Permit history for 1 Oxford St, Cambridge
Cambridge, MA · 17 permits on file · 2021–2026
17
Permits on file
2021
First permit
2026
Most recent
$51,473,900
Declared value (all work)
Permits on file (17)
Ordered most recent first. Data from the city's open data portal.
Building: Alteration and Addition
Interior abatement/selective demo, and architectural, mechanical, electrical, plumbing renovations to existing classrooms, labs, and office spaces on levels 2, 3, 4, and 5 of the building.
Contractor:
Wise Construction
Status: Active
Apr 21, 2026
Declared cost: $2,498,465
Building: Alteration and Addition
Selective demolition, and architectural, electrical, fire alarm, fire protection, structural, renovations to lecture hall e located in the basement of the building. also includes the addition of a wheel chair lift within the space.
Contractor:
Wise Construction
Status: Active
Apr 21, 2026
Declared cost: $835,534
Building: Alteration and Addition
Replacement of lab waste ph neutralization system equiopment. we will also be converting an adjacent kitchenette to be future space for additional filtration for the lab waste ph neutralization system.
Contractor:
TERVA Construction
Status: Active
Nov 25, 2025
Declared cost: $285,000
Building: Alteration and Addition
Interior abatement/selective demo, and interior architectural, mechanical, electrical, plumbing, and fire protection renovations to existing classroom and offices spaces on levels 3, 4, and 5 of the building.
Contractor:
Wise Construction
Status: Active
May 1, 2025
Declared cost: $1,863,531
Building: Alteration and Addition
Demo of existing mechanical and electrical service in the basement level. installation of a new air handling unit with associated mechanical and electrical services. demo and relocate one (1) sprinkler head. install one (1) new smoke detect
Contractor:
Wise Construction Corp.
Status: Active
Apr 2, 2025
Declared cost: $266,470
Building: Alteration and Addition
The harvard science center renovation project consists of select renovations within the harvard science center building. the work includes renovations located in the basement. new architectural features existing space including new interior
Contractor:
Wise Construction
Status: Active
May 28, 2024
Declared cost: $605,077
Building: Alteration and Addition
Renovating a class room into a office 221
Contractor:
HJ Russell
Status: Active
May 22, 2024
Declared cost: $100,148
Building: Alteration and Addition
The harvard science center renovation project toilet rooms consists of renovations of the restrooms, offices, and corridors located on floors 1-4. new architectural features in existing space include new interior partitions & finishes. alon
Contractor:
Wise Construction
Status: Complete
Apr 29, 2024
Declared cost: $1,441,981
Building: Alteration and Addition
Interior renovations of lecture halls a & b only, including all related mep/fp/fa systems and interior finishes. no change of use or footprint.
Contractor:
Wise Construction
Status: Complete
Apr 26, 2024
Declared cost: $8,700,464
Building: Alteration and Addition
Renovation to lobby on level 1 and basement. this includes basement stair and corridor improvement along with renovations to the mepfp.
Contractor:
Walsh Brothers
Status: Complete
Apr 1, 2024
Declared cost: $2,654,274
Building: Alteration and Addition
Renovation of classroom into it closet
Contractor:
HJ Russell and Company
Status: Active
Dec 12, 2023
Declared cost: $281,143
Building: Alteration and Addition
Renovation of existing classrooms for harvard university
Contractor:
HJ Russell and Company
Status: Active
Dec 8, 2023
Declared cost: $48,247
Building: Alteration and Addition
Enabling lab 210 located on level 2. moving existing meps and building a 2 hour rated wall in student lab space.
Contractor:
Walsh Brothers
Status: Complete
Oct 17, 2023
Declared cost: $57,740
Building: Alteration and Addition
Renovation to existing teachings labs & classrooms located on levels 1 & 2. in addition, improvements related to the lab & classroom renovations include mepfp improvements - include level 5 mech penthouse infrastructure, stair 1 improveme
Contractor:
Walsh Brothers, Inc.
Status: Active
Oct 3, 2023
Declared cost: $25,378,223
Building: Alteration and Addition
The work being executed under this project includes interior renovations of the existing restrooms on floors 1-8. alterations to the fire sprinkler system will involve the relocation of sprinkler heads and reconfiguration of sprinkler pip
Contractor:
Wise Construction
Status: Active
Jun 7, 2023
Declared cost: $3,050,528
Building: Alteration and Addition
Renovation of office space
Contractor:
JCZC Construction
Status: Active
Oct 11, 2022
Declared cost: $155,378
Building: Alteration and Addition
Installation of new horizontal and vertical busduct, replacement of 480v switchboard. expansion/revision of existing electrical rooms from basement to level 5. added el closets on level 6 and 7.
Contractor:
Walsh Brothers, Inc.
Status: Active
Dec 20, 2021
Declared cost: $3,251,697
Check permits at another Cambridge address
Free instant lookup, no signup.
Search Cambridge permits →
Disclaimer: Permit data comes from Cambridge's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Cambridge building department before buying, selling, or planning work.