Permit history for 11601 W Touhy Ave
Chicago, IL · 500 permits on file · 2023–2026
500
Permits on file
2023
First permit
2026
Most recent
31
Unique contractors
$134,856,935
Declared value (all work)
Permits on file (500)
Ordered most recent first. Data from the city's open data portal.
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: ACTIVE
May 6, 2026
Declared cost: $100
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 5/1/2026. end date: 5/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wri
Status: ACTIVE
Apr 30, 2026
Permit fee: $75
PERMIT - SIGNS
Illuminate wall sign; 363 sq/ft; south elevation; china air
Apr 24, 2026
Declared cost: $6,000
Permit fee: $700
PERMIT - SIGNS
Illuminate wall sign; 359 sq/ft; south elevation; china cargo
Apr 24, 2026
Declared cost: $6,000
Permit fee: $700
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install telephone. specific location: 1st floor.
Status: ACTIVE
Apr 21, 2026
Declared cost: $2,300
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: ACTIVE
Apr 10, 2026
Declared cost: $100
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 4 circuits to existing 100 amp service disconnecting means. receptacle outlets: 4 . lighting outlets: 1. specific location: warehouse.
Status: ACTIVE
Apr 9, 2026
Declared cost: $20,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 7 circuits to existing 400 amp service disconnecting means. receptacle outlets: 1 . lighting outlets: 0. specific location: warehouse.
Contractor:
SCHWAN ELECTRIC CONTRACTING, C
Status: ACTIVE
Apr 6, 2026
Declared cost: $4,500
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Third revision permit to the second revision permit #101062734, first revised permit #101038071, and to the original permit #100987429 to revise the solar inverter locations and associated conduits. they will be relocated from equipment rac
Contractor:
DAVID ROSE
Status: ACTIVE
Mar 30, 2026
Declared cost: $1,862,535
Permit fee: $1,875
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 4/1/2026. end date: 5/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete writ
Status: COMPLETE
Mar 27, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. alter existing system ii emergency lighting. receptacle outlets: 0 . lighting outlets: 0. specific location: ord ring tunnel.
Contractor:
COURTESY ELECTRIC, INC.
Status: ACTIVE
Mar 16, 2026
Declared cost: $6,740,001
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Mar 9, 2026
Declared cost: $100
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Reroofing
Scope: roof replacement. area: 30800 sq. ft. roof covering: mineral - surfaced roll roofing. location: rooftop. il roofing contractor license: 104004426.
Contractor:
CENTIMARK CORPORATION
Status: ACTIVE
Mar 2, 2026
Declared cost: $497,021
Permit fee: $3,175
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 3/1/2026. end date: 3/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wri
Contractor:
HORIZON CONTRACTORS, INC.
Status: COMPLETE
Feb 24, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. new temporary 1000 amp service disconnecting means with 24 circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: trailer lot.
Contractor:
CHICAGO DEPARTMENT OF AVIATION
Status: ACTIVE
Feb 20, 2026
Declared cost: $150
Permit fee: $175
PERMIT - ELEVATOR EQUIPMENT
Removal/decommission of one(1) 3500lb capacity, 5-floor, 150fpm, passenger elevator(#89), pursuant to the scope of work submitted.(ev005021)
Feb 11, 2026
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Feb 2, 2026
Declared cost: $100
Permit fee: $100
PERMIT - ELEVATOR EQUIPMENT
Oia '10000 w ohare st' replacement of door operator on one(1) 3500lb capacity, 12-floor, passenger elevator(#3), pursuant to the scope of work submitted.(o'hare hilton)
Feb 2, 2026
Declared cost: $38,000
Permit fee: $425
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 2/1/2026. end date: 3/3/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete writ
Status: COMPLETE
Jan 26, 2026
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Dds 2019 cbrc: aa ord l concourse renovation. deep foundations including the installation of caissons at adjacent to the existing l concourse building. these foundations will support passenger boarding bridges and fixed walk-ways for 2 reco
Contractor:
F.H. PASCHEN, S.N. NIELSEN & ASSOCIATES, LLC.
Status: ACTIVE
Jan 13, 2026
Declared cost: $320,000
Permit fee: $7,375
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Jan 5, 2026
Declared cost: $100
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 1/1/2026. end date: 1/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wri
Status: ACTIVE
Dec 23, 2025
Permit fee: $75
PERMIT - ELEVATOR EQUIPMENT
Replacement of hydraulic valve and power unit on one(1) 2000lb capacity, 7-floor, passenger elevator(#29) terminal #1, pursuant to the scope of work submitted. (ev009758)
Dec 17, 2025
Permit fee: $405
PERMIT - ELEVATOR EQUIPMENT
Replacement of hydraulic valve on one(1) 2000lb capacity, 7-floor, passenger elevator(#23) in terminal #1, pursuant to the scope of work submitted.(ev019129)
Dec 17, 2025
Permit fee: $405
PERMIT - ELEVATOR EQUIPMENT
Replacement of hydraulic valve and power unit on one(1) 2000lb capacity, 7-floor, passenger elevator(#30), pursuant to the scope of work submitted.
Dec 17, 2025
Permit fee: $300
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: factory/industrial. start date: 12/15/2025. end date: 12/15/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must mainta
Contractor:
SKY ELECTRIC
Status: ACTIVE
Dec 16, 2025
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: factory/industrial. start date: 12/15/2025. end date: 12/15/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must mainta
Contractor:
SKY ELECTRIC
Status: ACTIVE
Dec 16, 2025
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Dec 4, 2025
Declared cost: $100
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o"hare.
Status: COMPLETE
Dec 1, 2025
Declared cost: $100
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 12/1/2025. end date: 12/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HORIZON CONTRACTORS, INC.
Status: COMPLETE
Nov 25, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: warehouse area of air france cargo building.
Contractor:
ISO COMMUNICATIONS, INC.
Status: COMPLETE
Nov 19, 2025
Declared cost: $30,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. new permanent 100 amp service disconnecting means with 10 circuits. receptacle outlets: 10 . lighting outlets: 0. specific location: loading dock.
Contractor:
SONOMA ELECTRICAL SERVICES
Status: COMPLETE
Nov 18, 2025
Declared cost: $150
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: terminal 5- smg offices lower level.
Contractor:
ISO COMMUNICATIONS, INC.
Status: COMPLETE
Oct 24, 2025
Declared cost: $2,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: terminal 5 upper level concourse across from m9.
Contractor:
ISO COMMUNICATIONS, INC.
Status: COMPLETE
Oct 24, 2025
Declared cost: $2,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: room a847.
Contractor:
ISO COMMUNICATIONS, INC.
Status: COMPLETE
Oct 24, 2025
Declared cost: $12,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: air france lounge.
Contractor:
ISO COMMUNICATIONS, INC.
Status: COMPLETE
Oct 24, 2025
Declared cost: $19,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: terminal 5 east dock.
Contractor:
ISO COMMUNICATIONS, INC.
Status: COMPLETE
Oct 24, 2025
Declared cost: $95,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: terminal 5, gates m9 and m6.
Contractor:
ISO COMMUNICATIONS, INC.
Status: COMPLETE
Oct 24, 2025
Declared cost: $10,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: room ul-207.
Contractor:
ISO COMMUNICATIONS, INC.
Status: COMPLETE
Oct 24, 2025
Declared cost: $2,500
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: terminal 5 lower level uscbp hall.
Contractor:
ISO COMMUNICATIONS, INC.
Status: COMPLETE
Oct 24, 2025
Declared cost: $3,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: the dearborn, bar siena, farm 2 air and ul storage.
Contractor:
ISO COMMUNICATIONS, INC.
Status: COMPLETE
Oct 24, 2025
Declared cost: $30,000
Permit fee: $250
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 11/1/2025. end date: 12/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
Oct 22, 2025
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Dds 2019 cbrc: aa ord l concourse. interior renovation, limited relocation of concessions program, updated building systems, reconfiguration of 3 boarding gates, and the addition of one egress stair. no work on jetbridges at gates l1a and l
Contractor:
BUILDING PERMITS
Status: ACTIVE
Oct 21, 2025
Declared cost: $85,000,000
Permit fee: $52,051
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: ACTIVE
Oct 9, 2025
Declared cost: $100
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 10/1/2025. end date: 10/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Oct 1, 2025
Permit fee: $100
PERMIT - SIGNS
Address located at 838 patton drive, installation of wall signage for qatar airways
Sep 19, 2025
Declared cost: $8,000
Permit fee: $400
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Sep 15, 2025
Declared cost: $100
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 3 circuits to existing 200 amp service disconnecting means. receptacle outlets: 9 . lighting outlets: 0. specific location: 1st floor.
Contractor:
FERIK ELECTRICAL SERVICE,INC.
Status: ACTIVE
Sep 2, 2025
Declared cost: $10,000
Permit fee: $500
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 9/1/2025. end date: 10/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wri
Status: COMPLETE
Aug 28, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Aug 6, 2025
Declared cost: $100
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. new permanent 100 amp service disconnecting means with 24 circuits. receptacle outlets: 10 . lighting outlets: 10. specific location: terminal 5 space # 520.
Status: COMPLETE
Aug 5, 2025
Declared cost: $15,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 8/1/2025. end date: 8/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Aug 4, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 8/1/2025. end date: 8/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Aug 4, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 8/1/2025. end date: 8/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Aug 4, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: hudson news t1/t3.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Jul 30, 2025
Declared cost: $3,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 8/1/2025. end date: 8/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wri
Contractor:
HORIZON CONTRACTORS, INC.
Status: COMPLETE
Jul 29, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Jul 14, 2025
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 2 . lighting outlets: 0. specific location: terminal 3 @ g7.
Status: COMPLETE
Jul 9, 2025
Declared cost: $3,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 7/1/2025. end date: 7/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Jun 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 7/1/2025. end date: 7/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Jun 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 7/1/2025. end date: 7/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Jun 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 7/1/2025. end date: 7/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Jun 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 7/1/2025. end date: 7/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Jun 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Reroofing
Scope: roof recover. area: 31 sq. ft. roof covering: other. location: roof - 899 upper express drive, des plaines, il. il roofing contractor license: 104000394.
Contractor:
BUILDING PERMITS
Status: ACTIVE
Jun 27, 2025
Declared cost: $188,687
Permit fee: $200
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 3 . lighting outlets: 0. specific location: terminal 1.
Status: COMPLETE
Jun 25, 2025
Declared cost: $5,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 3 circuits to existing 3200 amp service disconnecting means. receptacle outlets: 3 . lighting outlets: 0. specific location: terminal 3 bag room.
Status: ACTIVE
Jun 25, 2025
Declared cost: $350,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. alter existing data/video. specific location: terminal # g concourse.
Status: COMPLETE
Jun 24, 2025
Declared cost: $10,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 7/1/2025. end date: 7/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wri
Contractor:
HORIZON CONTRACTORS, INC.
Status: COMPLETE
Jun 23, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 122 circuits to existing 1200 amp service disconnecting means. receptacle outlets: 12 . lighting outlets: 0. specific location: t3 bag room.
Status: ACTIVE
Jun 18, 2025
Declared cost: $550,000
Permit fee: $2,250
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: fire pump mechanical room.
Status: ACTIVE
Jun 6, 2025
Declared cost: $20,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Jun 5, 2025
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 2 . lighting outlets: 0. specific location: t3 l1/g5.
Status: COMPLETE
Jun 5, 2025
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: t3 @ h1.
Status: COMPLETE
Jun 4, 2025
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. new temporary 300 amp service disconnecting means with 24 circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: trailers.
Contractor:
CITY OF CHICAGO DEPARTMENT OF AVIATION
Status: ACTIVE
Jun 4, 2025
Declared cost: $150
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
Dds 2019 cbrc: install 2-stop elevator, requisite security vestibule, foundations and tie-in to adjacent paving. (occupancy classification: a5 construction type 1a). cda project # h1215.19-06. consultant review: v3 companies of il
Contractor:
BUILDING PERMITS
Status: COMPLETE
May 30, 2025
Declared cost: $1,994,264
Permit fee: $2,425
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: t5 @ m8.
Status: COMPLETE
May 30, 2025
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: mcdonalds t3 @ l8.
Status: COMPLETE
May 29, 2025
Declared cost: $5,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 4 . lighting outlets: 0. specific location: t5 bag room.
Status: COMPLETE
May 28, 2025
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 6/1/2025. end date: 7/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete writ
Contractor:
HORIZON CONTRACTORS, INC.
Status: COMPLETE
May 23, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 6/1/2025. end date: 7/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
May 22, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 6/1/2025. end date: 7/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
May 22, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 6/1/2025. end date: 7/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
May 22, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 6/1/2025. end date: 7/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
May 22, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 6/1/2025. end date: 7/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
May 22, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 11 . lighting outlets: 0. specific location: hudson news ord.
Status: COMPLETE
May 15, 2025
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
May 6, 2025
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 5/1/2025. end date: 5/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Apr 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 5/1/2025. end date: 5/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Apr 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 5/1/2025. end date: 5/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Apr 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 5/1/2025. end date: 5/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Apr 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 5/1/2025. end date: 5/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Apr 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 10 . lighting outlets: 0. specific location: terminal 3 l concourse.
Status: ACTIVE
Apr 29, 2025
Declared cost: $35,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 10 . lighting outlets: 0. specific location: terminal 3 g concourse.
Status: ACTIVE
Apr 29, 2025
Declared cost: $35,000
Permit fee: $75
PERMIT - WRECKING/DEMOLITION
Wreck and remove a 1 story masonry building (building 527 at o'hare)
Apr 29, 2025
Declared cost: $746,000
Permit fee: $2,850
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 5/1/2025. end date: 5/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wri
Status: COMPLETE
Apr 28, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 2 @f10.
Status: COMPLETE
Apr 22, 2025
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 2 @ e8.
Status: COMPLETE
Apr 22, 2025
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: delta tech ops t5.
Status: COMPLETE
Apr 22, 2025
Declared cost: $5,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 3 circuits to existing 225 amp service disconnecting means. receptacle outlets: 3 . lighting outlets: 0. specific location: terminal 1 c concourse.
Status: COMPLETE
Apr 11, 2025
Declared cost: $110,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Apr 9, 2025
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 4/1/2025. end date: 5/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete writ
Status: COMPLETE
Mar 28, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 4/1/2025. end date: 5/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
Mar 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 4/1/2025. end date: 5/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
Mar 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 4/1/2025. end date: 5/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
Mar 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 4/1/2025. end date: 5/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
Mar 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 4/1/2025. end date: 5/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
Mar 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: basement level.
Contractor:
COURTESY ELECTRIC, INC.
Status: COMPLETE
Mar 21, 2025
Declared cost: $25,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 0 . lighting outlets: 1. specific location: terminal 1 concourse basement.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Mar 19, 2025
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Mar 11, 2025
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: t5 upper level west airline corridor.
Status: COMPLETE
Mar 7, 2025
Declared cost: $3,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 3/1/2025. end date: 3/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wri
Status: COMPLETE
Feb 28, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 3/1/2025. end date: 3/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Feb 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 3/1/2025. end date: 3/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Feb 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 3/1/2025. end date: 3/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Feb 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 3/1/2025. end date: 3/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Feb 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 3/1/2025. end date: 3/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Feb 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Plumbing Work
Repair or in-kind replacement of 0 plumbing fixtures as described in permit application. includes repair or replacment of plumbing piping. locations: 0 residential unit(s), 1 non-residential unit(s), l apron ready room.
Contractor:
CITY OF CHICAGO DEPARTMENT OF AVIATION
Status: COMPLETE
Feb 26, 2025
Declared cost: $25,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: upper level concourse at terminal 5.
Status: COMPLETE
Feb 24, 2025
Declared cost: $10,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 48 . lighting outlets: 0. specific location: terminal 1 and 2.
Status: ACTIVE
Feb 21, 2025
Declared cost: $15,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior alteration to existing ready room to install lockers and storage space, with associated mechanical and electrical. locations: 0 residential unit(s), 1 non-residential unit(s), terminal 3 l -apron.
Contractor:
CITY OF CHICAGO DEPARTMENT OF AVIATION
Status: ACTIVE
Feb 17, 2025
Declared cost: $175,000
Permit fee: $575
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 2 . lighting outlets: 0. specific location: t5 bhs control room.
Status: COMPLETE
Feb 17, 2025
Declared cost: $6,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 1 circuits to existing 125 amp service disconnecting means. add 1 circuits to existing 100 amp service disconnecting means. receptacle outlets: 2 . lighting outlets: 0. specific location: terminal 5.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Feb 14, 2025
Declared cost: $15,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 8 . lighting outlets: 2. specific location: ord terminal 1 starbucks b9.
Status: COMPLETE
Feb 14, 2025
Declared cost: $24,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 1 bag room.
Status: COMPLETE
Feb 12, 2025
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install other. specific location: terminal #2 ticket counters.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: ACTIVE
Feb 7, 2025
Declared cost: $15,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 2 . lighting outlets: 0. specific location: terminal #2 and #3.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Feb 7, 2025
Declared cost: $10,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 2/1/2025. end date: 3/3/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete writ
Status: COMPLETE
Jan 31, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 2/1/2025. end date: 3/3/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Jan 29, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 2/1/2025. end date: 3/3/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Jan 29, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 2/1/2025. end date: 3/3/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Jan 29, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 2/1/2025. end date: 3/3/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Jan 29, 2025
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Second revision permit follows first permit revision number 101038071, this is the second revision revision permit to the original permit number 100987429, to revise the single line diagram to include an additional pv ac disconnect and add
Contractor:
VERDE SOLUTIONS LLC
Status: SUSPENDED
Jan 29, 2025
Declared cost: $1,862,535
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 2/1/2025. end date: 3/3/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Jan 29, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Jan 23, 2025
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Jan 23, 2025
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 3 . lighting outlets: 0. specific location: terminal 5 main checkpoint.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Jan 13, 2025
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 8 . lighting outlets: 1. specific location: terminal 1 c concourse col 27/a.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Jan 9, 2025
Declared cost: $10,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 6 . lighting outlets: 8. specific location: frontera t5.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Jan 9, 2025
Declared cost: $12,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 1/1/2025. end date: 1/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wri
Status: COMPLETE
Jan 8, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 8 . lighting outlets: 4. specific location: terminal #2 at gate f14.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Jan 7, 2025
Declared cost: $9,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. new permanent 100 amp service disconnecting means with 9 circuits. receptacle outlets: 6 . lighting outlets: 4. specific location: t5 storage room.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Dec 26, 2024
Declared cost: $10,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: factory/industrial. start date: 12/13/2024. end date: 12/13/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must mainta
Contractor:
SKY ELECTRIC
Status: COMPLETE
Dec 23, 2024
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2025. end date: 1/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Dec 23, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: factory/industrial. start date: 1/1/2025. end date: 1/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain c
Contractor:
SKY ELECTRIC
Status: COMPLETE
Dec 23, 2024
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2025. end date: 1/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Dec 23, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2025. end date: 1/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Dec 23, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2025. end date: 1/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Dec 23, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: united airlines c10 club.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Dec 23, 2024
Declared cost: $10,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2025. end date: 1/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Dec 23, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 4 . lighting outlets: 0. specific location: delta t5 baghall and re-check.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Dec 16, 2024
Declared cost: $7,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Dec 10, 2024
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 5 circuits to existing 200 amp service disconnecting means. receptacle outlets: 5 . lighting outlets: 0. specific location: t1 & t3 bag rooms ord.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Dec 9, 2024
Declared cost: $550,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 12/2/2024. end date: 1/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wri
Status: COMPLETE
Dec 4, 2024
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
2019 cbc: revision to permit 101048431 due to reconfiguration of stairs and catwalks due to presence of existing mep components and coordination with existing structure. revision results in: removal of suspended catwalk components, reconfig
Contractor:
CONSTRUCTION SERVICE ASSOCIATE
Status: ACTIVE
Nov 29, 2024
Declared cost: $2,500,000
Permit fee: $1,775
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2024. end date: 12/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 26, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2024. end date: 12/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 26, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2024. end date: 12/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 26, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2024. end date: 12/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 26, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2024. end date: 12/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 26, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 2 . lighting outlets: 0. specific location: terminal 5 food court.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 26, 2024
Declared cost: $6,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2024. end date: 12/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 26, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior alteration for low height partitions for cubicle setup, associated electrical and data included, minor ductowrk adjustments. area of work 1500 sq ft.locations: 0 residential unit(s), 1 non-residential unit(s),
Contractor:
CITY OF CHICAGO - AVIATION
Status: ACTIVE
Nov 21, 2024
Declared cost: $150,000
Permit fee: $575
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 0 . lighting outlets: 2. specific location: terminal #1 @ b7.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 20, 2024
Declared cost: $8,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Reroofing
Scope: roof repair. area: 12800 sq. ft. roof covering: other. location: the roof. il roofing contractor license: 104000281.
Contractor:
COMPLETE BUILDING MAINTENANCE COMPANY
Status: COMPLETE
Nov 19, 2024
Declared cost: $79,529
Permit fee: $200
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 0 . lighting outlets: 1. specific location: terminal 3 h/k food court.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 19, 2024
Declared cost: $6,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 2 . lighting outlets: 0. specific location: terminal 5 ord.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 19, 2024
Declared cost: $10,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 3 . lighting outlets: 0. specific location: terminal #2.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 14, 2024
Declared cost: $7,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 14 . lighting outlets: 0. specific location: terminals 1,2 and 3.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 8, 2024
Declared cost: $5,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Contractor:
HILTON CHICAGO CORPORATION
Status: COMPLETE
Nov 7, 2024
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: hilton chicago o'hare.
Status: COMPLETE
Nov 7, 2024
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install data/video. specific location: terminal 2 ord.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 4, 2024
Declared cost: $110,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 6 circuits to existing 400 amp service disconnecting means. receptacle outlets: 0 . lighting outlets: 6. specific location: hangar 770 ord.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Nov 1, 2024
Declared cost: $25,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 11/1/2024. end date: 12/1/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
Nov 1, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 4 . lighting outlets: 0. specific location: united airlines terminal 1 ticketing.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 30, 2024
Declared cost: $15,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 10 . lighting outlets: 0. specific location: terminal 3 mezz office.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 28, 2024
Declared cost: $5,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2024. end date: 12/1/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 25, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2024. end date: 12/1/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 25, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2024. end date: 12/1/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 25, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2024. end date: 12/1/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 25, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2024. end date: 12/1/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 25, 2024
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2024. end date: 12/1/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 25, 2024
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Sc 2019 cbc: revision to permit 101049257, revision to routing of new sanitary line for the lot polish airlines lounge due to discovered conditions. occupancy classification a2, type 1b construction.
Contractor:
MARON ELECTRIC COMPANY
Status: SUSPENDED
Oct 25, 2024
Declared cost: $195,000
Permit fee: $4,115
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 0 . lighting outlets: 2. specific location: terminal 5 baggage control room.
Status: COMPLETE
Oct 23, 2024
Declared cost: $6,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: factory/industrial. start date: 10/17/2024. end date: 1/15/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintai
Status: COMPLETE
Oct 23, 2024
Permit fee: $250
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 3 @ l26 ramp.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 18, 2024
Declared cost: $5,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: factory/industrial. start date: 10/4/2024. end date: 12/3/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain
Contractor:
SKY ELECTRIC
Status: COMPLETE
Oct 17, 2024
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 3 at k1.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 16, 2024
Declared cost: $1,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal #1 c concourse.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 15, 2024
Declared cost: $25,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. new temporary 200 amp service disconnecting means with 30 circuits. receptacle outlets: 30 . lighting outlets: 0. specific location: t5 (old app lot).
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 7, 2024
Declared cost: $15,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: united airlines cargo building.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 4, 2024
Declared cost: $15,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 5 baggage area.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 4, 2024
Declared cost: $5,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 3 @l2a.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 4, 2024
Declared cost: $1,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 3 gate l2a/l1a.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 4, 2024
Declared cost: $3,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 36 . lighting outlets: 0. specific location: terminal 3 bag room.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 4, 2024
Declared cost: $25,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 10/1/2024. end date: 10/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 2, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 10/1/2024. end date: 10/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 2, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 10/1/2024. end date: 10/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 2, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 10/1/2024. end date: 10/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 2, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: utilty. start date: 10/1/2024. end date: 10/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Oct 2, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Reroofing
Scope: roof replacement. area: 1900 sq. ft. roof covering: other. location: roof of 727 hangar rd american airlines hangar 1. il roofing contractor license: 104014585.
Contractor:
CONSTRUCTION SERVICE ASSOCIATES
Status: COMPLETE
Oct 2, 2024
Declared cost: $36,950
Permit fee: $475
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 3 . lighting outlets: 0. specific location: terminal #2.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Oct 1, 2024
Declared cost: $10,500
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: revision to permit #101037240 to show change in underground plumbing line run terminal 3 l-apron. plumbing work only
Contractor:
JB PLUMBING LLC
Status: SUSPENDED
Sep 26, 2024
Declared cost: $10,000
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: storage. start date: 10/1/2024. end date: 10/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Sep 26, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 0 circuits to existing 20 amp service disconnecting means. receptacle outlets: 2 . lighting outlets: 0. specific location: terminal #3 h/k.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Sep 23, 2024
Declared cost: $3,500
Permit fee: $25
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 0 . lighting outlets: 1. specific location: terminal #1.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Sep 23, 2024
Declared cost: $15,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 45 . lighting outlets: 0. specific location: terminal #3.
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Sep 23, 2024
Declared cost: $25,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: storage. start date: 10/1/2024. end date: 10/31/2024. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Contractor:
HARTMANN ELECTRIC COMPANY, INC
Status: COMPLETE
Sep 18, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Provide low voltage locations for the terminal #3 improvement project in the main terminal, basement lower and upper level.
Status: ACTIVE
Sep 11, 2024
Declared cost: $85,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Remove existing receptacles and install with new configuration at the protein bar kiosk at t5 main.
Status: COMPLETE
Sep 5, 2024
Declared cost: $1,200
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
August 2024 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Sep 4, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
September 2024, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Sep 4, 2024
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
September 2024 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Sep 4, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Change out existing receptacles,switches to new and install new 20amp 120 volt circuit to new sign from existing circuit at terminal #1 b18 grove pronto sandwiches.
Status: COMPLETE
Sep 4, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
August 2024, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Sep 4, 2024
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric maintenance september, 2024
Status: COMPLETE
Aug 30, 2024
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of september.
Status: COMPLETE
Aug 29, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of september.
Status: COMPLETE
Aug 29, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of september.
Status: COMPLETE
Aug 29, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of september.
Status: COMPLETE
Aug 29, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of september.
Status: COMPLETE
Aug 29, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of september.
Status: COMPLETE
Aug 29, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Provide daily amp readings of temporary power connections for bus duct at american airlines bag room.
Status: COMPLETE
Aug 26, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance
Status: COMPLETE
Aug 19, 2024
Declared cost: $25,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance
Status: COMPLETE
Aug 19, 2024
Declared cost: $25,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Disconnect 5 pendant light fixtures and install 5 new pendant light fixtures in macaroni grill at terminal #3 at k2.
Status: COMPLETE
Aug 19, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Disconnect power to advertising monitors for permanent removal in t-1, t-2 and t-3.
Status: COMPLETE
Aug 15, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit august 2024
Status: COMPLETE
Aug 1, 2024
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of august.
Status: COMPLETE
Jul 31, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of august.
Status: COMPLETE
Jul 31, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of august.
Status: COMPLETE
Jul 31, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of august.
Status: COMPLETE
Jul 31, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of august.
Status: COMPLETE
Jul 31, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of august.
Status: COMPLETE
Jul 31, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT - SIGNS
Address located at 838 patton drive, installation of wall signage for etihad cargo
Jul 26, 2024
Declared cost: $8,000
Permit fee: $400
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for august 2024 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line s
Status: COMPLETE
Jul 24, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for september 2024 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-lin
Status: COMPLETE
Jul 24, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Building 836
Status: COMPLETE
Jul 24, 2024
Declared cost: $58,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Reroofing
Scope: roof recover. area: 158400 sq. ft. roof covering: built-up roof. location: roof replacement. il roofing contractor license: 104017138.
Contractor:
LEGACY TRANSPORTATION SERVICES
Status: COMPLETE
Jul 17, 2024
Declared cost: $499,999
Permit fee: $5,625
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Replace lowering motor in clear channel monitor at terminal #1 b/c tunnel entrance and c/b tunnel entrance.
Status: ACTIVE
Jul 16, 2024
Declared cost: $10,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Other Work
Repair cmu wall at sub-bay 7 8, repair exterior wall panel system in sub-bay 7, address steel beam deflection insub-bay 2. locations: 0 residential unit(s), 1 non-residential unit(s), exterior work, exterior metal panels.
Contractor:
GILBANE BUILDING COMPANY, INC.
Status: ACTIVE
Jul 3, 2024
Declared cost: $1,000,000
Permit fee: $625
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
August general
Status: COMPLETE
Jul 2, 2024
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
July general
Status: COMPLETE
Jul 2, 2024
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
September general
Status: COMPLETE
Jul 2, 2024
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit july, 2024
Status: COMPLETE
Jul 1, 2024
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
July 2024, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Jun 29, 2024
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install 4 -cat 6 data cables within the temporary frontier bso office on the lower level baggage claim 12. install 1-6 strand armored single mode fiber from the bso office to comm. rm. al-636. all cables to be in
Status: COMPLETE
Jun 29, 2024
Declared cost: $14,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
July 2024 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Jun 29, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install 29-cat 6 data cables within the protein bar space. cables to be installed in conduit provided by others.
Status: COMPLETE
Jun 29, 2024
Declared cost: $7,700
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install 48-cat 6 data cables within the butcher and the burger space. install 1-6 strand armored single mode fiber between the store location and comm. rm. al-682. in stall 18/2 speaker cable to 6 speaker locatio
Status: ACTIVE
Jun 29, 2024
Declared cost: $21,000
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
2019 cbc: new metal access stairs, metal suspended catwalks, metal maintenance platforms and metal escape ladder as per plans.(conditional permit subject to field inspections)
Contractor:
POWER CONSTRUCTION COMPANY, LLC
Status: ACTIVE
Jun 28, 2024
Declared cost: $2,500,000
Permit fee: $2,460
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for july 2024 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line sid
Status: COMPLETE
Jun 27, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of july.
Status: COMPLETE
Jun 27, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of july.
Status: COMPLETE
Jun 27, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of jully.
Status: COMPLETE
Jun 27, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of july.
Status: COMPLETE
Jun 27, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of july.
Status: COMPLETE
Jun 27, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of july.
Status: COMPLETE
Jun 27, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Add to existing burglar alarm. job# 282499846
Status: COMPLETE
Jun 21, 2024
Declared cost: $3,598
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance
Status: COMPLETE
Jun 19, 2024
Declared cost: $25,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Butcher & burger temperature control
Status: ACTIVE
Jun 3, 2024
Declared cost: $15,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
June 2024, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Jun 2, 2024
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
June 2024 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Jun 2, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit june, 2024
Status: COMPLETE
May 31, 2024
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of june.
Status: COMPLETE
May 30, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for june 2024 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line sid
Status: COMPLETE
May 30, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of june.
Status: COMPLETE
May 30, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of june.
Status: COMPLETE
May 30, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of june.
Status: COMPLETE
May 30, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of june.
Status: COMPLETE
May 30, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of june.
Status: COMPLETE
May 30, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Modify 5 existing circuits to conform to new equipment layout at veteran's coffee terminal 3 at k15.
Status: COMPLETE
May 28, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Spr- 2019 cbc: revision permit# 100987429 -to revise pv layout and mechanical attachments on the roof and layout based lightning protection coordination. the total system area remains the same. reducing total number of pv panel modules from
Contractor:
VERDE SOLUTIONS LLC
Status: COMPLETE
May 24, 2024
Declared cost: $1,862,535
Permit fee: $1,175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing circuits to new equipment at eli's cheesecake at terminal #1 gate b9.
Status: COMPLETE
May 22, 2024
Declared cost: $5,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Relocation of electrical work for structural rework in t1. adding gurtz electric as contractor to existing permit for work 101042787.
Status: ACTIVE
May 15, 2024
Declared cost: $5,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing circuit to new display for barclay plinko, terminal #3 h/k.
Status: COMPLETE
May 14, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Remove gate power cabinet and replace with new cabinet and breaker at jet bridge m16 terminal #5.
Status: COMPLETE
May 14, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance
Status: COMPLETE
May 14, 2024
Declared cost: $25,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Lot polish airlines business lounge
Contractor:
CITY OF CHICAGO DEPARTMENT OF AVIATION
Status: COMPLETE
May 7, 2024
Declared cost: $5,000,000
Permit fee: $5,462
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit may, 2024
Status: COMPLETE
May 1, 2024
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
May 2024 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
May 1, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
May 2024, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
May 1, 2024
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of may.
Status: COMPLETE
Apr 29, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of may.
Status: COMPLETE
Apr 29, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of may.
Status: COMPLETE
Apr 29, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of may.
Status: COMPLETE
Apr 29, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for may 2024 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line side
Status: COMPLETE
Apr 29, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of may.
Status: COMPLETE
Apr 29, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of may.
Status: COMPLETE
Apr 29, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Switchgear maintenance in terminal 2
Status: ACTIVE
Apr 23, 2024
Declared cost: $10,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing power and data to 4 new monitors at chilis t2@f9.
Status: COMPLETE
Apr 22, 2024
Declared cost: $4,500
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Rework existing circuits for monitors at chilis terminal # 3@g-9.
Status: COMPLETE
Apr 22, 2024
Declared cost: $4,500
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing power and data to 7 new monitors at chilis terminal #3 @ h2.
Status: COMPLETE
Apr 22, 2024
Declared cost: $4,500
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing circuits and data to 5 new monitors at chilis t1@b14.
Status: COMPLETE
Apr 22, 2024
Declared cost: $4,500
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install new 12 strand fiber optic cable from the truck rack facility to new efso plc control panels in t-1, t-2, t-3, t-5 and cargo buildings. extend existing power to new plc panels. per cda project # th6066.23-00, efso fiber reroute.
Status: COMPLETE
Apr 18, 2024
Declared cost: $2,500,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
April general
Status: COMPLETE
Apr 17, 2024
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
June general
Status: COMPLETE
Apr 17, 2024
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Maygeneral
Status: COMPLETE
Apr 17, 2024
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**the modification to the existing approved fire alarm system for a remodeled area.
Status: COMPLETE
Apr 16, 2024
Declared cost: $12,036
Permit fee: $750
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing circuits to trailers at oats.
Status: COMPLETE
Apr 16, 2024
Declared cost: $45,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Disconnect power to 12 self-check in units at american airlines ticketing area a.
Status: ACTIVE
Apr 12, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing circuit for new power outlet at skyscraper bar, terminal #3 @k10.
Status: COMPLETE
Apr 10, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Disconnect power to jet bridges at g14 thru g20. extend existing 480volt feeds to new jet bridges and equipment at l5,l7 and l9 for american airlines.
Status: COMPLETE
Apr 9, 2024
Declared cost: $45,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install 1-6 strand armored single mode fiber between comm.r.al-503 and the publican quality bread store on the upper level. also install 12-cat 6 data cables within the store area. all cables to be installed in c
Status: COMPLETE
Apr 9, 2024
Declared cost: $7,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Disconnect existing plc wiring, remove controls, install new controls and reconnect, in 8 plc cabinets in t5 bag hall.
Status: COMPLETE
Apr 4, 2024
Declared cost: $75,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
**electrical only permit**install 400 amp feed for generator
Status: COMPLETE
Apr 3, 2024
Declared cost: $200
Permit fee: $300
PERMIT - SIGNS
Illuminated wall sign; 48 sq/ft; 30 sq/ft of text; south elevation
Apr 2, 2024
Declared cost: $4,000
Permit fee: $250
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
April 2024 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Apr 2, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
April 2024, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Apr 2, 2024
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit april, 2024
Status: COMPLETE
Apr 1, 2024
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of april.
Status: COMPLETE
Mar 28, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of april.
Status: COMPLETE
Mar 28, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of april.
Status: COMPLETE
Mar 28, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of april.
Status: COMPLETE
Mar 28, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of april.
Status: COMPLETE
Mar 28, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of april.
Status: COMPLETE
Mar 28, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for april 2024 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line si
Status: COMPLETE
Mar 26, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Provide new 100amp 120/208 volt panel to provide power and lighting circuits for the protein bar in terminal #5 space # 571.
Status: COMPLETE
Mar 21, 2024
Declared cost: $15,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install new 100amp 480volt 3 phase fused disconnect weatherproof disconnect switch at american airlines terminal #3 gate g19 to provide service disconnect for jet bridge power.
Status: COMPLETE
Mar 19, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
March 2024, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Mar 15, 2024
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
March 2024 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Mar 15, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Disconnect power to flush valves, replace fixtures with led's in two bathrooms at swiss port lounge t5.
Status: COMPLETE
Mar 12, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing 480 volt circuit to temporary distribution panel to provide power for 7 temporary construction trailers and two water pumps at cab hill.
Status: ACTIVE
Mar 6, 2024
Declared cost: $30,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit#101037240 change plumbing and hvac contractors.
Contractor:
CHICAGO O'HARE AIRPORT
Status: COMPLETE
Mar 6, 2024
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit march, 2024
Status: COMPLETE
Mar 1, 2024
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for march 2024 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line si
Status: COMPLETE
Feb 28, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of march.
Status: COMPLETE
Feb 27, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of march.
Status: COMPLETE
Feb 27, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of march.
Status: COMPLETE
Feb 27, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of march.
Status: COMPLETE
Feb 27, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of march.
Status: COMPLETE
Feb 27, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of march.
Status: COMPLETE
Feb 27, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Electrical & data installation to add (2) new clear kiosks in united terminal 1 / gate area 2 using existing circuits and data
Status: COMPLETE
Feb 27, 2024
Declared cost: $25,000
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
United terminal 1, concourse b-c tunnel structural repairs, current use/occupancy classification c-1, large assembly (passenger station/ terminal). proposed use/occupancy classification c-1. const. type ia.
Status: COMPLETE
Feb 27, 2024
Declared cost: $3,000,000
Permit fee: $4,344
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install one cat 6 data cable between comm.rm.pl-300 and rm.ul-119. cable to be installed in existing cable tray and conduit
Status: COMPLETE
Feb 24, 2024
Declared cost: $2,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5 for new lower level dunkin donuts. install 1-6 strand armored single mode fiber from the store to comm.rm.ll-562. install 30-cat 6 data cables to various locations within the store and install 16/2 speaker cable t
Status: COMPLETE
Feb 24, 2024
Declared cost: $16,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing terminal 3 l-apron level space with associated mechanical, electrical and plumbing work per plans.
Contractor:
W. E. O'NEIL CONSTRUCTION CO.
Status: ACTIVE
Feb 20, 2024
Declared cost: $1,500,000
Permit fee: $1,795
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
100a service for bus trailer in g lot
Status: COMPLETE
Feb 8, 2024
Declared cost: $75
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
February 2024 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Feb 4, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
February 2024, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Feb 4, 2024
Declared cost: $800
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Dds 2019 cbrc: caisson foundations for relocated passenger boarding bridges and new fixed walkways connecting existing concourse l to reconfigured aircraft parking positions for american airlines cda project number h1178.17 (occupancy group
Contractor:
ROSSI CONTRACTORS, INC
Status: PHASED PERMITTING
Feb 1, 2024
Declared cost: $2,800,000
Permit fee: $6,525
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit february, 2024.
Status: COMPLETE
Feb 1, 2024
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t5 for the month of february.
Status: COMPLETE
Jan 31, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of february.
Status: COMPLETE
Jan 31, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of february.
Status: COMPLETE
Jan 31, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Replace generator at east tank farm for menzies.
Status: COMPLETE
Jan 31, 2024
Declared cost: $55,000
Permit fee: $75
PERMIT - SIGNS
United cargo - ground sign - (hanger 770 - hangar rd elevation) - 5'-2"h x 6'-0"w (31 sqft)
Jan 31, 2024
Declared cost: $15,000
Permit fee: $300
PERMIT - SIGNS
East elevation: united cargo - wall sign - 3'-11"h x 21'-4"w (84 sqft)
Jan 31, 2024
Declared cost: $10,000
Permit fee: $300
PERMIT - SIGNS
United cargo - ground sign - (hanger 710 and 775 - hangar rd elevation) - 5'-2"h x 6'-0"w (31 sqft)
Jan 31, 2024
Declared cost: $15,000
Permit fee: $300
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for february 2024 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line
Status: COMPLETE
Jan 31, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of february.
Status: COMPLETE
Jan 31, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of february.
Status: COMPLETE
Jan 31, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of february.
Status: COMPLETE
Jan 31, 2024
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install battery chargers at terminal 5 at o'hare airport
Status: COMPLETE
Jan 29, 2024
Declared cost: $75
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self-cert permit for interior alterations to existing airline operations space at ord t3, landside, ticket area; existing group b = business, no change for new british airways. no change to lease area, no impact to demising walls or means
Contractor:
RICHARD MENDLES
Status: SUSPENDED
Jan 29, 2024
Declared cost: $350,000
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Make emergency repairs to east tank farm generator at menzies fueling system.
Status: COMPLETE
Jan 24, 2024
Declared cost: $5,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
January 2024, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Jan 23, 2024
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
January 2024 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Jan 23, 2024
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self cert pd-0 tenant interior alteration of retail space with associated architectural, mechanical, electrical and fire protection work.
Contractor:
CITY OF CHICAGO DEPARTMENT OF AVIATION
Status: COMPLETE
Jan 22, 2024
Declared cost: $1,920,000
Permit fee: $1,035
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install 8-cat 6 data cables. 4 cables between cd2 and cd3 to the nearest ont and 4 cables between cd8 and cd9 to the nearest ont. cables to be installed in conduits installed by others
Status: COMPLETE
Jan 22, 2024
Declared cost: $5,800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5 metropolis coffee. install 1-6 strand armored single mode fiber to comm.rm.e01. install 20-cat 6 cables to various locations within the store. all cables to be installed in conduits installed by others
Status: COMPLETE
Jan 22, 2024
Declared cost: $10,000
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5 six points store. install 1-6 strand armored single mode fiber to comm.rm.e01.install 34-cat 6 data cables to various locations within the store. all cables to be installed in conduits installed by others
Status: COMPLETE
Jan 22, 2024
Declared cost: $15,000
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5 at the in motion/boulevard and branch store. install 6 strand armored single mode fiber to comm.rm.e01. install 27-cat 6 data cables to various locations and 18/2 speaker wire to 2 speaker locations. cable to be i
Status: COMPLETE
Jan 22, 2024
Declared cost: $20,000
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install 1-cat 6 data cable between comm.rm.pl-300 and rm.ul-120. cable to be installed in existing cable trays and conduits
Status: COMPLETE
Jan 22, 2024
Declared cost: $2,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
March general
Status: COMPLETE
Jan 19, 2024
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
January general
Status: ACTIVE
Jan 19, 2024
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
February general
Status: COMPLETE
Jan 19, 2024
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior alteration to existing terminal 3 g-concourse level to include electrical work per plans, no plumbing or hvac work under this permit. location: aa terminal 3-g concourse.
Contractor:
CHICAGO O'HARE AIRPORT
Status: ACTIVE
Jan 18, 2024
Declared cost: $500,000
Permit fee: $350
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior alteration to existing terminal 3 l-concourse level to include electrical work per plans, no plumbing or hvac work under this permit. locations: 0 residential unit(s), 1 non-residential unit(s), 1 interior comm
Contractor:
CHICAGO O'HARE AIRPORT
Status: ACTIVE
Jan 18, 2024
Declared cost: $500,000
Permit fee: $350
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing 60amp 208 volt circuit to new kiosk at the central de-icing pad for united airlines.
Status: COMPLETE
Jan 16, 2024
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for month 2024 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line si
Status: COMPLETE
Jan 4, 2024
Declared cost: $100
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Upgrade 8 existing control panels for bag room devices at terminal 5 bag baggage room.
Status: COMPLETE
Jan 3, 2024
Declared cost: $250,000
Permit fee: $75
PERMIT - ELEVATOR EQUIPMENT
Replace jack unit on passenger elevator car 49, 5400lbs @ 150fpm, 3 floors, subject to city of chicago dept. of buildings elevatpr bureau inspection (ev005002).
Jan 3, 2024
Declared cost: $5,000
Permit fee: $300
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit january 2024
Status: COMPLETE
Jan 2, 2024
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of january.
Status: COMPLETE
Dec 26, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of january.
Status: COMPLETE
Dec 26, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of january.
Status: COMPLETE
Dec 26, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t5 for the month of january.
Status: COMPLETE
Dec 26, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of january.
Status: COMPLETE
Dec 26, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of january.
Status: COMPLETE
Dec 26, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing 20amp circuits to new signage at united airlines hangars 710.770 and 775.
Status: COMPLETE
Dec 13, 2023
Declared cost: $15,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at terminal 5. install 2-cat 6 data cables within office area pl-325. cables to be installed in existing conduits
Status: COMPLETE
Dec 12, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at terminal 5. install 1-cat 6 data cable between rm.ul-139 and new time clock location in west airline corridor and install 1-cat 6 data cable between rm.ul-209 and new time clock location in east airline corridor. cab
Status: COMPLETE
Dec 12, 2023
Declared cost: $4,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
December 2023 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Dec 8, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
December 2023, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Dec 8, 2023
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit-december 2023.
Status: COMPLETE
Dec 1, 2023
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of december.
Status: COMPLETE
Nov 30, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of december.
Status: COMPLETE
Nov 30, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenace permit for united airlines for the month of december.
Status: COMPLETE
Nov 30, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of december.
Status: COMPLETE
Nov 30, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of december.
Status: COMPLETE
Nov 30, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of december.
Status: COMPLETE
Nov 30, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for december 2023 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line
Status: COMPLETE
Nov 30, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Make necessary modifications to ahu at terminal #3 stinger to conform with local codes.
Status: COMPLETE
Nov 28, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing power and data circuit to new menu board kiosk at mcdonalds terminal 3 h/k food court.
Status: COMPLETE
Nov 27, 2023
Declared cost: $2,500
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Disconnect jet bridge at gate l1b and reconnect at gate l1a for american airlines in terminal #3.
Status: COMPLETE
Nov 20, 2023
Declared cost: $3,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing circuits to new locations for seating power,apis, rids and jetbridges at united airlines terminal #1 gates c1, c3,c5 and c7.
Status: COMPLETE
Nov 20, 2023
Declared cost: $250,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
November general
Status: COMPLETE
Nov 15, 2023
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
General october
Status: COMPLETE
Nov 15, 2023
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
December general
Status: COMPLETE
Nov 15, 2023
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing circuits and data to temporary uber reserve kiosk in terminal #2.
Status: COMPLETE
Nov 3, 2023
Declared cost: $25,000
Permit fee: $150
PERMIT - ELEVATOR EQUIPMENT
Replacement of power unit on one(1) 3500lb capacity, 3-floor, 125fpm, passenger elevator(#1), pursuant to the scope of work submitted.(609 s. access rd.) american airlines building #609 ev010103
Nov 1, 2023
Declared cost: $28,884
Permit fee: $405
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit november, 2023.
Status: COMPLETE
Nov 1, 2023
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for november 2023 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line
Status: COMPLETE
Oct 31, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
November 2023 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Oct 31, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
November 2023, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Oct 31, 2023
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Installation of new lighting at salt dome amc o'hare international airport
Contractor:
TORRES ELECTRICAL CONTRACTORS
Status: COMPLETE
Oct 27, 2023
Declared cost: $500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of november.
Status: COMPLETE
Oct 26, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of november.
Status: COMPLETE
Oct 26, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t5 for the month of november.
Status: COMPLETE
Oct 26, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of november.
Status: COMPLETE
Oct 26, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of november.
Status: COMPLETE
Oct 26, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of november.
Status: COMPLETE
Oct 26, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT - SIGNS
West storefront elevation: 12' x 1'-2" led illuminated wall sign "hudson nonstop"
Oct 26, 2023
Declared cost: $2,600
Permit fee: $250
PERMIT - SIGNS
Southwest storefront elevation: 2'-4" x 4' led illuminated wall sign "just walk out technology by amazon"
Oct 26, 2023
Declared cost: $2,600
Permit fee: $250
PERMIT - SIGNS
Northwest storefront elevation: 1'-6" x 1'-6" led illuminated blade sign "hudson nonstop"
Oct 26, 2023
Declared cost: $2,600
Permit fee: $300
PERMIT - SIGNS
Southwest storefront elevation: 12' x 1'-2" led illuminated wall sign "hudson nonstop"
Oct 26, 2023
Declared cost: $2,600
Permit fee: $250
PERMIT - SIGNS
South storefront elevation: 9'-10" x 1' led illuminated wall sign "hudson nonstop"
Oct 26, 2023
Declared cost: $2,600
Permit fee: $250
PERMIT - ELEVATOR EQUIPMENT
Modernization of one(1) 2000lb capacity, 100fpm, 2-floor, hydraulic, passenger elevator(#260), pursuant to the scope of work submitted.(ev011962)
Oct 18, 2023
Declared cost: $120,500
Permit fee: $405
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install 27 cat 6 data cables and 15 cat 6 cables for cctv and 12 strand single mode armored fiber to comm. rm. al-520 at hampton social. cables to be installed in new conduits installed by others.
Status: COMPLETE
Oct 17, 2023
Declared cost: $45,000
Permit fee: $300
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install 17- cat 6 data cable to new fids monitors at 4 different locations at t5. east ticket counters, upper level east rotunda, upper level near gate m13 and on the lower lever at cd10/cd11. cables to be instal
Status: COMPLETE
Oct 17, 2023
Declared cost: $18,000
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install 52 cat 6 data cables, 27 cat 6 cables for cctv and a 12 strand armored single mode fiber to comm. rm. e01 at bar sienna. cables to be installed in new conduits installed by others and existing cable tray
Status: COMPLETE
Oct 17, 2023
Declared cost: $96,000
Permit fee: $300
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5.relocate 2 existing cat 6 data cables from rm. ul-221 back to comm. rm. pl-301 and the other to a time clock location near rm. u665. cable to be installed in existing cable tray and new conduit installed by others
Status: COMPLETE
Oct 17, 2023
Declared cost: $3,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at t5. install 1-cat 6 data cable between comm. rm. pl-301 and rm. ul-210.cable to be installed in existing conduit and cable tray
Status: COMPLETE
Oct 17, 2023
Declared cost: $2,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be performed at 617 south access drive. install 63 cat 6 data cables to various locations throughout the office area. cables to be installed in existing conduits and new conduits installed by others
Status: COMPLETE
Oct 17, 2023
Declared cost: $34,000
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install 120volt 20 amp circuit for future sign.
Contractor:
WOLF ELECTRIC INC.
Status: COMPLETE
Oct 12, 2023
Declared cost: $3,500
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing circuit for coffee maker in terminal 5 british airways lounge
Status: COMPLETE
Oct 4, 2023
Declared cost: $4,600
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
October 2023, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Oct 3, 2023
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
October 2023 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Oct 3, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbc: provide heated canopies at five (5) united airlines terminal one vestibule entrances at o'hare airport. the construction includes the structural supports, metal canopies, lighting and heating elements as per plans. associated
Contractor:
CONSTRUCTION SERVICE ASSOCIATE
Status: EXPIRED
Oct 3, 2023
Declared cost: $1,800,000
Permit fee: $1,675
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit october, 2023
Status: COMPLETE
Sep 29, 2023
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Provide electrical infrastructure and impact protection for new battery chargers that are provided by southwest airlines.
Status: ACTIVE
Sep 29, 2023
Declared cost: $100,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month october.
Status: COMPLETE
Sep 28, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenace permit for menzies for the month of october.
Status: COMPLETE
Sep 28, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for october 2023 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line
Status: COMPLETE
Sep 28, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of october.
Status: COMPLETE
Sep 28, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of october.
Status: COMPLETE
Sep 28, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of october.
Status: COMPLETE
Sep 28, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of october.
Status: COMPLETE
Sep 28, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT - ELEVATOR EQUIPMENT
Replacement of hoist cables on one(1) 2000lb capacity, 7-floor, 350fpm, passemnger elevator(#23 parking), pursuant to the scope of work submitted.(ev012821)
Sep 27, 2023
Permit fee: $150
PERMIT - ELEVATOR EQUIPMENT
Cab interior replacement on passenger elevators #6 and #7, pursuant to the scope of work on location at time of inspection. terminal 5
Sep 27, 2023
Declared cost: $100,000
Permit fee: $510
PERMIT - SIGNS
Wall sign
Sep 20, 2023
Declared cost: $4,000
Permit fee: $400
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install 30 amp feed to new wash tank at united airlines hangar 710.
Status: COMPLETE
Sep 18, 2023
Declared cost: $2,500
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Disconnect and reconnect passenger loading bridge at terminal #1 gate c9.
Status: COMPLETE
Sep 7, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install cat 6 cable to new training room area for spirit airlines in terminal #3.
Status: COMPLETE
Sep 5, 2023
Declared cost: $5,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
September 2023, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Sep 3, 2023
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
September 2023 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Sep 3, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit september, 2023.
Status: COMPLETE
Sep 1, 2023
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of september.
Status: COMPLETE
Aug 30, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of september.
Status: COMPLETE
Aug 30, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of september.
Status: COMPLETE
Aug 30, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of september.
Status: COMPLETE
Aug 30, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of september.
Status: COMPLETE
Aug 30, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for september 2023 in areas controlled by mmg. areas not included: airport 4160 volt services, equipment and devices, airport maintenance complex (amc bldg) & id badging office and runways.
Status: COMPLETE
Aug 30, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Electrically refurbish 4 passenger loading bridges for gates e7, e9, e14 and e16.
Status: ACTIVE
Aug 30, 2023
Declared cost: $25,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of september.
Status: COMPLETE
Aug 30, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Perform electrical refurbishment on g4 & g6 jet bridges at terminal #3 g concourse.
Status: COMPLETE
Aug 25, 2023
Declared cost: $15,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
August general
Status: COMPLETE
Aug 22, 2023
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
September general
Status: COMPLETE
Aug 22, 2023
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Disconnect and reconnect power to tsa xray machine at terminal #1 check point #3.
Status: COMPLETE
Aug 17, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Antenna and equipment upgrade on existing cell site. contractor change to mzi. existing permit 100961681.
Status: ACTIVE
Aug 14, 2023
Declared cost: $30,000
Permit fee: $150
PERMIT - ELEVATOR EQUIPMENT
Replace valve on one (1) 2500lb.cap, 3-stop, 150 fpm, hydraulic passenger elevator #212 in terminal #1. pursuant to the scope of work submitted. ev012821
Aug 9, 2023
Declared cost: $1,500
Permit fee: $405
PERMIT - RENOVATION/ALTERATION
2019 cbc: foundation only-new 16" reinforced slab under new equipment location as per plans.
Contractor:
CONSTRUCTION SERVICE ASSOCIATE
Status: PHASED PERMITTING
Aug 8, 2023
Declared cost: $1,265,145
Permit fee: $875
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install owner furnished co-ax cable thru existing conduit from the united airlines terminal #5 ramp level communications room to the roof antenna.
Status: COMPLETE
Aug 4, 2023
Declared cost: $3,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
August 2023, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Aug 3, 2023
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
August 2023 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Aug 3, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Repair 4" underground conduits in the east bay feeding pits 5a and 5b at united airlines service center building 710.
Status: COMPLETE
Aug 1, 2023
Declared cost: $10,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric permit august, 2023.
Status: COMPLETE
Jul 31, 2023
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of august.
Status: COMPLETE
Jul 28, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of august.
Status: COMPLETE
Jul 28, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of august.
Status: COMPLETE
Jul 28, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of august.
Status: COMPLETE
Jul 28, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of august.
Status: COMPLETE
Jul 28, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of august.
Status: COMPLETE
Jul 28, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for august 2023 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line s
Status: COMPLETE
Jul 27, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing power and data for uno pizza/hot dog kiosk from t1 c6 to c11.
Status: COMPLETE
Jul 18, 2023
Declared cost: $2,500
Permit fee: $150
PERMIT - SIGNS
Illuminated wall sign; south elevation; 202 sq/ft qantasfreight
Jul 18, 2023
Declared cost: $9,000
Permit fee: $700
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend existing circuits to 54 new battery chargers at terminal # 5 east extension ramp area.
Status: ACTIVE
Jul 14, 2023
Declared cost: $150,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be done at t5. install 1-cat6 data cable between comm.rm.pl-300 and rm.ul-116. cable to be installed in existing cable tray and conduit
Status: COMPLETE
Jul 13, 2023
Declared cost: $2,000
Permit fee: $150
PERMIT - ELEVATOR EQUIPMENT
Replacement of hoist cables on one(1) 15000lb capacity, 75fpm, 4-floor, elevator #22f, pursuant to the scope of work submitted.(ev012821)
Jul 12, 2023
Declared cost: $5,000
Permit fee: $150
PERMIT - ELEVATOR EQUIPMENT
Replacement of hoist cables on one(1) 3500lb capacity, 3-floor, 125fpm, elevator(#60), pursuant to the scope of work submitted.(ev012821)
Jul 12, 2023
Declared cost: $5,000
Permit fee: $255
PERMIT - SIGNS
West elevation: 2' x 2' led illuminated blade sign "arch"
Jul 6, 2023
Declared cost: $3,800
Permit fee: $300
PERMIT - SIGNS
North elevation: 12'-3" x 1'-6" led illuminated flat wall sign "mcdonald's"
Jul 6, 2023
Declared cost: $3,800
Permit fee: $250
PERMIT - SIGNS
North elevation: 1'-10 7/8" x 1'-8" led illuminated arch
Jul 6, 2023
Declared cost: $1,800
Permit fee: $250
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
July 2023 . maintenance, service 3200a, 480/277v, 3ph,4w lufthansa cargo
Status: COMPLETE
Jul 1, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
July 2023, maintenance nippon cargo electrical service 2000a, 277/480v, 3ph, 4w
Status: COMPLETE
Jul 1, 2023
Declared cost: $800
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electric maintenance july, 2023
Status: COMPLETE
Jun 30, 2023
Declared cost: $30,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance for july 2023 in areas controlled by smg. areas not included: all escalators, all doors (including overhead, roll-up & respective operators, all jet bridges (responsible only for power to exterior of building-line sid
Status: COMPLETE
Jun 29, 2023
Declared cost: $1,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
July general
Status: COMPLETE
Jun 29, 2023
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
June general
Status: COMPLETE
Jun 29, 2023
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for united airlines for the month of july.
Status: COMPLETE
Jun 28, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for work as directed by american airlines for the month of july.
Status: COMPLETE
Jun 28, 2023
Declared cost: $2,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for menzies for the month of july.
Status: COMPLETE
Jun 28, 2023
Declared cost: $2,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for oats, airport transit system for the month of july.
Status: COMPLETE
Jun 28, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for swiss port for the month of july.
Status: COMPLETE
Jun 28, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Monthly maintenance permit for hudson news t-1, t-2, t-3 and t-5 for the month of july.
Status: COMPLETE
Jun 28, 2023
Declared cost: $1,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Extend cat 6 cable from g14 communications room to g4 and g6 common use hold rooms in terminal. #3.
Status: COMPLETE
Jun 22, 2023
Declared cost: $5,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Relocate existing conduits to above new ceiling elevation as required in the space next to ttrt in t5.
Status: COMPLETE
Jun 22, 2023
Declared cost: $5,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be done at t5. install 2-cat 6 data cables to 8 cda conference room locations, 16 cables total, between comm.rm. e11 and the new east addition conference rooms. cables to be installed in existing cable tray and new conduits installe
Status: COMPLETE
Jun 21, 2023
Declared cost: $6,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be done at t5. install 1-cat 6 data cable between comm.rm.pl-301 and rm.ul-220. cable to be installed in existing cable tray and conduit
Status: COMPLETE
Jun 21, 2023
Declared cost: $2,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Work to be done at t5. install 12-cat 6 data cables, 2 each to 6 fids monitors, in the uscbp hall between carousels 4/5, 6/6 and 7/8. cables to be installed in new conduits installed by others
Status: COMPLETE
Jun 21, 2023
Declared cost: $3,500
Permit fee: $75
Disclaimer: Permit data comes from Chicago's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Chicago building department before buying, selling, or planning work.