Commercial Fire Protection
Status: Permit Issued
Apr 22, 2026
Commercial MEP
Status: Permit Issued
Apr 13, 2026
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Permit Issued
Mar 27, 2026
Commercial MEP
Contractor: Ohio Heating
Status: Permit Issued
Dec 24, 2025
Graphics Sign
Status: Permit Issued
Oct 15, 2025
Graphics Sign
Status: Permit Issued
Oct 15, 2025
Commercial Fire Protection
Status: Final Inspection Approved
May 8, 2025
Commercial MEP
Status: Final Inspection Approved
Apr 29, 2025
Commercial MEP
Status: Final Inspection Approved
Apr 28, 2025
Commercial Fire Protection
Status: Final Inspection Approved
Apr 25, 2025
Commercial MEP
Contractor: ABRAM CONTRACTORS
Status: Final Inspection Approved
Apr 24, 2025
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 17, 2025
Commercial MEP
Status: Final Inspection Approved
Jan 3, 2025
Commercial MEP
Status: Final Inspection Approved
Apr 25, 2024
Commercial MEP
Status: Final Inspection Approved
Apr 22, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 19, 2024
Commercial MEP
Status: Final Inspection Approved
Feb 7, 2024
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Feb 5, 2024
Commercial MEP
Status: Final Inspection Approved
Feb 1, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jan 19, 2024
Commercial MEP
Status: Final Inspection Approved
Jan 10, 2024
Commercial MEP
Status: Final Inspection Approved
Dec 28, 2023
Commercial Fire Protection
Status: Final Inspection Approved
Nov 30, 2023
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Nov 30, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 22, 2023
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Nov 15, 2023
Commercial MEP
Status: Final Inspection Approved
Nov 8, 2023
Commercial MEP
Contractor: ABRAM CONTRACTORS
Status: Final Inspection Approved
Nov 6, 2023
Commercial MEP
Status: Final Inspection Approved
Nov 2, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 1, 2023
Commercial Fire Protection
Status: Final Inspection Approved
Oct 13, 2023
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Oct 12, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Oct 9, 2023
Commercial MEP
Status: Final Inspection Approved
Oct 9, 2023
Commercial MEP
Contractor: ABRAM CONTRACTORS
Status: Final Inspection Approved
Oct 9, 2023
Commercial MEP
Status: Final Inspection Approved
Oct 9, 2023
Commercial MEP
Status: Final Inspection Approved
Sep 29, 2023
Commercial MEP
Status: Final Inspection Approved
Sep 15, 2023
Commercial MEP
Contractor: ABRAM CONTRACTORS
Status: Final Inspection Approved
Sep 14, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Sep 13, 2023
Commercial Fire Protection
Status: Final Inspection Approved
May 11, 2023
Commercial MEP
Status: Final Inspection Approved
May 11, 2023
Commercial MEP
Status: Final Inspection Approved
May 10, 2023
Commercial Fire Protection
Status: Final Inspection Approved
May 8, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
May 3, 2023
Commercial MEP
Status: Final Inspection Approved
Apr 10, 2023
Commercial MEP
Status: Final Inspection Approved
Apr 10, 2023
Commercial Fire Protection
Status: Final Inspection Approved
Apr 4, 2023
Commercial MEP
Contractor: ABRAM CONTRACTORS
Status: Final Inspection Approved
Apr 4, 2023
Commercial MEP
Status: Final Inspection Approved
Mar 30, 2023
Commercial MEP
Contractor: ABRAM CONTRACTORS
Status: Final Inspection Approved
Mar 28, 2023
Commercial Fire Protection
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Mar 27, 2023
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Mar 27, 2023
Commercial MEP
Status: Final Inspection Approved
Mar 24, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Mar 23, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Mar 23, 2023
Commercial Fire Protection
Status: Final Inspection Approved
Mar 9, 2023
Commercial MEP
Contractor: ARATA PLUMBING LLC
Status: Final Inspection Approved
Nov 21, 2022
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Nov 3, 2022
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Oct 26, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Oct 19, 2022
Commercial MEP
Status: Final Inspection Approved
Oct 19, 2022
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Mar 25, 2021
Commercial Fire Protection
Status: Final Inspection Approved
Mar 17, 2021
Commercial MEP
Status: Final Inspection Approved
Mar 17, 2021
Commercial MEP
Status: Final Inspection Approved
Mar 15, 2021
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Mar 10, 2021
Commercial MEP
Status: Permit Issued
Sep 22, 2020
Commercial Fire Protection
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Feb 11, 2020
Commercial MEP
Status: Final Inspection Approved
Feb 5, 2020
Commercial Fire Protection
Status: Final Inspection Approved
Jan 29, 2020
Commercial Fire Protection
Status: Final Inspection Approved
Jan 23, 2020
Commercial MEP
Status: Final Inspection Approved
Jan 22, 2020
Commercial Special
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Jan 21, 2020
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: M + A ARCHITECTS
Status: Final Inspection Approved
Jan 10, 2020
Commercial MEP
Status: Final Inspection Approved
Jan 10, 2020
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jan 8, 2020
Commercial MEP
Status: Final Inspection Approved
Jan 3, 2020
Commercial MEP
Status: Final Inspection Approved
Jan 3, 2020
Commercial MEP
Status: Final Inspection Approved
Jan 2, 2020
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Dec 30, 2019
Commercial Fire Protection
Status: Final Inspection Approved
Nov 29, 2019
Commercial MEP
Status: Final Inspection Approved
Nov 27, 2019
Commercial Special
Mechanical permits or na
Contractor: M & A ARCHITECTS
Status: Permit Issued
Nov 22, 2019
Commercial Fire Protection
Status: Final Inspection Approved
Nov 19, 2019
Commercial MEP
Status: Final Inspection Approved
Nov 14, 2019
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 13, 2019
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jun 5, 2019
Commercial MEP
Status: Final Inspection Approved
Jun 5, 2019
Commercial MEP
Contractor: All Pack Services
Status: Final Inspection Approved
Jun 3, 2019
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
May 28, 2019
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Mar 15, 2019
Commercial Fire Protection
Status: Final Inspection Approved
Mar 12, 2019
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Mar 8, 2019
Commercial MEP
Status: Final Inspection Approved
Mar 8, 2019
Commercial MEP
Status: Final Inspection Approved
Mar 8, 2019
Commercial Fire Protection
Status: Final Inspection Approved
Jul 20, 2018
Commercial MEP
Status: Final Inspection Approved
Jul 10, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Jul 3, 2018
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jun 29, 2018
Commercial MEP
Status: Final Inspection Approved
Jun 27, 2018
Commercial MEP
Status: Final Inspection Approved
Jun 27, 2018
Commercial MEP
Status: Final Inspection Approved
Jun 27, 2018
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jun 22, 2018
Graphics Building Wall Illuminated
Contractor: MOORE SIGNS
Status: Permit Issued
Jun 21, 2018
Commercial MEP
Status: Final Inspection Approved
Jun 18, 2018
Commercial MEP
Status: Final Inspection Approved
Jun 15, 2018
Commercial MEP
Status: Final Inspection Approved
Jun 14, 2018
Commercial MEP
Status: Final Inspection Approved
Jun 14, 2018
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jun 6, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Jun 6, 2018
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jun 6, 2018
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jun 4, 2018
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jun 1, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Mar 8, 2018
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Feb 12, 2018
Commercial MEP
Status: Final Inspection Approved
Feb 8, 2018
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Feb 6, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Feb 6, 2018
Commercial MEP
Status: Final Inspection Approved
Jan 31, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Jan 31, 2018
Commercial MEP
Status: Final Inspection Approved
Jan 31, 2018
Commercial MEP
Status: Final Inspection Approved
Jan 30, 2018
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jan 26, 2018
Commercial MEP
Status: Final Inspection Approved
Dec 14, 2017
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Nov 21, 2017
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Nov 15, 2017
Commercial MEP
Status: Final Inspection Approved
Nov 15, 2017
Commercial MEP
Status: Permit Issued
Nov 14, 2017
Commercial MEP
Status: Final Inspection Approved
Nov 14, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 14, 2017
Commercial MEP
Status: Final Inspection Approved
Nov 3, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 2, 2017
Commercial MEP
Status: Final Inspection Approved
Oct 16, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Sep 29, 2017
Commercial MEP
Status: Final Inspection Approved
Sep 22, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Sep 18, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Sep 13, 2017
Graphics Building Wall Illuminated
Mechanical permits or na
Contractor: DANITE SIGN CO
Status: Permit Issued
Jun 26, 2017
Commercial MEP
Status: Final Inspection Approved
May 19, 2017
Commercial Major Alteration
Status: Final Inspection Approved
May 12, 2017
Commercial Major Alteration
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
May 2, 2017
Commercial MEP
Status: Final Inspection Approved
May 1, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 28, 2017
Commercial New Construction
Status: Permit Issued
Apr 18, 2017
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Feb 1, 2017
Commercial MEP
Status: Final Inspection Approved
Jan 26, 2017
Commercial MEP
Status: Final Inspection Approved
Jan 25, 2017
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jan 20, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jan 17, 2017
Commercial MEP
Status: Final Inspection Approved
Oct 21, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Oct 19, 2016
Commercial MEP
Status: Final Inspection Approved
Oct 18, 2016
Commercial MEP
Status: Final Inspection Approved
Oct 17, 2016
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Oct 13, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Oct 12, 2016
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 3, 2016
Commercial MEP
Status: Final Inspection Approved
Sep 30, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Sep 28, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: CBRE GROUP INC
Status: Certificate of Occupancy Issued
Sep 26, 2016
Commercial MEP
Status: Final Inspection Approved
Sep 22, 2016
Commercial MEP
Status: Final Inspection Approved
Sep 19, 2016
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Sep 15, 2016
Commercial New Construction
Contractor: CBRE GROUP INC
Status: Permit Issued
Sep 9, 2016
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jun 29, 2016
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jun 29, 2016
Commercial MEP
Status: Final Inspection Approved
Jun 27, 2016
Commercial MEP
Status: Final Inspection Approved
Jun 27, 2016
Commercial MEP
Status: Final Inspection Approved
Jun 27, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jun 27, 2016
Commercial New Construction
Status: Final Inspection Approved
May 11, 2016
Commercial Major Alteration
Mechanical permits or na
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Apr 6, 2016
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Apr 5, 2016
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Apr 4, 2016
Commercial Major Alteration
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Mar 2, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Feb 29, 2016
Commercial New Construction
Contractor: ABRAM CONTRACTORS
Status: Final Inspection Approved
Feb 29, 2016
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Feb 26, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Feb 26, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Feb 25, 2016
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Feb 25, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Feb 25, 2016
Commercial New Construction
Status: Final Inspection Approved
Feb 24, 2016
Commercial Major Alteration
Mechanical permits or na
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Feb 23, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Feb 18, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Feb 10, 2016
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 9, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Feb 9, 2016
Commercial New Construction
Status: Permit Issued
Feb 9, 2016
Commercial New Construction
Status: Permit Issued
Jan 29, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Jan 26, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Jan 22, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Jan 22, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jan 21, 2016
Commercial Repair Replace
Status: Final Inspection Approved
Jan 8, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Nov 11, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Nov 3, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Oct 27, 2015
Residential Repair Replace
Status: Permit Issued
Oct 20, 2015
Commercial New Construction
Status: Final Inspection Approved
Oct 16, 2015
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Oct 15, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Oct 15, 2015
Commercial New Construction
Status: Permit Issued
Oct 2, 2015
Commercial New Construction
Status: Permit Issued
Sep 23, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Jul 10, 2015
Commercial New Construction
Status: Permit Issued
Jul 8, 2015
Commercial New Construction
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jul 7, 2015
Commercial New Construction
Status: Final Inspection Approved
Jul 6, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Jul 6, 2015
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jul 2, 2015
Commercial New Construction
Status: Permit Issued
Jun 4, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Feb 11, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Feb 11, 2015
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Feb 10, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Feb 10, 2015
Commercial New Construction
Status: Permit Issued
Feb 5, 2015
Commercial New Construction
Status: Permit Issued
Feb 3, 2015
Commercial New Construction
Status: Permit Issued
Feb 3, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Dec 9, 2014
Commercial Major Alteration
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Dec 3, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Nov 25, 2014
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 21, 2014
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Nov 19, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Nov 13, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Nov 6, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Oct 29, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Oct 10, 2014
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: UNISPACE
Status: Certificate of Occupancy Issued
Sep 26, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Sep 22, 2014
Commercial Major Alteration
Contractor: DYNALECTRIC OHIO
Status: Final Inspection Approved
Sep 16, 2014
Commercial Major Alteration
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Sep 5, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Sep 4, 2014
Commercial New Construction
Status: Permit Issued
Aug 29, 2014
Commercial Major Alteration
Mechanical permits or na
Contractor: GFP SYSTEMS INC
Status: Final Inspection Approved
Aug 26, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Aug 26, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Aug 22, 2014
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Aug 22, 2014
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Aug 20, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Aug 18, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Aug 14, 2014
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: UNISPACE
Status: Certificate of Occupancy Issued
Aug 8, 2014
Commercial New Construction
Status: Permit Issued
Aug 4, 2014
Commercial New Construction
Status: Permit Issued
Jul 24, 2014
Commercial Major Alteration
Contractor: DYNALECTRIC OHIO
Status: Final Inspection Approved
Jul 10, 2014
Commercial New Construction
Contractor: UNISPACE
Status: Permit Issued
Jun 27, 2014
Commercial Repair Replace
Status: Final Inspection Approved
Mar 28, 2014
Commercial Major Alteration
Contractor: DYNALECTRIC OHIO
Status: Final Inspection Approved
Mar 18, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Mar 17, 2014
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Jan 13, 2014
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Dec 20, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Dec 19, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jun 25, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jun 24, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jun 20, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: BOYLE THOMAS J
Status: Final Inspection Approved
Jun 19, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jun 19, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 31, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
May 28, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
May 17, 2013
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
May 17, 2013
Commercial Major Alteration
Mechanical permits or na
Contractor: BONNETTE MICHAEL J
Status: Final Inspection Approved
Oct 30, 2012
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Sep 28, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Sep 24, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Sep 19, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Sep 13, 2012
Commercial New Construction
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Sep 13, 2012
Commercial New Construction
Mechanical permits or na
Contractor: M G ABBOTT INC
Status: Final Inspection Approved
Sep 7, 2012
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Sep 6, 2012
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Aug 24, 2012
Commercial Major Alteration
Contractor: M G ABBOTT INC
Status: Permit Issued
Jul 11, 2012
Commercial Major Alteration
Mechanical permits or na
Contractor: M G ABBOTT INC
Status: Final Inspection Approved
Jul 10, 2012
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Jul 2, 2012
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jun 29, 2012
Commercial New Construction
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Permit Issued
May 29, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 18, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 18, 2012
Commercial New Construction
Mechanical permits or na
Contractor: M G ABBOTT INC
Status: Final Inspection Approved
Apr 17, 2012
Commercial Major Alteration
Mechanical permits or na
Contractor: M G ABBOTT INC
Status: Final Inspection Approved
Apr 17, 2012
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Apr 17, 2012
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Apr 16, 2012
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Apr 16, 2012
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Apr 16, 2012
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Apr 16, 2012
Commercial Major Alteration
Status: Final Inspection Approved
Apr 6, 2012
Commercial New Construction
Mechanical permits or na
Contractor: M G ABBOTT INC
Status: Permit Issued
Mar 15, 2012
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Mar 15, 2012
Commercial New Construction
Mechanical permits or na
Contractor: M G ABBOTT INC
Status: Permit Issued
Mar 15, 2012
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Mar 15, 2012
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Mar 15, 2012
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Mar 15, 2012
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Mar 14, 2012
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Mar 14, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 14, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 14, 2012
Commercial Repair Replace
Status: Final Inspection Approved
Feb 10, 2012
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Feb 10, 2012
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
Jan 18, 2012
Commercial Major Alteration
Mechanical permits or na
Contractor: M G ABBOTT INC
Status: Final Inspection Approved
Jan 9, 2012
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Permit Issued
Jan 9, 2012
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Permit Issued
Jan 5, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Dec 12, 2011
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Nov 21, 2011
Commercial Major Alteration
Mechanical permits or na
Contractor: M G ABBOTT INC
Status: Permit Issued
Nov 17, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Nov 17, 2011
Commercial New Construction
Contractor: M G ABBOTT INC
Status: Permit Issued
Nov 14, 2011
Commercial New Construction
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Nov 3, 2011
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Oct 21, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 12, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 11, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 11, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Oct 7, 2011
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
Oct 4, 2011
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
Oct 4, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 4, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: RECONSTRUCTION LLC
Status: Final Inspection Approved
Sep 29, 2011
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Sep 21, 2011
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: RECONSTRUCTION LLC
Status: Permit Issued
Sep 19, 2011
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Sep 9, 2011
Commercial Major Alteration
Mechanical permits or na
Contractor: M G ABBOTT INC
Status: Final Inspection Approved
Sep 8, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Sep 1, 2011
Commercial New Construction
Status: Permit Issued
Aug 25, 2011
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Aug 24, 2011
Commercial Major Alteration
Mechanical permits or na
Contractor: BONNETTE MICHAEL J
Status: Final Inspection Approved
Aug 2, 2011
Commercial Major Alteration
Contractor: BONNETTE MICHAEL J
Status: Final Inspection Approved
Aug 2, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 1, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jul 28, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jul 27, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jul 22, 2011
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
Jul 14, 2011
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Jul 14, 2011
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Jul 13, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jul 7, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jun 15, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jun 13, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 16, 2011
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
May 13, 2011
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
May 13, 2011
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
May 13, 2011
Graphics Building Wall Illuminated
Mechanical permits or na
Contractor: DANITE SIGN CO
Status: Permit Issued
May 13, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 6, 2011
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
May 5, 2011
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
May 5, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 3, 2011
Commercial New Construction
Additions, alterations and conversions - residential
Status: Permit Issued
Apr 27, 2011
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
Apr 25, 2011
Commercial Major Alteration
Expired permits
Status: Final Inspection Approved
Apr 14, 2011
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
Mar 28, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 10, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 4, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 3, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 3, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Feb 2, 2011
Commercial Addition
Mechanical permits or na
Status: Final Inspection Approved
Jan 27, 2011
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Jan 14, 2011
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Jan 10, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 3, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 24, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 23, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 22, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 22, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 22, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 19, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Nov 18, 2010
Commercial Repair Replace
Mechanical permits or na
Status: Final Inspection Approved
Nov 8, 2010
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Nov 1, 2010
Commercial Major Alteration
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Nov 1, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 29, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Oct 26, 2010
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Oct 19, 2010
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Oct 19, 2010
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Oct 15, 2010
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Oct 15, 2010
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Oct 8, 2010
Commercial New Construction
Status: Final Inspection Approved
Sep 30, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 30, 2010
Commercial Major Alteration
Mechanical permits or na
Contractor: BONNETTE MICHAEL J
Status: Final Inspection Approved
Aug 18, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 16, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 13, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Aug 5, 2010
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jul 30, 2010
Commercial Major Alteration
Mechanical permits or na
Contractor: ABRAM CONTRACTORS
Status: Final Inspection Approved
Jul 15, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jul 14, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jul 14, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jul 13, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jul 12, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jul 12, 2010
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Jun 24, 2010
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Jun 17, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Mar 8, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Mar 4, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Mar 3, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 25, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Feb 25, 2010
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Feb 18, 2010
Graphics Building Wall Illuminated
Mechanical permits or na
Contractor: SIGNCOM INC
Status: Permit Issued
Feb 8, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 2, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 2, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: NEWSOME ELECTRIC
Status: Final Inspection Approved
Jan 26, 2010
Commercial Major Alteration
Mechanical permits or na
Contractor: FIRE GUARD, INC
Status: Final Inspection Approved
Jan 25, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jan 14, 2010

Check permits at another Columbus address

Free instant lookup, no signup.

Search Columbus permits →
Disclaimer: Permit data comes from Columbus's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Columbus building department before buying, selling, or planning work.