Permit history for 1410 S Museum Campus Dr

Cook County, IL · 161 permits on file · 2021–2025

161
Permits on file
2021
First permit
2025
Most recent
48
Unique contractors
$3,708,202
Declared value (all work)

Permits on file (161)

Ordered most recent first. Data from the city's open data portal.

Building Permit
The work involves tenant improvements to a concessionaire/food service property at the museum campus, owned by the parks district. construction of new outdoor bar on the sites existing patio. bar enclosed by roofed structure and used season
Contractor: JENNA ALIA
Status: CLOSED
Dec 8, 2025
Declared cost: $230,000
Building Permit
Permit expires on 12/24/2025 erection starts 10/31/2025, erection ends 11/2/2025. self cert 2019 cdc. 1 24x20 sl100 mobile stage with 8x8 wings for the ireland fan tailgate party at soldier field stadium green on nov 1 2025. set-up is oct
Status: CLOSED
Oct 24, 2025
Declared cost: $2,000
Building Permit
Permit expires on 12/24/2025 erection starts 11/9/2025, erection ends 11/9/2025. cbc 2019. reinstatement of 2024 permit 101058268 for the 2025 mobile stage for the chicago bears at stadium green on nov 9, 2025. set-up nov 9 and takedown no
Status: CLOSED
Oct 24, 2025
Declared cost: $2,000
Building Permit
Line voltage electrical work. new temporary 200 amp service disconnecting means with 2 circuits. receptacle outlets 2 . lighting outlets 0. specific location south parking lot.
Contractor: SAGE ANTHONY
Status: CLOSED
Oct 23, 2025
Declared cost: $5,000
Building Permit
Permit expires on 12/17/2025 erection starts 10/31/2025, erection ends 11/3/2025. self cert 2019 cdc. 2 - 40ft x 80ft assembly pole tents for the ireland fan tailgate party at soldier field stadium green on nov 1 2025. set-up is oct 31 an
Contractor: JOIIET TENT CO
Status: CLOSED
Oct 17, 2025
Declared cost: $9,000
Building Permit
Permit expires on 12/14/2025 erection starts 10/25/2025, erection ends 10/25/2025. self cert cbc2019. light the night chicago 2025 tent and stage on oct 25. set-up oct 25 and takedown oct 25, 2025. 1-40x40 tent and 1-sl100 mobile stage. bl
Status: CLOSED
Oct 14, 2025
Declared cost: $4,000
Building Permit
Electrical maintenance permit. occupancy assembly. start date 10/7/2025. end date 1/5/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete writ
Status: CLOSED
Oct 9, 2025
Declared cost: $1
Building Permit
Permit expires on 12/03/2025 erection starts 10/17/2025, erection ends 10/18/2025. cbc2019 - reinstatement od 2024 permit 101059995 for the 2025 acs making strides stage on oct 18. setup is oct 17 and takedown is oct 18. same 1-24x20 sl10
Status: CLOSED
Oct 3, 2025
Declared cost: $3,000
Building Permit
Permit expires on 12/02/2025 erection starts 10/19/2025, erection ends 10/19/2025. cbc 2019. reinstatement of 2024 permit 101058268 for the 2025 mobile stage for the chicago bears at stadium green on oct 19, 2025. set-up oct 19 and takedow
Status: CLOSED
Oct 2, 2025
Declared cost: $2,000
Building Permit
Permit expires on 11/10/2025 erection starts 9/26/2025, erection ends 9/27/2025. cbc2019 reinstatement of 2022 permit 100988694 for the 2025 aids run stage at stadium green in soldier field on sept 27, 2025. setup on sept. 26 and takedown
Status: CLOSED
Sep 10, 2025
Declared cost: $3,000
Building Permit
Permit expires on 11/05/2025 erection starts 9/21/2025, erection ends 9/21/2025. cbc 2019. reinstatement of 2024 permit 101058268 for the 2025 mobile stage for the chicago bears at stadium green on sept 21, 2025. set-up sept 21 and takedow
Status: CLOSED
Sep 5, 2025
Declared cost: $2,000
Building Permit
Permit expires on 11/03/2025 erection starts 9/19/2025, erection ends 9/20/2025. self cert. cbc2019 - reinstatement of 2022 permit 100987771 for the 2025 als walk at soldier field stadium green on sept 20. setup is sept19 and takedown is s
Status: CLOSED
Sep 3, 2025
Declared cost: $3,000
Building Permit
For permit b200412302 replacement electrical contractor. new contractors listed under other applicants and contractors on permit certificate.
Status: CLOSED
Sep 3, 2025
Declared cost: $1
Building Permit
Spr 2019 cbrc exterior only expansion of existing level 400 west concourse deck including new stair, railings to match existing and lighting fixtures under new deck, no plumbing or hvac. no additional stadium occupancy. deck expansion for o
Status: CLOSED
Aug 29, 2025
Declared cost: $900,000
Building Permit
Line voltage electrical work. new temporary 200 amp service disconnecting means with 2 circuits. receptacle outlets 1 . lighting outlets 1. specific location south parking lot.
Status: CLOSED
Aug 7, 2025
Declared cost: $5,000
Building Permit
Upgrades to existn commercial kitchen museum campus food kiosk- install new pizza oven and new sliding service window per plans relocate plumbing fixtures
Contractor: JENNA ALIA
Status: CLOSED
Mar 26, 2025
Declared cost: $25,000
Building Permit
Upgrades to existn commercial kitchen museum campus food kiosk- install new pizza oven and new sliding service window per plans relocate plumbing fixtures
Contractor: JENNA ALIA
Status: CLOSED
Mar 26, 2025
Declared cost: $25,000
Building Permit
Grounding and final connections for loading dock generator for chicago/atlanta game sunday 12/31
Contractor: TAYLOR ELECTRIC CO
Status: PENDING
Dec 29, 2023
Declared cost: $5,000
Building Permit
Grounding and final connections for temporary generator on loading dock for bears/cardinals game on sunday december 24th 2024
Contractor: TAYLOR ELECTRIC CO
Status: PENDING
Dec 22, 2023
Declared cost: $5,000
Building Permit
Grounding and final connections for temp generator on loading dock for bears/lions game on sunday december 10th 2023
Contractor: TAYLOR ELECTRIC CO
Status: PENDING
Dec 6, 2023
Declared cost: $40,000
Building Permit
Monthly maintenance for december 2023
Contractor: TAYLOR ELECTRIC CO
Status: PENDING
Dec 6, 2023
Declared cost: $40,000
Building Permit
Grounding and final connections for generator at the loading dock for bears/panthers game thursday night nov 9th
Status: CLOSED
Nov 9, 2023
Declared cost: $5,000
Building Permit
Monthly main for november 2023
Status: CLOSED
Nov 2, 2023
Declared cost: $40,000
Building Permit
Install temporary holiday lighting at police officers memorial.
Status: CLOSED
Oct 26, 2023
Declared cost: $1,000
Building Permit
Grounding and final connections for temporary generator at the tv truck dock for sunday 10/22 bears vs raiders game
Status: CLOSED
Oct 19, 2023
Declared cost: $5,000
Building Permit
Permit expires on 12/17/2023 erection starts 10/26/2023, erection ends 10/28/2023. self certification. reinstatement of 2022 permit 100991410 for the komen race 2023 mobile stage at soldier field stadium green. same 1-24x20 mobile stage wi
Status: CLOSED
Oct 17, 2023
Declared cost: $2,000
Building Permit
Grounding and final connections for generator in loading dock for bears game sunday 10/15
Status: CLOSED
Oct 11, 2023
Declared cost: $5,000
Building Permit
Permit expires on 12/06/2023 erection starts 10/20/2023, erection ends 10/21/2023. self certification. reinstatement of 2022 permit 100992699 for autism speaks stage 2023 at soldier field stadium green. same 1-24x20 sl100 mobile stage with
Status: CLOSED
Oct 6, 2023
Declared cost: $2,000
Building Permit
Permit expires on 12/05/2023 erection starts 10/21/2023, erection ends 10/21/2023. self certification. light the night chicago 2023 tents and stage. 1-sl100 24x20 stage w wings, 1-20x30 tent and 1-40x40 tent. leukemia lymphoma society wit
Status: CLOSED
Oct 5, 2023
Declared cost: $5,000
Building Permit
Permit expires on 12/02/2023 erection starts 10/13/2023, erection ends 10/14/2023. self cert. reinstatement of 2022 permit 100992185 for acs making strides stage 2023. same 1-24x20 sl100 stage. enmotive co with sesg.
Status: CLOSED
Oct 2, 2023
Declared cost: $2,000
Building Permit
Grounding and final connections for generator for aids walks on saturday 9/30/23 at the stadium green area
Status: CLOSED
Sep 29, 2023
Declared cost: $5,000
Building Permit
Monthly maintenance for october 2023
Status: CLOSED
Sep 29, 2023
Declared cost: $40,000
Building Permit
Permit expires on 11/26/2023 erection starts 10/6/2023, erection ends 10/7/2023. self cert. reinstatement of 2019 permit 100844846 for the 2023 walk to end alzheimers stage. same 1-24x20 sl-100 mobile stage with wings. csem.
Contractor: DELWYN HARRIS CSEM
Status: CLOSED
Sep 26, 2023
Declared cost: $2,000
Building Permit
Permit expires on 11/15/2023 erection starts 9/29/2023, erection ends 9/30/2023. self cert. reinstatement of 2022 permit 100988694 for the 2023 aids run stage at stadium green in soldier field. same 1-24x20 sl-100 mobile stage with wings.
Contractor: MATT BEZROUCH CSEM
Status: CLOSED
Sep 15, 2023
Declared cost: $2,000
Building Permit
Permit expires on 11/11/2023 erection starts 9/12/2023, erection ends 9/16/2023. erection starts 9/12/2023, erection ends 9/16/2023. erection starts , erection ends . self-certerection starts09/12/23, erection ends09/16/23 erection of te
Status: CLOSED
Sep 11, 2023
Declared cost: $25,000
Building Permit
Maintenance for the month of sept 2023
Status: CLOSED
Sep 8, 2023
Declared cost: $40,000
Building Permit
Permit expires on 11/08/2023 erection starts 9/22/2023, erection ends 9/23/2023. self cert. reinstatement of 2022 permit 100987771 for the 2023 als walk at soldier field. same 1- sl250 - 32x24 mobile stage. lakeshore athletic services
Status: CLOSED
Sep 8, 2023
Declared cost: $3,000
Building Permit
Permit expires on 11/06/2023 erection starts 9/21/2023, erection ends 9/22/2023. self certification. reinstatement of 2022 permit 100986932 for heartwalk 2023 mobile stage at soldier field south lot. same 1-24x20 mobile stage with wings.
Status: CLOSED
Sep 6, 2023
Declared cost: $2,000
Building Permit
Permit expires on 10/25/2023 erection starts 7/25/2023, erection ends 7/30/2023. erection starts 7/25/2023, erection ends 7/30/2023. self-cert erection starts 07/25/23 ends 07/30/23erection of temporary stage for a 07/29/2023 ed sheeran
Status: CLOSED
Aug 25, 2023
Declared cost: $25,000
Building Permit
Temp power for karol g.
Status: CLOSED
Aug 22, 2023
Declared cost: $5,000
Building Permit
Monthly maintenance for august 2023
Status: CLOSED
Aug 11, 2023
Declared cost: $40,000
Building Permit
Permit expires on 09/24/2023 erection starts 8/1/2023, erection ends 8/2/2023. chelsea fan fest soccer event mobile stage- self-ceet- 1 day event 08/2/2023erect one 1 32x24 mobile stage. erect 08/1/2023- remove 08/2/2023 assembly
Status: CLOSED
Jul 24, 2023
Declared cost: $20,000
Building Permit
Final connections and grounding for generator inside stadium for the ed sheeran concert. generator onsite tuesday 7/25 through sunday 7/30 for the ed sheeran concert
Status: CLOSED
Jul 24, 2023
Declared cost: $10,000
Building Permit
Monthly maintenance for july 2023
Status: CLOSED
Jul 19, 2023
Declared cost: $40,000
Building Permit
Permit expires on 09/18/2023 erection starts 7/18/2023, erection ends 7/24/2023. erection starts , erection ends . erection starts 07/18/2023, erection ends 07/24/2023 self-cert erection of temporary stage for a 07/22-23/2023 beyonce conc
Status: CLOSED
Jul 18, 2023
Declared cost: $25,000
Building Permit
Permit expires on 09/13/2023 erection starts 7/24/2023, erection ends 7/31/2023. self cert. vending tent for ed sheeran concert at soldier field. 1-30x30 tent. joliet tent co.
Contractor: JOLIET TENT CO
Status: CLOSED
Jul 13, 2023
Declared cost: $2,000
Building Permit
Permit expires on 09/13/2023 erection starts 7/24/2023, erection ends 7/31/2023. self cert. vending tent for ed sheeran concert at soldier field. 1-30x30 tent. joliet tent co.
Contractor: JOLIET TENT CO
Status: CLOSED
Jul 13, 2023
Declared cost: $2,000
Building Permit
Permit expires on 09/03/2023 erection starts 7/14/2023, erection ends 7/15/2023. big ten 10k 2023 mobile stage- 1 day event 07/15/2023erect one 1 24x16 mobile stage. erect 07/14/2023- remove 07/15/2023 assembly
Status: CLOSED
Jul 3, 2023
Declared cost: $10,000
Building Permit
Monthly maintenance for june of 2023
Status: CLOSED
Jun 14, 2023
Declared cost: $40,000
Building Permit
Permit expires on 08/12/2023 erection starts 6/23/2023, erection ends 6/24/2023. self cert. gold cup modelo display truss at soldier field south green. 1-40ft x 40ft display truss. csem
Status: CLOSED
Jun 12, 2023
Declared cost: $3,000
Building Permit
Permit expires on 08/01/2023 erection starts 6/5/2023, erection ends 6/20/2023. reinstatement of 2022 permit 100973514 for sail grand prix chicago large tents at soldier field south parking lot. same 2 - 66 x 132 and 10 - 60x82 tents for
Contractor: JK RENTALS 2 LLC
Status: CLOSED
Jun 1, 2023
Declared cost: $90,000
Building Permit
Grounding and final connections for temporary generator for taylor swift concert 6/2 6/3 and 6/4
Status: CLOSED
Jun 1, 2023
Declared cost: $10,000
Building Permit
Permit expires on 07/31/2023 erection starts , erection ends . self-cert erection starts 05/30/23, erection ends 06/05/2023. erection of temporary stage for a taylor swift concert june 2-4, 2023 at soldier field overall area 19,664 sq.ft.
Status: CLOSED
May 31, 2023
Declared cost: $25,000
Building Permit
Permit expires on 07/30/2023 erection starts 6/6/2023, erection ends 6/19/2023. self cert - sail grand prix chicago small tents at soldier field south parking lot. 1-60x66 tent and 1-30x50 tent . sail gp with blue peak tents.
Contractor: BLUE PEAK TENTS INC
Status: CLOSED
May 30, 2023
Declared cost: $7,000
Building Permit
Permit expires on 07/26/2023 erection starts 5/29/2023, erection ends 6/5/2023. self cert. taylor swift concert vending tents at soldier field. 1-30x30 and 1-20x40 tents. joliet tent co.
Status: CLOSED
May 26, 2023
Declared cost: $4,000
Building Permit
Permit expires on 07/25/2023 erection starts 6/8/2023, erection ends 6/20/2023. self cert - sail grand prix chicago 2023 airclad staff tent at soldier field south parking lot. 1-33 x 41 alum frame tent. sail gp with blue peak tents.
Contractor: BLUE PEAK TENTS INC
Status: CLOSED
May 25, 2023
Declared cost: $2,000
Building Permit
Permit expires on 07/17/2023 erection starts 5/2/2023, erection ends 5/7/2023. erection starts , erection ends . erection starts 05/02/2023, erection ends 05/07/2023 self-cert erection of temporary stage for a 05/06/2023 luke combs concer
Status: CLOSED
May 22, 2023
Declared cost: $25,000
Building Permit
Permit expires on 07/15/2023 erection starts 8/1/2023, erection ends 1/28/2024. reinstatement of permit 100980322 for two 2 4w x 60l x 3h alumuminum seating platforms w/26 fixed seats to be used for chicago bears home events. erection sta
Status: CLOSED
May 15, 2023
Declared cost: $6,000
Building Permit
Monthly maintenance for may of 2023
Status: CLOSED
May 1, 2023
Declared cost: $40,000
Building Permit
Monthly maintenance for april 2023
Status: CLOSED
May 1, 2023
Declared cost: $40,000
Building Permit
Permit expires on 06/27/2023 erection starts 4/29/2023, erection ends 4/30/2023. 2023 walk ms tent and stage at soldier field south lot. 1- 49 x 98 tent and 1-24x20 mobile stage with wings. nmss with special events services group.
Contractor: SESG INC
Status: CLOSED
Apr 27, 2023
Declared cost: $8,000
Building Permit
Temp power for ed sheeran
Status: CLOSED
Apr 17, 2023
Declared cost: $5,000
Building Permit
Temp power for tylor swift
Status: CLOSED
Apr 17, 2023
Declared cost: $5,000
Building Permit
Temp power for luke combs
Status: CLOSED
Apr 17, 2023
Declared cost: $5,000
Building Permit
Temp power for beyonce
Status: CLOSED
Apr 17, 2023
Declared cost: $5,000
Building Permit
Permit expires on 06/06/2023 erection starts 4/21/2023, erection ends 4/22/2023. self cert. 2023 night nation run mobile stage at soldier field south lot. 1-32x24 apex mobile stage. tmt productions llc with chicago special events managemen
Status: CLOSED
Apr 6, 2023
Declared cost: $2,000
Building Permit
Grounding and final connections 100 kw temporary generator for april 22nd night nation event
Status: CLOSED
Mar 28, 2023
Declared cost: $5,000
Building Permit
Monthly maintenance for march 2023
Status: CLOSED
Mar 13, 2023
Declared cost: $40,000
Building Permit
Maintenance for february 2023
Status: CLOSED
Feb 1, 2023
Declared cost: $40,000
Building Permit
Monthly maintenance for january 2023
Status: CLOSED
Jan 9, 2023
Declared cost: $40,000
Building Permit
Monthly maintenance for december 2022
Status: CLOSED
Dec 9, 2022
Declared cost: $40,000
Building Permit
Install temporary holiday lighting at police officers memorial.
Status: CLOSED
Nov 21, 2022
Declared cost: $1,000
Building Permit
Monthly maintenance for november 2022
Status: CLOSED
Nov 2, 2022
Declared cost: $40,000
Building Permit
Grounding and final connections for generator in the south lot for light the night event on saturday october 22nd 2022
Status: CLOSED
Oct 19, 2022
Declared cost: $5,000
Building Permit
Permit expires on 12/18/2022 erection starts 10/21/2022, erection ends 10/22/2022. self certification. autism speaks stage 2022 at soldier field stadium green. 1-24x20 sl100 mobile stage with wings. enmotive co with superstage self certif
Contractor: SUPER STAGE INC
Status: CLOSED
Oct 18, 2022
Declared cost: $2,000
Building Permit
Permit expires on 12/13/2022 erection starts 10/28/2022, erection ends 10/29/2022. self certification. komen race 2022 mobile stage at soldier field stadium green. 1-24x20 mobile stage with wings. super stage inc.
Contractor: SUPER STAGE INC
Status: CLOSED
Oct 13, 2022
Declared cost: $2,000
Building Permit
Permit expires on 12/13/2022 erection starts 10/14/2022, erection ends 10/15/2022. self cert. acs making strides stage 2022. 1-24x20 sl100 stage. enmotive co with superstage. self certification conditional approval subject to field ins
Contractor: SUPER STAGE INC
Status: CLOSED
Oct 13, 2022
Declared cost: $2,000
Building Permit
Monthly maintenance for october 2022
Status: CLOSED
Oct 6, 2022
Declared cost: $40,000
Building Permit
Permit expires on 12/05/2022 erection starts 10/22/2022, erection ends 10/22/2022. self certification. light the night chicago 2022 tents and stage. 1-sl100 24x20 stage, 1-20x30 tent, 1-40x40 tent and 1-30ft dia. inflatable dome tent. leuk
Status: CLOSED
Oct 5, 2022
Declared cost: $6,000
Building Permit
Permit expires on 11/30/2022 erection starts 10/15/2022, erection ends 10/16/2022. self certification. reinstatement of 2021 permit 100944402 for moving day chicago 2022 at soldier field south lot. same 1-16x16 mobile stage. parkinsons fou
Contractor: SUPER STAGE INC
Status: CLOSED
Sep 30, 2022
Declared cost: $2,000
Building Permit
Fire alarm permitto provide a panel replacement of an existing city of chicago approved fire detection system with a new siemens xls fire detection system.
Status: CLOSED
Sep 29, 2022
Declared cost: $90,200
Building Permit
Permit expires on 11/21/2022 erection starts 10/8/2022, erection ends 10/8/2022. self cert. reinstatement of 2019 permit 100844846 for the 2022 walk to end alzheimers stage. same 1-24x20 sl-100 mobile stage with wings. csem.
Status: CLOSED
Sep 21, 2022
Declared cost: $2,000
Building Permit
Permit expires on 11/19/2022 erection starts 10/4/2022, erection ends 10/6/2022. self cert. 2022 acura training event tent and awnings. 1-20x40 tent and 2-30x50 awnings. jackson dawson with csem.
Status: CLOSED
Sep 19, 2022
Declared cost: $9,000
Building Permit
Permit expires on 11/19/2022 erection starts 10/1/2022, erection ends 10/2/2022. self cert. 2022 aids run stage at stadium green in soldier field.1-24x20 sl-100 mobile stage with wings. chicago special events management.self certification
Status: CLOSED
Sep 19, 2022
Declared cost: $2,000
Building Permit
Permit expires on 11/16/2022 erection starts 9/17/2022, erection ends 9/18/2022. self cert - susan g. komen stage at soldier field south lot. 1-24x20 mobile stage with wings. csem with event 360. self certification conditional approval
Status: CLOSED
Sep 16, 2022
Declared cost: $2,000
Building Permit
Grounding and connections for temporary generator in south lot sunday 9/17 for the komen breast walk
Status: CLOSED
Sep 15, 2022
Declared cost: $5,000
Building Permit
Permit expires on 11/12/2022 permit expires on 11/08/2022 erection starts 9/23/2022, erection ends 9/24/2022. self cert. 2022 als walk at soldier field. 1- sl250 - 32x24 mobile stage. lakeshore athletic services with superstage.
Status: CLOSED
Sep 12, 2022
Declared cost: $3,000
Building Permit
Monthly main for sept 2022
Status: CLOSED
Sep 7, 2022
Declared cost: $40,000
Building Permit
Permit expires on 11/02/2022 erection starts 9/15/2022, erection ends 9/16/2022. self certification. heartwalk 2022 mobile stage at soldier field south lot. 1-24 x20 mobile stage with wings. ravenswood events with super stage inc.
Contractor: SUPER STAGE INC
Status: CLOSED
Sep 2, 2022
Declared cost: $2,000
Building Permit
Permit expires on 10/22/2022 erection starts 08/31/22 , erection ends09/04/22 . self-cert erection of temporary stage for a 09/03/22 rammstein concert at soldier field overall area 18,848 sq.ft. inlcuding1. main stage 15,908 sf2. foh tech
Status: CLOSED
Aug 22, 2022
Declared cost: $25,000
Building Permit
Permit expires on 10/16/2022 erection starts 08/16/22 , erection ends08/21/22 erection of temporary stage for a 08/19/22 bad bunny concert at soldier field overall area 17,192 sq.ft. inlcuding1. main stage 12,696 sf2. runway thrust stages 1
Status: CLOSED
Aug 17, 2022
Declared cost: $25,000
Building Permit
Permit expires on 10/17/2022 erection starts 08/16/22 , erection ends08/21/22 erection of temporary stage for a 08/19/22 red hot chili peppers concert at soldier field overall area 14,992 sq.ft. inlcuding1. main stage 10,240 sf2. foh tech h
Status: CLOSED
Aug 17, 2022
Declared cost: $25,000
Building Permit
Temp power for rammstein concert
Status: CLOSED
Aug 10, 2022
Declared cost: $5,000
Building Permit
Monthly main for august 2022
Status: CLOSED
Aug 5, 2022
Declared cost: $40,000
Building Permit
Permit expires on 09/26/2022 erection starts 08/01/22 , erection ends08/06/22 . self-cert erection of temporary stage for a 08/05/22 elton john concert at soldier field overall area 22,808 sq.ft. inlcuding1. main stage 19,992 sf2. foh tech
Status: CLOSED
Jul 26, 2022
Declared cost: $25,000
Building Permit
Permit expires on 09/22/2022 erection starts 8/1/2022, erection ends 4/1/2023. erection starts 8/1/2022, erection ends 4/1/2023. re-installation reinstatement of previously approved removable field level seating platforms in 2020 permit 10
Contractor: MARK D DEMARSH
Status: CLOSED
Jul 22, 2022
Declared cost: $15,000
Building Permit
Permit expires on 09/13/2022 erection starts 07/20/22 , erection ends07/25/22 . erection of temporary stage for a 07/24/22 the weeknd concert at soldier field overall area 17,540 sq.ft. inlcuding1. main stage 11,292 sf2. led thrust stage 1
Status: CLOSED
Jul 13, 2022
Declared cost: $25,000
Building Permit
Grounding and final connections for temporary generator in the south lot for the bubble run event on saturday july 9th.
Status: CLOSED
Jul 8, 2022
Declared cost: $5,000
Building Permit
Maintenance for the month of july 2022
Status: CLOSED
Jul 5, 2022
Declared cost: $40,000
Building Permit
Permit expires on 09/01/2022 erection starts 7/10/2022, erection ends 7/10/2022. mobile stage- 1 day event 07/10/2022 big ten 10k 2022 erect one 1 24x16 mobile stage. erect 07/10/2022- remove 07/1-0/2022 assembly self certification cond
Contractor: SUPER STAGE INC
Status: CLOSED
Jul 1, 2022
Declared cost: $10,000
Building Permit
Temp power for elton john concert
Status: CLOSED
Jun 17, 2022
Declared cost: $5,000
Building Permit
Permit expires on 08/09/2022 erection starts 6/10/2022, erection ends 6/20/2022. structural peer review - sail grand prix chicago large tents at soldier field south parking lot. 2-66 x 132 and 10-60x82 tents for sailboat repairs. jk renta
Contractor: JK RENTALS 2 LLC
Status: CLOSED
Jun 9, 2022
Declared cost: $90,000
Building Permit
Grounding and final connections for 100 kw temporary generator in south lot of soldier field gp sailing event monday june 6th
Status: CLOSED
Jun 3, 2022
Declared cost: $5,000
Building Permit
Grounding and final connections for temporary generator for stadium green event sunday june 5th in south lot of soldier field
Status: CLOSED
Jun 3, 2022
Declared cost: $5,000
Building Permit
Permit expires on 08/03/2022 erection starts 06/21/22 , erection ends06/26/22 .erection of temporary stage for a 06/25/22 kenny chesney concert at soldier field overall area 15,969 sq.ft. inlcuding1. main thrust stages 13,150 sf2. foh tech
Contractor: BRUCE BRONGE
Status: CLOSED
Jun 3, 2022
Declared cost: $25,000
Building Permit
Permit expires on 08/01/2022 erection starts 6/3/2022, erection ends 6/4/2022. self certification. stage for the color run at soldier field south lot. 1-24 x16 mobile stage. super stage inc. self certification conditional approval subje
Contractor: SUPER STAGE INC
Status: CLOSED
Jun 1, 2022
Declared cost: $2,000
Building Permit
Permit expires on 08/01/2022 erection starts 6/10/2022, erection ends 6/20/2022. self cert - sail grand prix chicago small tents at soldier field south parking lot. 1-30x65 tent 1-30x50 tent 1-32x40 tent 1-13x39 tent and 1-24x20 sl100
Contractor: JK RENTALS 2 LLC
Status: CLOSED
Jun 1, 2022
Declared cost: $7,000
Building Permit
Electrical main for jun 2022
Status: CLOSED
Jun 1, 2022
Declared cost: $40,000
Building Permit
Permit expires on 07/27/2022 erection starts 5/27/2022, erection ends 5/28/2022. self certification. reinstatement of 2018 permit 100761726 - soldier field 10 mile 2022 event. same 1-24x16 platform with 28x23 lighting truss. enmotive cowit
Status: CLOSED
May 27, 2022
Declared cost: $2,000
Building Permit
Permit expires on 07/23/2022 erection starts 6/4/2022, erection ends 6/6/2022. self cert. futbol fiesta 2022 chicago - dome tent and truss at soldier field. 1-24 dia. dome tent and 1-80 long entry truss. kilowatt events with csem
Status: CLOSED
May 23, 2022
Declared cost: $3,000
Building Permit
Temp power for drake concert.
Status: CLOSED
May 19, 2022
Declared cost: $5,000
Building Permit
Temp power for kenny chesney concert.
Status: CLOSED
May 19, 2022
Declared cost: $5,000
Building Permit
Temp power for red hot chili peppers concert.
Status: CLOSED
May 19, 2022
Declared cost: $5,000
Building Permit
Temp power for bad bunny concert.
Status: CLOSED
May 19, 2022
Declared cost: $5,000
Building Permit
Temp power for the weekend concert.
Status: CLOSED
May 19, 2022
Declared cost: $5,000
Building Permit
Permit expires on 07/17/2022 erection starts05/24/22 , erection ends05/30/22 . ereself ction of temporary stage for cold play concert at soldier field. overall area 23,939 sq.ft. including1. main thrust stages 19,833 sq.ft.2. 60 field dela
Status: CLOSED
May 17, 2022
Declared cost: $25,000
Building Permit
Permit expires on 07/16/2022 erection starts 5/20/2022, erection ends 5/21/2022. self certification. 2 tents for the bark event at soldier field. 1-10x120 tent and 1-10x130 tent. star events with marquee event rentals.
Status: CLOSED
May 16, 2022
Declared cost: $3,000
Building Permit
Grounding and final connections for temporary generator in south lot fo ford ride and drive event on monday may 15th 2022.
Status: CLOSED
May 13, 2022
Declared cost: $5,000
Building Permit
Permit expires on 07/12/2022 erection starts 5/22/2022, erection ends 5/22/2022. self certification. crohns and colitis walk at soldier field- 1-16 x16 mobile stage. crohns and colitis foundation with super stage inc.
Contractor: SUPER STAGE INC
Status: CLOSED
May 12, 2022
Declared cost: $2,000
Building Permit
Permit expires on 07/12/2022 erection starts 5/14/2022, erection ends 5/20/2022. self cert. 2022 ford pro productivity accelerator event tents and awnings. 1-20x40 tent, 1-20x60 tent, 1-20x60 l-shape tent, and 2-30x50 awnings. jackson daws
Status: CLOSED
May 12, 2022
Declared cost: $9,000
Building Permit
Permit expires on 07/09/2022 erection starts 5/7/2022, erection ends 5/7/2022. structure- self-cert, 1 day event 5/7/2022 run to remember erect one 1 24 x 4 x 16 inflatable arch setup 5/7/2022- remove 05/07/2022assembly self certification
Status: CLOSED
May 9, 2022
Declared cost: $5,000
Building Permit
Temp power for coldplay concert
Status: CLOSED
May 4, 2022
Declared cost: $5,000
Building Permit
Monthly maintenance for may 2022
Status: CLOSED
Apr 29, 2022
Declared cost: $40,000
Building Permit
Permit expires on 06/11/2022 erection starts 4/23/2022, erection ends 4/24/2022. self certification. walk ms 2022 chicago event with 1-24 x16 mobile stage. national ms society with super stage inc.
Contractor: SUPER STAGE INC
Status: CLOSED
Apr 11, 2022
Declared cost: $2,000
Building Permit
Maintenance for april 2022
Status: CLOSED
Apr 6, 2022
Declared cost: $40,000
Building Permit
Maintenance for the month of march 2022
Status: CLOSED
Mar 9, 2022
Declared cost: $40,000
Building Permit
Spr 2019 cbrc - expansion of existing retail space on grand concourse level to create tempered point of purchase enclosure. work all within confines of existing structure and does not increase floor area.certified corrections subject to fie
Contractor: TIM LEFEVOUR
Status: CLOSED
Feb 22, 2022
Declared cost: $100,000
Building Permit
Electrical maintenance for feb. 2022
Status: CLOSED
Feb 4, 2022
Declared cost: $40,000
Building Permit
Monthly maintenance for january 2022
Status: CLOSED
Dec 30, 2021
Declared cost: $40,000
Building Permit
Monthly maintenance for december 2021
Status: CLOSED
Dec 6, 2021
Declared cost: $40,000
Building Permit
Underground directional drilling approx. 1000 in public way. starting point at 41.857991, -87.615686. looking south in public way toward mccormick place. end point at 41.855377, -87.615026.
Status: CLOSED
Nov 30, 2021
Declared cost: $10,000
Building Permit
Monthly main for november 2021
Status: CLOSED
Nov 4, 2021
Declared cost: $40,000
Building Permit
Permit expires on 01/02/2022 erection starts 10/15/2021, erection ends 10/16/2021. self certification. acs 2021 making strides event. 1-24x24 mobile stage with wings. american cancer society with super stage inc.
Contractor: SUPER STAGE INC
Status: CLOSED
Nov 2, 2021
Declared cost: $2,000
Building Permit
Permit expires on 01/02/2022 erection starts 10/23/2021, erection ends 10/24/2021. self certification. moving day chicago at soldier field south lot. 1-16x16 mobile stage. parkinsons foundation with super stage inc.
Contractor: SUPER STAGE INC
Status: CLOSED
Nov 2, 2021
Declared cost: $2,000
Building Permit
Permit expires on 01/02/2022 erection starts 10/22/2021, erection ends 10/23/2021. self certification. autism speaks stage event at stadium green. 1-24x24 mobile stage with wings. super stage inc.
Contractor: SUPER STAGE INC
Status: CLOSED
Nov 2, 2021
Declared cost: $3,000
Building Permit
Permit expires on 12/29/2021 erection starts 10/30/2021, erection ends 10/30/2021. self certification. light the night chicago 2021 tent and stage. 1-sl100 - 24x20 stage with wings and 1-20x30 tent. lakeshore athletic services with superst
Status: CLOSED
Oct 29, 2021
Declared cost: $3,000
Building Permit
Grounding and final connections for temporary generator for the light the night event saturday oct. 30th 2021. in the south lot
Status: CLOSED
Oct 28, 2021
Declared cost: $5,000
Building Permit
Maintenance for the month of october 2021
Status: CLOSED
Oct 12, 2021
Declared cost: $40,000
Building Permit
Permit expires on 12/08/2021 erection starts 10/8/2021, erection ends 10/9/2021. self cert. reinstatement of 2019 permit 100844846 for the 2021 walk to end alzheimers stage. same 1-24x20 sl-100 mobile stage with wings. chicago special even
Status: CLOSED
Oct 8, 2021
Declared cost: $2,000
Building Permit
Permit expires on 11/28/2021 erection starts 10/1/2021, erection ends 10/2/2021. self cert. reinstatement of 2016 permit 100671942 for the 2021 aids run stage at stadium green in soldier field. same 1-24x20 sl-100 mobile stage with wings
Status: CLOSED
Sep 28, 2021
Declared cost: $2,000
Building Permit
Grounding and final connections for temporary generator for fox sports sf sat 9/25 for notre dame vs wisconsin
Status: CLOSED
Sep 22, 2021
Declared cost: $5,000
Building Permit
Grounding and final connections for temporary generator for bar stool. event date september 25th 2021 sf notre dame vs. wisconsin
Status: CLOSED
Sep 22, 2021
Declared cost: $5,000
Building Permit
Grounding and final connections for espn sf saturday 9/25 for notre dame vs. wisconsin
Status: CLOSED
Sep 22, 2021
Declared cost: $5,000
Building Permit
Maintenance for the month of sept 2021
Status: CLOSED
Sep 20, 2021
Declared cost: $40,000
Building Permit
Erect one 40x40 tent, erect one 10x20 tent and erect 28x32 stage
Status: CLOSED
Sep 14, 2021
Declared cost: $7,500
Building Permit
Permit expires on 11/13/2021 erection starts 9/17/2021, erection ends 9/18/2021. self certification. reinstatement of 2016 permit 100668117 for the als walk. same sl250 - 32x24 mobile stage. lakeshore athletic services with superstage. se
Status: CLOSED
Sep 13, 2021
Declared cost: $3,000
Building Permit
Permit expires on 11/09/2021 erection starts 9/1/2021, erection ends 9/6/2021. erection starts , erection ends . erection of a temporary stage for a los bukis concert at soldier field.erection to begin 09/01/21 erection ends 09/06/21overal
Status: CLOSED
Sep 9, 2021
Declared cost: $25,000
Building Permit
Permit expires on 11/09/2021 erection starts 9/24/2021, erection ends 9/25/2021. tent- 1 day event 9/25/2021shamrock series- notre dame erect one 1 20x30 frame tent setup 9/24/2021- remove 9/25/2021assembly
Status: CLOSED
Sep 9, 2021
Declared cost: $7,500
Building Permit
Permit expires on 10/26/2021 erection ends 8/27/2021. erection of a temporary stage for a kanye west concert at soldiers field.erection starts 08/23/21 erection ends 08/27/21 overall area of main stage 8,825 sf self certification conditi
Status: CLOSED
Aug 26, 2021
Declared cost: $25,000
Building Permit
Temp power for kanye west
Status: CLOSED
Aug 20, 2021
Declared cost: $5,000
Building Permit
Final connections grounding for temporary generator in south lot for friday night walk and roll event.
Status: CLOSED
Aug 13, 2021
Declared cost: $5,000
Building Permit
Monthly maintenance for august 2021
Status: CLOSED
Aug 10, 2021
Declared cost: $40,000
Building Permit
Permit expires on 10/09/2021 erection starts 8/6/2021, erection ends 8/12/2021. 7 small tents for the gm fleet meeting at soldier field south lot. 5-40x60 tents, 1-40x80 tent and 1-20x40 tent. jk rentals, llc. self certification conditio
Contractor: JK RENTALS LLC
Status: CLOSED
Aug 9, 2021
Declared cost: $15,000
Building Permit
Permit expires on 10/06/2021 erection starts 8/5/2021, erection ends 8/12/2021. large tent for the gm fleet meeting at soldier field south lot. 1-82x115 tent. jk rentals, inc.
Contractor: JK RENTALS LLC
Status: CLOSED
Aug 6, 2021
Declared cost: $9,000
Building Permit
Grounding and final connections of temporary 50 kw generator in south lot for gm fleet summit event august 6th through august 11th
Status: CLOSED
Aug 5, 2021
Declared cost: $5,000
Building Permit
Monthly maintenance for july 2021
Status: CLOSED
Jul 15, 2021
Declared cost: $40,000
Building Permit
Temp power for los bukis concert
Status: CLOSED
Jul 12, 2021
Declared cost: $5,000
Building Permit
Grounding and final connection for temporary generator in south lot for love and laughter event june 19th 2021
Status: CLOSED
Jun 11, 2021
Declared cost: $5,000
Building Permit
Monthly maintenance for june 2021
Status: CLOSED
Jun 1, 2021
Declared cost: $40,000
Building Permit
Grounding and final connections for temporary generator in south lot for rupauls drive and drag event may 28th 29th and 30th.
Status: CLOSED
May 27, 2021
Declared cost: $5,000
Building Permit
Monthly maintenance for the month of may 2021
Status: CLOSED
May 10, 2021
Declared cost: $40,000

Check permits at another Cook County address

Free instant lookup, no signup.

Search Cook County permits →
Disclaimer: Permit data comes from Cook County's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Cook County building department before buying, selling, or planning work.