Permits on file (71)

Ordered most recent first. Data from the city's open data portal.

Plumbing ComMin
Kitchen/break sink
Status: Closed
Sep 13, 2024
Permit fee: $85
Commercial Remodel
#240. tennant improvement. no change to exiting. (jjl) certificate of occupancy required: no special inspections required: no const type: iv occupancy: b 2020 msbc occupant load: 9 sprinklered: yes
Contractor: CRAWFORD MERZ LLC
Status: Closed
Sep 6, 2024
Declared cost: $25,455
Permit fee: $991
Plumbing ComMin
Status: Closed
Jun 24, 2024
Permit fee: $125
Commercial Remodel
Non structural demo to create white box (maa)
Contractor: CRAWFORD MERZ LLC
Status: Closed
Apr 5, 2024
Declared cost: $72,118
Permit fee: $2,007
Commercial Remodel
Suite 110 - white box type of interior demo certificate of occupancy required: no const type: 4 occupancy: b 2020 msbc occupant load: 12 sprinklered: yes tenant: tbd floor(s): 1st a
Contractor: CRAWFORD MERZ LLC
Status: Closed
Mar 25, 2024
Declared cost: $21,350
Permit fee: $862
Commercial Remodel
White box demolition - suite 460 const type: iv occupancy: b 2020 msbc occupant load: 13 sprinklered: yes architect: nathaniel shea #24515
Contractor: CRAWFORD MERZ LLC
Status: Closed
Feb 5, 2024
Declared cost: $45,210
Permit fee: $914
Commercial Remodel
White box demolition - suite 330 const type: iv occupancy: b 2020 msbc occupant load: 16 sprinklered: yes architect: nathaniel shea #24515
Contractor: CRAWFORD MERZ LLC
Status: Closed
Feb 5, 2024
Declared cost: $48,655
Permit fee: $960
Plumbing ComMin
Suite 200 phaedon/install 2 breakroom sinks
Status: Closed
Dec 14, 2023
Permit fee: $249
Mechanical ComMFDRR
Unit # 200. replace 4 existing vav with new
Contractor: Kraft Mechanical
Status: Closed
Dec 14, 2023
Declared cost: $74,000
Permit fee: $1,339
Commercial Remodel
T/i - suite 200 phaedon 2020 msbc architect: shea, nathaniel william - 24515
Contractor: CRAWFORD MERZ LLC
Status: Closed
Dec 1, 2023
Declared cost: $486,399
Permit fee: $8,050
Commercial Remodel
2nd floor. interior improvements. infill atrium. no change to exiting. (jjl) architect: tanek - nathaniel shea #24515 engineer: paulson clark - troy such #41374 special inspections to be performed by paulson and clark. type iv heav
Contractor: CRAWFORD MERZ LLC
Status: Closed
Nov 27, 2023
Declared cost: $34,830
Permit fee: $1,217
Mechanical ComMFDRR
Furnish and install 1 new perimeter vav and associated supply duct, modify existing vav zones to serve new space configuration. furnish and install return air sound boots
Contractor: Kraft Mechanical
Status: Closed
Jul 21, 2023
Declared cost: $15,000
Permit fee: $306
Commercial Remodel
Parking garage structural repairs. engineer: deiss
Status: Closed
Jul 13, 2023
Declared cost: $379,404
Permit fee: $6,513
Mechanical ComMFDRR
Replace vav's+modify ducts
Contractor: Kraft Mechanical
Status: Closed
Jul 13, 2023
Declared cost: $20,000
Permit fee: $408
Commercial Remodel
Interior tenant improvements - suite 440 hkm law certificate of occupancy required: no const type: 4 occupancy: b 2020 msbc occupant load: no change sprinklered: yes architect: n shea #24515
Contractor: CRAWFORD MERZ LLC
Status: Closed
Jun 23, 2023
Declared cost: $140,939
Permit fee: $3,082
Commercial Remodel
Tenant improvement - suite 560 certificate of occupancy required: no special inspections required: no const type: 4 occupancy: b 2020 msbc occupant load: 33 sprinklered: yes tenant: logic stream a
Contractor: CRAWFORD MERZ LLC
Status: Closed
Jun 15, 2023
Declared cost: $139,035
Permit fee: $3,067
Plumbing ComMin
#208 wellness room 1 sink
Status: Closed
Mar 16, 2023
Permit fee: $85
Mechanical ComMFDNR
Install one branch duct and 1 air transfer with f/s damper for wellness room.
Contractor: Kraft Mechanical
Status: Closed
Mar 8, 2023
Declared cost: $2,000
Permit fee: $85
Commercial Remodel
Suite 250. demo only. no contruction. (jjl) architect: tanek - nathaniel shea #24515
Contractor: CRAWFORD MERZ LLC
Status: Closed
Mar 3, 2023
Declared cost: $6,984
Permit fee: $345
Commercial Remodel
Suite 208 wellness room. (jjl) certificate of occupancy required: no ***** special inspections required: no***** const type: iv ***occupancy: b ***2020 msbc***** occupant load: 2 ***** sprinklered
Contractor: CRAWFORD MERZ LLC
Status: Closed
Feb 28, 2023
Declared cost: $33,939
Permit fee: $1,192
Mechanical ComMFDNR
Extend existing ductwork and adding and replacing existing supply grilles per attached drawings.
Contractor: Kraft Mechanical
Status: Closed
Feb 27, 2023
Declared cost: $5,000
Permit fee: $102
Mechanical ComMFDNR
Ductwork modification per attached plan.
Contractor: Kraft Mechanical
Status: Closed
Feb 24, 2023
Declared cost: $5,270
Permit fee: $108
Commercial Remodel
Tenant build-out of 1,422 sf office space for milliken showroom - suite #120 - designer's guild building. minor partition framing for employee break area. no change to exiting/corridors/occupant load. 2 exits provided. certificate of occu
Contractor: CRAWFORD MERZ LLC
Status: Closed
Feb 24, 2023
Declared cost: $36,700
Permit fee: $1,267
Commercial Remodel
Tenant improvement at suite #140 management office - designers guild building. select demo to install glazing at interior wall, construction partition walls for one enclosed office, create kitchenette/breakroom, remainder is open office. a
Contractor: CRAWFORD MERZ LLC
Status: Closed
Feb 13, 2023
Declared cost: $29,751
Permit fee: $1,092
Mechanical ComMFDNR
Suite 235. plans attached.
Contractor: Kraft Mechanical
Status: Closed
Feb 10, 2023
Declared cost: $45,550
Permit fee: $929
Plumbing ComMin
For suite 120/milliken breakroom - roughin, provide and install a water heater and sink
Status: Closed
Feb 9, 2023
Permit fee: $85
Plumbing ComMin
Fixtures for suite 235 breakroom including 2 cold valves for coffee line and fridge. and instant water heater
Status: Closed
Feb 9, 2023
Permit fee: $208
Mechanical ComMFDNR
Replacing tow existing vav boxes and adding two new boxes. grds and all associated ductwork. refer to attached drawings.
Contractor: Kraft Mechanical
Status: Closed
Feb 8, 2023
Declared cost: $45,000
Permit fee: $918
Mechanical ComMFDNR
Modification of hvac system, replacing two vav boxes, grds and all associated ductwork. refer to attached drawings.
Contractor: Kraft Mechanical
Status: Closed
Jan 31, 2023
Declared cost: $23,270
Permit fee: $475
Plumbing ComMin
For suite 480/gapen - sink & water heater
Status: Closed
Jan 31, 2023
Permit fee: $85
Commercial Remodel
Office remodeling suite 235. approx. 3500 sq ft. certificate of occupancy required: no const type: occupancy: b 2020 msbc sprinklered: yes architect: tanek
Contractor: CRAWFORD MERZ LLC
Status: Closed
Jan 27, 2023
Declared cost: $158,682
Permit fee: $3,340
Commercial Remodel
Tenant improvements (maa) const type: iv occupancy: b 2020 msbc occupant load: 20 sprinklered:yes 20% accessibility upgrades____fully______ tenant: gapen floor(s): architect: nate shea 245
Contractor: CRAWFORD MERZ LLC
Status: Closed
Jan 19, 2023
Declared cost: $243,628
Permit fee: $4,560
Commercial Remodel
Tenant improvement - suite 470 certificate of occupancy required: no special inspections required: no const type: 4 occupancy: b 2020 msbc occupant load: 8 sprinklered: yes tenant: spec architect:
Contractor: CRAWFORD MERZ LLC
Status: Closed
Jan 17, 2023
Declared cost: $99,788
Permit fee: $2,493
Mechanical ComMFDNR
Drawing attached, replacing 2 vav with cooling coils and duct distribution relocation.. suite 590
Contractor: Kraft Mechanical
Status: Closed
Dec 30, 2022
Declared cost: $26,237
Permit fee: $535
Plumbing ComMin
Fixtures for suite 590 - breakroom
Status: Closed
Dec 16, 2022
Permit fee: $125
Commercial Remodel
Tenant improvements #590 certificate of occupancy required: no special inspections required: no const type: 4 occupancy: b 2020 msbc occupant load: 27 sprinklered: yes tenant: floor(s): 5
Contractor: CRAWFORD MERZ LLC
Status: Closed
Dec 2, 2022
Declared cost: $86,450
Permit fee: $2,259
Mechanical ComMFDNR
Furnish and install 2 new zones with duct . (2 new vav systems, drawings attached.)
Contractor: Kraft Mechanical
Status: Closed
Nov 2, 2022
Declared cost: $20,000
Permit fee: $408
Mechanical ComMFDNR
Hvac system alteration adding new three zone of finned tube radiation, replace three existing vav boxes, grds and all associated ductwork. refer to attached drawings.
Contractor: Kraft Mechanical
Status: Closed
Aug 26, 2022
Declared cost: $45,000
Permit fee: $918
Mechanical ComMFDNR
Installing new finned tube radiation, replacing two existing vav boxes and associated ductwork. refer to attached drawings.
Contractor: Kraft Mechanical
Status: Closed
Jun 24, 2022
Declared cost: $15,000
Permit fee: $306
Commercial Remodel
Interior remodel of suite 400. certificate of occupancy required: yes no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required: yes no const ty
Contractor: CRAWFORD MERZ LLC
Status: Closed
May 20, 2022
Declared cost: $88,768
Permit fee: $2,295
Mechanical ComMFDNR
Replacing 5 vavs and installing two new adding grds and modifying ductwork per attached plan.
Contractor: Kraft Mechanical
Status: Closed
May 19, 2022
Declared cost: $32,700
Permit fee: $667
Commercial Remodel
T/i - unit 375 - 'christensen law' ----- architect: nathaniel william shea - 24515 construction type: occupancy: b sprinklered: yes ----- electrical work is not a part of this permit - jurisdiction of state of minnesota ----- issu
Contractor: CRAWFORD MERZ LLC
Status: Closed
Mar 31, 2022
Declared cost: $325,275
Permit fee: $5,738
Mechanical ComMFDNR
Hvac alteration to accommodate for new tenant space, adding one new vav box, grds and all associated ductwork. refer to attached drawings.
Contractor: Kraft Mechanical
Status: Closed
Mar 22, 2022
Declared cost: $35,000
Permit fee: $714
Commercial Remodel
T/i - suite 500 ----- architect: nathaniel shea - 24515 ----- occupancy: b construction type: iv sprinklered: yes ----- issuance of this permit doesn't allow a violation of building code or any other laws or ordinances. ----- wor
Contractor: CRAWFORD MERZ LLC
Status: Closed
Mar 8, 2022
Declared cost: $156,366
Permit fee: $3,311
Plumbing ComFdBv
For suite 500 1 sink
Status: Closed
Feb 28, 2022
Permit fee: $85
Plumbing ComFdBv
For floors 4 -6: provide and install fixtures on existing rough-ins for restrooms
Status: Closed
Feb 28, 2022
Permit fee: $746
Mechanical ComMFDNR
Emergency replacement of 10 ton split and reconnecting existing ductwork.
Contractor: Kraft Mechanical
Status: Closed
Jan 25, 2022
Declared cost: $35,000
Permit fee: $714
Mechanical ComMFDNR
Installing new restroom exhaust per attached plan.
Contractor: Kraft Mechanical
Status: Closed
Dec 14, 2021
Declared cost: $2,500
Permit fee: $85
Commercial Remodel
Shell building - 6th floor - add bathroom w 60 inch circle, grab bars, toilet, lavatory, hi/lo fountain - architect: nathaniel shea - 24515 - occupancy: b construction type: i-b sprinklered: yes - required - maintain/restore/replac
Contractor: CRAWFORD MERZ LLC
Status: Closed
Dec 6, 2021
Declared cost: $21,300
Permit fee: $862
Commercial Remodel
Certificate of occupancy required: no special inspections required: no const type: i-b occupancy: b 2020 msbc occupant load: sprinklered: yes energy code chapter used: elevator review ________ 2
Contractor: CRAWFORD MERZ LLC
Status: Closed
Dec 6, 2021
Declared cost: $56,338
Permit fee: $1,719
Commercial Remodel
Shell building - 5th floor - add bathroom w 60 inch circle, grab bars, toilet, lavatory, hi/lo fountain - architect: nathaniel shea - 24515 - occupancy: b construction type: i-b sprinklered: yes - required - maintain/restore/replac
Contractor: CRAWFORD MERZ LLC
Status: Closed
Dec 6, 2021
Declared cost: $21,300
Permit fee: $862
Plumbing ComFdBv
5th and 6th flr-rough in and install restrooms
Status: Closed
Dec 6, 2021
Permit fee: $249
Mechanical ComMFDNR
Adding two vav box with grd's and all associated ductwork. refer to attached drawings.
Contractor: Kraft Mechanical
Status: Closed
Nov 23, 2021
Declared cost: $15,000
Permit fee: $306
Mechanical ComMFDNR
Duct and grd's modification per attached plan.
Contractor: Kraft Mechanical
Status: Closed
Nov 23, 2021
Declared cost: $4,000
Permit fee: $86
Mechanical ComMFDNR
Installing fin tube radiation, one vav box, grd's and associated ductwork. refer to attached drawings.
Contractor: Kraft Mechanical
Status: Closed
Nov 23, 2021
Declared cost: $15,000
Permit fee: $306
Commercial Remodel
Non-structural tenant improvement suite 660 certificate of occupancy required: no special inspections required: no const type: iv occupancy: b 2020 msbc occupant load: 7 sprinklered: yes tenant:
Contractor: CRAWFORD MERZ LLC
Status: Closed
Nov 15, 2021
Declared cost: $57,947
Permit fee: $1,737
Commercial Remodel
T/i suite 360 -- reconfigure partition walls within space - architect: nathaniel shea - 24515 - occupancy: b construction type: i-b sprinklered: yes - required - maintain/restore/replace all fire-rated assemblies/components withi
Contractor: CRAWFORD MERZ LLC
Status: Closed
Nov 15, 2021
Declared cost: $36,605
Permit fee: $1,267
Commercial Remodel
T/i suite 350 - 'designers guild' building - architect: nathaniel william shea - 24515 - occupancy: b construction type: i sprinklered: yes - suite 350 = 1,154 sf / occupant load = 8 ----- ----- issuance of this permit shall
Contractor: CRAWFORD MERZ LLC
Status: Closed
Nov 4, 2021
Declared cost: $65,046
Permit fee: $1,881
Mechanical ComMFDRR
Replacement of (2) 15 ton rtus. burners each less than 400k btuh. includes gas piping.
Contractor: Kraft Mechanical
Status: Closed
Oct 26, 2021
Declared cost: $75,000
Permit fee: $1,426
Commercial Remodel
Tenant improvement suite 680 additional work to bldg891278. certificate of occupancy required: no special inspections required: no const type: iv occupancy: b 2020 msbc occupant load: 4,695 sf. / 150 gross = 31.3 = 31
Contractor: CRAWFORD MERZ LLC
Status: Closed
Sep 27, 2021
Declared cost: $12,567
Permit fee: $537
Mechanical ComMFDNR
Hvac system adding baseboard radiation heating, snowmelt piping , hydronic piping and all associated per attached plans.
Contractor: Kraft Mechanical
Status: Closed
Sep 16, 2021
Declared cost: $500,000
Permit fee: $7,005
Mechanical ComMFDNR
Hvac for tenant improvement, will utilize existing rooftop unit, replacing existing zone dampers with vav boxes, installing fin tube radiation, grds and all associated ductwork. refer to attached drawings.
Contractor: Kraft Mechanical
Status: Closed
Aug 11, 2021
Declared cost: $50,000
Permit fee: $1,020
Commercial Remodel
Tenant improvement - suite 290 certificate of occupancy required: no special inspections required: no const type: iv occupancy: b 2020 msbc occupant load: 7 sprinklered: yes tenant: focus financial s
Contractor: ANDERSON CC INC
Status: Closed
Aug 9, 2021
Declared cost: $70,000
Permit fee: $1,953
Plumbing ComFdBv
Replace one existing break room sink in the same location, in a 2nd floor office tenant space. no waste, vent, or water piping work involved.
Status: Closed
Aug 5, 2021
Permit fee: $85
Plumbing ComFdBv
Install waste, vent, & water for break sink
Status: Closed
Jul 22, 2021
Permit fee: $85
Commercial Remodel
Interior tenant improvement for new office space in existing commercial building. aaj (project dox plans) ***09/09/2021 - additional permit # bldg906812 issued due to additional work to this scope of work by david bond. see permit #
Contractor: CRAWFORD MERZ LLC
Status: Closed
Jul 19, 2021
Declared cost: $140,850
Permit fee: $3,082
Commercial Remodel
(dmh - projectdox) select demo only to approx 7,435 sqft 3rd floor office space. additional plans, permits and approvals required for remodeling. architect: tanek approved plans and permit must be on site before inspections will
Contractor: ANDERSON CC INC
Status: Closed
Jun 29, 2021
Declared cost: $50,000
Permit fee: $1,593
Mechanical ComMFDNR
Tenant improvement of hvac system utilizing existing air handling unit, adding vav boxes, finned tube radiation heating, supply diffusers, return grilles and all associated duct work. refer to attached drawings.
Contractor: Kraft Mechanical
Status: Closed
May 7, 2021
Declared cost: $150,000
Permit fee: $2,350
Mechanical ComMFDRR
Replace 10 ton ground mounted rtu in existing enclosure. heat input less than 400k btu.
Contractor: Kraft Mechanical
Status: Closed
May 4, 2021
Declared cost: $20,000
Permit fee: $481
Commercial Remodel
Spot tuckpointing, brick repolacement and sealant repairs. remove decorative concrete entry arch from 3rd street entrance area. sck
Contractor: AMERICAN MASONRY
Status: Closed
Apr 30, 2021
Declared cost: $162,950
Permit fee: $2,091
Plumbing ComFdBv
Break room sink
Status: Closed
Apr 22, 2021
Permit fee: $85

Check permits at another Minneapolis address

Free instant lookup, no signup.

Search Minneapolis permits →
Disclaimer: Permit data comes from Minneapolis's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Minneapolis building department before buying, selling, or planning work.