PERMIT – EXPRESS PERMIT PROGRAM Storm Water Management Plan
Approval of new plan for stormwater management. project type: airport. project area: 18 acres. this approval does not authorize any construction work. construction work may require separate permit(s).
Status: ACTIVE
May 22, 2026
Permit fee: $3,000
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 12 circuits to existing 1200 amp service disconnecting means. receptacle outlets: 12 . lighting outlets: 0. specific location: de-icing facility.
Status: ACTIVE
May 20, 2026
Declared cost: $25,000
Permit fee: $325
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Fire alarm: modification of existing system. associated building permit:101056000. affects: 0 dwelling units; 1 non-residential units. high-rise building: no. voice communication: no. special locking: no. monitoring type: supervising statio
Status: ACTIVE
May 20, 2026
Permit fee: $775
PERMIT - RENOVATION/ALTERATION
Revisions to previously permitted (#101061323 and #101067914)) work including renovation of existing offices including removing/relocation existing furniture, repainting existing walls and doors, and building new walls/doors and adding new
Contractor: CHIP SANDIFER
Status: ACTIVE
May 14, 2026
Declared cost: $73,455
Permit fee: $2,889
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 3 . lighting outlets: 0. specific location: spirit airlines ticket counter.
Status: ACTIVE
May 1, 2026
Declared cost: $3,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 5/1/2026. end date: 5/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: ACTIVE
Apr 29, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 5/1/2026. end date: 5/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: ACTIVE
Apr 29, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 5/1/2026. end date: 5/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: ACTIVE
Apr 29, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 5/1/2026. end date: 5/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: ACTIVE
Apr 29, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 5/1/2026. end date: 5/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: ACTIVE
Apr 29, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit b200446859: additional electrical contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Status: COMPLETE
Apr 27, 2026
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: clear channel t3@h1.
Status: ACTIVE
Apr 8, 2026
Declared cost: $1,500
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: interior alterations to holdrooms and new shallow foundations for a passenger boarding bridge (pbb) relocation at gate b2 in concourse b of existing terminal 1 at o'hare international airport. includes holdroom reconfiguratio
Contractor: MAP STRATEGIES, LLC
Status: ACTIVE
Apr 6, 2026
Declared cost: $5,000,000
Permit fee: $3,725
PERMIT - NEW CONSTRUCTION
Dds 2019 cbc: revision to permit 101068757. revisions to the angle and spacing for the tiebacks, lowering of bottom of sheet piles, and eliminating 2nd row of tiebacks for the permanent cut off wall (permanent earth retention system) only p
Status: ACTIVE
Apr 2, 2026
Declared cost: $24,000,000
Permit fee: $9,750
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 4/1/2026. end date: 5/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Mar 31, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 4/1/2026. end date: 5/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Mar 31, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 4/1/2026. end date: 5/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Mar 31, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 4/1/2026. end date: 5/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Mar 31, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 15 . lighting outlets: 0. specific location: gate t3, t5.
Status: ACTIVE
Mar 30, 2026
Declared cost: $70,000
Permit fee: $250
PERMIT - NEW CONSTRUCTION
Dds 2019 cbc: full building permit for the confined spaces portions of consolidated tunnel between future ohare global terminal and future satellite 2 concourse buildings at o'hare international airport, including building systems enabling
Contractor: MAP STRATEGIES, LLC
Status: ACTIVE
Mar 16, 2026
Declared cost: $220,000,000
Permit fee: $94,380
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 6 circuits to existing 100 amp service disconnecting means. receptacle outlets: 6 . lighting outlets: 0. specific location: united airlines terminal #1.
Status: ACTIVE
Mar 13, 2026
Declared cost: $25,000
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Storm Water Management Plan
Approval of new plan for stormwater management. project type: airport. project area: 26.71 acres. this approval does not authorize any construction work. construction work may require separate permit(s).
Contractor: BOVA CARL J
Status: ACTIVE
Mar 13, 2026
Permit fee: $3,000
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 4 . lighting outlets: 0. specific location: united airlines.
Status: ACTIVE
Mar 13, 2026
Declared cost: $6,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 36 . lighting outlets: 0. specific location: terminal #5.
Status: ACTIVE
Mar 10, 2026
Declared cost: $15,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 0 . lighting outlets: 1. specific location: occ tunnel.
Status: ACTIVE
Mar 7, 2026
Declared cost: $1,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 6 . lighting outlets: 0. specific location: united airlines terminal 1 ticketing..
Status: ACTIVE
Mar 3, 2026
Declared cost: $5,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 3/2/2026. end date: 4/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Mar 2, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 3/2/2026. end date: 4/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Mar 2, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 3/2/2026. end date: 4/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Mar 2, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 3/2/2026. end date: 4/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Mar 2, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 3/2/2026. end date: 4/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Mar 2, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 4 circuits to existing 100 amp service disconnecting means. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 5 upper level soli on the fly kiosk.
Status: ACTIVE
Feb 26, 2026
Declared cost: $20,000
Permit fee: $175
PERMIT - NEW CONSTRUCTION
Dds 2019 cbc: full building permit for the superstructure, enclosure, and interior fit out of satellite 1 concourse terminal building at o'hare international airport. caissons only permit under 10106693. ers only permit under 101068757. sha
Contractor: MAP STRATEGIES, LLC
Status: PHASED PERMITTING
Feb 25, 2026
Declared cost: $730,000,000
Permit fee: $448,658
PERMIT - REINSTATE REVOKED PMT
Reinstate permit no 101046976 must begin work and or request inspection no later than ***august 2026*** on permit 101046976
Feb 11, 2026
Permit fee: $34,228
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 2/2/2026. end date: 3/4/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: COMPLETE
Feb 2, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 2/2/2026. end date: 3/4/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Feb 2, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 2/2/2026. end date: 3/4/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Feb 2, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 2/2/2026. end date: 3/4/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Feb 2, 2026
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 2/2/2026. end date: 3/4/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete wr
Status: ACTIVE
Feb 2, 2026
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Spr 2019 chicago rehabilitation code title 14r w/ april 2022 supplements: interior and exterior renovation and alteration work at the existing united airlines cargo facility warehouse, building 630 (occupancy s-1, type ib) at o'hare interna
Status: ACTIVE
Jan 28, 2026
Declared cost: $750,000
Permit fee: $1,875
PERMIT - RENOVATION/ALTERATION
Dds 2019 cbrc: phase 1 of 2. removal and replacement of baggage handling system and associated building works - all work associated with replacement of the existing 60 double stack piers and 4 makeup unites with 18 new makeup units. re-mo
Status: ACTIVE
Jan 21, 2026
Declared cost: $14,920,040
Permit fee: $39,796
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: satellite 1 concouse term. bldg at o'hare.
Status: ACTIVE
Jan 16, 2026
Declared cost: $50,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 2 . lighting outlets: 0. specific location: terminal 1 @ b10.
Status: COMPLETE
Jan 9, 2026
Declared cost: $2,500
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Relocation of a pbbinstallation of a new foundation for a relocated pbbinstallation of new apron pavement to accommodatenew electrical
Contractor: MAP STRATEGIES, LLC
Status: ACTIVE
Jan 8, 2026
Declared cost: $1
Permit fee: $3,625
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2026. end date: 1/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Dec 29, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2026. end date: 1/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Dec 29, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2026. end date: 1/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Dec 29, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2026. end date: 1/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Dec 29, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 1/1/2026. end date: 1/31/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Dec 29, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: l stinger.
Status: ACTIVE
Dec 16, 2025
Declared cost: $2,500
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Spr 2019 chicago rehabcode title 14r w/ april 2022 supplements: alteration & renovation to apron level at terminal 1, b & c concourse o'hare international airport. work includes selective demo, partial height walls, adding cmu walls to encl
Status: ACTIVE
Dec 11, 2025
Declared cost: $500,000
Permit fee: $1,825
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 4 . lighting outlets: 0. specific location: terminal 5.
Status: COMPLETE
Dec 1, 2025
Declared cost: $35,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2025. end date: 12/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Nov 25, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2025. end date: 12/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Nov 25, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2025. end date: 12/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Nov 25, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2025. end date: 12/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Nov 25, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 12/1/2025. end date: 12/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Nov 25, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Mechanical Work
Ductwork extension/reconfiguration, hydronic piping extension/reconfiguration, repair/replacement affecting 1 systems : 34 other air handling equipment(huntair) . electrical work under this permit = yes . locations: 0 residential unit(s),
Contractor: LOO JASON C
Status: ACTIVE
Nov 20, 2025
Declared cost: $56,000,000
Permit fee: $12,775
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: united airlines service center.
Status: COMPLETE
Nov 18, 2025
Declared cost: $5,500
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbc: alterations building permit for upgrades to the existing heating and refrigeration plant (o'hare building 450) to provide heating to consolidated tunnel, satellites, and o'hare global terminal. (occ. f-1; type iib const.) cda
Contractor: MAP STRATEGIES, LLC
Status: ACTIVE
Nov 13, 2025
Declared cost: $10,500,000
Permit fee: $8,479
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 1 circuits to existing 225 amp service disconnecting means. receptacle outlets: 1 . lighting outlets: 0. specific location: ti @ c23.
Status: COMPLETE
Nov 10, 2025
Declared cost: $1,500
Permit fee: $175
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: t5 m19.
Status: COMPLETE
Nov 4, 2025
Declared cost: $20,000
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2025. end date: 12/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Oct 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2025. end date: 12/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Oct 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2025. end date: 12/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Oct 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2025. end date: 12/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Oct 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 11/1/2025. end date: 12/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Oct 30, 2025
Permit fee: $75
PERMIT - NEW CONSTRUCTION
Dds 2019 cbc: shallow foundations and below grade substructure permit for basement level of proposed satellite 1 concourse terminal building at o'hare international airport. includes underground electrical and plumbing scope of work. caisso
Contractor: MAP STRATEGIES, LLC
Status: PHASED PERMITTING
Oct 29, 2025
Declared cost: $100,000,000
Permit fee: $129,325
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. alter existing other. specific location: g concourse t3 penthouse.
Status: COMPLETE
Oct 17, 2025
Declared cost: $2,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 3.
Status: COMPLETE
Oct 17, 2025
Declared cost: $1,200
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install other. specific location: t5 u922.
Status: COMPLETE
Oct 10, 2025
Declared cost: $8,500
Permit fee: $100
PERMIT - ELEVATOR EQUIPMENT
Replacement of power unit and door operators on four(4) 4000lb capacity, 3-floor, 125fpm, passenger elevators(1-4), pursuant to the scope of work submitted.
Oct 8, 2025
Declared cost: $290,500
Permit fee: $1,305
PERMIT - RENOVATION/ALTERATION
2019 chicago building rehab code title 14rthis project consists of adding 2 steel post structures and concrete foundations to support 2 digital signs, with associated electrical hookup on the exterior baggage tunnel driveway entrances at gr
Status: ACTIVE
Oct 6, 2025
Declared cost: $630,000
Permit fee: $975
PERMIT – EXPRESS PERMIT PROGRAM Construction Trailer
1 temporary trailer(s) in connection with work under permit 101074603. permit start date: 9/26/2025. permit duration: 1 years.
Status: ACTIVE
Oct 2, 2025
Permit fee: $250
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 10/1/2025. end date: 10/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Sep 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal 1.
Status: COMPLETE
Sep 30, 2025
Declared cost: $4,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 10/1/2025. end date: 10/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Sep 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. alter existing data/video. specific location: terminal 1.
Status: COMPLETE
Sep 30, 2025
Declared cost: $25,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 10/1/2025. end date: 10/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Sep 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 10/1/2025. end date: 10/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Sep 30, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 10/1/2025. end date: 10/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete
Status: COMPLETE
Sep 30, 2025
Permit fee: $75
PERMIT - NEW CONSTRUCTION
Dds 2019 cbc: caissons only (vertical penetration only) permit for proposed satellite 1 concourse terminal building and connector bridge to concourse c of existing terminal 1 at o'hare international airport (construction type ib, occ group
Status: PHASED PERMITTING
Sep 22, 2025
Declared cost: $10,000,000
Permit fee: $7,125
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 1 circuits to existing 600 amp service disconnecting means. receptacle outlets: 1 . lighting outlets: 0. specific location: terminal #5.
Status: COMPLETE
Sep 18, 2025
Declared cost: $7,500
Permit fee: $175
PERMIT - NEW CONSTRUCTION
Dds 2019 cbc: permanent cut off wall (permanent earth retention system) only permit including excavation for proposed satellite 1 concourse building and portion of proposed consolidated tunnel between future ohare global terminal and future
Status: ACTIVE
Sep 17, 2025
Declared cost: $1
Permit fee: $7,125
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 2 . lighting outlets: 0. specific location: terminal 3 l28.
Status: COMPLETE
Sep 16, 2025
Declared cost: $5,500
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 15 . lighting outlets: 0. specific location: terminal 5.
Status: COMPLETE
Sep 16, 2025
Declared cost: $20,000
Permit fee: $100
PERMIT - NEW CONSTRUCTION
Spr 2019 cbc: full building permit for the construction of new midfield cooling plant (mcp) (o'hare building 240), midfield cooling tower (o'hare building 241), including deep foundations and sitework serving the plant. (occ. f-1; type iib
Contractor: MAP STRATEGIES, LLC
Status: ACTIVE
Sep 12, 2025
Declared cost: $85,000,000
Permit fee: $16,522
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 5 . lighting outlets: 1. specific location: t5 m38.
Status: COMPLETE
Sep 5, 2025
Declared cost: $15,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. alter existing other. specific location: terminal 1 and 2.
Status: ACTIVE
Sep 4, 2025
Declared cost: $550,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit b200430745: additional other contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Status: COMPLETE
Sep 4, 2025
Permit fee: $100
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 15 circuits to existing 800 amp service disconnecting means. receptacle outlets: 15 . lighting outlets: 0. specific location: gate g7 g9 g13 g11 g2.
Status: COMPLETE
Sep 2, 2025
Declared cost: $350,000
Permit fee: $325
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. add 30 circuits to existing 800 amp service disconnecting means. receptacle outlets: 30 . lighting outlets: 0. specific location: e15 e17 g2 g3 g17 g20.
Status: COMPLETE
Sep 2, 2025
Declared cost: $1,000,000
Permit fee: $625
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 9/1/2025. end date: 10/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Aug 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. start date: 9/1/2025. end date: 10/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete written records of all
Status: COMPLETE
Aug 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 9/1/2025. end date: 10/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Aug 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 9/1/2025. end date: 10/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Aug 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 9/1/2025. end date: 10/1/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Aug 27, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 5 . lighting outlets: 0. specific location: terminal #1 @b10.
Status: COMPLETE
Aug 26, 2025
Declared cost: $10,500
Permit fee: $375
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. new temporary 400 amp service disconnecting means with 42 circuits. receptacle outlets: 6 . lighting outlets: 0. specific location: cab hill ord.
Status: ACTIVE
Aug 18, 2025
Declared cost: $20,000
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Ds 2019 cbrc: ers/ex only using stabilization piles for the renovation of existing 2-story with 1 level below grade at terminal 3 of o'hare international airport. caissons only permitted under d23030-01, full building permit under d23030-03
Status: ACTIVE
Aug 14, 2025
Declared cost: $1,100,000
Permit fee: $7,291
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install other. specific location: terminal #5.
Status: COMPLETE
Aug 12, 2025
Declared cost: $85,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Storm Water Management Plan
Approval of new plan for stormwater management. project type: airport. project area: 64.76 acres. this approval does not authorize any construction work. construction work may require separate permit(s).
Contractor: KIBBONS JAMES M
Status: ACTIVE
Aug 8, 2025
Permit fee: $3,000
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 2 . lighting outlets: 0. specific location: united airlines terminal #1 c concourse.
Status: COMPLETE
Aug 4, 2025
Declared cost: $15,500
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 8/1/2025. end date: 8/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Jul 31, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Monthly Maintenance Permit
Electrical maintenance permit. occupancy: business. start date: 8/1/2025. end date: 8/31/2025. all work under this permit must be performed by employees of the listed electrical contractor. the electrical contractor must maintain complete w
Status: COMPLETE
Jul 31, 2025
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Line voltage electrical work. outdoor lighting for 50000 square feet. receptacle outlets: 0 . lighting outlets: 6. specific location: ord parking lot b.
Status: ACTIVE
Jul 31, 2025
Declared cost: $690,000
Permit fee: $3,775
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: revision to permit #101067372 to show new office, ready room, tire room and breakroom configurations revise mechanical, electrical and pluming to accommodate architectural chages in g apron terminal 3 per plans. (use gr
Contractor: A. HORN, INC.
Status: ACTIVE
Jul 22, 2025
Declared cost: $250,000
Permit fee: $1,290
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: revision to permit #101064700 to add new elevator lobby, change wall type in in tire room to cmu, add trench drain, oil interceptor and assoicated piping in tire room, revise hvac in breakroom revise mechanical, electri
Contractor: A. HORN, INC.
Status: ACTIVE
Jul 16, 2025
Declared cost: $50,000
Permit fee: $975
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior alteration to existing locker room, to include addition of new partion, finishes, plumbing, electrical and ductwork. locations: 0 residential unit(s), 1 non-residential unit(s), terminal 1 - concourse c - basem
Contractor: FUJIKAWA TOMOO T
Status: COMPLETE
Jul 9, 2025
Declared cost: $50,000
Permit fee: $325
PERMIT - RENOVATION/ALTERATION
Interior renovation of two hotel guestrooms to function as 'model rooms' for an eventual whole building renovation of all guestrooms. renovation scope consists of removal and relocation of some interior partitions and ceilings, reworking of
Contractor: JUSTIN JAMESON
Status: COMPLETE
Jul 2, 2025
Declared cost: $500,000
Permit fee: $675
PERMIT – EXPRESS PERMIT PROGRAM Storm Water Management Plan
Approval of new plan for stormwater management. project type: airport. project area: 5.37 acres. this approval does not authorize any construction work. construction work may require separate permit(s).
Contractor: AVRAM JOSEPH M
Status: ACTIVE
Jun 25, 2025
Permit fee: $3,000
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. alter existing lighting. specific location: lobby of hotel.
Status: COMPLETE
Jun 24, 2025
Declared cost: $3,000
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Renovating an existing storage room and janitors closet into 5 single user restrooms within the lower level of the hilton ohare hotel. the building is an existing residential building with accessory occupancies, one of which is storage. the
Contractor: JUSTIN JAMESON
Status: ACTIVE
May 28, 2025
Declared cost: $400,000
Permit fee: $1,825
PERMIT – EXPRESS PERMIT PROGRAM Storm Water Management Plan
Approval of new plan for stormwater management. project type: airport. project area: 10.05 acres. this approval does not authorize any construction work. construction work may require separate permit(s).
Contractor: BOVA CARL J
Status: ACTIVE
May 6, 2025
Permit fee: $3,000
PERMIT – EXPRESS PERMIT PROGRAM Storm Water Management Plan
Approval of new plan for stormwater management. project type: airport. project area: 38.6 acres. this approval does not authorize any construction work. construction work may require separate permit(s).
Contractor: ANTONOGLU JOHN N
Status: ACTIVE
Apr 29, 2025
Permit fee: $3,000
PERMIT – EXPRESS PERMIT PROGRAM Storm Water Management Plan
Approval of new plan for stormwater management. project type: airport. project area: 999 acres. this approval does not authorize any construction work. construction work may require separate permit(s).
Contractor: JULKOWSKI JEFF J
Status: ACTIVE
Apr 29, 2025
Permit fee: $3,000
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: revisions to previously permitted (#101061323) work including renovation of existing offices including removing/relocation existing furniture, repainting existing walls and doors, and building new walls/doors and adding
Contractor: CHIP SANDIFER
Status: SUSPENDED
Apr 22, 2025
Declared cost: $131,304
Permit fee: $7,130
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: alterations to existing office space, break room, locker room and washrooms in g apron terminal 3 per plans. (use group b construction type ia)
Contractor: A. HORN, INC.
Status: ACTIVE
Apr 16, 2025
Declared cost: $3,000,000
Permit fee: $3,688
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: alterations to existing office space, break room, washrooms and construct new elevator shaft in l apron terminal 3 per plans and structural peer review. (use group b construction type ia)
Contractor: A. HORN, INC.
Status: ACTIVE
Apr 10, 2025
Declared cost: $3,000,000
Permit fee: $4,813
PERMIT – EXPRESS PERMIT PROGRAM Nonstructural Interior Work
Scope: nonstructural interior refresh of existing starbucks kiosk, replace trim, counter and equipment, install new circuits, remove one sink, all other plumbing fixtures to remain. locations: 0 residential unit(s), 1 non-residential unit(s
Contractor: CHIN LINDA K
Status: ACTIVE
Mar 4, 2025
Declared cost: $100,150
Permit fee: $575
PERMIT – EXPRESS PERMIT PROGRAM Plumbing Work
Repair or in-kind replacement of 7 plumbing fixtures as described in permit application. includes repair or replacment of plumbing piping. locations: 0 residential unit(s), 0 non-residential unit(s), 1 interior common areas, terminal 1 ga
Status: COMPLETE
Feb 20, 2025
Declared cost: $20,000
Permit fee: $175
PERMIT - RENOVATION/ALTERATION
Self-cert: 2019 cbrc: interior work only. interior alteration and renovation work to construct an approximate 5,037 sf airport lounge at chicago o'hare international airport, on the upper level of concourse m at tenant space u635. work is
Status: COMPLETE
Jan 27, 2025
Declared cost: $4,500,000
Permit fee: $3,248
PERMIT - RENOVATION/ALTERATION
Renovation of existing offices including removing/relocation existing furniture, repainting existing walls and doors, and building new walls/doors and adding new data ports.
Contractor: CHIP SANDIFER
Status: ACTIVE
Nov 4, 2024
Declared cost: $5,014,000
Permit fee: $13,714
PERMIT - RENOVATION/ALTERATION
Renovation of existing offices including removing/relocation existing furniture, repainting existing walls and doors, and building new walls/doors and adding new data ports.
Contractor: CHIP SANDIFER
Status: SUSPENDED
Nov 4, 2024
Declared cost: $552,000
Permit fee: $1,004
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. install security. specific location: traffic tunnel under taxiway lima & kilo at o'hare.
Status: COMPLETE
Oct 29, 2024
Declared cost: $2,500,000
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage/communication electrical work. alter existing audio. install data/video. specific location: ord terminal 1 c18 united polaris club.
Contractor: PACE SYSTEMS, INC.
Status: COMPLETE
Oct 15, 2024
Declared cost: $80,000
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
2019 cbc: interior work only - interior renovation of four existing tenant suits on both the upper level and apron level of terminal 2. work includes select demolition, additional partitions, doors, and associated mep/fp and technology wor
Status: COMPLETE
Oct 15, 2024
Declared cost: $1,750,000
Permit fee: $2,675
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: exterior reconfiguration of airplane boarding bridges with new mat foundations and rework of the exterior curtain wall where the bridges meet the 2 story airport building (occupancy group a-3 and b; type ib construction)
Status: ACTIVE
Oct 1, 2024
Declared cost: $2,281,000
Permit fee: $1,775
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
For permit 101046833: replacement plumbing contractor. replacement other contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Contractor: CT MECHANICAL LLC
Status: COMPLETE
Sep 18, 2024
Permit fee: $100
PERMIT - RENOVATION/ALTERATION
Spr 2019: - hvac upgrades to an existing 2-story cargo facility as per plans at o'hare airport. work to include removing & replacing 4 rooftop hvac, 2 liebert split systems, 1 boiler pump, hw boilers with circulators, 5 gas unit heaters, 44
Contractor: F.E. MORAN INC
Status: ACTIVE
Aug 30, 2024
Declared cost: $1,700,000
Permit fee: $45,688
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior alterations to existing c16 polaris lounge (concourse c) at o'hare airport. scope to include demolition of an existing tenant space and the expansion of an existing airport lounge, bar, dining room, kitchen sto
Status: ACTIVE
Aug 27, 2024
Declared cost: $9,100,000
Permit fee: $7,960
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: interior demo only to existing concourse level as per plans. (1a construction. a3-assembly use)
Status: ACTIVE
Aug 23, 2024
Declared cost: $700,000
Permit fee: $3,066
PERMIT - RENOVATION/ALTERATION
2019 cbc: interior work only. interior renovation of a vacant room to a new office for united and cda badging operations. work includes work within an existing room in the business area of the basement level of t1-concourse b. existing d
Status: SUSPENDED
Aug 20, 2024
Declared cost: $240,000
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Furnish and install the electrical heat trace with associated controller on (10) drains. permit request expedited by aecom/hunt permit no. 101011725.
Status: COMPLETE
Aug 7, 2024
Declared cost: $222,500
Permit fee: $150
PERMIT - WRECKING/DEMOLITION
Wreck and remove a 2 story masonry building (building 464- former a t&t)
Jul 30, 2024
Declared cost: $275,000
Permit fee: $2,550
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Remove existing circuits. add cercuits and devices terminal 3 rotunda renovations
Status: COMPLETE
Jul 9, 2024
Declared cost: $48,000
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Installation of chicago department of aviation public address system infrastructure, cabling and speakers in the t5 landside parking garage.
Status: ACTIVE
Jun 26, 2024
Declared cost: $290,000
Permit fee: $450
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
Installation of new conduit for power and lighting for haymarket area at o'hare blue line station under t1, t2, t3 parking garage. install of new light fixtures, install of conduit for fire alarm only. no fire alarm cable or devices include
Status: ACTIVE
Jun 18, 2024
Declared cost: $90,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit #100864237. to change of other (hvac) contractor.
Status: COMPLETE
Jun 5, 2024
Permit fee: $100
PERMIT - ELEVATOR EQUIPMENT
Installation of four(4) 4000lb capacity, 6-floor, 500fpm, passenger elevators, and two(2) 40", 100fpm, passenger escalators, pursuant t othe scope of work plans submitted.
Jun 5, 2024
Declared cost: $2,089,800
Permit fee: $3,630
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Installation of coax cable in existing cable tray from termial 1 occ mdf room to terminal 2 tower mdf room.
Status: COMPLETE
May 28, 2024
Declared cost: $20,000
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Installation of conduit raceway for power and data cabling for united t2 gate e3 podium.
Status: COMPLETE
May 23, 2024
Declared cost: $40,000
Permit fee: $225
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
United airlines t2 club electrical renovations
Status: ACTIVE
May 15, 2024
Declared cost: $150,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Install armored fiber and coax cabling.
Status: COMPLETE
May 11, 2024
Declared cost: $20,000
Permit fee: $750
PERMIT - RENOVATION/ALTERATION
2019 cbc: self-cert: removal of existing back-to-back static signs and installation of new led back-to-back signs on new substructure supported from existing structural steel arm. associated power and date wired to new signs as per plans.
Status: COMPLETE
May 9, 2024
Declared cost: $1,500,000
Permit fee: $1,775
PERMIT - RENOVATION/ALTERATION
Self-cert: interior alteration of existing previously unused space into new full service restaurant. work includes demolition of existingconstruction, installation of new partitions, doors, ceilings, finishes,hvac system, restrooms, plumbin
Contractor: MAMAN CORPORATION
Status: COMPLETE
May 8, 2024
Declared cost: $3,500,000
Permit fee: $2,371
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit no. 100864237 to add gc, mason, plumber, electrician and hvac contractors to work on building 790.
Contractor: PAULSON SCOTT
Status: COMPLETE
Apr 29, 2024
Permit fee: $100
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 2 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 5 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 3 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 7 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 8 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 9 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 6 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 12 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 13 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each entry associated with the signs. sign 1 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 14 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 11 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 4 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - SIGNS
Install sign with american airlines logo, verbiage differing based on function at each terminal entry associated with the signs. sign 10 of 14.
Apr 22, 2024
Declared cost: $25,000
Permit fee: $300
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: interior build-out of space 571 at o'hare airport terminal 5 for the new tenant protein bar as per plans (occupancy group a3 & h2; type ib construction)
Status: SUSPENDED
Apr 11, 2024
Declared cost: $1,124,000
Permit fee: $1,775
PERMIT - RENOVATION/ALTERATION
2019 chicago building codelevel 2 alteration to the 2nd floor of an existing 2-story office buildng (b) of type i-a construction w/ sprinkler system
Contractor: HEATH FERRY
Status: SUSPENDED
Feb 28, 2024
Declared cost: $10,000
Permit fee: $925
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit #101011725.change of electrical contractor
Status: COMPLETE
Feb 5, 2024
Permit fee: $100
PERMIT - SIGNS
Install 1 set of illuminated blade sign (six points market)
Dec 15, 2023
Declared cost: $800
Permit fee: $300
PERMIT - SIGNS
Install 1 set of illuminated blade sign (m metropolis coffee company)
Dec 15, 2023
Declared cost: $800
Permit fee: $300
PERMIT - SIGNS
Install 1 set of illuminated wall sign (six points market)
Dec 15, 2023
Declared cost: $2,000
Permit fee: $250
PERMIT - SIGNS
Install 1 set of illuminated channel letters (metropolis coffee company)
Dec 15, 2023
Declared cost: $2,000
Permit fee: $250
PERMIT - SIGNS
Install 1 set of illuminated channel letters
Dec 8, 2023
Declared cost: $2,000
Permit fee: $250
PERMIT - SIGNS
Install 1 set of illuminated channel letters
Dec 8, 2023
Declared cost: $2,800
Permit fee: $250
PERMIT – EXPRESS PERMIT PROGRAM Fence or Trash Enclosure
Purpose: new/replacement installation. chain link fence - 6'-0' ' (height) x 280'-0' ' (length). location: north end of avis budget existing facilities.
Status: COMPLETE
Dec 1, 2023
Declared cost: $98,000
Permit fee: $175
PERMIT - SIGNS
Install 1 set of illuminated channel letters
Nov 17, 2023
Declared cost: $3,500
Permit fee: $250
PERMIT – EXPRESS PERMIT PROGRAM Other Work
Removal of existing gate c5 door and jet bridge. installation of new glass facade where gate c5 was removed. locations: 1 non-residential unit(s), 1 interior common areas, exterior work, o'hare airport terminal 1 concourse c gate 5.
Contractor: UNITED AIRLINES
Status: SUSPENDED
Nov 17, 2023
Declared cost: $50,000
Permit fee: $244
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Installation of cat6 and cat6a cable in raceway provided by others. termianl 1 gates c4, c6, c8 and c10. lv cable related to wap and camera locations only.
Status: COMPLETE
Oct 9, 2023
Declared cost: $61,000
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
Self-cert 2019 cbrc: alterations to ground floor of existing airport terminal building. relocation of baggage service office from existing trailer to ground floor.(occupancy groups b, s-1; type ib construction
Contractor: DARIN HUBARTT
Status: EXPIRED
Sep 29, 2023
Declared cost: $200,000
Permit fee: $875
PERMIT - RENOVATION/ALTERATION
Renovation of existing offices including removing/relocation existing furniture, repainting existing walls and doors, and building new walls/doors and adding new data ports.
Contractor: CHIP SANDIFER
Status: EXPIRED
Sep 20, 2023
Declared cost: $82,000
Permit fee: $875
PERMIT - ELEVATOR EQUIPMENT
Removal of existing hydraulic, push button operation, 25,000lb.cap, 2-floor (front & rear opening), sidewalk freight elevator # n1x048. pursuant to the scope of work submitted. ev005004
Jul 19, 2023
Declared cost: $100,000
Permit fee: $255
PERMIT - ELEVATOR EQUIPMENT
Installation of one (1) 25,000lb.cap, 2-stop(front & rear) 24ft. rise, holeless telescoping hydraulic sidewalk freight elevator #n1x048. pursuant to the plans submitted. ev005004
Jul 19, 2023
Declared cost: $600,000
Permit fee: $360
PERMIT - ELEVATOR EQUIPMENT
Removal of one (1) smoke detector from upper level of united's 4500lb.cap, 2-floor, only elevator. pursuant to tk elevator and the scope of work submitted. ev005004
Jul 19, 2023
Permit fee: $300
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Provide (3) 20a/1p circuits for vendor kiosk from existing panelboard.
Status: COMPLETE
Jun 15, 2023
Declared cost: $1
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
New interior buildout walk-up restaurant to include new plumbing, eletrical, mechanical system and food services equipment.
Contractor: JOHN WOBER
Status: COMPLETE
Jun 14, 2023
Declared cost: $10,000,000
Permit fee: $2,211
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbc - construction of new one story pump station and associated wet wells part of taxiway k-l project at ord international airport as per plans.(occupancy use f-2, construction type ¿ ii-b). cda project no - h6235.20 (taxiway k-l
Status: ACTIVE
Jun 7, 2023
Declared cost: $7,978,355
Permit fee: $2,259
PERMIT - ELEVATOR EQUIPMENT
Installation of two (2) units; one (1) 4000lb.cap, 200 fpm, 4-64kn belts, poly buffers, 4-floor, gen3 edge gearless traction passenger elevator. and one (1) 25,000lb.cap, 25 fpm, 2-stop, hydraulic sidewalk elevator. pursuant to the plans su
May 17, 2023
Declared cost: $1,111,000
Permit fee: $555
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbc revision to existing permit#100972665 to add additional 3000 s.f. of area on the upper-level hold rooms in the east concourse of international terminal 5 at ord international airport as per plans. (occupancy a-3, type o
Contractor: ANDREW PILARCIK
Status: COMPLETE
May 15, 2023
Declared cost: $150,000
Permit fee: $4,021
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc - renovations to existing concourse c to accommodate the reconfiguration of new passenger boarding bridges (pbb) in preparation of future satellite 1 concourse building at terminal 1 of ord international airport as per plans (
Status: SUSPENDED
May 9, 2023
Declared cost: $17,793,303
Permit fee: $4,279
PERMIT - REINSTATE REVOKED PMT
Reinstate permit no 100845578 and change general contractor to f. h. paschen, change mason to all masonry, change hvac to ct mechanical and change plumber to harrington site services company, must begin work and or request inspections no la
Apr 14, 2023
Declared cost: $1
Permit fee: $975
PERMIT - REINSTATE REVOKED PMT
Reinstate permit no 100846651 and change general contractor to f. h. paschen, change mason to all masonry, change hvac to ct mechanical and change plumber to harrington site services company, must begin work and or request inspections no la
Apr 14, 2023
Declared cost: $1
Permit fee: $1,725
PERMIT - NEW CONSTRUCTION
2019 new cbc - full building permit for proposed 6 story parking garage facility with approximatelhy 95400 sf parking space per story, and helical ramp structures at terminal 5 of ohare international airport as per plans. shallow foundati
Status: COMPLETE
Apr 5, 2023
Declared cost: $77,092,111
Permit fee: $209,995
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Replacing existing 208v 3 ph 4w 100a panel with 30 space panel
Status: COMPLETE
Mar 24, 2023
Declared cost: $100
Permit fee: $225
PERMIT - EASY PERMIT PROCESS
Remove and replace: (1) vrf (3) liebert crac units, hydronic & refrigeration piping, valves, strainers, temperature controls, electrical circuit, panelboards, and testing and balancing.
Mar 8, 2023
Permit fee: $1,200
PERMIT - NEW CONSTRUCTION
Revision to permit #101001168 to modify the south retaining wall design from concrete wall to modular block wall for proposed 6 story parking garage facility at terminal 5 of ord international airport as per plan
Status: COMPLETE
Jan 31, 2023
Declared cost: $1,553,000
Permit fee: $6,525
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Low voltage cable in new 2 story admin and controls building job# 787-515
Status: COMPLETE
Jan 25, 2023
Declared cost: $50,000
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
We are pulling a wire and installing fire alarm devices in 2-story building. all work is done inside only.
Status: COMPLETE
Jan 25, 2023
Declared cost: $24,498
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
Self certification: -interior alteration of 3,549 sq. ft. of the existing office suite of the hilton o'hare hotel, as per plans. -all exist. mechanical systems to remain. distribution to be adjusted per new revised architectural layout, as
Contractor: OSLO BUILDERS LLC
Status: EXPIRED
Jan 12, 2023
Declared cost: $485,000
Permit fee: $1,388
PERMIT - NEW CONSTRUCTION
Proposed shallow foundation on caissons including proposed retaining wall and earth retention systems - for proposed 6 story parking garage facilty with 95,400 sf of parking spaces per story, and helical, ramp structures that one for upward
Status: PHASED PERMITTING
Jan 5, 2023
Declared cost: $1
Permit fee: $23,025
PERMIT - RENOVATION/ALTERATION
2019 chicago rehabilitation codelevel 2 alteration to the 2nd floor of an existing 2-story office building (b) of type i-a construction w/ sprinkler systemno hvac or plumbing work
Contractor: HEATH FERRY
Status: EXPIRED
Jan 4, 2023
Declared cost: $25,000
Permit fee: $2,300
PERMIT - ELEVATOR EQUIPMENT
Installation of one(1) 3500lb capacity, 2-floor, 110fpm, hydraulic, passenger elevator, pursuant to the scope of work plans submitted.
Nov 29, 2022
Declared cost: $90,000
Permit fee: $510
PERMIT - RENOVATION/ALTERATION
Dds revision to permit #100838564 to include minor design changes of pbb (passenger boarding bridge) caissons at east extension and west concourse for proposed terminal 5 repurposing/expansion at ohare international airport as per plans. c
Status: COMPLETE
Nov 9, 2022
Declared cost: $75,000
Permit fee: $6,075
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Subcontractor to maron electric on the e gate electrical upgrades at ohare.
Status: COMPLETE
Nov 3, 2022
Permit fee: $150
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Provide 20a receptacles to kiosk coolers and light kiosk's terminal 5.
Status: COMPLETE
Oct 17, 2022
Declared cost: $13,000
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: interior and exterior alterations to existing 2 story warehouse at o'hare int'l airport. scope to include new overhead doors, material handling system, general power, exterior lighting modifications and 2 new rooftop heaters.
Status: EXPIRED
Oct 5, 2022
Declared cost: $3,680,000
Permit fee: $20,715
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbc - revision to permit#100972665 to include new hvac supply diffusers connected to the existing hvac system for cda tenant spaces on the upper level west concourse of international terminal 5 at o'hare international airport
Contractor: JEFF RANDERSON
Status: COMPLETE
Sep 12, 2022
Declared cost: $100,000
Permit fee: $713
PERMIT - RENOVATION/ALTERATION
Partial demolition of existing pedestrian bridge between terminal 5 and existing surface parking lot in preparation for proposed 6 story parking garage facility at o¿hare international airport.
Status: PHASED PERMITTING
Sep 9, 2022
Declared cost: $475,000
Permit fee: $1,075
PERMIT - SIGNS
Installation of (1) double sided projecting blade sign to be mounted outside the store within the concourse in o'hare airport,. sign to read dd
Contractor: DOYLE SIGNS INC
Sep 7, 2022
Declared cost: $2,500
Permit fee: $300
PERMIT - SIGNS
Installation of (1) set of internally illuminated channel letters to be mounted outside the store within the concourse in o'hare airport,. sign to read dunkin'
Contractor: DOYLE SIGNS INC
Sep 7, 2022
Declared cost: $2,500
Permit fee: $250
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbc - interior architectural renovations (phase 2) of public areas and holdrooms in lower level,apron level & upper level concourse of international terminal 5 at o'hare international airport as per plans. (occupancy - a-3,
Contractor: JEFF RANDERSON
Status: COMPLETE
Sep 7, 2022
Declared cost: $5,400,000
Permit fee: $46,008
PERMIT - SIGNS
Installation of (1) set of internally illuminated channel letters to be mounted outside the store within the concourse in o'hare airport,. sign to read dd
Contractor: DOYLE SIGNS INC
Sep 7, 2022
Declared cost: $2,500
Permit fee: $250
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbc - interior tenant buildout of 1 cda office and 4 vestibules in the apron level of international terminal 5 at o'hare international airport as per plans. (occupancy - b, type of construction - ib). scope of work to include
Status: COMPLETE
Aug 5, 2022
Declared cost: $250,000
Permit fee: $825
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Subcontractor to maron electric on the c10 club at ohare
Status: COMPLETE
Jul 25, 2022
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
Self-certified project 2019 cbrc - interior alteration of existing ord terminal 5 apron level space for southwest airlines operations with no change in current mixed occupancy classification b business and with storage locker areas and smal
Contractor: DARIN HUBARTT
Status: COMPLETE
Jun 17, 2022
Declared cost: $1,900,000
Permit fee: $1,719
PERMIT - RENOVATION/ALTERATION
Self cert 2019 cbc - interior tenant buildout of 3 cda offices in mezzanine and apron levels of international terminal 5 at o'hare international airport as per plans. (occupancy - b & a-3, type of construction - ib). scope of work to includ
Status: COMPLETE
Jun 9, 2022
Declared cost: $1,000,000
Permit fee: $2,092
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Change electrical contractor on permit number: 100958125 to canino electric co.
Contractor: SOUND INCORPORATED
Status: COMPLETE
Jun 3, 2022
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
Self-certified project - revision to original permit # 100941941 - interior alteration of delta air line's ticket counters on upper level & breakroom, office and other spaces on apron level with architectural, mechanical & electrical work.
Contractor: SCOTT MEADER
Status: COMPLETE
May 17, 2022
Declared cost: $1,200,000
Permit fee: $1,923
PERMIT - RENOVATION/ALTERATION
Dds revision to existing permit #100876352 to include design changes on the proposed terminal 5 interior area buildout for east, west and headhouse of terminal 5 and federal inspection services areas as per plans. cda project no - h2028.18-
Status: COMPLETE
May 16, 2022
Declared cost: $10,000,000
Permit fee: $176,578
PERMIT - RENOVATION/ALTERATION
Renovation of existing meeting room and retail space into one larger meeting space. includes revisions to electrical distribution and fire alarm and fire protection system. new finishes and lighting fixtures throughout with minor removal of
Contractor: SAAEMA ALAVI
Status: EXPIRED
May 11, 2022
Declared cost: $750,000
Permit fee: $972
PERMIT - RENOVATION/ALTERATION
Direct developer services. revision to existing permit #100838565 to include design changes on the proposed terminal 5 repurposing/expansion project at ohare international airport as per plans. cda project no - h2028.18-02. the project is d
Status: COMPLETE
May 6, 2022
Declared cost: $2,500,000
Permit fee: $26,027
PERMIT - RENOVATION/ALTERATION
Direct developer services. revision to existing permit #100838566 to include design changes on the proposed terminal 5 repurposing/expansion project at ohare international airport as per plans. cda project no - h2028.18-02. the project is d
Status: COMPLETE
May 6, 2022
Declared cost: $2,000,000
Permit fee: $6,178
PERMIT - RENOVATION/ALTERATION
Spr 2019 cbrc: interior alterations to existing 1st floor and apon level c10 terminal for united airlines. scope to include mechanical, electrical, plumbing and food service. no change to existing use (a-2 occupancy / type 1b construction)(
Status: COMPLETE
Apr 18, 2022
Declared cost: $10,500,000
Permit fee: $12,465
PERMIT - NEW CONSTRUCTION
2019 cbc: new construction of a 2-story precast admin and controls building as per plans.**certified corrections subject to field inspections & audit **
Status: COMPLETE
Mar 23, 2022
Declared cost: $2,500,000
Permit fee: $5,535
PERMIT - RENOVATION/ALTERATION
Construct new taco johns restaurant within existing shell space.
Status: COMPLETE
Feb 23, 2022
Declared cost: $200,000
Permit fee: $1,575
PERMIT - NEW CONSTRUCTION
Deep foundation - caissons only permit- for a proposed 6-story concrete parking garage structure at terminal 5 of ohare international airport as per plans.
Contractor: REYES GROUP LTD
Status: PHASED PERMITTING
Feb 23, 2022
Declared cost: $2,200,000
Permit fee: $14,224
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Additional 200 branch circuit to permit 100933907
Status: COMPLETE
Jan 28, 2022
Declared cost: $2,000
Permit fee: $2,250
PERMIT - RENOVATION/ALTERATION
Self-certified project - interior alteration of existing west concourse lower, apron, upper & mezzanine levels of terminal 5 for delta air lines operations with no change in current mixed occupancy classification of c-1 assembly, e business
Status: COMPLETE
Dec 17, 2021
Declared cost: $12,000,000
Permit fee: $22,350
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
*** change of contractor - 100941941 ***
Status: COMPLETE
Dec 17, 2021
Permit fee: $150
PERMIT - ELEVATOR EQUIPMENT
Install four (4) 4000lb.cap, 125 fpm, 2-floor, hydraulic passenger elevators #31, #32, #33, & #34. pursuant to the plans submitted
Nov 3, 2021
Declared cost: $483,504
Permit fee: $2,250
PERMIT - ELEVATOR EQUIPMENT
Install four (4) 6000lb.cap, 3-stop, passenger elevators, #20 roped hydraulic, 100 fpm, 8-38" cables. #21 roped hydraulic, 150 pfm, 8-3/8" cables. #22 & #23 hole-less hydraulic, 100 fpm, 2-stage jacks. purusant to the plans submitted.
Nov 3, 2021
Declared cost: $634,470
Permit fee: $2,880
PERMIT - EASY PERMIT PROCESS
Installation of maintenance mezzanine for united airlines at o'hare airport. maintenance use and employee access only. structure to be metal grating supported by steel beams and attached to the existing structure. cda project number th1485
Oct 27, 2021
Declared cost: $319,710
Permit fee: $575
PERMIT - RENOVATION/ALTERATION
Cbrc 2019: interior alterations to delta sky club lounge and amenity suite at o'hare airport, terminal 5, building 325. work to include non-load-bearing partitions, new finishes, furniture, equipment, millwork, food service area, and assoc
Status: COMPLETE
Oct 26, 2021
Declared cost: $12,177,711
Permit fee: $11,287
PERMIT - ELEVATOR EQUIPMENT
Installation of two(2) 5000lb capacity, (1) 2-floor, (1) 3-floor, 200fpm, traction, passnger elevators, pursuant to the scope of work plans submitted. terminal 5 expansion cars #35-36
Sep 29, 2021
Declared cost: $290,957
Permit fee: $1,465
PERMIT - ELEVATOR EQUIPMENT
Installation of one(1) 2500lb capacity, 200fpm, 4-floor, traction, passenger elevator, pursuant to the sope of work plans submitted.car #rct
Sep 29, 2021
Declared cost: $161,036
Permit fee: $720
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Revision to permit 100899320 to change the electrical contractor to horizon contractors inc.
Status: COMPLETE
Sep 9, 2021
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Perform electrical work as a subcontractor to hartmann electric under permit # 100844271 at terminal 5 ohare int'l airport. job description: direct developer services ord termianl 5 expansion - tsa - core area
Status: COMPLETE
Sep 8, 2021
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Replace the fuel management system for above ground storage tank.
Status: COMPLETE
Aug 12, 2021
Declared cost: $7,000
Permit fee: $150
PERMIT - RENOVATION/ALTERATION
V-3 drawings (cost of const = $1,000,000): renovation to existing truck maintenance facility, including upgrades to mechanical, electrical and plumbing. truck maintenance facility is mixed occupancy: h-3 garages and e business. there will
Status: ACTIVE
Aug 11, 2021
Declared cost: $50,000,000
Permit fee: $3,557
PERMIT – EXPRESS PERMIT PROGRAM Electrical Work
Remodell of termintal gate areas
Status: COMPLETE
Aug 3, 2021
Declared cost: $300
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
*dds* revision to permit #100876352 to ventilation layout beneath proposed core expansion build out to allow for compliant mechanical air intake/exhaust separation for proposed terminal 5 repurposing/expansion at ohare international airport
Status: COMPLETE
Jul 19, 2021
Declared cost: $300,000
Permit fee: $3,075
PERMIT - RENOVATION/ALTERATION
*dds* revision to existing permit #100838565 to include changes to exterior cladding and ventilation layout beneath proposed core expansion build out to allow for compliant mechanical air intake/exhaust separation for proposed terminal 5 re
Status: COMPLETE
Jul 19, 2021
Declared cost: $2,500,000
Permit fee: $3,075
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838566 to add b3 integrate for low voltage raceway installation; gurtz electric to remain electrician for remainder of electrical and low voltage
Jul 19, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100876352 to add b3 integrate for low voltage raceway installation; gurtz electric to remain electrician for remainder of electrical and low voltage
Jul 19, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838566 to add jm polcurr for the lightling system; gurtz electric to remain electrician for remainder of electrical and low voltage
Jul 19, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100876352 to add jm polcurr for the lightling system; gurtz electric to remain electrician for remainder of electrical and low voltage
Jul 19, 2021
Declared cost: $1
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
Self cert cbc 2019: revision to permit # 100899320 to bathroom layouts to include relocating plumbing fixtures. (occupancy class r-1, construction type 1b)
Status: COMPLETE
Jul 6, 2021
Declared cost: $100,000
Permit fee: $575
PERMIT - RENOVATION/ALTERATION
2018 cbc. addition of new below grade comed vault at gate m12 for proposed terminal 5 repurposing/expansion at o'hare international airport as per plans. cda project no - h2028.18-02. proposed comed vault & terminal 5 repurposing/expansion
Status: COMPLETE
Jun 9, 2021
Declared cost: $1,000,000
Permit fee: $1,575
PERMIT - REINSTATE REVOKED PMT
Reinstate 100755718 and install power construction co
Jun 2, 2021
Declared cost: $5,000
Permit fee: $8,113
PERMIT - WRECKING/DEMOLITION
Wreck and remove a 1 story metal building (truck filling station/building 988)
Jun 1, 2021
Declared cost: $1
Permit fee: $500
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838566 to add ampere electric for the electrical feeders installation; gurtz electric to remain electrician for remainder of electrical and low voltage
Jun 1, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100876352 to add evans electric for the electrical distribution/gear scope; gurtz electric to remain electrician for remainder of electrical and low voltage
Jun 1, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100876352 to add ampere electric for the electrical feeders installation; gurtz electric to remain electrician for remainder of electrical and low voltage
Jun 1, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838566 to add live wire electric for the electrical branch raceway installation; gurtz electric to remain electrician for remainder of electrical and low voltage
Jun 1, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838566 to add evans electric for the electrical distribution/gear scope; gurtz electric to remain electrician for remainder of electrical and low voltage
Jun 1, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100876352 to add live wire electric for the electrical branch raceway installation; gurtz electric to remain electrician for remainder of electrical and low voltage
May 28, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100876352 to change electrical contractor gibson electric to canino electric for: security cabling for t5 trade package 23b - full building
May 20, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100876352 to change electrical contractor gibson electric to gim electric for: security reaceway and security devices for t5 trade package 23b - full building
May 20, 2021
Declared cost: $1
Permit fee: $75
PERMIT - ELEVATOR EQUIPMENT
Installation of (3) moving walks and (4) escalators at terminal 5 pursuant to plans submitted and subject to city of chicago dept. of buildings elevator bureau inspection.
May 19, 2021
Permit fee: $3,250
PERMIT – EXPRESS PERMIT PROGRAM Fire Alarm System
**fire alarm permit**the fire alarm system is being submitted for non-jurisdictional review per city of chicago code section 15-16-110 elevator recall shall be addressable to comply with city of chicago building code 18-30
Status: COMPLETE
May 14, 2021
Declared cost: $286,000
Permit fee: $675
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838565 to change electrical contractor gibson electric to leyden electric for: electrical power systems and av raceway systems for t5 trade package 23b - head-house/core expansion - shell & core.
May 11, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838565 to change electrical contractor gibson electric to taylor electric for: electrical fixtures and lighting raceway for t5 trade package 23b - head-house/core expansion - shell & core.
May 11, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838565 to change electrical contractor gibson electric to canino electric for: telecommunications, horizontal and backbone cabling - head-house/core expansion - shell & core.
May 11, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838565 to change electrical contractor gibson electric to gim electric for: telecommunications raceway and security for t5 trade package 23b - head-house/core expansion - shell & core.
May 11, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838565 to change electrical contractor gibson electric to cable communication inc. for: public address system raceway, cabling, and devices - head-house/core expansion - shell & core.
May 11, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit #100838565 to change electrical contractor gibson electric to livewire electric for: electrical distribution for t5 trade package 23b - head-house/core expansion - shell & core.
May 11, 2021
Declared cost: $1
Permit fee: $75
PERMIT - RENOVATION/ALTERATION
*direct developer services* revision to permit #100844271 to include modifications to tsa break room layout, the egress corridor and access to adjacent office spaces on the o'hare airport terminal 5 repurposing/expansion project as per plan
Status: COMPLETE
May 6, 2021
Declared cost: $50,000
Permit fee: $8,063
PERMIT - EASY PERMIT PROCESS
Revision to permit # 100876352 to add cable communications inc. for the public address system work only. gurtz electric co. to remain electrician for remainder of electrical and low voltage.
Apr 23, 2021
Declared cost: $1
Permit fee: $75
PERMIT - EASY PERMIT PROCESS
Revision to permit # 100838566 to add cable communications inc. for the public address system work only. gurtz electric co. to remain electrician for remainder of electrical and low voltage.
Apr 23, 2021
Declared cost: $1
Permit fee: $75
PERMIT – EXPRESS PERMIT PROGRAM Administrative Change
Subcontractor permit to permit #100876352 & #100838566. we are a subcontractor to gurtz electric for the pa system installation of conduits, raceways, wiring & devices in area between column 140 to the far east end of building (new mdf room
Status: COMPLETE
Apr 13, 2021
Permit fee: $75

Check permits at another Chicago address

Free instant lookup, no signup.

Search Chicago permits →
Disclaimer: Permit data comes from Chicago's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Chicago building department before buying, selling, or planning work.