: $72,060
Electrical Service / Circuit / Feeder
Electrical construction of new walker imaginarium
Status: Permit Issued
Feb 6, 2026
Permit fee: $400
Electrical Service / Circuit / Feeder
Childrens main campus annual gear cleaning
Status: Finaled
Nov 19, 2025
Permit fee: $40
Mechanical HVAC
Providing and installing new hvac equipment including associated ductwork.
Status: Permit Issued
Nov 11, 2025
Permit fee: $141
Mechanical HVAC
Providing and installing new hvac equipment including associated ductwork.
Status: Permit Issued
Nov 11, 2025
Permit fee: $141
Renovation (Structural)
A 15,900 sf addition to children's hospital new orleans for a child enrichment center devoted to exhibit space for patient and visitor use. two floors of the addition are located adjacent to the existing concourse. the project includes an
Status: Permit Issued
Jun 6, 2025
Permit fee: $53,232
Electrical Sign
Connect to existing electrical feed
Status: Finaled
Apr 17, 2025
Permit fee: $40
Electrical Repair / Replacement / Addition
Room build out
Status: Closed
Nov 15, 2024
Permit fee: $55
Electrical Service / Circuit / Feeder
Annual switchgear torque and clean. cut-in/cut-out scheduled w/ entergy
Status: Meter Release
Nov 8, 2024
Permit fee: $40
Mechanical HVAC
Add digital controls to 3 fcu for suite. reduct each unit as per drawings. 6a center tower
Status: Finaled
Oct 24, 2024
Permit fee: $595
Electrical Repair / Replacement / Addition
Annual switch gear clean and torque. we have a 5-year contract for this work i will submit a copy of the original singed scope that we submitted for the original permit in 2021.
Status: Certificate of Completion
Nov 14, 2023
Permit fee: $40
Renovation (Non-Structural)
Stair infill project, west tower floors 4, 5, 6
Status: Permit Issued
Jul 24, 2023
Permit fee: $852
Mechanical HVAC
Install (1) 250 ton water cooled chiller
Status: Permit Issued
Jul 24, 2023
Permit fee: $786
Electrical Repair / Replacement / Addition
Remodel of cardiology clinic
Status: Permit Issued
May 23, 2023
Permit fee: $52
Renovation (Non-Structural)
Cardiology clinic renovation.
Status: Permit Issued
Apr 11, 2023
Permit fee: $360
Electrical Repair / Replacement / Addition
Pm switch gear for hospital
Status: Permit Issued
Nov 2, 2022
Permit fee: $40
Electrical Repair / Replacement / Addition
Connect to electrical sign circuit
Status: Permit Issued
Sep 27, 2022
Permit fee: $40
Electrical Repair / Replacement / Addition
Remodel of specialty pharmacy
Status: Permit Issued
Aug 31, 2022
Permit fee: $115
Renovation (Non-Structural)
Renovation of suite 2107, on the 2nd floor of children's hospital from an existing office space to a 1998sf retail pharmacy. scope consists of demolishing of non-load bearing wall creating a more open plan. new millwork and interior walls
Status: Permit Issued
Aug 2, 2022
Permit fee: $2,052
New Construction
Installation of fuel storage soley for emergency generators (as part of plan to reduce amount of fuel stored onsite by decommissioning underground tanks).
Status: Permit Issued
Jun 29, 2022
Permit fee: $2,460
Moving Equipment
Modernization of one (1) hydraulic elevator
Status: Certificate of Completion
Dec 10, 2021
Permit fee: $1,295
Moving Equipment
Modernization of two (2) hydraulic elevators.
Status: Permit Issued
Dec 10, 2021
Permit fee: $2,645
Electrical Repair / Replacement / Addition
Planned outage and reconnect. maintenance on switchgear msb-1 clean and torque gear.
Status: Permit Issued
Dec 1, 2021
Permit fee: $40
Electrical Repair / Replacement / Addition
Planned outage and reconnect. maintenance of switchgear msb-3 clean and torque gear.
Status: Permit Issued
Dec 1, 2021
Permit fee: $40
Electrical Repair / Replacement / Addition
Planned outage and reconnect. maintenance of switchgear msb-4 clean and torque gear.
Status: Permit Issued
Dec 1, 2021
Permit fee: $40
Electrical Repair / Replacement / Addition
Planned outage and reconnect. maintenance of switchgear msb-5 clean and torque gear.
Status: Permit Issued
Dec 1, 2021
Permit fee: $40
Attached Sign
Manufacture and install (1) set of 1’-4” led illuminated channel letters with 4” x 4” x 10’-11” raceway attached at bottom of letters.
Status: Sub-Permits Finaled
Sep 23, 2021
Permit fee: $255
Renovation (Structural)
Implementation of infrastructure upgrades phase 1 at lcmc children's hospital of new orleans.
Status: Permit Issued
Aug 10, 2021
Permit fee: $26,598

Check permits at another New Orleans address

Free instant lookup, no signup.

Search New Orleans permits →
Disclaimer: Permit data comes from New Orleans's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the New Orleans building department before buying, selling, or planning work.