Permit history for 22 S Greene St

Baltimore, MD · 154 permits on file · 2021–2026

154
Permits on file
2021
First permit
2026
Most recent

Permits on file (154)

Ordered most recent first. Data from the city's open data portal.

Hospital Hospital
Bfpe will replace existing quick response pendent sprinklers with tyco ty3531 concealed pendent sprinklers within two restroom areas. no existing sprinkler piping will be modified as part of this work. bathroom wl1302, approximately 485 sq.
May 1, 2026
Hospital Hospital
Modify existing sprinkler for tenant work.
Apr 24, 2026
Hospital Hospital
The partial occupancy permit for stocking and activation commencement for levels, 4, 5, 6, 7, 8, 9 & 14 (split level penthouse) along with a portion of level 1 lobby to access the stairwells and elevators. occupancy will be excluded from l
Apr 20, 2026
Hospital Hospital
Scope of work: --------- level ii interior alterations ------- - renovations of 10th and 11th floors in existing hospital building and - fit out of 10th and 11th floors in newly constructed patient unit tower, in existing hospital.
Apr 10, 2026
Hospital Hospital
Bfpe will add and relocate sprinkler protection to match new wall and ceilig layout.
Apr 9, 2026
Hospital Hospital
Please add your licensed gc and your licensed electrical contractors before any work can begin. install (3) building-mounted signs: sign a) "team member entrance" illuminated 11" x 51" = 3.90 sf, sign c3) "the roslyn and leonard stoler
Apr 8, 2026
Food Processing: Light Food Processing: Light
***** renovation/upgrade of existing patient services kitchen consisting of***** scope of work: ----- level ii interior alterations (equipment upgrade) ------ - existing and relocated food service equipment, new electrical and plumbing
Apr 6, 2026
Hospital Hospital
Low voltage security access control as per code.
Mar 11, 2026
Health Care Facility Health-Care Clinic
Cabling for commercial das installation for floors 10-13 as per code.
Mar 3, 2026
Health Care Facility Health-Care Clinic
Cabling for commercial das installation floors 2-9 as per code.
Mar 3, 2026
Hospital Hospital
Revisions to issued fire alarm permit #com2024-01304, plan #2024-1147
Feb 27, 2026
Health Center Health-Care Clinic
Cabling for new cancer center, install 2,132 data locations. as per code.
Feb 18, 2026
Hospital Hospital
3rd party fire sprinkler review - modify existing system to provide coverage for new layout. add/relocate.
Feb 17, 2026
Hospital Hospital
Fire alarm - com2022-02411 - addition - 10 story, 239,723 sf cancer center, an addition to the university of maryland medical center with some renovations to existing building. via pending permit amendment com2024-01746, construction of ad
Feb 13, 2026
Hospital Hospital
18235 - ummc s12 d-wing renovation. installing data cabling for office renovation.
Feb 11, 2026
Hospital Hospital
Provide and install ten (10) cat 6 plenum flush mount 2-data locations. provide and install one (1) cat6a 2-data wireless access point location.
Feb 11, 2026
Hospital Hospital
Low voltage permit related to fire alarm at ummc stoler center for advanced medicine
Feb 2, 2026
Hospital Hospital
Bpe will modify the existing sprinkler system. add 3rd party review
Jan 29, 2026
Hospital Hospital
Scope of work: ------ level i interior alterations ----- renovation and alterations to existing ummc sga13 evs suite as per plans as per code
Dec 23, 2025
Hospital Hospital
Replace the communication nurse call stand-alone system, work to include replacement and installation 1211 devices as per plans as per code.
Dec 11, 2025
Hospital Hospital
The existing material distribution center on the west wing of the ground floor in the north building will undergo a renovation to construct a new de-casing room in support of increased infection control measures. the work will include selec
Dec 8, 2025
Hospital Hospital
Scope of work: ---------- cat i demolition ------ - interior non-structural demolition in preparation of future renovations. as per plans as per code. ************** separate permit will be filed for interior fit-out. ******
Dec 1, 2025
Hospital Hospital
Add and relocate automatic sprinklers as necessary for new architectural modifications. total sprinklers relocated = 4 total sprinklers added = 1 total sprinklers this project = 5
Dec 1, 2025
Health Care Facility Health Care Facility
Install (4 signs in total, 3 are illuminated) building-mounted signs: sign d3: "university of maryland medical center w/logo" 10'-5" x 46'-9" = 487.13 sf, sign d1: "logo" 52 5/8" x 125 1/4" = 45.77 sf, sign c3: "the roslyn and leonard stole
Nov 25, 2025
Hospital Hospital
Scope of work: ------ level ii interior alterations ------- - 9th floor fit out within a newly constructed patient unit tower. as per plans and as per code
Nov 17, 2025
Hospital Hospital
Amend com2022-02411 issued 11/20/2023 to modify scope of work to add installation of underslab piping for plumbing (107 fixtures to coordinate with construction project phasing on site) above 8th floor ceiling (which is the base of the 9th
Nov 12, 2025
Hospital Hospital
********* o renovation of existing non-sleeping patient care suite for use as a urology clinic, along with additional work space for staff and health care providers. this renovation will maintain most existing partition layouts with ******
Nov 11, 2025
Hospital Hospital
Level ii interior alterations (equipment) -------- the or-32 project involves a renovation and equipment upgrade of a 1,046-square-foot hybrid operating room consisting of a control room, equipment room, and operating room on the second f
Oct 29, 2025
Health Care Facility Health Care Facility
************ amendment for additional scope; com2024-02809. ************* scope of work: ----------- interior alterations ---------- renovation of existing patient holding. this includes modifications to architectural. -----
Oct 17, 2025
Hospital Hospital
Low voltage security access control as per code.
Oct 15, 2025
Hospital Hospital
Add and relocate automatic sprinklers as necessary due to architectural modifications. total sprinklers added = 3 total sprinklers relocated =7. total sprinklers this project = 10
Oct 15, 2025
Health Care Facility Health Care Facility
Cabling for new cancer center
Oct 13, 2025
Hospital Hospital
Fire alarm permit
Aug 25, 2025
Hospital Hospital
Add and relocate automatic sprinklers as necessary for new architectural modifications. demo old dry system and replace for like sizes with stainless steel pipe. total sprinklers relocated - 43 total sprinklers added - 2 total sprinklers t
Aug 21, 2025
Hospital Hospital
74 low voltage tempurature control devices
Aug 20, 2025
Health Center Health Center
Scope of work: ------- interior alteraitons (equipment) --------- interior renovation of approximately 880 sq. ft. of existing space on the third floor south building at the ummc campus to replace cath lab equipment, consisting of arc
Aug 13, 2025
Hospital Hospital
Low voltage security access control
Jul 15, 2025
Hospital Hospital
Low voltage security access control
Jul 8, 2025
Hospital Hospital
Low voltage security access control
Jul 8, 2025
Industrial: General Industrial: General
To use portion (south hospital ground level) as utility room.
Jul 8, 2025
Hospital Hospital
79 low voltage devices
Apr 7, 2025
2-07 2-07
Use ground floor, suite wgl223 at the weinberg building for pediatric ed use.
Jan 27, 2025
3-28 3-28
Modify an existing sprinkler system wing a & b (add 1, relocate 63) as per plans as per code.
Dec 9, 2024
2-07 2-07
Renovation of existing offices for use as the hospital's central blood bank, including blood testing and provision of blood supply to other units within the hospital. in addition to the blood bank work area, renovations will include offices
Dec 6, 2024
2-07 2-07
Amend permit: add general contractor . reinstate original permit.(original permit:com2021-01333:renovation and upgrade of existing technical infrastructure (mep) within an existing hospital building, on limited areas of floors 00b (basement
Dec 4, 2024
2-07 2-07
Use portion of space as entry vestibule for hospital employees, with the exception of the following areas to be excluded until final completion of space and updated occupancy certificate. the following is a list of spaces to be excluded for
Nov 14, 2024
3-28 3-28
Installation of four temporary heat detectors, thirty-six audio visual devices, three pull stations, thirty smoke detectors, two permanent heat detectors, five duct smoke detectors, four door holders, sixteen supervised iam relays as per p
Sep 26, 2024
2-07 2-07
Plug (11) sprinklers, relocate (46) sprinklers, add (3) sprinklers for new tenant layout as per plans as per code.
Jul 8, 2024
3-52 3-53
Use portion of hospital as a gift shop.
Jul 5, 2024
3-28 3-28
Fire alarm as per plans as per code.
May 28, 2024
2-07 2-07
Relocate 8 sprinkler heads into new it closets on floors 3-9. each it closet is approx. 18 sqft. additionally one head will be relocated closer to the wall on the ground floor to provide proper coverage. the room on the ground floor is ap
May 23, 2024
3-29 3-29
Install (15) # low voltage as per code.
May 16, 2024
3-28 3-28
Provide new devices, relocate and demo existing fire alarm devices as per plans as per code.
Apr 29, 2024
2-07 2-07
Relocate nine sprinklers for new wall and ceiling layout as per plans as per code.
Feb 15, 2024
2-07 2-07
Add 2 and 11 relocate heads for new wall and ceiling layouts as per plans as per code.
Feb 7, 2024
2-07 2-07
********** amend issued permit com2022-02411 / approved plans #2022-2009 issued 11/20/23 ******** scope of work ------- foundations work ------- for modification of existing structural foundation to support as-built data of work around to e
Feb 6, 2024
3-28 3-28
Install (5) # low voltage as per code.
Dec 14, 2023
2-07 2-07
Amend permit: add plumber and gas contractor . (original permit:com2022-02411:scope of work:---addition---10 story, 239,723 sf cancer center, an addition to the university of maryland medical center with some renovations to existing buildin
Dec 11, 2023
2-07 2-07
Add (2) and relocate (12) sprinklers for new tenant layout.
Dec 7, 2023
2-07 2-07
Amend permit: add electrical contractor . (original permit:com2022-02411:scope of work:---addition---10 story, 239,723 sf cancer center, an addition to the university of maryland medical center with some renovations to existing building. as
Nov 21, 2023
2-07 2-07
Scope of work:---addition---10 story, 239,723 sf cancer center, an addition to the university of maryland medical center with some renovations to existing building. as per plans and as per code.
Nov 20, 2023
3-28 3-28
Amend permit: add electrical contractor . (original permit:com2023-01955:scope of work: ----- level 2 interior alteration (equipment installation)------ of 1295 sqft to update existing radiology medical equipment, replace finishes and alte
Nov 16, 2023
3-28 3-28
Scope of work: ----- level 2 interior alteration (equipment installation)------ of 1295 sqft to update existing radiology medical equipment, replace finishes and alter the mechanical, plumbing and electrical systems in the area of work as
Nov 9, 2023
2-07 2-07
Amend to add electrical contractor: (original permit:com2023-01724:scope of work: ----level ii interior alterations------ the renovation of existing 5,400 sf inpatient unit to create new patient rooms with private bathrooms, update finishes
Nov 7, 2023
2-07 2-07
Amend/revise 2022-2588 to up size one water main from 2.5'' to 3'', head count is unchanged. all work as per plans as per code.
Oct 3, 2023
2-07 2-07
Amend permit: add hvac and plumbing contractor .(original permit:com2022-02718:renovation of existing patient- and non-patient rooms (for use as a high risk observation unitwithin the pediatric emergency medicine department) renovation will
Sep 11, 2023
2-07 2-07
Amend permit: add electrical contractor . (original permit:com2022-02718:renovation of existing patient- and non-patient rooms (for use as a high risk observation unitwithin the pediatric emergency medicine department) renovation will maint
Sep 7, 2023
2-07 2-07
Amend permit: add electrical contractor . extend original permit.(original permit:com2021-03481:new staff entrance as per plans as per code.) original permit description:(com2021-03481) new staff entrance as per plans as per code.
Aug 14, 2023
2-07 2-07
Amend permit: add hvac and plumber contractor . (original permit:com2021-03481:new staff entrance as per plans as per code.) original permit description:(com2021-03481) new staff entrance as per plans as per code.
Aug 10, 2023
2-07 2-07
Renovation of existing patient- and non-patient rooms (for use as a high risk observation unitwithin the pediatric emergency medicine department) renovation will maintain selected existing partitions layouts as well as demolition/reconfigur
Jul 28, 2023
2-07 2-07
Partial permit subject to all conditions of agreement on file for removal of existing asphalt paving, sidewalks, planters, attached canopy and lobby area addition to grade only for a hospital pending action for plan 2022-2009 i
Jul 18, 2023
2-07 2-07
Amend permit: change electrical contractor . (original permit:com2023-00846:interior renovation of approximately 1,000 square feet of existing space on the ground floor ummc campus to replace linear accelerator, consisting of architectural,
Jul 11, 2023
2-07 2-07
Interior renovation of approximately 1,000 square feet of existing space on the ground floor ummc campus to replace linear accelerator, consisting of architectural, structural, mechanical, electrical, plumbing, fire alarm, and low voltage w
Jul 5, 2023
3-28 3-28
Add 2 strobes to exisitng fire alarm system as per plans as per code.
May 18, 2023
3-43 3-42
Install (8) # low voltage as per code.
Apr 27, 2023
3-28 3-28
Install (13) # low voltage as per code. *not fire alarm related
Apr 17, 2023
2-07 2-07
Partial permit subject to all conditions of agreement on file for interior demolition in preparation of construction of the following building portions - ground floor (3452sf); level 1 (9706sf); level 2 (7393sf) for a hospital p
Apr 11, 2023
2-07 2-07
Extend original permit.(original permit:com2022-80892:install (40) # low voltage as per code.) original permit description:(com2022-80892) install (40) # low voltage as per code.
Mar 23, 2023
3-28 3-28
Fire alarm installation as per plans as per code.
Mar 9, 2023
2-07 2-07
Installing new main, branch piping, and sprinkler coverage (50 heads) to the un-sprinkled portion of the 7th floor d wing infusion area as per plans as per code.
Feb 28, 2023
2-07 2-07
Amend permit: add plumber and hvac contractor .(original permit:com2022-03127:scope of work:-----interior alterations----interior renovation work within an existing hospital for administrative offices and partial demolition work for future
Feb 15, 2023
2-07 2-07
Amend to add electrical contractor: (original permit:com2022-03127:scope of work:-----interior alterations----interior renovation work within an existing hospital for administrative offices and partial demolition work for future work. as p
Feb 13, 2023
2-07 2-07
Scope of work:-----interior alterations----interior renovation work within an existing hospital for administrative offices and partial demolition work for future work. as per plans as per code.
Feb 7, 2023
2-07 2-07
Amend permit# com2022-01742 (plan number 2022-1418) issued on 9/6/2022 to revise design for renovation of existing pediatric outpatient care suite for use as a oral+maxillofacial surgery clinic, along with additional work space for staff an
Jan 20, 2023
2-07 2-07
Extend original permit.(original permit:com2021-84993:install (64) # fixtures/devices, (11) # fixtures/devices, (18) # unclassified/other work as per code.) original permit description:(com2021-84993) install (64) # fixtures/devices, (1
Jan 12, 2023
3-28 3-28
Renovations to existing fire alarm wiring for south hospital 7th floor c & d wings & 8th floor north hospital e wing. installation of one alarm panel, 28 visual devices, 1 pull station, 2 heat detectors, 5 smoke detectors, 5 duct detectors
Nov 29, 2022
2-07 2-07
Modify an existing 8th floor level sprinkler system, relocate 12 sprinkler heads as per plans as per code.
Nov 28, 2022
3-42 3-42
Install (2) # low voltage as per code.
Oct 27, 2022
2-07 2-07
Amend permit: add ekectrical contractor . (original permit:com2022-01742:renovation of existing pediatric outpatient care suite (for use as a combined urology and oral+maxillofacial surgery clinic, along with additional work space for staff
Oct 27, 2022
2-07 2-07
Amend permit: add plumber and gas contractor . (original permit:com2022-01742:renovation of existing pediatric outpatient care suite (for use as a combined urology and oral+maxillofacial surgery clinic, along with additional work space for
Oct 21, 2022
3-28 3-28
Provide and install three strobes and two temporary heat detectors for the fire alarm in the pharmacy of the shock trauma building on the third floor as per plans as per code.
Oct 11, 2022
3-28 3-28
Amend permit: add electrical contractor . (original permit:com2020-01606:renovation of approximately 7,644 sf of vacated space in the ground floor of the north building of the university of maryland medical center, to consolidated the pharm
Sep 26, 2022
2-07 2-07
Install (26) # low voltage as per code.
Sep 20, 2022
2-07 2-07
Install (1) # low voltage as per code.
Sep 19, 2022
2-07 2-07
Install (40) # low voltage as per code.
Sep 15, 2022
2-07 2-07
Aa conv: full description loaded as comment
Sep 8, 2022
2-07 2-07
Renovation of existing pediatric outpatient care suite (for use as a combined urology and oral+maxillofacial surgery clinic, along with additional work space for staff and health care providers) renovation will maintain some existing partit
Sep 6, 2022
2-07 2-07
C wing -suite conversion for c &d wing; create a single c&d wing patient care suite; finishes, furniture, casework & equipment; all new finishes, furniture, casework & equipment; walls- new non- rated interior walls & doors; new 1 hr rated
Aug 24, 2022
2-07 2-07
Aa conv: full description loaded as comment
Aug 24, 2022
3-28 3-28
Modify existing sprinkler coverage to new mechanical layouts. work on levels 5, 7 and 8. 5 relocates and 1 adds. remove 1 zone control. relocate standpipe on 5th floor largest pipe size 1''
Jul 29, 2022
3-13 3-13
Use portion of main level for/as carry-out kiosk (great cookie).
Jul 27, 2022
2-07 2-07
Extend original permit.(original permit:com2021-84993:install (64) # fixtures/devices, (11) # fixtures/devices, (18) # unclassified/other work as per code.) original permit description:(com2021-84993) install (64) # fixtures/devices, (1
Jun 29, 2022
3-28 3-28
Provide fire alarm permit for the installation of one strobe and one smoke detector in gudelsky building first floor for entrance to the great cookie as per plans as per code. (electrical permit com2022-59219)
Jun 28, 2022
2-07 2-07
Scope of work:-----category 1 interior demolition --------interior demo only to include - c wing architectural demolition scope – 4,087 sf, remove most existing wall, floor & ceiling finishes, remove partial interior walls, demolish inter
Apr 25, 2022
2-07 2-07
Amend permit: add electrical contractor . (original permit:com2021-01333:renovation and upgrade of existing technical infrastructure (mep) within an existing hospital building, on limited areas of floors 00b (basement) through 8 (10 floors
Apr 20, 2022
2-07 2-07
Amend permit: add electrical contractor . (original permit:com2021-03954:scope of work:removal of existing ''great cookie'' vendor casework; relocation of existing vending equipment; demolition of existing plumbing and electrical lines; ins
Apr 13, 2022
3-28 3-28
Relocation of 9 sprinklers for new ceiling layout as per plans as per code.
Apr 5, 2022
2-07 2-07
Amend permit: add plumber contractor . (original permit:com2021-03954:scope of work:removal of existing ''great cookie'' vendor casework; relocation of existing vending equipment; demolition of existing plumbing and electrical lines; instal
Mar 28, 2022
2-07 2-07
Amend permit: add plumber and hvac contractor .(original permit:com2021-01333:renovation and upgrade of existing technical infrastructure (mep) within an existing hospital building, on limited areas of floors 00b (basement) through 8 (10 fl
Mar 24, 2022
2-07 2-07
Renovation and upgrade of existing technical infrastructure (mep) within an existing hospital building, on limited areas of floors 00b (basement) through 8 (10 floors total) as per plans as per code.
Mar 18, 2022
2-07 2-07
Amend permit: add electrical contractor . (original permit:com2021-03954:scope of work:removal of existing ''great cookie'' vendor casework; relocation of existing vending equipment; demolition of existing plumbing and electrical lines; ins
Mar 18, 2022
2-07 2-07
New staff entrance as per plans as per code.
Feb 24, 2022
2-07 2-07
Scope of work:removal of existing ''great cookie'' vendor casework; relocation of existing vending equipment; demolition of existing plumbing and electrical lines; installation of new casework; installation of new plumbing and electrical li
Jan 10, 2022
3-28 3-28
Low voltage & fire alarm for registration & gift shop relocation consisting of one nac panel, ten smoke detectors, eight speaker strobes, one strobe & four relays as per plans as per code.
Dec 28, 2021
3-28 3-28
Provide low voltage permit for installation of three smoke detectors, three duct smoke detectors as per plans as per code.
Dec 28, 2021
2-07 2-07
Install (64) # fixtures/devices, (11) # fixtures/devices, (18) # unclassified/other work as per code.
Nov 30, 2021
3-29 3-29
Relocating 14 sprinklers to accommodate new interior alterations and follow the guidelines of nfpa 13, 2016 for phase one as per plans as per code. phase 2 will later be submitted once we have access to the scope of work.
Nov 22, 2021
3-28 3-28
Use portion of premises three patient activity rooms, one seclusion room, patient and staff toilet, and office space at the 12th floor of the north hospital at university of maryland medical center on 12th floor west wing.
Nov 17, 2021
2-07 2-07
Demolish existing automatic wet fire sprinkler system back to 4'' main located in corridor, install new 4'' center fed tree system (add 38, relocate 6) supplied by existing 6'' standpipe located in stairwell. plans/design per nfpa 13-2016
Nov 16, 2021
3-28 3-28
Install (23) # low voltage as per code. (non-fire alarm related devices)
Oct 29, 2021
2-07 2-07
Install (1) # gas test as per code.
Oct 28, 2021
2-07 2-07
Fire alarm to add & modify the existing building fire alarm system as per plans, as per code. (reference to permit# com2021-01264)
Sep 23, 2021
2-07 2-07
Amend permit: add hvac contractor .(original permit:com2021-02138:new reception desk and adjacent staff area for ummc south lobby, t includes circulation control elements (walls and interior doors) and new terrazzo floor finish at entire so
Aug 26, 2021
2-07 2-07
Amend permit: add electrical contractor .(original permit:com2021-02138:new reception desk and adjacent staff area for ummc south lobby, t includes circulation control elements (walls and interior doors) and new terrazzo floor finish at ent
Aug 26, 2021
2-07 2-07
New reception desk and adjacent staff area for ummc south lobby, t includes circulation control elements (walls and interior doors) and new terrazzo floor finish at entire south lobby as per plans as per code. separate permit required for s
Aug 24, 2021
3-28 3-28
Fire alarm only 1 - smoke detector 1 - duct smoke detector 2 - speaker/strobe as per plans as per code.
Aug 17, 2021
2-07 2-07
Install (1) btu fuel piping (other than 1 or 2 family) (bge is replacing the existing meter with a new one. current piping needs to be relocated to connect to new meter per request of bge. removal of old pipe and replace with new . pipe is
Aug 16, 2021
3-28 3-28
Low voltage & fire alarm permit for installation of low voltage fire alarm devices consisting of three speaker/strobes & three strobes as per plans as per code.
Aug 10, 2021
2-07 2-07
Modify existing sprinkler coverage for ren ovated ct scan room. provide sprinkler coverage in new closets inside t scan room and new supply closet outside of room. total sprinkler 7: (4 relocated, 3 adds) as per plans as per code.
Jul 21, 2021
2-07 2-07
The scope of work includes bfpe demoing the two inch main and branchlines and tie back into the existing main. bfpe will run new branchlines to provide the proper coverage (10 heads) in the ewly renovated ct scan as per plans as per code.
Jul 21, 2021
2-07 2-07
Relocate (14) sprinklers to accommodate new wall & ceiling layout on 3rd floor (s3c03) as per plans as per code.
Jul 16, 2021
3-29 3-29
Amend permit com com2017-17329 plan 2017-2608 issued 12/21/2017 (reinstated under com2020-80331) to update plans as per plans as per code.
Jul 16, 2021
2-07 2-07
Amend permit: add plumber and hvac contractor . (original permit:com2021-01736:interior renovation to create an office work area for medical staff as per plans as per code.) original permit description:(com2021-01736) interior renovation t
Jul 15, 2021
2-07 2-07
Install new fire alarm devices to an existing system as per plans as per code (in reference to building permit#com2020-01606)
Jul 15, 2021
3-28 3-28
Amend permit: add electrical contractor .(original permit:com2021-00433:removal and replacement of existing sterilizers, including addition of supplemental cooling units as per plans as per code. ) original permit description:(com2021-00433
Jul 14, 2021
3-28 3-28
Amend to add plumbing & hvac contractor: (original permit:com2021-00433:removal and replacement of existing sterilizers, including addition of supplemental cooling units as per plans as per code. ) original permit description:(com2021-00433
Jul 12, 2021
2-07 2-07
Add 7 new heads off atrium system to feed new vestibule and add coverage under new ada ramp as per plan as per code.
Jul 9, 2021
2-07 2-07
Relocate 14 heads to accommodate new ceiling and wall layout as per plans as per code.
Jul 9, 2021
2-07 2-07
Amend permit: add electrical contractor . (original permit:com2021-00443:interior renovation of approximately 1,100 sf of space currently used for storage (following the renovation the space will be used as a cardiac catheterization lab as
Jul 9, 2021
2-07 2-07
Amend permit: add electrical contractor . (original permit:com2021-01736:interior renovation to create an office work area for medical staff as per plans as per code.) original permit description:(com2021-01736) interior renovation to creat
Jul 7, 2021
2-07 2-07
Interior renovation to create an office work area for medical staff as per plans as per code.
Jul 6, 2021
3-28 3-28
Removal and replacement of existing sterilizers, including addition of supplemental cooling units as per plans as per code.
Jul 1, 2021
3-28 3-28
Install (8) # low voltage as per code (*notes: 1. low voltage devices are not related for fire alarm).
Jun 14, 2021
2-07 2-07
Amend permit: add electrical contractor .(original permit:com2021-01264:minor improvements to the interior handicap accessibility of the south entrance at greene and lombard. the existing revolving door will be removed and a glass vestibule
Jun 8, 2021
2-07 2-07
Amend permit: add plumber and hvac contractor . (original permit:com2021-01119:removal and replacement of the existing simulation ct. the walls and ceilings will be removed within the area of renovation to reconfigure the scan and control
Jun 7, 2021
2-07 2-07
Amend permit: add electrical contractor .(original permit:com2021-00443:interior renovation of approximately 1,100 sf of space currently used for storage (following the renovation the space will be used as a cardiac catheterization lab as w
Jun 3, 2021
2-07 2-07
Removal and replacement of the existing simulation ct. the walls and ceilings will be removed within the area of renovation to reconfigure the scan and control room, a new enlarged scan room and room will be constructed with new drywall wal
Jun 3, 2021
2-07 2-07
Amend permit: add plumber and hvac contractor .(original permit:com2021-00443:interior renovation of approximately 1,100 sf of space currently used for storage (following the renovation the space will be used as a cardiac catheterization la
Jun 2, 2021
2-07 2-07
Minor improvements to the interior handicap accessibility of the south entrance at greene and lombard. the existing revolving door will be removed and a glass vestibule will be constructed under the existing glass canopy. the interior raise
Jun 1, 2021
2-07 2-07
Remove existing and install new sprinkler system (82 heads) in area of renovation as per plans as per code.
Jun 1, 2021
2-07 2-07
Use portion of existing hospital for anatomic pathology, grossing, morgue work (anatomic pathology lab, basement floor, pathology phase 2a and 2b).
Jun 1, 2021
2-07 2-07
Interior renovation of approximately 1,100 sf of space currently used for storage (following the renovation the space will be used as a cardiac catheterization lab as well as associated equipment and control rooms) as per plans as per code.
May 25, 2021
3-28 3-28
Installation of four smoke detectors, one heat detector, two speaker strobes as per plans as per code.
May 3, 2021
2-07 2-07
Modify existing fire alarm system for the anatomic pathology phase#2b as per plans as per code.
Apr 23, 2021

Check permits at another Baltimore address

Free instant lookup, no signup.

Search Baltimore permits →
Disclaimer: Permit data comes from Baltimore's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Baltimore building department before buying, selling, or planning work.