Permit history for 3400 N Charles St
Baltimore, MD · 187 permits on file · 2021–2026
187
Permits on file
2021
First permit
2026
Most recent
Permits on file (187)
Ordered most recent first. Data from the city's open data portal.
Educational Educational
(6) sprinkler relocation on existing sprinkler system for tenant improvement.
May 6, 2026
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Demo old devices and install 5 wall mounted horn/strobes on existing nac circuit. as per plans as per code.
May 5, 2026
Research and Development Facility Research and Development Facility
Add 11/relocate 42 to accommodate the interior renovation to existing laboratory
Mar 2, 2026
Educational Educational
138 data locations being added as per code.
Feb 19, 2026
Commercial Commercial
Add fire alarm devices to existing labs (drichko, sushkov & demille)
Feb 17, 2026
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Internal gas line connection by adding valves & gas stub out to allow for a new bge gas meter to be installed at amr2.
Feb 5, 2026
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Furnish and install 7 horn strobe devices on existing nac circuit.
approved for work only. subject to the permitted uses and regulations under the provisions of the zoning ordinance.
Jan 21, 2026
Educational Facility: Commercial-Vocational Educational Facility: Commercial-Vocational
Replacement of ceilings and aluminum storefront openings, installation of furring and gypsum board on walls and painting of all surfaces in the corridor at krieger hall.
Jan 14, 2026
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Install to code 40 low voltage category 6a cables in wall locations for data usage and 5 ceiling locations for wireless access points in remsen hall existing space reconfiguration.
Jan 13, 2026
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Two unenclosed metal exterior trellis structures are to be located on an existing paved plaza outside mse library. the paved plaza is the roof assembly of portions of the library that is below grade. power for exterior lighting and conven
Jan 9, 2026
Educational Educational
Furnish and install seven (7) new speaker / strobe devices tied into the existing notification and speaker circuits.
Dec 19, 2025
Educational Educational
Renovation of jhu hall
Dec 11, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Install new sprinkler coverage for jhfre bio east. add automatic sprinklers as necessary due to architectural modifications in areas with existing main. new branchlines in area of work. total sprinklers this project = 51
Dec 9, 2025
Mixed Use (Commerical) Mixed Use (Commerical)
Scope - design modifications to the normal power system serving clark hall server room 315. the existing ups system is over capacity and will need the addition of three (3) new servers to be installed next year. most of the servers do not l
Nov 20, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Levi hall 2nd floor - installation of 78 low voltage data cables in support of building permit bccm-25-001047. as per code.
Nov 18, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Mudd hall third fl lab - installation of 24 low voltage data cables in support of building permit bccm-25-000813.as per code.
Nov 18, 2025
Business Business
******** renovation to approx. 3160 sf on the 2nd floor of levi hall and shall include but not limited to: **********
scope of work:
-------- level ii interior alterations ---------
cat i demoltiion: selective demolition of walls
Nov 12, 2025
Educational Educational
Work consists of modifying the existing wet fire sprinkler system by adding 2 and relocating 2 sprinklers to accomodate the new int. alt. all work shall conform to nfpa 13-2016 and baltimore city fire code. match existing ordinary occupancy
Nov 6, 2025
Health Care Facility Health Care Facility
Install fire alarm per approved drawings per nec code
Oct 16, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Install new sprinkler coverage for jhu levi hall. add automatic sprinklers as necessary due to architectural modifications in areas with existing main. new branchlines in area of work.
total sprinklers this project = 52
Oct 15, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Scope of work:
------- level ii interior alterations ---------
renovation of (3) existing laboratory bays located in the bloomberg research center building. the work will take place in the following areas:
• area a: basement
Oct 14, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Add and relocate automatic sprinklers as necessary due to architectural modifications. total sprinklers relocated = 9 total sprinklers added = 2 total sprinklers this project = 11
Oct 7, 2025
Institutional Institutional
Interior alteration for a lab fit out at jhu, work to include mep installations as per plans as per code. *** a licensed general contractor and a licensed electrical contractor is required to be added to this permit before work can begin. *
Sep 19, 2025
Business Business
************ renovations to approximately 1300 square feet of existing lab area on the third floor level of mudd hall located on the johns hopkins homewood campus. the renovation will include: ***********
scope of work:
-------- l
Sep 8, 2025
Educational Educational
Bfpe will modify the existing sprinkler system in shaffer hall. changes to the system will include new
zones added on the ground and 3rd floors. bfpe will also add a newzone the first floor to add sprinkler
protection to the testing cente
Aug 28, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Install 3 strobes, 3 storbes/horn to existing fire alarm system as per code
Aug 25, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Fire alarm permit
Aug 25, 2025
Business Business
************ renovations to approximately 1500 square feet of existing lab/office area on the second floor of remsen hall located on the johns hopkins homewood campus. the renovation will include but not limited to*******
scope of work:
Aug 21, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Install to code 24 category 6 low voltage cables in existing space terminating in wall plates for data / telecommunications connections
Aug 8, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Total sprinklers relocated - 53 total sprinklers added - 20 total mech tee added - 2
add and relocate sprinklers due to architectural modification. total sprinklers = 73
demo existing branchline and main piping from stub into the space. r
Jul 31, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Provide miscellaneous demo of four (4) receptacle outlets. furnish and install twelve (12) new ceiling mounted duplex receptacle outlet. provide four (4) new branch power circuits from existing panel pp2-gb. provide connection to new lab ca
Jul 21, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Fire alarm in the renovation area
Jul 17, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Install to code 14 low voltage category 6 data outlets and 2 wireless access points.
Jul 7, 2025
Educational Facility: Post-Secondary Educational Facility: Post-Secondary
Use portion of mason hall as a board room.
Jun 24, 2025
Office Office
Use as an office
Jun 18, 2025
Educational Facility: Commercial-Vocational Educational Facility: Commercial-Vocational
Relocate (07) existing sprinkler heads in renovated labs at basement level
Jun 16, 2025
Educational Educational
Installation of 154 low voltage data cables in support of building permit com2024-01014
Jun 11, 2025
Educational Educational
Modify exsiting wet pipe sprinkler system per renovation to existing lab.
add/relocate (13) sprinkler heads
Jun 5, 2025
2-03 2-03
Install 2 new devices and relocated 9 devices as per plans as per code.
Jan 22, 2025
2-03 2-03
Provide and install fire alarm system as per plans as per code.
Jan 20, 2025
2-03 2-03
Amend permit: add electircal contractor .(original permit:com2024-02166: **** msel gsf: 183,746 sf: **** scope of work: ------ level ii interior alterations ------ interior improvements include a full replacement and upgrade of mechani
Jan 2, 2025
3-28 3-28
Fire alarm work including low-voltage fire alarm devices as per plans as per code.
Jan 2, 2025
2-07 2-07
Extend wet pipe sprinkler system in sub basement, basement and 1st floor. total of 81 heads as per plans as per code.
Dec 23, 2024
2-03 2-03
**** msel gsf: 183,746 sf: **** scope of work: ------ level ii interior alterations ------ interior improvements include a full replacement and upgrade of mechanical, electrical and plumbing systems, and structural work includes: framing
Dec 11, 2024
2-03 2-03
Add 1 and relocate 8 automatic sprinklers as necessary due to architectural modifications. 9 heads as per plans as per code.
Dec 11, 2024
2-03 2-03
********** [bloomberg center-reich lab] ****** scope of work: ---- level ii interior alterations ----- laboratory renovation for new user as per plans as per code.
Dec 5, 2024
2-03 2-03
Amend permit: add electrical contractor . (original permit:com2023-03617:scope of work: ------ level ii interior alterations ------ renovation of lab space in the basement of an existing higher education academic research building. additio
Dec 5, 2024
2-07 2-07
Relay will modify the existing sprinkler system (10 heads) to accommodate the new tenant layout. all will be in accordance with the nfpa13 and the ahj as per plans as per code.
Dec 4, 2024
1-02 1-02
Provide coverage in the 280sqft space. this space will be protected by (2) relocated victaulic v3802 155° concealed pendants and (3) added victaulic v3802 155° concealed pendants. as per plans as per code.
Dec 4, 2024
2-02 2-02
Amend permit: change electrical contractor . (original permit:com2024-01014:scope of work: -------- level ii interior alterations ----- renovations shall include approximately 1312 gsf on the ground, and 4th floors, new overstreet laborator
Oct 10, 2024
2-03 2-03
Amend permit: add electrical contractor . (original permit:com2024-01126: scope of work: ---------- interior alterations -------- cat ii interior demolition with structural stabilization (in preparation of future renovations to be covered
Oct 7, 2024
2-02 2-02
Amend permit: add electrical contractor . (original permit:com2024-01014:scope of work: -------- level ii interior alterations ----- renovations shall include approximately 1312 gsf on the ground, and 4th floors, new overstreet laboratory r
Oct 4, 2024
2-02 2-02
Amend permit: add hvac and plumber contractor . (original permit:com2024-01014:scope of work: -------- level ii interior alterations ----- renovations shall include approximately 1312 gsf on the ground, and 4th floors, new overstreet labora
Oct 4, 2024
3-42 3-42
Amend permit: add electrical contractor . (original permit:com2024-01499:scope of work: ------- level ii interior alterations ------- office renovation to 3rd floor area including a few reconfigured rooms, replacement of ceilings, lighting,
Sep 27, 2024
2-03 2-03
A portion of gilman hall to be used as a food service coffee shop owned by jhu hopkins dining and leased to lessee.
Sep 24, 2024
2-03 2-03
Scope of work: ---------- interior alterations -------- cat ii interior demolition with structural stabilization (in preparation of future renovations to be covered under a separate permit application). * interior excavation and installatio
Sep 24, 2024
2-02 2-02
Scope of work: -------- level ii interior alterations ----- renovations shall include approximately 1312 gsf on the ground, and 4th floors, new overstreet laboratory renovation of existing bloomberg rooms 026 & 028. new norcini laboratory r
Sep 24, 2024
3-42 3-42
Renovations to rooms 032, 031, 031a and 031b located on the ground level of levi hall approx. 820 the work will include renovation of existing space to accommodate new use, new finishes, new lab case work, shelving, fume hoods, -80 freezers
Sep 23, 2024
2-03 2-03
Provide and install fire alarm as per plans as per code.
Sep 11, 2024
2-03 2-03
**** [macaulay hall] **** scope of work: ------ level ii interior alterations ------ includes the demolition of an existing classroom space for the construction of a new office space within the first floor of an existing building. mechani
Aug 15, 2024
2-03 2-03
Install fire alarm as per plans as per code.
Aug 1, 2024
2-02 2-02
The addition of a 2 ceiling mounted white horn/strobes in the locker rooms as per plans as per code.
Jul 17, 2024
2-03 2-03
Amend permit: add plumber and hvac contractor . (original permit:com2023-03617:scope of work: ------ level ii interior alterations ------ renovation of lab space in the basement of an existing higher education academic research building. a
Jul 3, 2024
2-02 2-02
Fire alarm as per plans as per code.
Jun 25, 2024
3-42 3-42
Amend permit: add prime contractor . (original permit:com2024-00311:renovation of existing 1,500 sf office suite 313 in ames hall on the johns hopkins homewood campus. complete demolition of all interior walls, lighting, ceiling and finish
Jun 12, 2024
2-03 2-03
Amend permit: change electrical contractor . (original permit:com2024-64767:install (1) # branch circuits/feeders , (1) # fixtures/devices as per code.) original permit description:(com2024-64767) install (1) # branch circuits/feeders ,
Jun 5, 2024
2-03 2-03
Amend permit: add electrical contractor . (original permit:com2023-03617:scope of work: ------ level ii interior alterations ------ renovation of lab space in the basement of an existing higher education academic research building. additio
May 24, 2024
2-03 2-03
Scope of work: ------ level ii interior alterations ------ renovation of lab space in the basement of an existing higher education academic research building. additional mechanical, electrical, plumbing, and structural alterations to the s
May 22, 2024
2-03 2-03
Renovate classroom space low voltage wiring installing 30 cat 6a cables in ceiling space and terminating at workstation outlets as per code.
May 20, 2024
2-03 2-03
Install (1) # branch circuits/feeders , (1) # fixtures/devices as per code.
May 2, 2024
3-42 3-42
Amend permit: add hvac contractor . (original permit:com2024-00311:renovation of existing 1,500 sf office suite 313 in ames hall on the johns hopkins homewood campus. complete demolition of all interior walls, lighting, ceiling and finishe
Apr 23, 2024
3-42 3-42
Amend permit: add electrical contractor . (original permit:com2024-00311:renovation of existing 1,500 sf office suite 313 in ames hall on the johns hopkins homewood campus. complete demolition of all interior walls, lighting, ceiling and f
Apr 19, 2024
3-42 3-42
Amend plan no.2023-2467 permit no. com2023-02975 issued 12/15/23 due to plaster ceiling change, change the 12 upright heads to 12 sidewall heads as per plans as per code.
Apr 17, 2024
2-03 2-03
Install 8 fire alarm devices in lab area on basement level floor as per code.
Apr 16, 2024
2-07 2-07
Relocate 9 heads on the 1st floor of kreiger hall located on the johns hopkins campus, the approximate 1,000 sqft lab areas will be renovated and new sprinklers will be relocated from the existing branch line that runs through the scope are
Apr 4, 2024
2-07 2-07
Supply and install material for an expansion/renovation to the existing fire alarm system, scope of work involves replacing existing conventional smoke detectors on a one for one basis with conventional heat detectors in server room g29.
Mar 27, 2024
3-42 3-42
Renovation of existing 1,500 sf office suite 313 in ames hall on the johns hopkins homewood campus. complete demolition of all interior walls, lighting, ceiling and finishes. new interior partition walls, ceiling, lighting and finishes.
Mar 25, 2024
2-03 2-03
Provide new electrical device locations fed via existing circuits to coordinate with revised lockers in existing locker rooms as per plans as per code.
Feb 26, 2024
2-03 2-03
We are applying for a separate low voltage installation permit for this project.install as per code.
Feb 14, 2024
3-42 3-42
Modify existing wet fire sprinkler system by relocating 2 sprinklers and plugging 1 sprinkler to accomodate new int alt. all work shall match the existing light hazard occupancy. largest pipe 1''. all work performed under nfpa 13-2016 and b
Feb 14, 2024
2-03 2-03
Amend permit: add hvac contractor . (original permit:com2023-03261:scope of work :------- level ii interior alterations ------ interior renovation of several distinct lab spaces on the 2nd, 3rd, and 4th floors of an existing higher educatio
Feb 7, 2024
3-42 3-42
Amend permit: add hvac and plumber contractor . (original permit:com2023-03107:renovations to approximately 600 s.f. of existing lab area on the first floor level of maryland hall. the renovation will include but not limited to selective de
Feb 6, 2024
3-42 3-42
Amend permit: add plumber and hvac contractor . (original permit:com2023-03105:renovations to approximately 940 s.f. of existing lab area on the basement level of krieger hall. the renovation will include but not limited to selective demoli
Feb 6, 2024
2-03 2-03
Amend permit: add electrical contractor . (original permit:com2023-03261:scope of work :------- level ii interior alterations ------ interior renovation of several distinct lab spaces on the 2nd, 3rd, and 4th floors of an existing higher ed
Feb 1, 2024
2-03 2-03
Scope of work :------- level ii interior alterations ------ interior renovation of several distinct lab spaces on the 2nd, 3rd, and 4th floors of an existing higher education academic research building. per plans and as per code.
Jan 30, 2024
2-07 2-07
Relocate the existing sprinkler coverage (7 heads) in the approximate 600sqft area on the 1st floor of ames hall of the johns hopkins university campus. these areas will be treated as light hazard consisting primarily of office spaces. the
Jan 24, 2024
2-03 2-03
Scope of work: electrical alterations to include: install to code 20 low voltage data cables with rj45 faceplate outlets, all work will be done according to baltimore city code
Jan 22, 2024
3-42 3-42
Renovations to approximately 600 s.f. of existing lab area on the first floor level of maryland hall. the renovation will include but not limited to selective demolition of walls, doors, casework, lighting and finishes. new construction con
Jan 12, 2024
3-42 3-42
Renovations to approximately 940 s.f. of existing lab area on the basement level of krieger hall. the renovation will include but not limited to selective demolition of walls, doors, casework, lighting and finishes. new construction consist
Jan 12, 2024
3-42 3-42
Amend permit: add electrical contractor .(original permit:com2023-03105:renovations to approximately 940 s.f. of existing lab area on the basement level of krieger hall. the renovation will include but not limited to selective demolition of
Jan 12, 2024
3-42 3-42
Amend permit: add electrical contractor .(original permit:com2023-03107:renovations to approximately 600 s.f. of existing lab area on the first floor level of maryland hall. the renovation will include but not limited to selective demolitio
Jan 12, 2024
3-42 3-42
Relocate 8 and add 1 sprinkler to accomodate new int alt. all work per nfpa 13-2016. match existing light hazard occupancy throughout area of work. largest new pipe 1'' max protection area between sprinklers 196 ft². (ste 404, 408, 416) a
Jan 8, 2024
2-03 2-03
Amend permit: add hvac contractor . (original permit:com2023-01551:renovate existing room 411 on the fourth floor of krieger hall for use as a seminar room for the department of mathematics as per plans as per code.) original permit descrip
Dec 21, 2023
2-02 2-02
Relocate the existing sprinkler coverage in the approximate 1,100sqft areas on the 1st floor of krieger hall of the johns hopkins university campus. these areas will be treated as light hazard consisting of primarily lab office spaces and c
Dec 15, 2023
3-42 3-42
Modify the existing sprinkler system in accordance with the nfpa13 and the ahj. relocated sprinkler heads= 0 new additionalsprinkler heads = 33 as per plans as per code.
Dec 15, 2023
2-03 2-03
Furnish and install new fire alarm devices per plans and per code.
Dec 12, 2023
2-03 2-03
Amend permit: add electrical contractor .(original permit:com2023-01551:renovate existing room 411 on the fourth floor of krieger hall for use as a seminar room for the department of mathematics as per plans as per code.) original permit de
Dec 12, 2023
2-03 2-03
Renovate existing room 411 on the fourth floor of krieger hall for use as a seminar room for the department of mathematics as per plans as per code.
Dec 6, 2023
2-07 2-07
The scope of work includes bfpe adding ordinary hazard sprinkler coverage in the renovated lab b04. bfpe will follow existing pipe schedule in the building.
Dec 5, 2023
2-03 2-03
Amend permit: add hvac contractor . extend original permit.(original permit:com2023-02922:scope of work: ----- level ii interior alterations ----- renovation of a mesoscope lab within ames hall for the department of psychological and brain
Dec 5, 2023
2-03 2-03
Scope of work: ----- level ii interior alterations ----- renovation of a mesoscope lab within ames hall for the department of psychological and brain sciences in order to receive a new piece of equipment as per plans as per code.
Nov 28, 2023
2-03 2-03
Amend permit: add electrical contractor . (original permit:com2023-02922:scope of work: ----- level ii interior alterations ----- renovation of a mesoscope lab within ames hall for the department of psychological and brain sciences in order
Nov 28, 2023
2-02 2-02
Install 3 fire alarm devices in existing fa system as per plans as per code.
Oct 24, 2023
2-03 2-03
Scope of work: ----- paving----- replacement/modification of existing traffic calming structures (speed bumps) at ten (10) locations on jhu's homewood campus as per plans as per code.
Oct 20, 2023
2-02 2-02
Install 1 fire alarm device to existing fa system as per plans as per code.
Oct 11, 2023
2-03 2-03
Amend permit: add electrical contractor . (original permit:com2023-01635:interior renovation of approximately 800 gsf in the ground floor of krieger hall. renovation includes minor reconfiguration of walls, new hvac systems, new plumbing, n
Oct 10, 2023
2-03 2-03
Interior renovation of approximately 800 gsf in the ground floor of krieger hall. renovation includes minor reconfiguration of walls, new hvac systems, new plumbing, new lighting and electrical devices, new casework and architectural finish
Oct 6, 2023
2-04 2-04
Amend plan 2022-2696 com2022-03206 issued 1/9/23 for installation of a new fire detection system, including a new fire detection control panel, pull stations, horns strobes, speakers, conduit and wiring for the entire south chiller plant to
Oct 5, 2023
3-42 3-42
Amend permit: add hvac contractor . (original permit:com2023-02130:scope of work: ------ level ii interior alterations ----- interior demolition of existing non-loadbearing partitions of existing office space to include creation of 4 new of
Sep 28, 2023
3-42 3-42
Amend permit: add electrical contractor . (original permit:com2023-02130:scope of work: ------ level ii interior alterations ----- interior demolition of existing non-loadbearing partitions of existing office space to include creation of 4
Sep 15, 2023
3-42 3-42
Scope of work: ------ level ii interior alterations ----- interior demolition of existing non-loadbearing partitions of existing office space to include creation of 4 new offices, new solid core wood doors w/hollow metal frames w/ada compli
Aug 10, 2023
3-42 3-42
Renovations to approximately 1,100 s.f. of existing office area on the first floor of krieger hall located on the johns hopkins homewood campus. the renovation will include but not limited to selective demolition of walls, doors, built-in
Aug 8, 2023
3-47 3-47
Scope of work:-----level i interior alterations (equipment installation)-----phase 1 for the addition of a pool bulkhead for the pool, review is for the bulkhead and its adjustment to the pool wall for a temporary location until phase 2 is
Jul 25, 2023
2-03 2-03
Amend permit: add electrical contractor . (original permit:com2022-02865:reissuance: scope of work: ---exterior alterations—replace existing skylights at grade with new skylight system per plans and per code. (previously approved under pe
May 10, 2023
2-04 2-04
Fire detection devices added for a building extension as per plans as per code.
Jan 9, 2023
2-02 2-02
Add 1 and relocate 5 sprinklers on the 4th floor of dunning hall at johns hopkins university in baltimore for new tenant renovations. the previously calculated head spacing will be utilized and new sprinkler heads will be supplied to match
Nov 23, 2022
3-50 3-50
Portion of gilman hall building to be used for a food service coffee shop. coffee shop will be managed by a contracted partner and owned by johns hopkins university.
Nov 17, 2022
2-04 2-04
Reinstate original permit.(original permit:com2021-87318:scope of work: exterior alterations to include: removal of existing sprint pcs cellular equipment from existing smokestack located on campus. this equipment is no longer needed and is
Nov 9, 2022
2-03 2-03
Reissuance: scope of work: ---exterior alterations—replace existing skylights at grade with new skylight system per plans and per code. (previously approved under permit com2019-01151 plans 2019-632 issued 7/18/2019).
Nov 7, 2022
2-03 2-03
Using a portion of the premises as a hopkins dining location (levering coffee shop & cafe- mudd hall ) with main floor used as coffee shop with seating and bottom floor used as a dining facility with dining seating , kitchen ( cooking equ
Oct 21, 2022
3-42 3-42
Scope of work:--interior alterations level ii--fit-out of an existing medical office suite, will include partitions, ceilings, lighting, electrical, mechanical, all work shall be interior only on the third floor as per plans as per code.
Sep 27, 2022
3-42 3-42
Install fire alarm as per plans as per code.
Sep 8, 2022
3-42 3-42
Install fire alarm as per plans as per code.
Sep 8, 2022
2-03 2-03
Extend original permit.(original permit:com2021-85888: extend original permit.(original permit:com2020-02217:scope of work:---grading---installation of heating hot, chilled and domestic water piping from east side of wyman park drive and co
Aug 23, 2022
3-42 3-42
Amend permit: add electrical contractor . (original permit:com2021-04132:renovation of 7,000 sf of existing office space on ground floor of type 2 non combustible construction in croft/ shaffer hall for the purpose of constructing new offic
Aug 10, 2022
2-04 2-04
Installation of new wet pipe sprinkler system (94 heads) per nfpa 13 as per plans as per code.
Aug 9, 2022
3-42 3-42
Amend permit: add electrical contractor . (original permit:com2022-00719:interior renovaton of office to reception and testing rooms, demo includes finishes and ceiling system, new work includes new doors, walls, built-in millwork, finishes
Aug 3, 2022
3-42 3-42
Amend permit: change electrical contractor . (original permit:com2022-01460:scope of work:----interior alterations----interior renovation which includes new workstations & finish upgrades. demo includes walls, ceilings, floors. new work inc
Jul 27, 2022
3-42 3-42
Amend permit: add electrical contractor .(original permit:com2022-01583:scope of work:----interior alterations----interior-only renovation of two existing office spaces in maryland and malone halls on the jhu homewood campus to suit new off
Jul 25, 2022
3-42 3-42
Amend permit: add electrical contractor . (original permit:com2022-01583:scope of work:----interior alterations----interior-only renovation of two existing office spaces in maryland and malone halls on the jhu homewood campus to suit new of
Jul 25, 2022
3-42 3-42
Amend permit: add hvac contractor . (original permit:com2022-01583:scope of work:----interior alterations----interior-only renovation of two existing office spaces in maryland and malone halls on the jhu homewood campus to suit new office u
Jul 25, 2022
3-42 3-42
Scope of work:----interior alterations----interior-only renovation of two existing office spaces in maryland and malone halls on the jhu homewood campus to suit new office users with alterations to existing non-structural partitions and exi
Jul 21, 2022
2-07 2-07
Add one (1) and relocate four (4) quick response concealed sprinklers to provide the proper coverage in the newly renovated ames hall office / lab space as per plans as per code.
Jul 20, 2022
2-07 2-07
Add 24 quick response concealed sprinklers for office fit-outs in various buildings as per plans as per code.
Jul 20, 2022
3-42 3-42
Amend permit: add hvac contractor . extend original permit.(original permit:com2022-01460:scope of work:----interior alterations----interior renovation which includes new workstations & finish upgrades. demo includes walls, ceilings, floors
Jun 21, 2022
2-03 2-03
Installation of (1) wall mounted strobe on the (2) floor staff lounge 223 adding to the existing fire alarm system as per plans as per code.
Jun 17, 2022
2-03 2-03
Installation of (2) ceiling mounted strobes in the first floor reception 122a area to the existing fire alarm system as per plans as per code.
Jun 17, 2022
2-03 2-03
Installation of (1) ceiling mounted strobe in the ground floor office area tied into the existing fire alarm system as per plans as per code.
Jun 14, 2022
3-42 3-42
Scope of work:----interior alterations----interior renovation which includes new workstations & finish upgrades. demo includes walls, ceilings, floors. new work includes walls, finishes - walls, flooring, ceiling system, lights, furniture a
Jun 13, 2022
3-42 3-42
Amend permit: change electrical contractor . (original permit:com2022-00719:interior renovaton of office to reception and testing rooms, demo includes finishes and ceiling system, new work includes new doors, walls, built-in millwork, finis
Jun 8, 2022
2-04
Engineering mechanics institute conference 2022 hosted the johns hopkins university from 05/31/22-06/03/22 between the hours of 7:30a-8:30p daily during the event. there will be food, tents and alcohol at two evening receptions. date of eve
Jun 3, 2022
2-03 2-03
Scope of work: install fire alarm as per plans as per code. (related to building permit com2022-61125)
May 12, 2022
3-42 3-42
Fire alarm as per plans as per code.
May 9, 2022
3-42 3-42
Amend permit: add hvac contractor . (original permit:com2022-00383:interior renovation of offices and staff lounge, scope of work in gilman hall, greenhouse, mergenthaler hall, shriver hall, demo includes doors, walls, ceiling system, floo
May 4, 2022
3-42 3-42
Amend permit: add hvac contractor .(original permit:com2022-00719:interior renovaton of office to reception and testing rooms, demo includes finishes and ceiling system, new work includes new doors, walls, built-in millwork, finishes: floor
May 4, 2022
3-42 3-42
Interior renovaton of office to reception and testing rooms, demo includes finishes and ceiling system, new work includes new doors, walls, built-in millwork, finishes: floors, walls, ceiling system, and lights as per plans as per code.
May 3, 2022
3-42 3-42
Interior renovation of offices and staff lounge, scope of work in gilman hall, greenhouse, mergenthaler hall, shriver hall, demo includes doors, walls, ceiling system, flooring. new work includes new doors, walls, millwork, finishes - wall
May 3, 2022
2-03 2-03
Install 101 sprinklers for a limited area second floor renovation as per plans as per code.
Apr 21, 2022
2-04 2-04
Scope of work: exterior alterations to include: removal of existing sprint pcs cellular equipment from existing smokestack located on campus. this equipment is no longer needed and is proposed to be removed. dc03xc230, all work will be done
Apr 4, 2022
3-42 3-42
Amend permit: add electrical contractor . (original permit:com2021-04132:renovation of 7,000 sf of existing office space on ground floor of type 2 non combustible construction in croft/ shaffer hall for the purpose of constructing new offic
Mar 31, 2022
3-42 3-42
Amend permit: add gas, plumber and hvac contractor . (original permit:com2021-04132:renovation of 7,000 sf of existing office space on ground floor of type 2 non combustible construction in croft/ shaffer hall for the purpose of constructi
Mar 28, 2022
3-42 3-42
Renovation of 7,000 sf of existing office space on ground floor of type 2 non combustible construction in croft/ shaffer hall for the purpose of constructing new office and research laboratory spaces. no exterior improvements, includes mech
Mar 24, 2022
2-03
Temporary placement of ice rink and temporary supporting structures at the existing tennis courts on the homewood campus of johns hopkins university. date of event 1/14/2022 to 2/27/2022, time : 10:00 am to 10:00 pm, area:17900(sf). outdoor
Feb 3, 2022
2-03 2-03
Install (202) # low voltage as per code.
Feb 2, 2022
2-03 2-03
Extend original permit.(original permit:com2020-02217:scope of work:---grading---installation of heating hot, chilled and domestic water piping from east side of wyman park drive and continuation of elec, telecom and the above noted utiliti
Jan 4, 2022
2-03 2-03
Amend permit: add electrical contractor . (original permit:com2021-03213:scope of work:---paving---560 sf concrete pad extension with new bollard to protect yard hydrant. splice at private electrical manhole south of the courts, private el
Nov 15, 2021
2-03 2-03
Amend permit: add plumber contractor .(original permit:com2021-03213:scope of work:---paving---560 sf concrete pad extension with new bollard to protect yard hydrant. splice at private electrical manhole south of the courts, private electr
Nov 12, 2021
2-03 2-03
Scope of work:---paving---560 sf concrete pad extension with new bollard to protect yard hydrant. splice at private electrical manhole south of the courts, private electrical ug ductbank to new transformer location protected with new bolla
Nov 10, 2021
2-07 2-07
Providing, connecting, programming and testing a new notification appliances & slc devices to the existing fire alarm system. notifier pse-10 power expander panel will be provided as per plans as per code.
Oct 18, 2021
2-07 2-07
Providing, connecting, programming and testing a new notification appliances, the power expander panel is an existing simplex as per plans as per code.
Oct 18, 2021
2-07 2-07
Providing, connecting, programming and testing a new notification appliances to the existing fire alarm system. the new notifier pse-10 power expander panel will interface with a simplex control module as per plans as per code.
Oct 13, 2021
2-07 2-07
Providing, connecting, programming and testing a new notification appliances & slc devices to the existing fire alarm system. notifier pse-10 power expander panel will be provided as per plans as per code.
Oct 13, 2021
2-03 2-03
Furnish and install (2) speaker strobes and (1) nac panel in hackerman hall lactation room as per plans as per code.
Oct 6, 2021
2-03 2-03
Furnish & install (1) speaker strobe in gilman hall lactation room as per plans as per code.
Oct 5, 2021
2-03 2-03
Installing 3 devices - (1) speaker strobe in 3 areas of building as per plans as per code.
Oct 4, 2021
2-03 2-03
Use existing and expanded o’connor rec center to include expanded gym / workout facilities, functional training space, program space, offices and a cafÉ.
Oct 4, 2021
2-03 2-03
Scope of work: install 53 low voltage data outlets as per code.
Sep 21, 2021
2-03 2-03
Amend permit: add plumber and hvac contractor .(original permit:com2020-02217:scope of work:---grading---installation of heating hot, chilled and domestic water piping from east side of wyman park drive and continuation of elec, telecom and
Sep 20, 2021
2-03 2-03
Amend permit: add electrical contractor .(original permit:com2020-02217:scope of work:---grading---installation of heating hot, chilled and domestic water piping from east side of wyman park drive and continuation of elec, telecom and the a
Sep 16, 2021
3-47 3-47
Amend permit com2020-01527 plan no. 2020-1184 issued 7/22/2020 to: add 22 additional heads.
Aug 19, 2021
3-28 3-28
Furnish install additional fire alarm notification and initiating devices as per plans as per code.
Aug 18, 2021
2-07 2-07
Relocate four (4) concealed sprinklers and plug one (1) existing outlet to provide, the proper coverage in the newly renovated lactation rooms as per plans as per code.
Aug 16, 2021
2-03 2-03
Extend original permit.(original permit:com2021-52215:install (33) # low voltage as per code.) original permit description:(com2021-52215) install (33) # low voltage as per code.
Aug 9, 2021
2-07 2-07
The scope of work includes bfpe to cut back four (4) dry branchlines to allow the new wall to be built between the garage and mechanical room. bfpe will also add six (6) uprights in the existing mechanical room to provide the proper coverag
Aug 4, 2021
2-04 2-04
Add (7) fire alarm devices to existing system as per plans as per code.
Jul 28, 2021
2-03 2-03
Renovation of existing interior rooms in gilman, hackerman, and hodson halls on the jhu homewood campus to create lactation rooms, work includes non-structural demolition, construction of new interior non-structural partitions with doors,
Jul 13, 2021
2-02 2-02
Provide a sprinkler system (32 heads) for the renovated space in a partially sprinklered building as per plans as per code.
Jul 8, 2021
3-47 3-47
Extend original permit.(original permit:com2020-01527:the installation of new sprinkler systems (314 heads) on floors 1-3 of existing recreational center at johns hopkins university, the addition of 1 new standpipe to new stairway, the re
Jun 22, 2021
3-42 3-42
Adding 8 and relocating 32 quick response concealed sprinkler heads to provide the proper coverage in the newly renovated office spaces on the ground floor of shriver hall as per plans as per code.
Jun 22, 2021
2-02 2-02
Site work improvements for the south plant chiller upgrade and utility distribution project will include demolition, pavements, surface improvements, and utilities, including hot and chilled water services, domestic water, electrical ductba
Jun 17, 2021
2-04 2-04
Amend permit: add electrical contractor . (original permit:com2021-00735:rooms g13, g14, g16a, g17: renovations to approximately 2,250 sf of space on the basement level of latrobe hall located on the johns hopkins homewood campus, the work
Jun 14, 2021
2-03 2-03
Relocating four (4) quick response pendents to provide the proper coverage in the newly renovated basement workspace and bathroom as per plans as per code.
Jun 11, 2021
3-42 3-42
Fire alarm permit
Jun 8, 2021
2-04 2-04
Adding fire devices to existing system as per plans as per code.
May 27, 2021
2-04 2-04
Amend permit: add plumber, gas and hvac contractor .original permit:com2021-00735:rooms g13, g14, g16a, g17: renovations to approximately 2,250 sf of space on the basement level of latrobe hall located on the johns hopkins homewood campus,
May 27, 2021
3-42 3-42
Relocate 8 sprinklers to accommodate the new interior layout. design shall match the existing light hazard occupancy and follow nfpa-13 2016 as per plans as per code.
May 21, 2021
2-04 2-04
Rooms g13, g14, g16a, g17: renovations to approximately 2,250 sf of space on the basement level of latrobe hall located on the johns hopkins homewood campus, the work will involve the relocation of the existing lab in latrobe hall g13/g14 t
May 21, 2021