Permit history for 222 W Merchandise Mart Plz

Chicago, IL · 393 permits on file · 2021–2026

393
Permits on file
2021
First permit
2026
Most recent
79
Unique contractors
$125,035,367
Declared value (all work)

Permits on file (393)

Ordered most recent first. Data from the city's open data portal.

PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200466373. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising sta
Status: ACTIVE
May 20, 2026
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit b200462408: replacement general contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Status: COMPLETE
May 13, 2026
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior alteration to lobby reception area to remove sliding door and replace with revolving door. locations: 0 residential unit(s), 1 non-residential unit(s), 1 interior common areas, 13th floor suite entry.
Contractor: HELFERT JEREMY D
Status: ACTIVE
May 7, 2026
Declared cost: $279,430
Permit fee: $325
PERMIT - RENOVATION/ALTERATION
Selfcert 2019 cbrc: interior alterations to existing 3rd floor office space - suite 312. no change to existing use. (business / 1a)
Status: ACTIVE
May 4, 2026
Declared cost: $70,000
Permit fee: $1,419
PERMIT - RENOVATION/ALTERATION
(self-cert 2019 cbrc) interior buildout of mechanical room on twelfth floor of 222 w merchandise mart plz, a 25 story building. scope of work includes general construction, mechanical, and electrical work. no plumbing or structural work to
Contractor: MAULIK SHAH
Status: ACTIVE
Apr 28, 2026
Declared cost: $1,300,000
Permit fee: $975
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 2 circuits to existing 200 amp service disconnecting means. receptacle outlets: 6 . lighting outlets: 1. specific location: unit 10-168.
Status: ACTIVE
Apr 22, 2026
Declared cost: $28,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101076323: replacement electrical contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Status: COMPLETE
Apr 16, 2026
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101076323. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: yes. monitoring type: supervising sta
Status: ACTIVE
Apr 16, 2026
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior alteration of existing showroom - suite 333 to include general construction, electrical and plumbing. no mechanical or structural work to be performed. locations: 0 residential unit(s), 0 non-residential unit(s
Status: ACTIVE
Apr 7, 2026
Declared cost: $270,000
Permit fee: $575
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101076323. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Apr 6, 2026
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior renovation of an existing restroom on the 12th floor, located at 222 w merchandise mart plaza, a commercial use 25 story building. scope of work to include general construction, plumbing, electrical, and mechan
Contractor: MAULIK SHAH
Status: ACTIVE
Mar 30, 2026
Declared cost: $332,000
Permit fee: $975
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: 5th floor.
Contractor: TITAN ELECTRIC LLC
Status: ACTIVE
Mar 27, 2026
Declared cost: $62,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 232 . lighting outlets: 0. specific location: 5th floor.
Status: ACTIVE
Mar 25, 2026
Declared cost: $24,600
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior alteration to existing showroom within suite, includes removal of non-load-bearing partitions, installation of new partitions, lighting, finishes, millwork, minor electrical work. no plumbing, mechanical or s
Status: ACTIVE
Mar 24, 2026
Declared cost: $66,127
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior alteration to existing suite, includes new partitions and millwork with minor electrical and plumbing with associated piping for wet bar.locations: 0 residential unit(s), 1 non-residential unit(s), rm.10-78.
Status: ACTIVE
Mar 23, 2026
Declared cost: $210,000
Permit fee: $575
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alteration of office suite 1211 on the 12th floor located at 222 w merchandise mart plaza, a 25 story building. scope of work includes general construction, mechanical, and electrical. no plumbing or structural
Contractor: MAULIK SHAH
Status: ACTIVE
Mar 4, 2026
Declared cost: $280,000
Permit fee: $18,788
PERMIT - RENOVATION/ALTERATION
Self-crt 2019 cbrc; tenant buildout of 4,893 sf showroom on the 10th floor including electrical, mechanical and plumbing. (occupancy group b, type ia construction)
Contractor: OFFICE MASTER INC.
Status: ACTIVE
Mar 3, 2026
Declared cost: $1,200,000
Permit fee: $3,158
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 326 . lighting outlets: 0. specific location: 5th floor.
Status: ACTIVE
Mar 3, 2026
Declared cost: $36,650
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101072718. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Feb 26, 2026
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install audio. install data/video. specific location: 9th floor for paypal.
Status: ACTIVE
Feb 24, 2026
Declared cost: $151,749
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Sc 2019 cbrc. interior fit-out of office space within existing office building. work includes selective demolition, new partitions, ceilings, mechanical, electrical, and lighting. no change to use or occupancy (occ. grp. b; const. type ia
Status: ACTIVE
Feb 10, 2026
Declared cost: $3,400,000
Permit fee: $11,790
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 380 . lighting outlets: 0. specific location: 9th floor.
Status: ACTIVE
Feb 3, 2026
Declared cost: $41,312
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101076323: replacement general contractor. replacement other contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Contractor: F.E. MORAN INC
Status: COMPLETE
Feb 2, 2026
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 240 . lighting outlets: 0. specific location: 4th floor.
Status: ACTIVE
Jan 23, 2026
Declared cost: $33,600
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Sc 2019 cbrc: interior renovations of an existing showroom located on the 3rd floor of the merchandise mart (suite 399). no change in occupancy or use. (occ. grp. m; const. type ia). as per plans.
Status: ACTIVE
Jan 23, 2026
Declared cost: $1,000,000
Permit fee: $9,260
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior replacement of entrance sliding door, new electrical for alteration of existing exit signageto suite exit. locations: 0 residential unit(s), 1 non-residential unit(s), suite 1048.
Contractor: TURF DESIGN, INC.
Status: ACTIVE
Jan 20, 2026
Declared cost: $41,000
Permit fee: $325
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101072828. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Jan 8, 2026
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: repair existing system. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising station . specific location: panel replacement.
Status: ACTIVE
Jan 5, 2026
Permit fee: $3,475
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101072272. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: no. special locking: yes. monitoring type: city fire alarm
Contractor: PYCZ ADAM JOSEPH
Status: ACTIVE
Jan 5, 2026
Permit fee: $200
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2026. end date: 1/1/2027. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Dec 31, 2025
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install security. specific location: fourth floor only.
Status: ACTIVE
Dec 10, 2025
Declared cost: $25,000
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Non structural interior alteration of existing tenant suite (business occupancy) on the 5th floor. interior build out to include non-structural and non-load bearing partitions, millwork, and finishes. installation of lighting fixtures, plum
Status: ACTIVE
Dec 9, 2025
Declared cost: $385,000
Permit fee: $13,130
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101072272. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Dec 3, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101068326. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Oct 28, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: 4th floor.
Status: ACTIVE
Oct 23, 2025
Declared cost: $102,000
Permit fee: $100
PERMIT - ELEVATOR EQUIPMENT
Installation of (1) one vertical wheelchair platform lift, 750lbs capacity @ 20fpm, pursuant to plans submitted and subject to city of chicago dept. of buildings elevator bureau inspection (ev004176).
Oct 20, 2025
Declared cost: $40,500
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101072828: replacement electrical contractor. replacement plumbing contractor. replacement other contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Status: COMPLETE
Oct 17, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. alter existing other. specific location: 4th floor.
Contractor: AVI-SPL LLC
Status: ACTIVE
Oct 15, 2025
Declared cost: $405,000
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior buildout of suite 619 (pierre frey) on the sixth floor of 222 w merchandise mart plz, a 25 story building. scope of work includes general construction, mechanical, electrical and plumbing. no structural work to
Status: ACTIVE
Oct 8, 2025
Declared cost: $1,000,000
Permit fee: $1,631
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alterations to existing 9th floor office space - suite 970. work to include minimal demo, new partitions, finishes, mechanical, electrical and plumbing as per plans. no structural work included. (1a constructio
Contractor: JC ANDERSON INC
Status: ACTIVE
Sep 24, 2025
Declared cost: $475,000
Permit fee: $11,705
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101051424. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: no. special locking: yes. monitoring type: supervising stat
Status: ACTIVE
Sep 18, 2025
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Selfcert 2019 cbrc: interior alterations to existing 4th floor office space - suite 400. no change to existing use. (occupancy b / construction type 1a)
Status: COMPLETE
Aug 28, 2025
Declared cost: $6,900,000
Permit fee: $15,993
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200435713. affects: 0 dwelling units; 1 non-residential units. high-rise building: no. voice communication: no. special locking: yes. monitoring type: none (exempt) .
Status: ACTIVE
Aug 21, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 143 . lighting outlets: 0. specific location: 5th floor.
Status: ACTIVE
Aug 13, 2025
Declared cost: $15,920
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101067563. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Jul 29, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install security. specific location: suite 1132.
Status: ACTIVE
Jul 28, 2025
Declared cost: $16,590
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing 8th floor office space - suite 075. structural peer review included. no change to existing use. (occupancy b / construction type 1a)
Status: ACTIVE
Jul 15, 2025
Declared cost: $750,000
Permit fee: $3,923
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101068326. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Jul 15, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: low voltage wiring 6th floor.
Status: COMPLETE
Jul 11, 2025
Declared cost: $5,800
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101067563: replacement electrical contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Contractor: SHAH MAULIK
Status: COMPLETE
Jul 10, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101065009. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Jul 8, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101066772. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Jul 8, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101067400. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Jul 8, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101064561. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Jul 8, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. alter existing data/video. specific location: 8th floor suite.
Status: ACTIVE
Jun 24, 2025
Declared cost: $90,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101068326: replacement general contractor. replacement electrical contractor. replacement other contractor. replacement plumbing contractor. new contractor(s) listed under "other applicants and contractors" on permit certific
Status: COMPLETE
Jun 24, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Scaffolding
Temporary scaffolding: qty: 3, max. length: 32 ft., max. height: 250 ft. location: east and south. permit expiration date: 365 days from permit issued date this permit is not valid without corresponding cdot public way permit.
Status: ACTIVE
Jun 11, 2025
Permit fee: $475
PERMIT – EXPRESS PERMIT PROGRAM Masonry Work
Tuckpointing and unit masonry repair / replacement: 5000 sq. ft., lintel qty. 0, max. length 0. location: south and east elevations.
Status: ACTIVE
Jun 11, 2025
Declared cost: $720,000
Permit fee: $375
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101067563: replacement general contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Contractor: SHAH MAULIK
Status: COMPLETE
Jun 4, 2025
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Non structural interior alteration of existing tenant suite (business occupancy) on the 11th floor. interior build out to include non-structural and non-load bearing partitions, millwork, and finishes. installation of new plumbing and light
Contractor: MAULIK SHAH
Status: ACTIVE
Jun 2, 2025
Declared cost: $850,000
Permit fee: $6,115
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101065009: replacement general contractor. replacement plumbing contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Status: COMPLETE
May 13, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101067400: replacement general contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Contractor: ROBY GLENN M
Status: COMPLETE
May 8, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: suite 107.
Status: ACTIVE
May 7, 2025
Declared cost: $160,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101062928. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: yes. monitoring type: supervising sta
Status: ACTIVE
May 5, 2025
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Interior renovation to existing commercial space in existing mercantile group m type 1 building, as per plans. proposed use/occupancy classification to remain same as existing. no work to exterior.
Contractor: NORA BULLARD
Status: ACTIVE
Apr 29, 2025
Declared cost: $525,000
Permit fee: $975
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101064475. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising stat
Status: ACTIVE
Apr 28, 2025
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior renovation of sixth floor tenant space suite 626 (blommer) at 222 w merchandise mart plaza, a 25 story mixed use building. scope of work includes general construction, electrical, hvac and finishes. no plumbing
Contractor: MAULIK SHAH
Status: ACTIVE
Apr 24, 2025
Declared cost: $80,000
Permit fee: $975
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200416569. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising sta
Status: ACTIVE
Apr 21, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101064860. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: no. special locking: yes. monitoring type: none (exempt) .
Status: ACTIVE
Apr 16, 2025
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing 3rd floor space - suite 312. no change to existing use. (occupancy b / construction type 1a)
Status: COMPLETE
Apr 10, 2025
Declared cost: $700,000
Permit fee: $4,550
PERMIT - RENOVATION/ALTERATION
Non structural interior alteration of existing common corridor on the 4th floor. interior renovation of common corridor to include non-structural and non-load bearing partitions and finishes. installation of new lighting fixtures. there is
Contractor: MAULIK SHAH
Status: COMPLETE
Apr 9, 2025
Declared cost: $75,000
Permit fee: $2,475
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200414373. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising sta
Status: ACTIVE
Mar 31, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200415613. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising sta
Status: ACTIVE
Mar 31, 2025
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc interior buildout of suite 570 on the fifth floor of 222 w merchandise mart plz, a 25 story building. scope of work includes general construction, mechanical, electrical, and plumbing work. no structural work to be perfo
Contractor: MAULIK SHAH
Status: ACTIVE
Mar 27, 2025
Declared cost: $1,567,500
Permit fee: $6,998
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alterations to existing suite 10-154 to include demo, new partitions, and electrical. m - mercantile. 1a construction
Status: COMPLETE
Mar 24, 2025
Declared cost: $136,117
Permit fee: $425
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: second floor.
Contractor: TITAN ELECTRIC LLC
Status: COMPLETE
Mar 24, 2025
Declared cost: $36,000
Permit fee: $25
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200415182. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising sta
Status: ACTIVE
Mar 21, 2025
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Non structural interior alteration of existing common corridor on the 4th floor. interior renovation of common corridor to include non-structural and non-load bearing partitions and finishes. installation of new lighting fixtures. there is
Contractor: MAULIK SHAH
Status: SUSPENDED
Mar 20, 2025
Declared cost: $150,000
Permit fee: $6,075
PERMIT - RENOVATION/ALTERATION
Interior renovation to create new restrooms on the 4th floor, located at 222 w merchandise mart plaza, a commercial use 25 story building. scope of work to include general construction, plumbing, electrical, and mechanical. no structural wo
Status: COMPLETE
Mar 14, 2025
Declared cost: $600,000
Permit fee: $975
PERMIT - RENOVATION/ALTERATION
Interior alterations to existing 3rd fl showroom. work to include demo, new partitions, mechanical, electrical and plumbing per plans. (occupancy type: b-business office; construction type: i-a)
Status: COMPLETE
Mar 11, 2025
Declared cost: $239,654
Permit fee: $2,098
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: medline.
Status: COMPLETE
Mar 6, 2025
Declared cost: $510,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior replacement of drywall, ceiling tile and trim to existing dunkin. locations: 0 residential unit(s), 1 non-residential unit(s), 1 interior common areas, interior of dunkin.
Contractor: PARASKIS PETER G
Status: COMPLETE
Feb 24, 2025
Declared cost: $95,000
Permit fee: $325
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101062928: replacement electrical contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Status: COMPLETE
Feb 19, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Change of owner for permit b200413784. new owner listed on this permit.
Status: COMPLETE
Feb 13, 2025
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alteration of office suite 410 on the fourth floor located at 222 w merchandise mart plaza, a 25 story building. scope of work includes general construction, mechanical, and electrical. no plumbing or structura
Contractor: MAULIK SHAH
Status: ACTIVE
Feb 3, 2025
Declared cost: $100,000
Permit fee: $1,355
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200405492. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising sta
Status: ACTIVE
Jan 9, 2025
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 999 . lighting outlets: 0. specific location: 12th floor.
Status: COMPLETE
Jan 7, 2025
Declared cost: $147,400
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2025. end date: 1/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
Jan 7, 2025
Permit fee: $925
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: demolition project for existing office space in suite 900 on the 9th floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo and architec
Contractor: NORA BULLARD
Status: SUSPENDED
Jan 6, 2025
Declared cost: $100,000
Permit fee: $4,399
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install security. specific location: ste 910.
Status: COMPLETE
Jan 2, 2025
Declared cost: $12,135
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: tenant buildout of 17,325 sf showroom on 3rd floor, including electrical, plumbing, and mechanical. (occupancy group b, type ia construction)
Status: SUSPENDED
Dec 30, 2024
Declared cost: $1,400,000
Permit fee: $7,717
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior demolition of existing non-structural conditions for 18,162 sf showroom on 3rd floor, including electrical, plumbing, and mechanical. (occupancy group b, type ia construction)
Status: ACTIVE
Dec 27, 2024
Declared cost: $125,500
Permit fee: $4,403
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alterations to existing 2nd floor. work to include demo, new partitions, mechanical, electrical and plumbing per plans. (occupancy type: b-business office; construction type: i-a)
Status: COMPLETE
Dec 19, 2024
Declared cost: $1,600,000
Permit fee: $4,354
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/2/2024. end date: 1/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Dec 4, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101059928. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: yes. monitoring type: supervising sta
Contractor: ESSCOE LLC
Status: ACTIVE
Dec 3, 2024
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200402248. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: no. special locking: no. monitoring type: none (exempt) .
Contractor: VORNADO / LLC
Status: ACTIVE
Nov 20, 2024
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install telephone. specific location: 8th floor.
Status: COMPLETE
Nov 6, 2024
Declared cost: $47,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101054225. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: no. special locking: yes. monitoring type: none (exempt) .
Status: ACTIVE
Nov 5, 2024
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101059928: replacement other contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Status: COMPLETE
Nov 1, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2024. end date: 12/1/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Nov 1, 2024
Permit fee: $100
PERMIT - ELEVATOR EQUIPMENT
Reactivate the 4th and 5th floors on six(6) 2500lb capacity, 18-floor, passenger elevators(#31-#36), pursu7ant to the scope of work submitted.(ev004176)
Oct 30, 2024
Declared cost: $300,000
Permit fee: $900
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: new system. associated building permit:101056748. affects: 0 dwelling units; 1 non-residential units. high-rise building: no. voice communication: no. special locking: yes. monitoring type: supervising station . specific locatio
Status: ACTIVE
Oct 21, 2024
Permit fee: $625
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alterations to existing 12th floor office space suite 1200. work to include new non load bearing partitions, plumbing, electrical and mechanical work as per plans. (1a construction. b-business use)
Status: COMPLETE
Oct 16, 2024
Declared cost: $11,500,000
Permit fee: $41,450
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200397702. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising sta
Status: ACTIVE
Oct 16, 2024
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200398011. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising sta
Status: ACTIVE
Oct 16, 2024
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200400103. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising sta
Status: ACTIVE
Oct 16, 2024
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:b200399023. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special locking: no. monitoring type: supervising sta
Status: ACTIVE
Oct 16, 2024
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 5th floor adding new visuals to the existing fire and voice evacuation system.
Status: COMPLETE
Oct 8, 2024
Declared cost: $7,006
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: change of occupancy from business to assembly on partial area of the 4th floor located at 222 w merchandise mart plz, a 25 story building. scope of work includes general construction, mechanical and electrical work. no plumb
Status: ACTIVE
Oct 8, 2024
Declared cost: $200,000
Permit fee: $19,849
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 2nd floor adding new speaker visuals to the existing fire and voice evacuation system.
Status: COMPLETE
Oct 8, 2024
Declared cost: $8,394
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 10/1/2024. end date: 10/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Oct 2, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 135 . lighting outlets: 0. specific location: 5th floor tenant space.
Status: COMPLETE
Oct 2, 2024
Declared cost: $8,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install audio. specific location: 8th floor.
Status: COMPLETE
Oct 1, 2024
Declared cost: $1,027,989
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
(self-cert 2019 cbrc) interior buildout of suite 206 on the first floor of 222 w merchandise mart plz, a 25 story building. scope of work includes general construction, mechanical, electrical, and plumbing work. no structural work to be per
Contractor: NORA BULLARD
Status: SUSPENDED
Sep 25, 2024
Declared cost: $350,000
Permit fee: $1,179
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 8th floor adding new speaker/visual and visual devices to the existing fire and voice evacuation system.
Status: COMPLETE
Sep 23, 2024
Declared cost: $18,798
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 2nd floor adding new speaker/visuals to existing fire and voice evacuation system.
Status: ACTIVE
Sep 12, 2024
Declared cost: $7,167
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant buildout of partial 4th floor. add additional speaker visual devices to existing fire alarm system.
Status: ACTIVE
Sep 12, 2024
Declared cost: $8,895
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Hardwire open area workstations on the 4th floor, circuits by others.
Status: COMPLETE
Sep 10, 2024
Declared cost: $5,520
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit #b200021613 to change licensed contractor to titan electric llc for work to be performed in unit 2-200.
Status: COMPLETE
Sep 10, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Hardwire open area workstations on the 8th floor, circuits by others.
Status: COMPLETE
Sep 10, 2024
Declared cost: $11,050
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install bas controls.
Status: COMPLETE
Sep 9, 2024
Declared cost: $116,129
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Hardwire open area workstations on the 2nd floor, circuits by others
Status: COMPLETE
Sep 5, 2024
Declared cost: $33,100
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
(self-cert 2019 cbrc) interior buildout of suite 2300 (allwyn) on the twenty third floor of 222 w merchandise mart plz, a 25 story building. scope of work includes general construction, mechanical, electrical and plumbing. no structural wor
Status: ACTIVE
Sep 4, 2024
Declared cost: $175,000
Permit fee: $3,441
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Voice & data cabling for 222 merchandise mart plaza, work is being done on the 5th floor.
Status: COMPLETE
Sep 4, 2024
Declared cost: $290,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
September 2024 maintenance
Status: COMPLETE
Aug 30, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: revision to permit 101037458 for mechanical and electrical modifications at ceiling of 10th floor showroom to change from plenum to non-plenum as per plans. 1a construction. m - mercantile
Status: SUSPENDED
Aug 29, 2024
Declared cost: $1,000
Permit fee: $2,801
PERMIT - ELEVATOR EQUIPMENT
Replace (6) 5/8" hoist cables on one (1) 6000lb.cap, 19-floors, 350 fpm, geared traction passenger elevator #3w. pursuant to the scope of work submitted. ev004176
Aug 28, 2024
Declared cost: $20,000
Permit fee: $425
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant buildout of partial 2nd floor. add additional speaker visual and visual devices to existing fire alarm system.
Status: ACTIVE
Aug 26, 2024
Declared cost: $18,222
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant buildout of partial 10th floor. add new speaker visual devices to existing fire alarm.
Status: ACTIVE
Aug 26, 2024
Declared cost: $6,596
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant buildout of partial 5th floor. add additional speaker visual devices to existing fire alarm system.
Status: COMPLETE
Aug 26, 2024
Declared cost: $54,162
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Scaffolding
Temporary scaffolding: qty: 2, max. length: 40 ft., max. height: 250 ft. location: interior courtyard. permit expiration date: 365 days from permit issued date
Status: COMPLETE
Aug 12, 2024
Permit fee: $325
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Hardwire open area workstations on the 5th floor. circuits by others.
Status: COMPLETE
Aug 7, 2024
Declared cost: $49,860
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alteration of office suite 400 on the fourth floor located at 222 w merchandise mart plaza, a 25 story building. scope of work includes general construction, mechanical, electrical and plumbing. no structural w
Status: ACTIVE
Aug 7, 2024
Declared cost: $500,000
Permit fee: $2,954
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing 1st floor mercantile space (suite 107). scope to include demolition, partitions, electrical, mechanical, and plumbing. structural peer review included for new lift and convenience stair.
Status: ACTIVE
Aug 7, 2024
Declared cost: $970,000
Permit fee: $2,547
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Interior installation of low voltage voice / data cabling for zs associates located on the 2nd floor.
Status: COMPLETE
Aug 7, 2024
Declared cost: $58,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbc: interior alterations of existing office suite 575, 5th floor, 8,115 sf. no change to group b occupancy or construction type ia.
Contractor: FOX CORPORATION
Status: COMPLETE
Aug 6, 2024
Declared cost: $1,014,000
Permit fee: $3,078
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit #101050917.to change of electrical and general contractors.
Contractor: JC ANDERSON INC
Status: COMPLETE
Aug 6, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Installation of a tele/data system
Status: COMPLETE
Aug 2, 2024
Declared cost: $6,805
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
August 2024 maintenance
Status: COMPLETE
Aug 2, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Security system work (81521 j.c. a - blommer expansion acs) (guso240726a)
Status: COMPLETE
Aug 1, 2024
Declared cost: $16,470
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Temperature control installation
Status: COMPLETE
Aug 1, 2024
Declared cost: $7,250
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 crbc: interior alterations to an existing 9th floor suite 901 office to subdivide the space as per plans. (occupancy type: b-business office; construction type: i-a)
Status: COMPLETE
Jul 23, 2024
Declared cost: $150,000
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Provide data location in suite #800 & #970 only
Status: COMPLETE
Jul 19, 2024
Declared cost: $5,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior alteration to existing retail food space, to replace plumbing fixtures and associated piping and drywall.locations: 0 residential unit(s), 1 non-residential unit(s), 1 interior common areas, restaurant/commerci
Status: COMPLETE
Jul 19, 2024
Declared cost: $120,000
Permit fee: $325
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alteration of existing suite 210 on the second floor of merchandise mart, located at 222 w merchandise mart plaza, a 25 story building. scope of work includes general construction, mechanical, electrical and pl
Contractor: MAULIK SHAH
Status: SUSPENDED
Jul 18, 2024
Declared cost: $1,200,000
Permit fee: $1,566
PERMIT - ELEVATOR EQUIPMENT
Replacement of hoist cables on and governor cables on six(6) 2500lb capacity, 23-floor, passenger elevators(#4 thru #9), pursuant to the scope of work submitted.(ev004176)
Jul 18, 2024
Declared cost: $100,000
Permit fee: $2,980
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior build-out to existing 8th floor office space. work to include new non load bearing partitions, electrical, mechanical and plumbing as per plans. no structural work. demo work under permit #101053339. (ia constr
Status: PHASED PERMITTING
Jul 17, 2024
Declared cost: $5,660,000
Permit fee: $10,472
PERMIT - RENOVATION/ALTERATION
Self cert 2021 cbrc: removal and replacement of existing exterior windows in the southeast light court on the 12th floor of the merchandise mart, a 25 story building. no electrical, mechanical, or plumbing work is to be performed. (occupanc
Contractor: MAULIK SHAH
Status: SUSPENDED
Jul 16, 2024
Declared cost: $815,000
Permit fee: $1,833
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Security system work (guso240711a - 81520-the mart 5f matter relo 134)
Status: COMPLETE
Jul 16, 2024
Declared cost: $795,895
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit# 104049860. to change vent/refrigeration contractor.
Status: COMPLETE
Jul 15, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit****fire alarm system*installation of access control system per nfpa sect. 101 on 5th floor. suite 500. installation of mag lock per occupancies listed 13-160-261 & 269.
Status: COMPLETE
Jul 15, 2024
Declared cost: $70,235
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior demolition of non-load bearing partitions in an existing 8th floor office space as per plans. no change in use. (1a construction. b-business)
Status: PHASED PERMITTING
Jul 12, 2024
Declared cost: $150,000
Permit fee: $5,022
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
July 2024 maintenance
Status: COMPLETE
Jul 1, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: demolition project for existing office space on the 12th floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes architectural demo, mechanical demo, electrical demo and p
Status: PHASED PERMITTING
Jun 20, 2024
Declared cost: $50,000
Permit fee: $3,996
PERMIT - RENOVATION/ALTERATION
Interior alteration to existing tenant buildout. suite 216.
Contractor: MAULIK SHAH
Status: COMPLETE
Jun 18, 2024
Declared cost: $100,000
Permit fee: $925
PERMIT - RENOVATION/ALTERATION
Tenant showroom build-out at suite 10-112. adjusting existing ductwork in space. recircuiting existing electrical breakers for lighting and power in tenant space. adding sink and dishwasher to tenant space.
Contractor: BRIAN NEVINS
Status: SUSPENDED
Jun 4, 2024
Declared cost: $100,000
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
June 2024 maintenance
Status: COMPLETE
Jun 3, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Masonry Work
Tuckpointing and unit masonry repair / replacement: 1675 sq. ft., lintel qty. 0, max. length 0. location: north and west elevation.
Status: ACTIVE
May 22, 2024
Declared cost: $646,000
Permit fee: $375
PERMIT - NEW CONSTRUCTION
Permit expires on 07/22/2024 erection starts: 6/7/2024, erection ends: 6/9/2024. erection starts: 6/7/2024, erection ends: 6/9/2024. diffatent- 1 day event 6/8/2024 erect one (1) 30x70 structure erect 6/7/2024, remove- 6/9/2024assembly
Status: COMPLETE
May 22, 2024
Declared cost: $8,100
Permit fee: $375
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant buildout of partial 3rd floor. add ceiling mount speaker visual and visual devices to existing fire alarm system.
Status: ACTIVE
May 21, 2024
Declared cost: $7,950
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant buildout of partial 3rd floor. add additional speaker visual devices to existing fire alarm.
Status: ACTIVE
May 21, 2024
Declared cost: $7,000
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant renovation of partial 10th floor. adding additional ceiling mount speaker visual devices to existing fire alarm system.
Status: ACTIVE
May 21, 2024
Declared cost: $5,310
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant buildout of partial 10th floor. add ceiling mount speaker visual and visual devices to existing fire alarm system.
Status: ACTIVE
May 21, 2024
Declared cost: $6,083
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: addition of tenant toilet rooms (2nd flr nw) with plumbing, hvac, electrical and fire-protection system design. no structural work. as per plans. (occupancy group b; type ia construction)
Contractor: MAULIK SHAH
Status: COMPLETE
May 17, 2024
Declared cost: $100,000
Permit fee: $925
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing 8th and 9th floor office spaces - suite 800 & suite 970. scope to include demolition, doors, mechanical, electrical, and finishes no change to existing use. (occupancy b / construction t
Contractor: JC ANDERSON INC
Status: SUSPENDED
May 9, 2024
Declared cost: $250,000
Permit fee: $3,802
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior demolition of existing suites 213, 214, 215 and 216 on the second floor of 222 w merchandise mart plz, a 25-story commercial building. scope of work to include general demolition, mechanical demolition, electri
Status: PHASED PERMITTING
May 7, 2024
Declared cost: $100,000
Permit fee: $1,141
PERMIT – EXPRESS PERMIT PROGRAM Scaffolding
Temporary scaffolding: qty: 2, max. length: 700 ft., max. height: 353 ft. location: north and west elevation. permit expiration date: 365 days from permit issued date this permit is not valid without corresponding cdot public way permit.
Status: COMPLETE
May 3, 2024
Permit fee: $325
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: structural peer review included. interior alterations to 5th floor office space suite 500. work to include demo, new partitions, mechanical, electrical and plumbing as per plans. b-business. 1a construction
Status: COMPLETE
Apr 30, 2024
Declared cost: $6,865,104
Permit fee: $21,927
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit***fire alarm permit* installation of electromagnetic locking devices per 2019 cbc sections 1010.1.9.7, 1010.1.9.9 & 1010.1.9.10 on floor 10
Status: COMPLETE
Apr 30, 2024
Declared cost: $2,500
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
May 2024 maintenance
Status: COMPLETE
Apr 30, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to a 2nd floor office suite 200 as per plans. work to include interior demolition, new partition, finishes, lighting, mechanical, electrical, and plumbing. no structural work. no change in use. (con
Status: COMPLETE
Apr 29, 2024
Declared cost: $2,470,000
Permit fee: $6,792
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: demolition project for existing office space on the 4th floor suits 432, 435 and 442 located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo an
Contractor: NORA BULLARD
Status: PHASED PERMITTING
Apr 29, 2024
Declared cost: $450,000
Permit fee: $7,626
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit#101044840 change electrical and hvac contractors
Status: COMPLETE
Apr 25, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit#101044839 change electrical and hvac contractor
Status: COMPLETE
Apr 24, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit****fire alarm permit** installation of electromagnetic locking devices per 2019 cbc sections 1010.1.9.7, 1010.1.9.9, and 1010.1.9.10 on floors 5.
Status: COMPLETE
Apr 5, 2024
Declared cost: $2,500
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
April 2024 maintenance
Status: COMPLETE
Mar 29, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage work
Status: COMPLETE
Mar 28, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Tenant showroom build-out including architectural work, electrical lighting, power, adding new dishwasher, kitchen sink and ice maker.
Contractor: PATTI JAGLINSKI
Status: COMPLETE
Mar 27, 2024
Declared cost: $155,000
Permit fee: $1,775
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior buildout of furniture showroom on 10th floor in existing 25 story building -merchandise mart. existing hvac is mostly existing to remain, add one sink and new lighting. all sprinkler work under separate fire de
Contractor: THOMAS PATRICK
Status: COMPLETE
Mar 27, 2024
Declared cost: $20,000
Permit fee: $925
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing 8th floor office space (suite 800) in an existing highrise building. no change to existing use. (occupancy b / construction type 1a)
Contractor: JC ANDERSON INC
Status: SUSPENDED
Mar 21, 2024
Declared cost: $100,000
Permit fee: $925
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing 9th floor office space (suite 970) in an existing highrise building. no change to existing use. (occupancy b / construction type 1a)
Contractor: JC ANDERSON INC
Status: SUSPENDED
Mar 20, 2024
Declared cost: $15,000
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant buildout of partial 3rd floor. add additional speaker visual devices to existing fire alarm system.
Status: ACTIVE
Mar 19, 2024
Declared cost: $6,877
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant renovation of 10th floor. adding new speaker visual and visual devices to existing fire alarm system.
Status: ACTIVE
Mar 19, 2024
Declared cost: $10,726
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 5th floor. adding new speaker/visuals to existing fire and voice evacuation system.
Status: ACTIVE
Mar 19, 2024
Declared cost: $11,798
Permit fee: $625
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit#101035690 change vent contractor
Status: COMPLETE
Mar 15, 2024
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: demolition project for existing office space on the 9th floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo and architectural demo.
Contractor: NORA BULLARD
Status: PHASED PERMITTING
Mar 14, 2024
Declared cost: $254,000
Permit fee: $3,296
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: demolition project for existing office space on the 12th floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo and architectural demo.
Contractor: NORA BULLARD
Status: PHASED PERMITTING
Mar 12, 2024
Declared cost: $75,700
Permit fee: $4,500
PERMIT - RENOVATION/ALTERATION
** revision to permit 101037458 **revision to capture the entire scope of work as described below :interior renovation of existing tenant on floor 10. renovation space for new interior partitions, ceiling, lighting, and finishes. as well as
Contractor: MAULIK SHAH
Status: COMPLETE
Mar 12, 2024
Declared cost: $3,500,000
Permit fee: $5,661
PERMIT - NEW CONSTRUCTION
Permit expires on 05/12/2024 erection starts: 06/06/2024, erection ends: 06/13/2024. self certification with peer review. reinstatement of 2023 permit 101014832. neocon 2024 tent at merchandise mart plaza. same 1-20x320 coat check tent on
Status: COMPLETE
Mar 12, 2024
Declared cost: $9,000
Permit fee: $779
PERMIT - RENOVATION/ALTERATION
(self-cert 2019 cbrc) interior buildout of suite 127 (brizo showroom) on the first floor of 222 w merchandise mart plz, a 25 story building. scope of work includes general construction, mechanical, electrical, and plumbing work. no structur
Contractor: NORA BULLARD
Status: SUSPENDED
Mar 8, 2024
Declared cost: $730,000
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
March 2024 maintenance
Status: COMPLETE
Mar 2, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
(self-cert 2019 cbrc) interior buildout of suite 136 (waterworks) on the first floor of 222 w merchandise mart plz, a 25 story building. scope of work includes general construction, mechanical, electrical and plumbing work. no structural wo
Contractor: KELLY ADAMS
Status: SUSPENDED
Feb 9, 2024
Declared cost: $300,000
Permit fee: $2,824
PERMIT - RENOVATION/ALTERATION
***self-cert permit ***interior renovation of existing suite on floor 10. renovation includes new interior partitions, ceilings, lighting, and finishes as well as the reworking of hvac, electrical, plumbing, sprinklers, and fire alarm. curr
Contractor: MAULIK SHAH
Status: COMPLETE
Feb 8, 2024
Declared cost: $3,500,000
Permit fee: $5,661
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit#101035358 change general, plumbing, electrical, and hvac contractors.
Status: COMPLETE
Feb 6, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
February 2024 maintenance
Status: COMPLETE
Feb 1, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Added electrical outlets
Status: COMPLETE
Jan 16, 2024
Declared cost: $200
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial fire alarm build out of 14th floor adding new speaker/visual to existing fire and voice evacuation system.
Status: ACTIVE
Jan 8, 2024
Declared cost: $5,422
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
January 2024 maintenance
Status: COMPLETE
Jan 2, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Replace 3 windows at 10th flr, 38 windows on 15th flr, and 28 windows at 16th flr, all to be same size and location (replacement only): qty 69 - no window being replaced is near a fire exit
Dec 11, 2023
Declared cost: $229,000
Permit fee: $525
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Replace existing pump controller, same voltage and hp
Status: ACTIVE
Dec 6, 2023
Declared cost: $10,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial fire alarm build out on 8th floor. adding new speaker/visuals to existing fire and voice evacuation system.
Status: ACTIVE
Dec 1, 2023
Declared cost: $6,227
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial fire alarm build out of the 16th floor. add new speaker/visuals and duct detectors to and existing fire and voice evacuations system.
Status: ACTIVE
Dec 1, 2023
Declared cost: $10,086
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
December 2023 maintenance
Status: COMPLETE
Dec 1, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Interior renovation of existing tenant office on floor 5. renovation of existing space for new interior partitions, ceilings, lighting and finishes, as well as the reworking of existing hvac, electrical, plumbing, sprinklers and fire alarm.
Contractor: MAULIK SHAH
Status: COMPLETE
Nov 30, 2023
Declared cost: $370,080
Permit fee: $4,639
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alteration of existing showroom 391 on the third floor located at 222 w merchandise mart plaza, a 25 story building. scope of work includes general construction, mechanical, electrical and plumbing. no structur
Status: SUSPENDED
Nov 28, 2023
Declared cost: $650,000
Permit fee: $2,227
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
November 2023 maintenance
Status: COMPLETE
Nov 1, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: interior renovation, stair infill, in existing business suite on the 4th and 5th floors located at 222 w merchandise mart, a 25 story building. scope of work includes structural, general construction and electrical. no mechan
Status: EXPIRED
Oct 30, 2023
Declared cost: $125,500
Permit fee: $1,675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit****fire alarm permit**security system work-maglock permitting (mart 2.0 fitness center) (guso230330a)
Status: COMPLETE
Oct 18, 2023
Declared cost: $46,000
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: demolition project for existing suites on the 4th floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo and architectural demo. current use:
Contractor: NORA BULLARD
Status: PHASED PERMITTING
Oct 13, 2023
Declared cost: $146,000
Permit fee: $9,624
PERMIT - RENOVATION/ALTERATION
Sc 2019 cbrc: demolition project for existing suites on the 5th floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo and architectural demo. current use:
Contractor: NORA BULLARD
Status: PHASED PERMITTING
Oct 13, 2023
Declared cost: $146,000
Permit fee: $11,160
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Tele/data wiring - lv wiring
Status: COMPLETE
Oct 11, 2023
Declared cost: $25,000
Permit fee: $1,275
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial tenant build out of 17th floor. adding new speaker/visual and visual devices to existing fire and voice evacuation system.
Status: ACTIVE
Oct 6, 2023
Declared cost: $8,486
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 10th floor. adding additional speaker/strobes to an existing fire and voice evacuation system.
Status: COMPLETE
Oct 6, 2023
Declared cost: $5,606
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 2nd floor. adding additional monitor modules to monitor new pre-action system on an existing fire and voice evacuation system.
Status: ACTIVE
Oct 6, 2023
Declared cost: $10,436
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial fire alarm build out of 2nd floor. adding new speaker/visual and visuals to existing fire and voice evacuation system.
Status: COMPLETE
Oct 6, 2023
Declared cost: $6,265
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 2nd floor, adding new speaker/visuals to existing fire and voice evacuation system.
Status: ACTIVE
Oct 6, 2023
Declared cost: $6,845
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing 8th floor office space (suite 800) to create 2 office use tenant spaces, work to tenant space a under this permit, work to tenant b to be under seperate permit, in an existing highrise b
Contractor: JC ANDERSON INC
Status: EXPIRED
Oct 5, 2023
Declared cost: $500,000
Permit fee: $1,703
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
October 2023 maintenance
Status: COMPLETE
Oct 2, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install 11 data cables and 3 ceiling speakers suite 208b
Status: COMPLETE
Sep 29, 2023
Declared cost: $3,000
Permit fee: $300
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: demolition project for existing suites on the 15th and 16th floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo and architectural demo. cu
Contractor: USD, LLC.
Status: PHASED PERMITTING
Sep 26, 2023
Declared cost: $750,000
Permit fee: $37,214
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
September 2023 maintenance
Status: COMPLETE
Sep 1, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing 8th floor office space, suite 075. no change in existing use. (occupancy b / construction type 1a)
Status: EXPIRED
Aug 24, 2023
Declared cost: $200,000
Permit fee: $1,024
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit****fire alarm system**installation of access control system per nfpa sect. 101 on 6th floor. suite 631. installation of mag lock per occupancies listed 13-160-261 & 269.
Status: COMPLETE
Aug 10, 2023
Declared cost: $10,564
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial fire alarm build out on the 6th floor. adding new speaker/visual devices to existing fire and voice evacuation system.
Status: COMPLETE
Aug 4, 2023
Declared cost: $9,386
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial fire alarm build out of 1st floor. adding new speaker/visuals to existing fire and voice evacuations system.
Status: COMPLETE
Aug 4, 2023
Declared cost: $6,726
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial fire alarm build out of 1st floor. adding additional monitor modules to monitor ansul system on an existing fire alarm system.
Status: COMPLETE
Aug 4, 2023
Declared cost: $3,358
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
August 2023 maintenance
Status: COMPLETE
Aug 2, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing business tenant space 208b for new physical therapy center in existing high rise building to include new partitions, finishes, mechanical, electrical and plumbing. no change in use. cons
Status: COMPLETE
Aug 2, 2023
Declared cost: $226,000
Permit fee: $875
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alterations to existing 17th floor office space suite 1750.work to include demo, new non load bearing partitions, plumbing, electrical and mechanical work as per plans. existing idf rooms to remain, not in scop
Status: COMPLETE
Aug 1, 2023
Declared cost: $2,200,000
Permit fee: $4,264
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Woodmode showroom re-work on the 1st floor.
Status: COMPLETE
Jul 24, 2023
Declared cost: $12,500
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: revision to permit #100988583 to reduce the size of the idf room located on the second floor as per plans. no change in occupancy. no structural work. (construction type: 1a; occupancy: a3 assembly)
Status: COMPLETE
Jul 10, 2023
Declared cost: $30,000
Permit fee: $875
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
July 2023 maintenance
Status: COMPLETE
Jul 3, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior renovation for existing showroom on the 21st floor located at 222 w merchandise mart, a 25 story building. scope of work includes general construction, electrical, plumbing, and fire protection. no mechanical o
Contractor: REDDIT INC.
Status: COMPLETE
Jun 22, 2023
Declared cost: $50,000
Permit fee: $1,563
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior tenant fit-out in existing demised lease space. installation ofnew finishes, equipment and decor
Status: EXPIRED
Jun 20, 2023
Declared cost: $400,000
Permit fee: $875
PERMIT - RENOVATION/ALTERATION
Interior renovation of existing restrooms on the 10th floor, located at 222 w merchandise mart plaza, a commercial use 25 story building. scope of work to include general construction, plumbing, electrical, and mechanical. no structural wor
Status: EXPIRED
Jun 15, 2023
Declared cost: $100,000
Permit fee: $875
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing 3rd floor office space, suite 312. no change to existing use. (occupancy b / construction type 1a)
Status: COMPLETE
Jun 14, 2023
Declared cost: $150,000
Permit fee: $875
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: demolition project for existing office suite on the 10th floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo and architectural demo.
Status: PHASED PERMITTING
Jun 12, 2023
Declared cost: $75,000
Permit fee: $7,381
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage audio/visual installation on the 2nd floor
Status: COMPLETE
Jun 6, 2023
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
June 2023 maintenance
Status: COMPLETE
Jun 2, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT - NEW CONSTRUCTION
Permit expires on 07/22/2023 permit expires on 07/15/2023 erection starts: 06/09/2023, erection ends: 06/15/2023. self certification with peer review - neocon 2023 tent at merchandise mart plaza. 1-20x320 coat check tent on kinzie st. blue
Status: COMPLETE
May 22, 2023
Declared cost: $9,000
Permit fee: $683
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: alteration of exterior wall to add new doors in the merchandise mart, a 25-story building located at 222 w merchandise mart plaza. scope of work includes general construction. no mechanical, electrical, plumbing or str
Contractor: BROWN JORDAN
Status: EXPIRED
May 9, 2023
Declared cost: $44,420
Permit fee: $875
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior renovation for existing showroom on the 1st floor located at 222 w merchandise mart, a 25-story building. scope of work includes general construction, electrical, and fire protection. no mechanical, plumbing an
Contractor: NORA BULLARD
Status: EXPIRED
May 9, 2023
Declared cost: $210,000
Permit fee: $954
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
May 2023 maintenance
Status: COMPLETE
May 1, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Replace light fixtures, add some receptacles to an existing showroom
Status: COMPLETE
Apr 26, 2023
Declared cost: $22,645
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
Sc cbc 2019 - interior tenant buildout of existing showroom space. elec and plumbing fixture replacement. no change is area or occupanct. no mech or fire scope.
Status: COMPLETE
Apr 11, 2023
Declared cost: $150,000
Permit fee: $1,222
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
April 2023 maintenance
Status: COMPLETE
Apr 4, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Security system work (mart 2.0 security system/skende) (guso230330a)
Status: COMPLETE
Mar 31, 2023
Declared cost: $46,535
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Remove/replace low height non load bearing closet with partial height slat wall millwork, counters and furniture to include frame 3 new arch opening with small wing walls in existing column bays at front of existing showroom 345. separate
Mar 27, 2023
Declared cost: $51,636
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial fire alarm build out of 6th floor. adding new speaker/visual and visual devices to the existing fire and voice evacuation system.
Status: COMPLETE
Mar 15, 2023
Declared cost: $11,500
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**** fire alarm permit ** installation of electromagnetic locking devices per cbc sections 1010.1.9.7, 1010.1.9.9, and 1010.1.9.10 on floor 6
Status: COMPLETE
Mar 15, 2023
Declared cost: $2,500
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 6th floor adding new speaker/visual devices to existing fire and voice evacuation system.
Status: COMPLETE
Mar 14, 2023
Declared cost: $6,520
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 12th floor. adding new speaker/visuals to existing fire and voice evacuation system.
Status: COMPLETE
Mar 14, 2023
Declared cost: $4,888
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial fire alarm build out of 6th floor, add new speaker/visual and visual devices to existing fire and voice evacuation system.
Status: COMPLETE
Mar 14, 2023
Declared cost: $5,636
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 2nd floor. adding new speaker and visual notification in renovated area.
Status: COMPLETE
Mar 14, 2023
Declared cost: $30,335
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 14th floor. adding new speaker/visuals to existing fire and voice evacuation system.
Status: COMPLETE
Mar 14, 2023
Declared cost: $6,440
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial fire alarm build out of 6th floor adding new speaker/visual and visual devices to existing fire and voice evacuation system.
Status: COMPLETE
Mar 14, 2023
Declared cost: $6,276
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit 100999574 change of electrical subcontractor to rex electric and technologies llc.
Contractor: DENARD RONALD
Status: COMPLETE
Mar 14, 2023
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Scandinavian showroom renovation - 3rd floor - suite 366
Status: COMPLETE
Mar 10, 2023
Declared cost: $54,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior renovation for existing showroom on the 1st floor located at 222 w merchandise mart, a 25 story building. scope of work includes general construction, mechanical, electrical, plumbing, and fire protection. no s
Contractor: BROWN JORDAN
Status: COMPLETE
Mar 8, 2023
Declared cost: $1,000,000
Permit fee: $1,014
PERMIT - EASY PERMIT PROCESS
Revision to permit#100999574 change general contractor to skender construction llc, plumbing contractor to great lakes plumbing & heating,
Mar 8, 2023
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
March maintenance
Status: COMPLETE
Mar 3, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT - SCAFFOLDING
Erect one (1) scaffold dates 02/21/2023 through 02/21/2024
Feb 21, 2023
Declared cost: $111
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install av equipment, inclusive of displays, speakers, and sound bars.
Status: COMPLETE
Feb 20, 2023
Declared cost: $52,250
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Facade inspection with as-necessary sealing of loose pieces of limestone with sealant at south and east elevations elevations, tuckpointing 1800 sqft.
Feb 16, 2023
Declared cost: $142,000
Permit fee: $352
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage temperature control work
Status: COMPLETE
Feb 16, 2023
Declared cost: $37,500
Permit fee: $450
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 crbc: interior alterations to an existing 9th floor suite 901 office to subdivide the space as per plans. work to include, mechanical, electrical, and fire protection. (occupancy type: b-business office; construction type: i-
Status: EXPIRED
Feb 15, 2023
Declared cost: $65,000
Permit fee: $875
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Voice data cabling , access control & video surveillance system
Status: COMPLETE
Feb 14, 2023
Declared cost: $74,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
February 2023 maintenance
Status: COMPLETE
Feb 2, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alterations to office suite 631 to include demo, new partitions, electrical, mechanical, and plumbing as per plans. 1a construction. b-business
Status: COMPLETE
Jan 30, 2023
Declared cost: $600,000
Permit fee: $2,211
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 3rd floor, utilizing existing speaker/visuals on existing fire and voice evacuation panel for renovation.
Status: COMPLETE
Jan 30, 2023
Declared cost: $2,895
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Self cert: the scope includes a tenant build-out on the 6nd floor of 222 merchandise mart plaza. the construction will include new interior partitions and millwork however no demising walls will be affected. work to include hvac, plumbing
Status: EXPIRED
Jan 19, 2023
Declared cost: $998,000
Permit fee: $4,731
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 6th floor adding new speaker/visuals to existing fire and voice evacuation system.
Status: COMPLETE
Jan 6, 2023
Declared cost: $8,070
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
January maintenance
Status: COMPLETE
Jan 3, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Dds 2019 cbrc: phase 1 of 1 - interior renovations on the second floor for a new conference center, fitness center, and private tenant lounge. work to include selective demolition, new partitions, doors, hardware, ceiling and lighting, fini
Contractor: TITAN ELECTRIC LLC
Status: COMPLETE
Dec 16, 2022
Declared cost: $9,000,000
Permit fee: $34,166
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Tucci showroom renovation
Status: COMPLETE
Dec 15, 2022
Declared cost: $75,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
New mechanical hoods with scrubbers to existing suite 101a for kitchen appliance showroom as per plans
Status: COMPLETE
Dec 2, 2022
Declared cost: $5,000
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
December maintenance
Status: COMPLETE
Dec 2, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Hardwire open area workstations on 9th floor, circuits by others
Status: COMPLETE
Nov 28, 2022
Declared cost: $350
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Changing ec on permit 100959110 to titan electric
Status: COMPLETE
Nov 22, 2022
Declared cost: $1
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Interior build out of existing showroom on the 6th floor at 222 w merchandise mart plaza, a 25 story building. scope of work includes general construction, electrical and mechanical. no structural work to be performed. current use: b (busi
Contractor: NORA BULLARD
Status: EXPIRED
Nov 15, 2022
Declared cost: $220,000
Permit fee: $1,816
PERMIT - ELEVATOR EQUIPMENT
Removal/decommission of one(1) veretical wheelchair lift(chopping block), pursuant to the scope of work submitted.(111301)
Nov 9, 2022
Declared cost: $2,500
Permit fee: $200
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Hardwire open area office partitions on 9th floor. circuits by others.
Status: COMPLETE
Nov 7, 2022
Declared cost: $45,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
November 2022 maintenance
Status: COMPLETE
Nov 2, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Installation of low voltage burglar alarm inteiror work only # 404416246 job # 115936298
Status: COMPLETE
Oct 27, 2022
Declared cost: $1,039
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbc: interior alterations to existing 6th floor office to include demo, new partitions, electrical, mechanical and plumbing as per plans (b-business, construction type 1a)
Status: COMPLETE
Oct 26, 2022
Declared cost: $250,000
Permit fee: $1,537
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit*****maglock permit required 17841 avent at the mart 9th floor. adding 14 cameras & 22 card readers
Status: COMPLETE
Oct 21, 2022
Declared cost: $83,000
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 11th floor adding new speaker/visual and visual devices to existing fire and voice evacuation system.
Status: COMPLETE
Oct 14, 2022
Declared cost: $6,667
Permit fee: $750
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**partial build out of 2nd floor. adding new speaker/visual devices to existing fire alarm and voice evacuation system.
Status: COMPLETE
Oct 14, 2022
Declared cost: $6,822
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant buildout of partial 6th floor. add additional speaker visual and visual devices to existing fire alarm system.
Status: COMPLETE
Oct 14, 2022
Declared cost: $8,457
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**tenant buildout of partial 9th floor. add additional speaker visual and visual devices to existing fire alarm system.
Status: COMPLETE
Oct 14, 2022
Declared cost: $37,256
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: demolition project for existing office suite on the 9th floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo and architectural demo. cu
Status: PHASED PERMITTING
Oct 6, 2022
Declared cost: $137,500
Permit fee: $4,379
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
October maintenance
Status: COMPLETE
Oct 4, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Interior build out of existing mechanical room on the 2nd floor at 222 w merchandise mart plaza, a 25 story building. scope of work includes demolition, general construction, electrical and mechanical. no structural work to be performed. c
Contractor: MAULIK SHAH
Status: EXPIRED
Sep 28, 2022
Declared cost: $1,255,650
Permit fee: $825
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage wiring
Status: COMPLETE
Sep 22, 2022
Declared cost: $127,632
Permit fee: $75
PERMIT - ELEVATOR EQUIPMENT
Hoist cable replacement on one(1) 6000lb capacity, 15-floor, 500fpm, passenger elevator(#39), pursuant to the scope of work submitted.(ev004176)
Sep 14, 2022
Declared cost: $8,500
Permit fee: $275
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
September maintenance
Status: COMPLETE
Sep 2, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: exterior alterations to the plaza at an existing office building with ground floor retail. work to include selective demo of concrete topping slab, sidewalk and curb. removal of planters, decking and storm drains; insta
Status: EXPIRED
Aug 24, 2022
Declared cost: $2,000,000
Permit fee: $3,765
PERMIT - EASY PERMIT PROCESS
Revision to permit no 100983471, to change of plumbing contractor to dw mechanical group.
Aug 19, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit#100970396 change plumbing contractor to f.e.moran inc
Aug 10, 2022
Declared cost: $75
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Interior installation of voice / data cabling for avant located on the 9th floor
Status: COMPLETE
Aug 2, 2022
Declared cost: $166,405
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Switch electrical contractor on permit #636074 from rex electric to titan electric for the project on the 12th floor restrooms
Status: COMPLETE
Aug 2, 2022
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit** ** fire alarm permit ** installation of electromagnetic locking devices per cbc sections 10(13-160-269) and 10(13-160-260) on floor 20
Status: COMPLETE
Aug 2, 2022
Declared cost: $2,500
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alterations to office suite 600 to include demo, new partitions, electrical, plumbing and mechanical work per plans. 1a construction. b-business
Status: EXPIRED
Aug 1, 2022
Declared cost: $184,054
Permit fee: $1,436
PERMIT - ELEVATOR EQUIPMENT
Replacement of hoistway doors on two(2) 8000lb capacity, 20-floor, freight elevators(#21,22), one(1) 10000lb capacity, 20-floor, freight elevator(#23), and two(2) 8000lb capacity, 19-floor, freight elevators(#25,26), pursuant to the scope o
Aug 1, 2022
Declared cost: $1,550,000
Permit fee: $1,405
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
August maintenance
Status: COMPLETE
Aug 1, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**** fire alarm system ** modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 1s
Status: COMPLETE
Jul 28, 2022
Declared cost: $12,086
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 8th floor.
Status: COMPLETE
Jul 28, 2022
Declared cost: $7,800
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Change of electrical contractor for original permit 100932364 need to add mcwilliams electric to this permit
Status: COMPLETE
Jul 27, 2022
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Structural beam replacement at dock level as per plans
Status: EXPIRED
Jul 26, 2022
Declared cost: $10,000
Permit fee: $825
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: demolition project for existing business suite 107 on the 1st floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo and architectural de
Status: PHASED PERMITTING
Jul 11, 2022
Declared cost: $68,000
Permit fee: $409
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**** fire alarm system ** modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the
Status: COMPLETE
Jul 6, 2022
Declared cost: $8,100
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**** fire alarm system ** modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 1s
Status: COMPLETE
Jul 6, 2022
Declared cost: $6,560
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**" fire alarm system " modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 12th
Status: COMPLETE
Jul 6, 2022
Declared cost: $12,086
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**** fire alarm system ** modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 6t
Status: COMPLETE
Jul 6, 2022
Declared cost: $19,640
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 crbc: interior alterations to an existing 9th floor suite 901 office space to include new partitions, mechanical, electrical, and plumbing as per plans. separate demolition permit . (occupancy type: b-business office; constru
Status: COMPLETE
Jul 6, 2022
Declared cost: $9,600,000
Permit fee: $22,744
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
July maintenance
Status: COMPLETE
Jul 5, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to change of gc to jc anderson inc,vent contractor to enviromental mechanical services,plumbing contractor to great lakes plumbing, electrical contractor to rex elect. & technologies llc
Jun 24, 2022
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit****fire alarm permit**security system work-maglock permitting (blommer ste. 624 access control/jca) (guso220425a)
Status: COMPLETE
Jun 23, 2022
Declared cost: $12,000
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit** ** fire alarm permit ** installation of electromagnetic locking devices per cbc sections 10(13-160-269) and 10(13-160-260) on floors 12
Status: COMPLETE
Jun 22, 2022
Declared cost: $2,500
Permit fee: $675
PERMIT - NEW CONSTRUCTION
Permit expires on 08/22/2022 erection starts: 6/24/2022, erection ends: 6/26/2022. self cert. river north live mobile stage. 1-24x20 sl100 - duff entertainment with superstage inc.**** self certification **** conditional approval **** sub
Status: COMPLETE
Jun 22, 2022
Declared cost: $2,000
Permit fee: $825
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc. interior buildout of suite 6-142 (wells abbott design) on the 6th floor of 222 w merchandise mart plz, an existing 25 story building. scope of work includes general construction, plumbing, mechanical, and electrical wor
Status: EXPIRED
Jun 10, 2022
Declared cost: $300,000
Permit fee: $825
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alteration of existing showroom on the 6th floor located at 222 w merchandise mart, a 25 story building. scope of work includes general construction, mechanical and electrical. no plumbing or structural work to
Status: EXPIRED
Jun 8, 2022
Declared cost: $175,000
Permit fee: $1,727
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit** ** fire alarm permit ** installation of electromagnetic locking devices per cbc sections 10(13-60-269) and 10(13-160-260) on floor 17.
Status: COMPLETE
Jun 7, 2022
Declared cost: $2,500
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Demolition project for existing office suite on the 9th floor located at 222 w merchandise mart plz, a commercial use 25 story building. scope of work includes electrical demo, mechanical demo and architectural demo. current use: b (busin
Status: EXPIRED
Jun 3, 2022
Declared cost: $275,000
Permit fee: $9,553
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
June maintenance
Status: COMPLETE
Jun 2, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Interior build-out for mercantile showroom on the 3rd floor (suite 398, forward space) located at 222 w merchandise plz, a 25-story building. scope of work includes general construction, hvac, electrical, lighting, plumbing, and finishes. n
Contractor: FORWARD SPACE
Status: COMPLETE
May 6, 2022
Declared cost: $200,000
Permit fee: $1,383
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
May maintenance
Status: COMPLETE
May 4, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Facade inspection with as-necessary sealing of loose pieces of limestone with sealant. north elevations, west elevations, s.w.and n.w. turrets. and north elevation penthouse.tuckpointing 1800 sqft.
May 4, 2022
Declared cost: $154,300
Permit fee: $352
PERMIT - SCAFFOLDING
Erect one (1) scaffold dates 05/03/2022 through 05/03/2023
May 3, 2022
Declared cost: $111
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: revision to permit #100958595 to include interior alterations to existing 8th floor office space in an existing 25 story building.no change to existing use. (occupancy b / construction type 1a)
Status: COMPLETE
May 3, 2022
Declared cost: $50,000
Permit fee: $825
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior renovation of existing restrooms and corridor on the 12th floor, located at 222 w merchandise mart plaza, a commercial use 25 story building. scope of work to include electrical, mechanical and architectural.
Status: EXPIRED
Apr 28, 2022
Declared cost: $1
Permit fee: $822
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior renovation of second floor tenant space suite 202 (thomas west salon) at 222 w merchandise mart plaza, a 25 story mixed use building. scope of work includes general construction, plumbing, electrical, hvac and
Status: EXPIRED
Apr 28, 2022
Declared cost: $1
Permit fee: $1,226
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing ground floor mercantile space - suite 135. no change to existing use. (occupancy m / construction type 1a)
Status: EXPIRED
Apr 28, 2022
Declared cost: $100,000
Permit fee: $825
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Ofs brands poke thru device changes on the 11th floor of themart. suite 1132
Status: COMPLETE
Apr 27, 2022
Declared cost: $22,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Security system work (ange-7788 blommer/jca) (guso220425a)
Status: COMPLETE
Apr 26, 2022
Declared cost: $12,000
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100953111 to change of gc to j.c anderson & plumbing contractor to advance plumbing
Apr 22, 2022
Declared cost: $850,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert project / 2019 cbrc: interior alterations to existing 10th floor showroom, suite 10-102, as per plans. (occupancy classification: b; construction type: 1a)
Status: EXPIRED
Apr 21, 2022
Declared cost: $100,000
Permit fee: $825
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Hardwire open area office cubicles on 4th floor, circuits by others.
Status: COMPLETE
Apr 19, 2022
Declared cost: $50,000
Permit fee: $75
PERMIT - NEW CONSTRUCTION
Permit expires on 06/14/2022 erection starts: 6/10/2022, erection ends: 6/16/2022. self certification - neocon 2022 tents - reinstatement of permit 100936117 for the same tents and locations at merchandise mart plaza. 1-20x80 tent, 1- 20x4
Status: COMPLETE
Apr 14, 2022
Declared cost: $9,000
Permit fee: $691
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
April maintenance
Status: COMPLETE
Apr 6, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 5th floor.
Status: COMPLETE
Mar 29, 2022
Declared cost: $15,760
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Tenant build of suite 101a for kitchen appliance showroom to include new interior partitions, finishes, mechanical, exhaust, electrical, lighting, plumbing and construction of a new mezzanine (less than 1,000 sf).
Contractor: NICHOLAS GULICK
Status: EXPIRED
Mar 15, 2022
Declared cost: $150,000
Permit fee: $1,623
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alterations to existing 8th floor office space in an existing 25 story building. no change to existing use. (occupancy b / construction type 1a)
Status: EXPIRED
Mar 8, 2022
Declared cost: $150,000
Permit fee: $1,829
PERMIT - EASY PERMIT PROCESS
Revision to permit no 100951478 to change general contractor to power construction, plumber to hill mechanical.
Mar 2, 2022
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
March maintenance
Status: COMPLETE
Mar 2, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert: interior alterations to an existing first floor office space, suite 116 as per plans. work includes selective demolition and interior construction of new partitions, doors and hardware, power and communication outlets, ceilings,
Status: COMPLETE
Feb 25, 2022
Declared cost: $365,870
Permit fee: $825
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit** ** fire alarm permit ** installation of electromagnetic locking devices per cbc sections 10(13-160-269) and 10(13-160-260) on floor 8.
Status: COMPLETE
Feb 22, 2022
Declared cost: $2,500
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
February maintenance
Status: COMPLETE
Feb 7, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self cert: interior build out of the 12th floor including new partition, doors, electrical, mechanical, plumbing fixtures
Status: COMPLETE
Feb 3, 2022
Declared cost: $5,200,000
Permit fee: $14,436
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage computer/phone cables
Status: COMPLETE
Feb 1, 2022
Declared cost: $22,500
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Change of general contractor on permit #100947271 to skender construction llc.
Jan 25, 2022
Declared cost: $1
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior renovation of sixth floor tenant space suite 624 (blommer) at 222 w merchandise mart plaza, a 25 story mixed use building. scope of work includes general construction, plumbing, electrical, hvac and finishes. n
Status: EXPIRED
Jan 25, 2022
Declared cost: $850,000
Permit fee: $3,764
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to 12th floor toilet rooms, in existing 25 floor commercial building (occupancy group (b) business; type 1a construction)
Contractor: MAULIK SHAH
Status: COMPLETE
Jan 12, 2022
Declared cost: $1
Permit fee: $825
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
January maintenance
Status: COMPLETE
Jan 6, 2022
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Addition of restrooms on the sixth floor, located at 222 w merchandise mart plz, an existing 25 story building. scope of work includes demolition, general construction, mechanical, electrical, and plumbing. no structural to be performed. cu
Status: COMPLETE
Dec 28, 2021
Declared cost: $100,000
Permit fee: $575
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 3rd floor.
Status: COMPLETE
Dec 20, 2021
Declared cost: $6,485
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 12th floor fan room.
Status: COMPLETE
Dec 20, 2021
Declared cost: $19,810
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Replacing maintenance bypass and ups due to water damage
Status: COMPLETE
Dec 15, 2021
Declared cost: $36,000
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Saw cut concrete at 3 north facing entry doors approx 22 lft, tuckpoint 85 l ft, remove 22 sq ft of concrete at thresholds at northeast entrance, sawcut, chip out and remove spalled and cracked concrete 64 sq ft at expansion joint 5" depth
Dec 13, 2021
Declared cost: $15,250
Permit fee: $352
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
December maintenance
Status: COMPLETE
Dec 2, 2021
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Interior renovation of existing tenant office on floor 5. renovation of existing space for new interior partitions, ceilings, lighting and finishes, as well as the reworking of existing hvac, electrical, plumbing, sprinklers and fire alarm.
Contractor: MAULIK SHAH
Status: COMPLETE
Nov 30, 2021
Declared cost: $939,090
Permit fee: $10,875
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing 8th floor office space. acar included. no change to existing use. (occupancy type b / construction type
Status: EXPIRED
Nov 17, 2021
Declared cost: $100,000
Permit fee: $825
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Allstate insurance - 131-44597-09 - low voltage permit for low voltage card access control installation
Status: COMPLETE
Nov 15, 2021
Declared cost: $2,686
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self cert 2021 cbrc: removal and replacement of existing exterior windows in the southwest light court on the 12th floor of the merchandise mart, a 25 story building. no electrical, mechanical, or plumbing work is to be performed. (occupanc
Status: EXPIRED
Nov 3, 2021
Declared cost: $699,000
Permit fee: $1,376
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
November maintenance
Status: COMPLETE
Nov 1, 2021
Declared cost: $1,000
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit#100924492 suite 210 - change plumbing contractor to dw mechanical group, inc.
Oct 27, 2021
Declared cost: $1
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: demolition project for existing office suite on the 12th floor located at 222 w merchandise mart, a commercial use 25 story building. (occupancy group b; type ia construction)
Status: PHASED PERMITTING
Oct 22, 2021
Declared cost: $400,000
Permit fee: $1,575
PERMIT - SCAFFOLDING
Erect two (2) scaffolds dates 10/15/2021 thorugh 10/15/2022
Oct 15, 2021
Declared cost: $111
Permit fee: $300
PERMIT - RENOVATION/ALTERATION
Interior build out of expanded mechanical rooms on the 12th floor at 222 w merchandise mart plaza, a 25 story building. scope of work includes demolition, general construction, electrical and mechanical. no structural work to be performed.
Status: COMPLETE
Oct 13, 2021
Declared cost: $2,283,000
Permit fee: $1,714
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 2nd floor.
Status: COMPLETE
Oct 11, 2021
Declared cost: $7,450
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
October maintenance
Status: COMPLETE
Oct 6, 2021
Declared cost: $1,000
Permit fee: $75
PERMIT - NEW CONSTRUCTION
Permit expires on 11/22/2021 erection starts: 10/1/2021, erection ends: 10/7/2021. self certification - neocon 2021 tents at merchandise mart plaza. 1-20'x80' tent, 1- 20'x40' tent, and 1-20'x 320' tent. blue peak tents.
Status: COMPLETE
Sep 22, 2021
Declared cost: $9,000
Permit fee: $691
PERMIT - RENOVATION/ALTERATION
Self cert for interior alterations of existing space.demolition of existing buildoutexisting and proposed use is group b business for a showroom
Contractor: NORCON, INC.
Status: COMPLETE
Sep 22, 2021
Declared cost: $25,000
Permit fee: $575
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
September maintenance
Status: COMPLETE
Sep 1, 2021
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Current tenant is subzero wolf with occupancy type business, group b. there will be no change in tenant or use type. the project is a interior alterations to refresh existing product showroom per plans **certified plans corrections: conditi
Contractor: NORCON, INC.
Status: COMPLETE
Sep 1, 2021
Declared cost: $467,500
Permit fee: $1,945
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 1st floor tenant sub-zero.
Status: COMPLETE
Aug 31, 2021
Declared cost: $7,790
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on lower level, lower level mezz,
Status: COMPLETE
Aug 30, 2021
Declared cost: $9,485
Permit fee: $675
PERMIT - RENOVATION/ALTERATION
Self cert application for interior alterations arch, mech and elec changes to a portion of the existing showroom for neoconcurrent and future use is business group b for a showroom.
Status: COMPLETE
Aug 30, 2021
Declared cost: $25,000
Permit fee: $825
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbrc: interior alterations to existing 8th floor office space in an existing 25 story building. no change to existing use. (occupancy b / construction type 1a)
Status: EXPIRED
Aug 12, 2021
Declared cost: $100,000
Permit fee: $825
PERMIT - RENOVATION/ALTERATION
Sc 2019 cbc - tenant interior buildout - no demoerg showroom suite 351
Contractor: XXX XXX
Status: COMPLETE
Aug 6, 2021
Declared cost: $50,000
Permit fee: $825
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
August maintenance
Status: COMPLETE
Aug 2, 2021
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Interior renovation for existing suite on the second floor located at 222 w merchandise mart plz, a 25 story building. scope of work includes demolition, general construction, mechanical, plumbing and electrical. no structural to be perform
Status: COMPLETE
Jul 21, 2021
Declared cost: $504,615
Permit fee: $1,677
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage wiring
Status: COMPLETE
Jul 9, 2021
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 6th floor.
Status: COMPLETE
Jul 6, 2021
Declared cost: $7,720
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
July maintenance
Status: COMPLETE
Jul 1, 2021
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
June maintenance
Status: COMPLETE
Jun 4, 2021
Declared cost: $1,000
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit # 100908214 to change gc to bear construction company
May 26, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Decommissioning of a wireless site (removal of obsolete antennas, equipment, mounts and cabinets only-no removal of mono-poles/towers or any structural components). t-mobile to remove former clearwire equipment from the site. site id: ch82x
May 19, 2021
Declared cost: $12,000
Permit fee: $825
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**modification of an existing city of chicago approved fire alarm and voice communication system, per city of chicago building code section 13-76-050, to accommodate a building renovation on the 6th floor bathrooms.
Status: COMPLETE
May 17, 2021
Declared cost: $6,300
Permit fee: $675
PERMIT - ELEVATOR EQUIPMENT
Modernization of one(1) 2000lb capacity, 2-floor, 100fpm, freight elevator, pursuant to the scope of work submitted.(ev004176) elevator #30(boiler)
May 5, 2021
Declared cost: $250,000
Permit fee: $615
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
May maintenance
Status: COMPLETE
May 4, 2021
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Install and maintain telephone wiring and equipment, monthly maintenance april through june 2021. merchandise mart properties
Status: COMPLETE
Apr 26, 2021
Declared cost: $225
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Removal of wireless equipment
Status: COMPLETE
Apr 21, 2021
Declared cost: $12,000
Permit fee: $75

Check permits at another Chicago address

Free instant lookup, no signup.

Search Chicago permits →
Disclaimer: Permit data comes from Chicago's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Chicago building department before buying, selling, or planning work.