Electrical Repair / Replacement / Addition
Replacement of substation c with new substation u. please note this application was already approved by electrical division (reference code emec0r) but application was rejected due to the contractor listed as frischhertz electric co. inc. a
Status: Finaled
Sep 24, 2025
Permit fee: $1,543
Accessory Structure
Structural steel fabrication & installation
i. see drawings in attachment a for structural steel scope.
ii. fabrication and installation of structural steel shall be in accordance with the
construction drawings and pip sts05120 and pip s
Status: Permit Issued
Sep 5, 2025
Permit fee: $1,056
Electrical Repair / Replacement / Addition
Transferring of existing 480v 3ph 4w loads from existing substation c to temporary substation to allow for replacement of substation c. replacement of substation c will be a separate project that will be filed at a later date once engineeri
Status: Permit Issued
Apr 23, 2025
Permit fee: $40
Electrical Repair / Replacement / Addition
Electrical refeed of cooling towers 1 and 2 that are being replaced.
Status: Permit Issued
Feb 14, 2025
Permit fee: $46
Electrical Repair / Replacement / Addition
Electrical refeed of cooling towers 1 and 2 that are being replaced.
Status: Permit Issued
Feb 14, 2025
Permit fee: $46
Renovation (Structural)
Scope of work for installation of rack and pinion elevator and the structural steel modifications required to install elevator doors on exterior face of existing roaster building. includes modification to the existing piping systems and rel
Status: Permit Issued
Jan 17, 2025
Permit fee: $4,926
Moving Equipment
Installation of one (1) elevator
Status: Finaled
Dec 20, 2024
Permit fee: $95
Electrical Repair / Replacement / Addition
Addition of two electrical rooms in existing warehouse 5. relocating feeders from existing substations to substations r and s. splicing existing electrical branch to be fed from electrical equipment in two new electrical rooms. replacing ex
Status: Permit Issued
Oct 15, 2024
Permit fee: $3,334
Electrical Repair / Replacement / Addition
Addition of two electrical rooms in existing warehouse 5. relocating feeders from existing substations to substations r and s. splicing existing electrical branch to be fed from electrical equipment in two new electrical rooms. replacing ex
Status: Permit Issued
Oct 15, 2024
Permit fee: $3,334
Renovation (Structural)
Renovate existing warehouse 5 by replacing the interior columns, install new concrete foundations for mcc rooms and hvac equipment, install new pile supported foundation for future process equipment install new metal stud walls.
*final i
Status: Inspections Finaled
Sep 26, 2024
Permit fee: $17,460
Renovation (Structural)
Renovate existing warehouse 5 by replacing the interior columns, install new concrete foundations for mcc rooms and hvac equipment, install new pile supported foundation for future process equipment install new metal stud walls.
*final i
Status: Inspections Finaled
Sep 26, 2024
Permit fee: $17,460
Electrical Repair / Replacement / Addition
Electrical renovation of cp office area
Status: Permit Issued
Dec 28, 2023
Permit fee: $70
Electrical Repair / Replacement / Addition
Final phase of substation t project. this involves installation of substation t, medium voltage feeder to substation t and swapping of the existing 480v loads from substation k and p to substation t.
Status: Finaled
Dec 19, 2023
Permit fee: $93
Mechanical HVAC
We will install 4 rooftop package units 1-12.5ton, 3-5ton, units and associated ductwork at the folgers facility.
Status: Permit Issued
Sep 28, 2023
Permit fee: $213
New Construction
New timber pile supported concrete foundation to support facility equipment.
*the slab height must be at the base flood elevation
Status: Certificate of Occupancy
Jul 14, 2023
Permit fee: $1,998
Electrical Service / Circuit / Feeder
Temporary feeder for trailer
Status: Permit Issued
May 24, 2023
Permit fee: $40
Electrical Service / Circuit / Feeder
New electrical installation for new storage warehouse and office space at the existing folgers coffee plant
Status: Permit Expired
May 24, 2023
Permit fee: $580
New Construction
For foundation only. foundation has been applied for as a separate permit to expedite construction under 23-01834-newc which includes the stormwater management.
new construction of storage warehouse and offices at existing folgers plant
Status: Certificate of Occupancy
May 16, 2023
Permit fee: $8,489
Electrical Repair / Replacement / Addition
Removal of substation f medium voltage switch and 13.8kv to 480v transformer. temporary refeed of substation p to distribution switchgear pdp 3328, 3342, and 3326 and motor control center mcc 3325.
Status: Finaled
Apr 10, 2023
Permit fee: $40
New Construction
Temporary construction trailer.
Status: Permit Issued
Mar 20, 2023
Permit fee: $195
New Construction
New slab for future warehouse building adjacent to existing warehouse. construction documents for warehouse building will be summitted separately next month.
Status: Certificate of Occupancy
Mar 20, 2023
Permit fee: $69,594
Electrical Repair / Replacement / Addition
Refeeding of substation e current loads from existing substation p to allow for removal of existing substation e.
Status: Certificate of Completion
Nov 20, 2022
Permit fee: $40
Permanent Generator
Replacement of existing generator with new generator in new location
Status: Permit Issued
Aug 1, 2022
Permit fee: $175
Accessory Structure
We are demolishing an existing driveway and concrete ramp. we are going back with an 18" thick slab. installing an emergency generator on this slab and erecting a metal grating platform around the generator.
this permit is a release o
Status: Permit Issued
Jul 18, 2022
Permit fee: $1,464
Electrical Repair / Replacement / Addition
Providing and installing a new feeder to motor control center 3353 and addition of section to existing motor control center 3352. this also includes all feeders from motor control center 3353 and new feeders from existing motor control cent
Status: Permit Issued
Jun 29, 2022
Permit fee: $400
Renovation (Non-Structural)
Providing and installing a new feeder to motor control center 3353 and addition of section to existing motor control center 3352. this also includes all feeders from motor control center 3353 and new feeders from existing motor control cent
Status: Permit Issued
Jun 27, 2022
Permit fee: $1,650
Electrical Repair / Replacement / Addition
Is office renovation
Status: Permit Issued
Jan 20, 2022
Permit fee: $40
Electrical Repair / Replacement / Addition
Renovation for can packing team room
Status: Permit Issued
Jan 20, 2022
Permit fee: $40
Renovation (Non-Structural)
550 square foot interior renovation of existing offices
Status: Permit Issued
Jan 12, 2022
Permit fee: $534
Renovation (Non-Structural)
1,000 square foot interior non-structural renovation of an existing office and meeting room
Status: Permit Issued
Jan 12, 2022
Permit fee: $948
Electrical Repair / Replacement / Addition
Renovate existing r&g and instant lab
Status: Permit Issued
May 14, 2021
Permit fee: $55
Renovation (Non-Structural)
1100 sf non-structural renovation of existing lab spaces. work to be done as per plans.
Status: Permit Issued
May 10, 2021
Permit fee: $1,860
Check permits at another New Orleans address
Free instant lookup, no signup.
Search New Orleans permits →
Disclaimer: Permit data comes from New Orleans's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the New Orleans building department before buying, selling, or planning work.