Commercial Fire Protection
Contractor: Designer
Status: Permit Issued
May 7, 2026
Commercial Fire Protection
Contractor: DALMATIAN FIRE
Status: Permit Issued
Mar 20, 2026
Commercial MEP
Status: Permit Issued
Feb 4, 2026
Commercial MEP
Status: Permit Issued
Jan 14, 2026
Commercial Fire Protection
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Dec 2, 2025
Commercial Fire Protection
Mechanical permits or na
Status: Final Inspection Approved
Nov 19, 2025
Commercial MEP
Status: Final Inspection Approved
Oct 28, 2025
Commercial MEP
Contractor: G Mechanical Inc
Status: Final Inspection Approved
Oct 22, 2025
Commercial MEP
Status: Final Inspection Approved
Oct 22, 2025
Commercial MEP
Status: Final Inspection Approved
Oct 3, 2025
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: Red Architecture
Status: Final Inspection Approved
Oct 1, 2025
Commercial Fire Protection
Status: Final Inspection Approved
Sep 22, 2025
Commercial MEP
Status: Final Inspection Approved
Aug 25, 2025
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Aug 1, 2025
Commercial MEP
Status: Permit Issued
Jun 6, 2025
Commercial MEP
Status: Final Inspection Approved
May 20, 2025
Commercial Fire Protection
Status: Final Inspection Approved
May 9, 2025
Commercial MEP
Status: Permit Issued
May 9, 2025
Commercial MEP
Status: Permit Issued
May 5, 2025
Commercial Fire Protection
Status: Final Inspection Approved
May 1, 2025
Commercial MEP
Status: Final Inspection Approved
Apr 28, 2025
Commercial MEP
Status: Permit Issued
Apr 18, 2025
Commercial MEP
Status: Permit Issued
Apr 14, 2025
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: Red Architecture
Status: Final Inspection Approved
Apr 8, 2025
Commercial MEP
Status: Permit Issued
Apr 8, 2025
Commercial Fire Protection
Status: Final Inspection Approved
Mar 20, 2025
Commercial MEP
Contractor: Axxel Electric
Status: Final Inspection Approved
Mar 13, 2025
Commercial MEP
Contractor: Claypool Electric
Status: Permit Issued
Mar 12, 2025
Commercial Structural
Public works and utilities buildings
Contractor: Moody Nolan
Status: Permit Issued
Feb 28, 2025
Commercial MEP
Status: Final Inspection Approved
Feb 27, 2025
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: AECOM
Status: Final Inspection Approved
Feb 12, 2025
Commercial Fire Protection
Status: Permit Issued
Feb 6, 2025
Commercial MEP
Contractor: The Waterworks
Status: Final Inspection Approved
Jan 13, 2025
Commercial MEP
Status: Permit Issued
Nov 19, 2024
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Oct 29, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Permit Issued
Oct 3, 2024
Commercial Fire Protection
Status: Final Inspection Approved
Sep 17, 2024
Commercial MEP
Status: Permit Issued
Aug 14, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: Red Architecture
Status: Expired Permit
Jun 28, 2024
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
May 7, 2024
Commercial Fire Protection
Status: Final Inspection Approved
Apr 5, 2024
Commercial MEP
Status: Permit Issued
Feb 16, 2024
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Feb 9, 2024
Commercial MEP
Contractor: WATERWORKS
Status: Final Inspection Approved
Jan 17, 2024
Commercial MEP
Contractor: WATERWORKS
Status: Final Inspection Approved
Jan 17, 2024
Commercial Structural
Structures other than buildings
Status: Expired Permit
Jan 17, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: Red Architecture
Status: Final Inspection Approved
Jan 16, 2024
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Jan 16, 2024
Commercial MEP
Contractor: G Mechanical
Status: Final Inspection Approved
Jan 9, 2024
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Jan 5, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: red Architecture
Status: Final Inspection Approved
Jan 2, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: Red Architecture
Status: Final Inspection Approved
Jan 2, 2024
Commercial Fire Protection
Status: Permit Issued
Dec 18, 2023
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Dec 8, 2023
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Dec 7, 2023
Commercial Special
Industrial buildings
Status: Permit Issued
Nov 30, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 13, 2023
Commercial MEP
Contractor: G Mechanical
Status: Final Inspection Approved
Oct 24, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Oct 9, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Oct 9, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Oct 9, 2023
Commercial Fire Protection
Status: Final Inspection Approved
Oct 9, 2023
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Oct 9, 2023
Commercial Fire Protection
Contractor: SUPERIOR GROUP
Status: Final Inspection Approved
Sep 20, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Aug 10, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jun 27, 2023
Commercial Fire Protection
Contractor: SUPERIOR GROUP
Status: Final Inspection Approved
Jun 22, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Permit Issued
Jun 12, 2023
Commercial Fire Protection
Status: Final Inspection Approved
May 25, 2023
Commercial MEP
Contractor: G Mechanical
Status: Final Inspection Approved
May 3, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 28, 2023
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Apr 28, 2023
Commercial Fire Protection
Status: Final Inspection Approved
Apr 24, 2023
Commercial MEP
Contractor: G Mechanical
Status: Final Inspection Approved
Mar 31, 2023
Commercial Fire Protection
Contractor: SUPERIOR GROUP
Status: Final Inspection Approved
Mar 21, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Expired Permit
Mar 16, 2023
Commercial Fire Protection
Status: Final Inspection Approved
Mar 6, 2023
Commercial MEP
Status: Final Inspection Approved
Feb 28, 2023
Commercial MEP
Status: Final Inspection Approved
Feb 14, 2023
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Feb 14, 2023
Commercial MEP
Contractor: G Mechanical Inc
Status: Final Inspection Approved
Feb 8, 2023
Commercial Fire Protection
Status: Final Inspection Approved
Feb 1, 2023
Commercial MEP
Contractor: SUPERIOR GROUP
Status: Final Inspection Approved
Jan 27, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jan 24, 2023
Commercial MEP
Contractor: G Mechanical Inc
Status: Final Inspection Approved
Dec 27, 2022
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Dec 20, 2022
Commercial Fire Protection
Contractor: SUPERIOR GROUP
Status: Final Inspection Approved
Dec 16, 2022
Commercial Fire Protection
Contractor: SUPERIOR GROUP
Status: Final Inspection Approved
Dec 1, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 22, 2022
Commercial Fire Protection
Status: Final Inspection Approved
Nov 21, 2022
Commercial Fire Protection
Status: Final Inspection Approved
Nov 18, 2022
Commercial Special
Status: Permit Issued
Nov 15, 2022
Commercial Special
Mechanical permits or na
Status: Permit Issued
Nov 7, 2022
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Oct 28, 2022
Commercial MEP
Contractor: G Mechanical Inc
Status: Final Inspection Approved
Oct 20, 2022
Commercial MEP
Status: Permit Issued
Oct 11, 2022
Commercial MEP
Status: Permit Issued
Oct 10, 2022
Commercial Fire Protection
Status: Final Inspection Approved
Oct 5, 2022
Commercial MEP
Status: Permit Issued
Oct 3, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Sep 29, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Sep 29, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Sep 12, 2022
Commercial MEP
Status: Final Inspection Approved
Sep 12, 2022
Commercial MEP
Contractor: SUPERIOR GROUP
Status: Final Inspection Approved
Sep 12, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Sep 7, 2022
Commercial MEP
Contractor: G MECHANICAL INC
Status: Final Inspection Approved
Sep 6, 2022
Commercial Fire Protection
Status: Final Inspection Approved
Jul 8, 2022
Commercial MEP
Contractor: Claypool electric
Status: Final Inspection Approved
Jun 7, 2022
Commercial Fire Protection
Status: Final Inspection Approved
May 27, 2022
Commercial MEP
Contractor: Radico, Inc.
Status: Final Inspection Approved
May 18, 2022
Commercial MEP
Contractor: Radico, Inc.
Status: Final Inspection Approved
May 18, 2022
Commercial Fire Protection
Status: Final Inspection Approved
Mar 9, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: PRECISION PERMITS
Status: Final Inspection Approved
Jan 28, 2022
Commercial MEP
Contractor: Area Electric
Status: Final Inspection Approved
Nov 10, 2021
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Oct 28, 2021
Commercial MEP
Status: Final Inspection Approved
Oct 28, 2021
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Oct 20, 2021
Commercial MEP
Status: Final Inspection Approved
Oct 7, 2021
Commercial MEP
Contractor: CRUIKSHANK PLUMBING
Status: Final Inspection Approved
Oct 5, 2021
Commercial MEP
Contractor: CRUIKSHANK PLUMBING
Status: Final Inspection Approved
Oct 5, 2021
Commercial MEP
Contractor: CRUIKSHANK PLUMBING
Status: Final Inspection Approved
Oct 5, 2021
Commercial MEP
Status: Final Inspection Approved
Oct 1, 2021
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Oct 1, 2021
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Oct 1, 2021
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Expired Permit
Oct 1, 2021
Commercial MEP
Status: Final Inspection Approved
Sep 21, 2021
Commercial MEP
Status: Permit Issued
Jul 1, 2021
Commercial MEP
Contractor: Air Force One
Status: Final Inspection Approved
May 18, 2021
Commercial Fire Protection
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Mar 19, 2021
Commercial MEP
Contractor: The Superior Group
Status: Final Inspection Approved
Mar 10, 2021
Commercial Fire Protection
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Mar 3, 2021
Commercial MEP
Status: Permit Issued
Nov 19, 2020
Commercial Fire Protection
Status: Final Inspection Approved
Jul 30, 2020
Commercial MEP
Contractor: KNIGHT ELECTRIC INC
Status: Final Inspection Approved
Apr 10, 2020
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Expired Permit
Sep 27, 2019
Commercial MEP
Status: Final Inspection Approved
Jun 13, 2019
Commercial MEP
Contractor: BIEHLE ELECTRIC INC
Status: Final Inspection Approved
Feb 7, 2019
Commercial MEP
Status: Permit Issued
Jan 30, 2019
Commercial MEP
Contractor: KE GUTRIDGE LLC
Status: Final Inspection Approved
Jan 28, 2019
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jan 23, 2019
Commercial MEP
Status: Final Inspection Approved
Jan 16, 2019
Commercial Fire Protection
Status: Final Inspection Approved
Jan 8, 2019
Commercial Fire Protection
Status: Final Inspection Approved
Jan 2, 2019
Commercial New Construction
Status: Permit Issued
Dec 10, 2018
Commercial MEP
Contractor: RYCO ELECTRIC
Status: Final Inspection Approved
Dec 7, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Dec 6, 2018
Commercial MEP
Status: Final Inspection Approved
Nov 28, 2018
Commercial MEP
Status: Final Inspection Approved
Nov 28, 2018
Commercial MEP
Status: Final Inspection Approved
Nov 26, 2018
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 20, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Oct 31, 2018
Commercial MEP
Status: Final Inspection Approved
Oct 18, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Oct 15, 2018
Commercial MEP
Status: Final Inspection Approved
Oct 11, 2018
Commercial MEP
Contractor: COMFORTROL INC
Status: Final Inspection Approved
Oct 10, 2018
Commercial MEP
Contractor: BRUNER COPORATION
Status: Final Inspection Approved
Sep 27, 2018
Commercial MEP
Contractor: BRUNER COPORATION
Status: Final Inspection Approved
Sep 25, 2018
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Final Inspection Approved
Jul 31, 2018
Graphics Building Ground Non-Illuminated
Contractor: MOORE SIGNS
Status: Permit Issued
Jun 12, 2018
Graphics Building Ground Non-Illuminated
Contractor: MOORE SIGNS
Status: Permit Issued
Jun 12, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Jun 8, 2018
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: JB ROOFING
Status: Expired Permit
May 18, 2018
Commercial MEP
Status: Final Inspection Approved
May 9, 2018
Commercial MEP
Status: Final Inspection Approved
May 2, 2018
Commercial MEP
Status: Final Inspection Approved
Apr 23, 2018
Commercial MEP
Status: Final Inspection Approved
Apr 20, 2018
Commercial Fire Protection
Status: Permit Issued
Apr 4, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Apr 3, 2018
Commercial MEP
Status: Final Inspection Approved
Apr 2, 2018
Commercial MEP
Status: Permit Issued
Mar 30, 2018
Commercial MEP
Status: Final Inspection Approved
Mar 29, 2018
Commercial MEP
Status: Final Inspection Approved
Mar 28, 2018
Commercial MEP
Status: Permit Issued
Mar 26, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Mar 21, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Mar 21, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Mar 14, 2018
Commercial MEP
Status: Final Inspection Approved
Mar 8, 2018
Commercial MEP
Status: Final Inspection Approved
Mar 5, 2018
Commercial Fire Protection
Status: Permit Issued
Mar 1, 2018
Commercial MEP
Status: Final Inspection Approved
Feb 26, 2018
Commercial MEP
Status: Final Inspection Approved
Feb 22, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Feb 16, 2018
Commercial MEP
Status: Final Inspection Approved
Feb 15, 2018
Commercial MEP
Status: Final Inspection Approved
Feb 15, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Feb 14, 2018
Commercial MEP
Status: Final Inspection Approved
Feb 13, 2018
Commercial MEP
Status: Final Inspection Approved
Feb 12, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Feb 12, 2018
Commercial MEP
Status: Final Inspection Approved
Feb 8, 2018
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Feb 5, 2018
Commercial MEP
Status: Final Inspection Approved
Jan 31, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Jan 29, 2018
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Final Inspection Approved
Jan 25, 2018
Commercial MEP
Status: Final Inspection Approved
Jan 17, 2018
Commercial Major Alteration
Status: Final Inspection Approved
Jan 17, 2018
Commercial New Construction
Status: Final Inspection Approved
Jan 16, 2018
Commercial Major Alteration
Additions, alterations and conversions - residential
Status: Certificate of Occupancy Issued
Jan 11, 2018
Commercial MEP
Status: Final Inspection Approved
Jan 10, 2018
Commercial MEP
Status: Final Inspection Approved
Jan 10, 2018
Commercial MEP
Status: Final Inspection Approved
Dec 13, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Dec 8, 2017
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Dec 4, 2017
Commercial MEP
Status: Final Inspection Approved
Nov 30, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Nov 30, 2017
Commercial MEP
Status: Permit Issued
Nov 20, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Nov 13, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Final Inspection Approved
Nov 3, 2017
Commercial MEP
Status: Final Inspection Approved
Oct 27, 2017
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Final Inspection Approved
Oct 24, 2017
Commercial MEP
Status: Expired Permit
Oct 11, 2017
Commercial MEP
Status: Final Inspection Approved
Jun 23, 2017
Commercial MEP
Contractor: Bruner Corporation
Status: Final Inspection Approved
Jun 12, 2017
Commercial MEP
Status: Final Inspection Approved
Jun 9, 2017
Commercial Major Alteration
Status: Final Inspection Approved
May 17, 2017
Commercial MEP
Contractor: CRUIKSHANK PLUMBING
Status: Final Inspection Approved
May 11, 2017
Commercial MEP
Status: Permit Issued
May 10, 2017
Commercial MEP
Status: Final Inspection Approved
May 9, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: CG ARCHITECTURE
Status: Certificate of Occupancy Issued
Apr 17, 2017
Commercial MEP
Status: Final Inspection Approved
Mar 21, 2017
Commercial Minor Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: DIVISION 7 INC
Status: Final Inspection Approved
Mar 14, 2017
Commercial MEP
Status: Final Inspection Approved
Feb 27, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Feb 6, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Jan 19, 2017
Commercial MEP
Status: Final Inspection Approved
Jan 11, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jan 11, 2017
Commercial MEP
Status: Final Inspection Approved
Jan 10, 2017
Commercial MEP
Status: Final Inspection Approved
Jan 5, 2017
Commercial MEP
Contractor: KNIGHT ELECTRIC INC
Status: Final Inspection Approved
Dec 29, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Dec 27, 2016
Commercial MEP
Status: Final Inspection Approved
Dec 22, 2016
Commercial MEP
Status: Final Inspection Approved
Dec 20, 2016
Commercial MEP
Status: Final Inspection Approved
Dec 16, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Dec 15, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Dec 2, 2016
Commercial MEP
Status: Final Inspection Approved
Dec 2, 2016
Commercial MEP
Status: Permit Issued
Dec 2, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Certificate of Occupancy Issued
Nov 30, 2016
Commercial MEP
Status: Final Inspection Approved
Nov 23, 2016
Commercial MEP
Status: Final Inspection Approved
Nov 21, 2016
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 18, 2016
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 18, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Nov 16, 2016
Commercial MEP
Status: Permit Issued
Nov 14, 2016
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 11, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Nov 8, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Expired Permit
Oct 26, 2016
Commercial MEP
Status: Final Inspection Approved
Oct 26, 2016
Commercial MEP
Status: Final Inspection Approved
Oct 19, 2016
Commercial MEP
Status: Final Inspection Approved
Oct 19, 2016
Commercial MEP
Status: Final Inspection Approved
Oct 18, 2016
Commercial MEP
Status: Final Inspection Approved
Oct 18, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Oct 17, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: CG ARCHITECTURE
Status: Certificate of Occupancy Issued
Oct 17, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Oct 17, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: CG ARCHITECTURE
Status: Certificate of Occupancy Issued
Oct 17, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Oct 13, 2016
Commercial New Construction
Status: Expired Permit
Oct 12, 2016
Commercial MEP
Status: Permit Issued
Oct 11, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Sep 27, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Aug 25, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Aug 24, 2016
Commercial MEP
Contractor: Claypool Electric
Status: Final Inspection Approved
Aug 12, 2016
Commercial MEP
Status: Final Inspection Approved
Aug 4, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Aug 1, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Jul 13, 2016
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Final Inspection Approved
Jun 30, 2016
Commercial MEP
Status: Final Inspection Approved
Jun 20, 2016
Commercial MEP
Status: Final Inspection Approved
Jun 15, 2016
Commercial MEP
Status: Final Inspection Approved
Jun 15, 2016
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Final Inspection Approved
Jun 9, 2016
Commercial Major Alteration
Status: Final Inspection Approved
May 16, 2016
Commercial Major Alteration
Status: Final Inspection Approved
May 4, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Apr 28, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Apr 27, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Apr 27, 2016
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 21, 2016
Residential Repair Replace
Status: Final Inspection Approved
Apr 13, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Final Inspection Approved
Apr 13, 2016
Commercial New Construction
Status: Final Inspection Approved
Mar 15, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Mar 1, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Feb 17, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Jan 28, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Final Inspection Approved
Jan 27, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Jan 6, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Dec 22, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Dec 14, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Dec 2, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Dec 1, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Nov 19, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Nov 19, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Nov 19, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: ECH ARCHITECTURE PS
Status: Certificate of Occupancy Issued
Nov 17, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Certificate of Occupancy Issued
Nov 9, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Sep 29, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Sep 29, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Sep 29, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Sep 23, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Sep 21, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Sep 9, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Sep 8, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Sep 3, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Sep 3, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Aug 27, 2015
Residential Major Alteration
Status: Final Inspection Approved
Aug 27, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Aug 18, 2015
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 12, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Jul 16, 2015
Commercial Major Alteration
Contractor: MK ELECTRIC LLC
Status: Final Inspection Approved
Jun 29, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Jun 18, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: THE PARADIES SHOPS
Status: Certificate of Occupancy Issued
Jun 10, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Jun 2, 2015
Commercial Major Alteration
Status: Final Inspection Approved
May 28, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Certificate of Occupancy Issued
May 20, 2015
Commercial Major Alteration
Status: Final Inspection Approved
May 15, 2015
Commercial New Construction
Status: Final Inspection Approved
May 15, 2015
Commercial Major Alteration
Status: Final Inspection Approved
May 11, 2015
Commercial Major Alteration
Status: Final Inspection Approved
May 5, 2015
Commercial Major Alteration
Status: Final Inspection Approved
May 5, 2015
Commercial Major Alteration
Status: Final Inspection Approved
May 1, 2015
Commercial Major Alteration
Status: Final Inspection Approved
May 1, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Apr 28, 2015
Commercial New Construction
Status: Permit Issued
Apr 17, 2015
Commercial New Construction
Status: Permit Issued
Apr 17, 2015
Commercial New Construction
Status: Final Inspection Approved
Apr 6, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Apr 6, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Apr 2, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Apr 2, 2015
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Mar 26, 2015
Commercial New Construction
Status: Final Inspection Approved
Mar 24, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Mar 24, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Mar 17, 2015
Commercial Major Alteration
Contractor: BRUNER COPORATION
Status: Final Inspection Approved
Mar 17, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Mar 17, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Mar 16, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Mar 16, 2015
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Mar 11, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Mar 10, 2015
Commercial Repair Replace
Status: Final Inspection Approved
Mar 4, 2015
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Feb 11, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Certificate of Occupancy Issued
Jan 30, 2015
Commercial Major Alteration
Status: Permit Issued
Jan 29, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARHITECTS
Status: Certificate of Occupancy Issued
Jan 21, 2015
Commercial Major Alteration
Status: Permit Issued
Jan 15, 2015
Commercial Minor Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: DIVISION 7 INC
Status: Final Inspection Approved
Dec 10, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Dec 8, 2014
Commercial New Construction
Status: Final Inspection Approved
Dec 5, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Nov 3, 2014
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Permit Issued
Oct 31, 2014
Commercial New Construction
Status: Final Inspection Approved
Oct 31, 2014
Commercial New Construction
Status: Final Inspection Approved
Oct 31, 2014
Commercial New Construction
Contractor: KNIGHT ELECTRIC INC
Status: Final Inspection Approved
Oct 27, 2014
Commercial Major Alteration
Status: Permit Issued
Sep 17, 2014
Commercial New Construction
Status: Final Inspection Approved
Sep 10, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Sep 5, 2014
Commercial Major Alteration
Contractor: GOSHORN ERIC C
Status: Final Inspection Approved
Aug 27, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Aug 22, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Aug 20, 2014
Commercial New Construction
Status: Permit Issued
Aug 12, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Aug 8, 2014
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA
Status: Certificate of Occupancy Issued
Jul 31, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Jul 28, 2014
Commercial New Construction
Status: Final Inspection Approved
Jul 16, 2014
Commercial New Construction
Status: Final Inspection Approved
Jul 16, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Jul 7, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Jul 7, 2014
Commercial New Construction
Status: Permit Issued
Jun 19, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Jun 10, 2014
Commercial Major Alteration
Status: Permit Issued
Jun 6, 2014
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: URS
Status: Certificate of Occupancy Issued
Jun 4, 2014
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 28, 2014
Commercial Major Alteration
Status: Final Inspection Approved
May 19, 2014
Commercial Major Alteration
Status: Final Inspection Approved
May 9, 2014
Commercial Major Alteration
Status: Final Inspection Approved
May 8, 2014
Commercial Major Alteration
Status: Final Inspection Approved
May 5, 2014
Commercial Major Alteration
Status: Final Inspection Approved
May 1, 2014
Commercial Major Alteration
Contractor: BRUNER CORPORATION
Status: Final Inspection Approved
May 1, 2014
Commercial New Construction
Status: Final Inspection Approved
Apr 29, 2014
Commercial Major Alteration
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Apr 25, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Apr 24, 2014
Commercial Repair Replace
Status: Final Inspection Approved
Apr 23, 2014
Commercial New Construction
Status: Final Inspection Approved
Apr 18, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Apr 17, 2014
Commercial Major Alteration
Contractor: MK ELECTRIC LLC
Status: Final Inspection Approved
Apr 11, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Apr 10, 2014
Commercial New Construction
Status: Permit Issued
Apr 10, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Apr 9, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Apr 9, 2014
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Apr 9, 2014
Commercial New Construction
Status: Permit Issued
Apr 8, 2014
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Apr 7, 2014
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA
Status: Final Inspection Approved
Apr 7, 2014
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Apr 4, 2014
Commercial New Construction
Status: Permit Issued
Mar 27, 2014
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: URS
Status: Certificate of Occupancy Issued
Mar 25, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Mar 24, 2014
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA
Status: Final Inspection Approved
Mar 18, 2014
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA
Status: Certificate of Occupancy Issued
Mar 10, 2014
Commercial Addition
Status: Permit Issued
Mar 3, 2014
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Feb 26, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Feb 21, 2014
Commercial Addition
Status: Final Inspection Approved
Feb 21, 2014
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jan 27, 2014
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 21, 2014
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 15, 2014
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 15, 2014
Commercial Repair Replace
Mechanical permits or na
Status: Permit Issued
Jan 13, 2014
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Jan 8, 2014
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Dec 19, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Dec 18, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Dec 18, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: KNIGHT ELECTRIC INC
Status: Permit Issued
Dec 13, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: DYNAMIX ENGINEERING
Status: Permit Issued
Dec 12, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Dec 12, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Dec 10, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Dec 10, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Dec 6, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Dec 5, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Dec 5, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Dec 4, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Dec 4, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Dec 2, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Dec 2, 2013
Commercial New Construction
Mechanical permits or na
Contractor: KNIGHT ELECTRIC INC
Status: Final Inspection Approved
Nov 26, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Nov 26, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Nov 26, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Nov 25, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 22, 2013
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA ARCHITECTS
Status: Final Inspection Approved
Nov 21, 2013
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Nov 21, 2013
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Nov 21, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: HARMON OWEN E
Status: Final Inspection Approved
Nov 20, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Nov 20, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: GOSHORN ERIC
Status: Final Inspection Approved
Nov 19, 2013
Commercial New Construction
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Nov 15, 2013
Graphics Building Ground Illuminated
Mechanical permits or na
Contractor: DANITE SIGN CO
Status: Permit Issued
Nov 14, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 8, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 8, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 5, 2013
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: GOSHORN ERIC
Status: Permit Issued
Nov 5, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: THE PARADIES SHOPS
Status: Certificate of Occupancy Issued
Oct 31, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA
Status: Certificate of Occupancy Issued
Oct 30, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: SUPERIOR GROUP
Status: Final Inspection Approved
Oct 29, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 25, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Oct 25, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 23, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 23, 2013
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Oct 21, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Oct 21, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 21, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 9, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 9, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 3, 2013
Commercial Minor Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: GILBANE BUILDING CO
Status: Final Inspection Approved
Oct 3, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 3, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 3, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Oct 1, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: UNITED SYSTEMS
Status: Final Inspection Approved
Sep 27, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Sep 26, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: PPS
Status: Certificate of Occupancy Issued
Sep 25, 2013
Commercial Addition
Mechanical permits or na
Status: Final Inspection Approved
Sep 24, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Sep 19, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Sep 4, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 27, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 6, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jul 24, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Jul 23, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jul 23, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Jul 22, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Jul 3, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: MSA
Status: Certificate of Occupancy Issued
Jun 21, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Jun 17, 2013
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Jun 17, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: LIMBACH COMPANY LLC
Status: Final Inspection Approved
Jun 14, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jun 11, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jun 7, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: BARRY ROBERT E
Status: Final Inspection Approved
Jun 7, 2013
Commercial New Construction
Mechanical permits or na
Contractor: KNIGHT ELECTRIC INC
Status: Final Inspection Approved
May 28, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
May 28, 2013
Commercial New Construction
Mechanical permits or na
Contractor: BARRY ROBERT E
Status: Permit Issued
May 23, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: KNIGHT ELECTRIC INC
Status: Final Inspection Approved
May 22, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: BARRY ROBERT E
Status: Final Inspection Approved
May 10, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
May 10, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 9, 2013
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
May 7, 2013
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
May 7, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: URS CORPORATION
Status: Certificate of Occupancy Issued
May 1, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: HERNANDEZ ROBERT A
Status: Final Inspection Approved
Apr 26, 2013
Commercial New Construction
Mechanical permits or na
Contractor: BARRY ROBERT E
Status: Permit Issued
Apr 25, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: ULTIMAX INC
Status: Certificate of Occupancy Issued
Apr 24, 2013
Commercial Minor Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 19, 2013
Commercial New Construction
Mechanical permits or na
Contractor: KNIGHT ELECTRIC INC
Status: Final Inspection Approved
Apr 17, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Apr 4, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 4, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: BRUNER CORPORATION
Status: Final Inspection Approved
Apr 4, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Apr 4, 2013
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Apr 3, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Mar 22, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Mar 20, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Mar 5, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Mar 5, 2013

Check permits at another Columbus address

Free instant lookup, no signup.

Search Columbus permits →
Disclaimer: Permit data comes from Columbus's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Columbus building department before buying, selling, or planning work.