Permit history for 245 N High St

Columbus, OH · 379 permits on file · 2010–2025

379
Permits on file
2010
First permit
2025
Most recent

Permits on file (379)

Ordered most recent first. Data from the city's open data portal.

Commercial MEP
Status: Permit Issued
Nov 21, 2025
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Permit Issued
Nov 18, 2025
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Permit Issued
Sep 15, 2025
Commercial MEP
Status: Permit Issued
Sep 5, 2025
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Jun 30, 2025
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Permit Issued
Jun 17, 2025
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Permit Issued
Jun 17, 2025
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Permit Issued
May 20, 2025
Commercial Fire Protection
Mechanical permits or na
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
May 8, 2025
Commercial MEP
Status: Final Inspection Approved
May 8, 2025
Commercial Fire Protection
Status: Final Inspection Approved
May 8, 2025
Commercial Special
Mechanical permits or na
Status: Permit Issued
Apr 30, 2025
Commercial Fire Protection
Status: Final Inspection Approved
Apr 28, 2025
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 21, 2025
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Apr 11, 2025
Commercial MEP
Status: Final Inspection Approved
Mar 28, 2025
Commercial MEP
Status: Permit Issued
Mar 24, 2025
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Mar 19, 2025
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Mar 19, 2025
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Mar 14, 2025
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Aug 26, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Aug 12, 2024
Commercial MEP
Status: Final Inspection Approved
Aug 12, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Aug 2, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Jul 9, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Jul 9, 2024
Commercial Fire Protection
Status: Permit Issued
Jun 20, 2024
Commercial Fire Protection
Status: Final Inspection Approved
Jun 12, 2024
Commercial Fire Protection
Status: Final Inspection Approved
Jun 11, 2024
Commercial Fire Protection
Status: Final Inspection Approved
Jun 11, 2024
Commercial Fire Protection
Status: Final Inspection Approved
Jun 7, 2024
Commercial MEP
Status: Final Inspection Approved
Jun 3, 2024
Commercial MEP
Status: Final Inspection Approved
May 31, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
May 30, 2024
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
May 28, 2024
Commercial MEP
Status: Final Inspection Approved
May 14, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
May 10, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
May 10, 2024
Commercial Fire Protection
Status: Final Inspection Approved
May 6, 2024
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Apr 30, 2024
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Apr 22, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 17, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Apr 17, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Apr 17, 2024
Commercial MEP
Status: Final Inspection Approved
Apr 16, 2024
Commercial MEP
Status: Final Inspection Approved
Apr 10, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 8, 2024
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Apr 1, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 1, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Mar 25, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Mar 25, 2024
Commercial MEP
Status: Permit Issued
Mar 22, 2024
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Mar 20, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Mar 18, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Mar 6, 2024
Commercial MEP
Status: Final Inspection Approved
Mar 6, 2024
Commercial MEP
Status: Final Inspection Approved
Jan 10, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Jan 8, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Jan 8, 2024
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jan 4, 2024
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Sep 25, 2023
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Sep 25, 2023
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Sep 18, 2023
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Aug 31, 2023
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Aug 15, 2023
Commercial MEP
Status: Final Inspection Approved
Aug 7, 2023
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Aug 3, 2023
Commercial MEP
Status: Final Inspection Approved
Jul 26, 2023
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Jul 26, 2023
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Jul 19, 2023
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jul 19, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jul 17, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jul 3, 2023
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
May 28, 2023
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
May 28, 2023
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
May 22, 2023
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Apr 26, 2023
Commercial MEP
Status: Final Inspection Approved
Apr 25, 2023
Commercial MEP
Status: Final Inspection Approved
Apr 24, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 17, 2023
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Mar 31, 2023
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Feb 21, 2023
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Feb 13, 2023
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Feb 13, 2023
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Dec 28, 2022
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Dec 7, 2022
Commercial MEP
Status: Final Inspection Approved
Nov 22, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Nov 21, 2022
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Nov 18, 2022
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Nov 17, 2022
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Nov 17, 2022
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Nov 11, 2022
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Nov 2, 2022
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Nov 2, 2022
Commercial MEP
Status: Final Inspection Approved
Oct 24, 2022
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Oct 24, 2022
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Permit Issued
Oct 24, 2022
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Oct 24, 2022
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Oct 10, 2022
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Oct 10, 2022
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Oct 5, 2022
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Oct 5, 2022
Commercial Fire Protection
Contractor: VFP FIRE
Status: Final Inspection Approved
Sep 27, 2022
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Sep 22, 2022
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Sep 22, 2022
Commercial MEP
Status: Final Inspection Approved
Sep 19, 2022
Commercial MEP
Status: Final Inspection Approved
Sep 19, 2022
Commercial MEP
Status: Final Inspection Approved
Sep 19, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Sep 15, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Sep 13, 2022
Commercial MEP
Status: Final Inspection Approved
Sep 12, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Sep 8, 2022
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Sep 7, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Sep 2, 2022
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Aug 24, 2022
Commercial MEP
Status: Permit Issued
Aug 23, 2022
Commercial Fire Protection
Status: Final Inspection Approved
Apr 14, 2021
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Mar 25, 2021
Commercial MEP
Status: Final Inspection Approved
Mar 16, 2021
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Mar 11, 2021
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Mar 9, 2021
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Feb 16, 2021
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Sep 25, 2019
Commercial MEP
Status: Permit Issued
Sep 12, 2019
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Aug 28, 2019
Commercial MEP
Status: Final Inspection Approved
Aug 20, 2019
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Aug 16, 2019
Commercial MEP
Status: Final Inspection Approved
Jul 17, 2019
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jun 20, 2019
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
May 15, 2019
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Apr 9, 2019
Commercial MEP
Status: Final Inspection Approved
Apr 8, 2019
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 1, 2019
Commercial Special
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: SPEER MECHANICAL
Status: Permit Issued
Mar 21, 2019
Commercial Special
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: SPEER MECHANICAL
Status: Permit Issued
Mar 21, 2019
Commercial Special
Mechanical permits or na
Status: Permit Issued
Mar 6, 2019
Commercial Special
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Permit Issued
Mar 4, 2019
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Feb 25, 2019
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Feb 4, 2019
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jan 29, 2019
Commercial MEP
Status: Final Inspection Approved
Jan 29, 2019
Commercial MEP
Contractor: SPEER MECHANICAL
Status: Final Inspection Approved
Jan 29, 2019
Graphics Building Wall Illuminated
Status: Permit Issued
Nov 16, 2018
Graphics Building Wall Illuminated
Status: Permit Issued
Nov 15, 2018
Commercial MEP
Status: Final Inspection Approved
Aug 28, 2018
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Aug 21, 2018
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Aug 16, 2018
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Aug 16, 2018
Commercial Fire Protection
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Aug 2, 2018
Commercial MEP
Status: Final Inspection Approved
Jul 11, 2018
Commercial MEP
Status: Final Inspection Approved
Jul 11, 2018
Commercial MEP
Status: Final Inspection Approved
Jul 10, 2018
Commercial Structural
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jun 7, 2018
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Apr 16, 2018
Commercial MEP
Status: Final Inspection Approved
Mar 7, 2018
Commercial Fire Protection
Contractor: MID CITY ELECTRIC
Status: Final Inspection Approved
Mar 5, 2018
Commercial MEP
Status: Permit Issued
Feb 27, 2018
Commercial Fire Protection
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Feb 23, 2018
Commercial MEP
Status: Final Inspection Approved
Feb 23, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Feb 12, 2018
Commercial Fire Protection
Status: Final Inspection Approved
Feb 9, 2018
Commercial MEP
Contractor: 1099 Sullivant Ave
Status: Final Inspection Approved
Feb 6, 2018
Commercial MEP
Contractor: 1099 Sullivant Ave
Status: Final Inspection Approved
Feb 6, 2018
Commercial MEP
Status: Final Inspection Approved
Feb 5, 2018
Commercial New Construction
Contractor: S A COMUNALE CO INC
Status: Permit Issued
Jan 31, 2018
Commercial MEP
Status: Final Inspection Approved
Jan 29, 2018
Commercial MEP
Status: Final Inspection Approved
Jan 29, 2018
Commercial MEP
Status: Final Inspection Approved
Jan 29, 2018
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: AECOM
Status: Certificate of Occupancy Issued
Jan 23, 2018
Commercial MEP
Contractor: BRUNER COPORATION
Status: Final Inspection Approved
Jan 23, 2018
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jan 12, 2018
Commercial MEP
Contractor: BRUNER CORPORATION
Status: Final Inspection Approved
Jan 5, 2018
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jan 4, 2018
Commercial Major Alteration
Status: Final Inspection Approved
Dec 21, 2017
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Dec 8, 2017
Commercial MEP
Contractor: 1099 Sullivant Ave
Status: Final Inspection Approved
Nov 30, 2017
Commercial Major Alteration
Mechanical permits or na
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Nov 29, 2017
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Nov 20, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Nov 20, 2017
Graphics Building Wall Illuminated
Status: Permit Issued
Nov 16, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: AECOM
Status: Final Inspection Approved
Nov 2, 2017
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Oct 26, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Oct 5, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Aug 23, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Aug 3, 2017
Commercial MEP
Status: Final Inspection Approved
Jun 16, 2017
Commercial New Construction
Mechanical permits or na
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Jun 12, 2017
Commercial MEP
Contractor: 1099 Sullivant Ave
Status: Final Inspection Approved
Jun 6, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jun 2, 2017
Commercial MEP
Contractor: 1099 Sullivant Ave
Status: Final Inspection Approved
May 26, 2017
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
May 26, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
May 24, 2017
Commercial MEP
Status: Final Inspection Approved
Mar 29, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Mar 29, 2017
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: BHDP ARCHITECTURE
Status: Certificate of Occupancy Issued
Mar 27, 2017
Commercial MEP
Status: Final Inspection Approved
Feb 8, 2017
Commercial MEP
Contractor: 1099 Sullivant Ave
Status: Final Inspection Approved
Feb 2, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Feb 2, 2017
Commercial Major Alteration
Contractor: S A COMUNALE CO INC
Status: Final Inspection Approved
Jan 30, 2017
Commercial MEP
Contractor: 1099 Sullivant Ave
Status: Final Inspection Approved
Jan 26, 2017
Commercial MEP
Status: Final Inspection Approved
Jan 20, 2017
Commercial MEP
Status: Final Inspection Approved
Jan 20, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Jan 19, 2017
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jan 12, 2017
Commercial New Construction
Status: Permit Issued
Jan 10, 2017
Commercial Major Alteration
Status: Final Inspection Approved
Jan 6, 2017
Commercial Major Alteration
Mechanical permits or na
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Dec 29, 2016
Commercial Major Alteration
Mechanical permits or na
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Dec 27, 2016
Commercial MEP
Status: Final Inspection Approved
Dec 21, 2016
Commercial MEP
Status: Final Inspection Approved
Dec 8, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Dec 6, 2016
Commercial MEP
Contractor: 1099 Sullivant Ave
Status: Final Inspection Approved
Dec 5, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Dec 5, 2016
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Dec 1, 2016
Commercial MEP
Status: Final Inspection Approved
Aug 17, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Aug 17, 2016
Commercial Major Alteration
Status: Final Inspection Approved
Jan 19, 2016
Commercial Repair Replace
Status: Final Inspection Approved
Nov 19, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Nov 19, 2015
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Nov 6, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Oct 9, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Oct 6, 2015
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Oct 2, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Oct 1, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Oct 1, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Sep 30, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Sep 30, 2015
Commercial New Construction
Status: Permit Issued
Sep 3, 2015
Commercial New Construction
Status: Permit Issued
Sep 1, 2015
Commercial Repair Replace
Status: Final Inspection Approved
Aug 20, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Aug 19, 2015
Commercial Major Alteration
Mechanical permits or na
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Aug 14, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Aug 14, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Aug 13, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Jul 21, 2015
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Jul 20, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Jul 20, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Permit Issued
Jul 16, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Jul 7, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Jun 5, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Jun 3, 2015
Commercial New Construction
Status: Final Inspection Approved
Apr 13, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Mar 13, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Mar 12, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Mar 10, 2015
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Mar 10, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Mar 4, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Mar 3, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Feb 24, 2015
Commercial New Construction
Status: Final Inspection Approved
Feb 19, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Feb 17, 2015
Commercial New Construction
Status: Final Inspection Approved
Feb 17, 2015
Commercial Major Alteration
Status: Final Inspection Approved
Feb 10, 2015
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Feb 10, 2015
Commercial Major Alteration
Contractor: VFP FIRE SYSTEMS
Status: Final Inspection Approved
Feb 9, 2015
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Feb 3, 2015
Commercial New Construction
Status: Permit Issued
Jan 15, 2015
Commercial Addition
Status: Final Inspection Approved
Dec 10, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Nov 20, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Nov 4, 2014
Commercial Major Alteration
Contractor: BRUNER COPORATION
Status: Final Inspection Approved
Oct 30, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Oct 22, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Oct 21, 2014
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Oct 20, 2014
Commercial Major Alteration
Status: Permit Issued
Oct 20, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Oct 8, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Oct 8, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Oct 8, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Oct 3, 2014
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Oct 2, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Sep 30, 2014
Commercial Major Alteration
Status: Permit Issued
Sep 26, 2014
Commercial Major Alteration
Status: Permit Issued
Sep 26, 2014
Commercial Major Alteration
Status: Final Inspection Approved
Sep 26, 2014
Commercial Major Alteration
Contractor: DEW JAMES F
Status: Final Inspection Approved
Sep 19, 2014
Commercial New Construction
Status: Permit Issued
Sep 19, 2014
Commercial Repair Replace
Status: Final Inspection Approved
Sep 16, 2014
Commercial New Construction
Status: Final Inspection Approved
Sep 2, 2014
Commercial Major Alteration
Contractor: BRUNER CORPORATION
Status: Final Inspection Approved
Aug 29, 2014
Commercial Major Alteration
Contractor: BRUNER CORPORATION
Status: Permit Issued
Aug 29, 2014
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Aug 28, 2014
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: BRUNER CORPORATION
Status: Final Inspection Approved
Aug 28, 2014
Commercial New Construction
Contractor: BRUNER CORPORATION
Status: Permit Issued
Jul 18, 2014
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Sep 9, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 26, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 2, 2013
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jul 31, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Mar 19, 2013
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Dec 20, 2012
Commercial Major Alteration
Mechanical permits or na
Contractor: STARKEY STEVEN G
Status: Final Inspection Approved
Dec 3, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Nov 30, 2012
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: URS
Status: Certificate of Occupancy Issued
Nov 29, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
Nov 27, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 30, 2012
Commercial Major Alteration
Status: Final Inspection Approved
May 29, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 29, 2012
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
May 29, 2012
Commercial Major Alteration
Status: Final Inspection Approved
May 29, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 8, 2012
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Apr 10, 2012
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Apr 4, 2012
Commercial Major Alteration
Status: Final Inspection Approved
Mar 27, 2012
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 19, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 11, 2011
Commercial Repair Replace
Mechanical permits or na
Status: Permit Issued
Sep 30, 2011
Commercial Major Alteration
Mechanical permits or na
Contractor: HARD MICHAEL D
Status: Final Inspection Approved
Sep 29, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Sep 28, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Sep 8, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Sep 1, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 23, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Aug 16, 2011
Commercial New Construction
Status: Permit Issued
Jul 29, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jul 18, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jul 15, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jul 12, 2011
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Jun 30, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 31, 2011
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
May 25, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 16, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Permit Issued
May 13, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 12, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
May 4, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 18, 2011
Commercial Major Alteration
Status: Final Inspection Approved
Apr 18, 2011
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Apr 18, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 15, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Apr 15, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Apr 13, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 12, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 8, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 6, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Apr 6, 2011
Commercial New Construction
Mechanical permits or na
Status: Permit Issued
Mar 23, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Mar 14, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 15, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 8, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 4, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 27, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 21, 2011
Commercial New Construction
Status: Final Inspection Approved
Jan 21, 2011
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Jan 19, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 18, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 12, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 12, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 12, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jan 11, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 7, 2011
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 3, 2011
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Dec 30, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Dec 7, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Oct 27, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Oct 6, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Sep 30, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Sep 17, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Sep 15, 2010
Commercial New Construction
Mechanical permits or na
Status: Final Inspection Approved
Sep 14, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Sep 13, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jul 7, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Jul 6, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jun 15, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jun 15, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jun 9, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jun 9, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 20, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 20, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Apr 19, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Mar 31, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Mar 29, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Mar 29, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Mar 29, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Mar 25, 2010
Commercial New Construction
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Final Inspection Approved
Mar 15, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 22, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Feb 2, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 28, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 28, 2010
Commercial Major Alteration
Mechanical permits or na
Status: Final Inspection Approved
Jan 19, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Contractor: DALMATIAN FIRE INC
Status: Final Inspection Approved
Jan 19, 2010
Commercial Major Alteration
Additions, alterations and conversions - non-residential and no-housekeeping
Status: Certificate of Occupancy Issued
Jan 15, 2010

Check permits at another Columbus address

Free instant lookup, no signup.

Search Columbus permits →
Disclaimer: Permit data comes from Columbus's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Columbus building department before buying, selling, or planning work.