Permit history for 150 Cambridgepark Dr, Cambridge
Cambridge, MA · 18 permits on file · 2021–2022
18
Permits on file
2021
First permit
2022
Most recent
$92,545,650
Declared value (all work)
Permits on file (18)
Ordered most recent first. Data from the city's open data portal.
Building: Alteration and Addition
This project will consist of a partial-floor speculative fit out of the 7th floor, comprising approximately 8,820 sf. this project will include installation of private offices, workstations, lab space, conference/meeting rooms, a breakroom
Contractor:
PIDC Construction LLC
Status: Complete
Nov 7, 2022
Declared cost: $2,789,391
Building: Alteration and Addition
Renovate existing office and lobby space to include lobby, restrooms, cafe, office and meeting areas.
Status: Complete
Jul 11, 2022
Declared cost: $2,941,398
Building: Alteration and Addition
Approximately 24,000/sf (5th floor) tenant fit out including open office seating, private meeting areas, and cafe space. new lab area includes open labs as well as tissue culture, cold room and glasswash rooms.
Status: Active
May 12, 2022
Declared cost: $6,594,221
Building: Alteration and Addition
2 floor (27,000/sf on 3rd and 16,000/sf on 4th) fit out including open office seating, private meeting areas, and cafe space. new lab area includes open labs as well as tissue culture and glasswash rooms.
Status: Active
May 12, 2022
Declared cost: $12,385,944
Building: Alteration and Addition
Approximately 21k sf fit out including open office seating, private meeting areas, and cafe space. new lab area includes open labs as well as tissue culture and glasswash rooms.
Status: Active
May 9, 2022
Declared cost: $4,365,087
Building: Alteration and Addition
Approximately 21k sf (10th floor) fit out including open office seating, private meeting areas, and cafe space. new lab area includes open labs as well as tissue culture and glasswash rooms.
Status: Active
May 5, 2022
Declared cost: $5,183,539
Building: Alteration and Addition
21k sf fit out including open office seating, private meeting areas, and cafe space. new lab area includes open labs as well as tissue culture and glasswash rooms.
Status: Active
Apr 19, 2022
Declared cost: $5,389,085
Building: Alteration and Addition
Install service elevator and floor 1 infill
Status: Complete
Mar 29, 2022
Declared cost: $9,117,515
Building: Alteration and Addition
Removal of finishes and mechanical, electrical and plumbing systems on levels 3 through 6 for future lab use
Status: Complete
Mar 9, 2022
Declared cost: $644,639
Building: Alteration and Addition
Interior fit out of new tenant amenities including workout space and yoga room.
Status: Complete
Jan 26, 2022
Declared cost: $993,438
Building: Alteration and Addition
This is a multi-phased project reconfiguring the building to lab/office including the expansion of the existing 150 cpd floor plate to support upgraded shared tenant spaces and enabling future freight elevator installation.
Status: Complete
Jan 11, 2022
Declared cost: $616,849
Building: Alteration and Addition
Modifications to run new supply and exhaust ductwork on floors 2-6 and 10 in support of building infrastructure for future lab tenants. the build out includes new stairs to the penthouse and new electrical rooms on each floor. new ahus and
Status: Complete
Jan 3, 2022
Declared cost: $13,247,467
Building: Alteration and Addition
13k sf fit out including open office seating, private meeting areas, and cafe space. new lab area includes open labs as well as tissue culture and glasswash rooms.
Status: Complete
Nov 1, 2021
Declared cost: $3,220,594
Building: Alteration and Addition
Corneagen is a 4,500 sf office lab fit up. finished spaces will include a reception area, cafe/lounge, open office, and conference rooms. lab fit up to include open lab benching as well as tissue culture labs and support spaces
Status: Complete
Nov 1, 2021
Declared cost: $1,862,769
Building: Alteration and Addition
Fit out of 6,700 sf with office and lab. office to include a new kitchenette, open office seating as well as private break out rooms/offices. lab to include open lab, tissue culture lab and equipment zones.
Status: Complete
Oct 20, 2021
Declared cost: $2,101,036
Building: Alteration and Addition
21k sf fit out including open office seating, private meeting areas, and cafe space. new lab area includes open labs as well as tissue culture and glasswash rooms.
Status: Complete
Oct 19, 2021
Declared cost: $5,456,360
Building: Alteration and Addition
Rework meps on several floors to accommodate new shaft ways and stairs
Contractor:
PIDC Construction
Status: Complete
Jul 14, 2021
Declared cost: $15,300,000
Building: Alteration and Addition
Demolition of existing architectural finishes, and mep infrastructure to create a shell space for future tenant fit ups on floors 7, 8 and 9. totaling approximately 41,000 sf.
Status: Active
May 11, 2021
Declared cost: $336,318
Check permits at another Cambridge address
Free instant lookup, no signup.
Search Cambridge permits →
Disclaimer: Permit data comes from Cambridge's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Cambridge building department before buying, selling, or planning work.