Permit history for 3600 Presidential Blvd
Austin, TX · 119 permits on file · 2021–2026
119
Permits on file
2021
First permit
2026
Most recent
Permits on file (119)
Ordered most recent first. Data from the city's open data portal.
Electrical Permit Repair
Enterprise electrical will be responsible for the demolition and replacement of eleven (11) installed electrical outlet models (referred to as towers)
Status: Active
Apr 22, 2026
Plumbing Permit Remodel
Interior renovation of existing public restrooms within austin-bergstrom international airport including selective demolition architectural finishes plumbing fixture replacement and associated electrical and plumbing work. no change of use
Status: Active
Mar 25, 2026
Electrical Permit Remodel
Interior renovation of existing public restrooms within austin-bergstrom international airport including selective demolition architectural finishes plumbing fixture replacement and associated electrical and plumbing work. no change of use
Status: Active
Mar 23, 2026
Building Permit New
Eplan: baus - airport project: installation of a temporary hanging scaffold system to limit impacts to the existing bagging claim level of the aus barbara jordan terminal during construction.
Status: Active
Feb 17, 2026
Electrical Permit Remodel
Installation of ramp information displays (rids) and gate information displays (gids) for southwest airlines on the ramp level and holdrooms of gates 22 and 23. exterior 2 locations 88 square feet; interior 2 locations 18 square feet.
Status: Final
Feb 13, 2026
Building Permit Remodel
Interior renovation of existing public restrooms within austin-bergstrom international airport including selective demolition architectural finishes plumbing fixture replacement and associated electrical and plumbing work. no change of use
Status: Active
Feb 11, 2026
Building Permit New
Installation of fourteen (14) 40x8 intermodal shipping containers 12 of which will be connected via pre-engineered pre-manufactured roof systems (3 roof systems connecting 4 containers each 2 free standing containers)
pupr2
Status: Active
Jan 29, 2026
Building Permit New
Eplan: baus - airport project: 2d and 3d art installation inside and extending out of the three skylights over the atrium infill area. the artwork will include sculptural bird sculptural floral soundwaves and mural components (7000 sf).
Status: Active
Jan 20, 2026
Building Permit Remodel
Installation of ramp information displays (rids) and gate information displays (gids) for southwest airlines on the ramp level and holdrooms of gates 22 and 23. exterior 2 locations 88 square feet; interior 2 locations 18 square feet.
Status: Final
Dec 22, 2025
Plumbing Permit Repair
Replacing about 40feet existing drain line piping with coated cast iron drain line piping and fittings. job located at gate 19 - saxon pub.
Status: Active
Nov 10, 2025
Building Permit New
Eplan: aus commercial expedited review - steel frame for terminal expansion phase ii c to be installed by artist in the west gate expansion area of the terminal scope of work will also include installation of steel art bays. (1000 sf)
Status: Final
Oct 21, 2025
Plumbing Permit Remodel
The atrium infill project will add floor plate to the open center atrium sections of the barbara jordan terminal for added queuing and other airport needs.
pupr2
Status: Active
Oct 6, 2025
Mechanical Permit Remodel
The atrium infill project will add floor plate to the open center atrium sections of the barbara jordan terminal for added queuing and other airport needs.
pupr2
Status: Active
Sep 30, 2025
Electrical Permit Upgrade
We are needing a standalone permit to relocate existing gse chargers at gate 12 to the new location at gate 22 on ramp level.
Status: Final
Sep 24, 2025
Electrical Permit Remodel
The atrium infill project will add floor plate to the open center atrium sections of the barbara jordan terminal for added queuing and other airport needs.
pupr2
Status: Active
Sep 9, 2025
Building Permit Remodel
A suspended artwork will be installed in the interior of the austin-bergstrom international airport (aus) terminal near gate 15. a fire review of the artwork design is needed. the artwork will be installed via clamps onto existing exposed i
Status: Final
Sep 5, 2025
Electrical Permit Repair
Install new 30 amp 208 volt circuit for coffee maker in the peached tortilla.
Status: Final
Aug 19, 2025
Electrical Permit Remodel
Eplan: baus review - installation of ramp information displays (rids) and gate information displays (gids) for southwest airlines on the ramp level and holdrooms of gates 14-21 exterior 8 locations 352 sf interior 8 locations 72 sf
Status: Final
Jul 16, 2025
Building Permit Remodel
Eplan: baus review - installation of ramp information displays (rids) and gate information displays (gids) for southwest airlines on the ramp level and holdrooms of gates 14-21 exterior 8 locations 352 sf interior 8 locations 72 sf
Status: Final
Jun 30, 2025
Building Permit Remodel
The atrium infill project will add floor plate to the open center atrium sections of the barbara jordan terminal for added queuing and other airport needs.
pupr2
Status: Active
Apr 28, 2025
Electrical Permit Upgrade
Secondary electrical contractor working on the installation of baggage handling conveyor system for the west infill checked bag inspection system at austin-bergstrom int. airport only. reference 2024-067458
Status: Final
Mar 4, 2025
Electrical Permit Remodel
Installation of new and replacing existing ad stand
Status: Final
Feb 18, 2025
Building Permit Remodel
Installation of new and replacing existing ad stand
Status: Expired
Feb 14, 2025
Electrical Permit Upgrade
Adding new outlets for food court check out kiosks.
Status: Expired
Feb 10, 2025
Electrical Permit Upgrade
Secondary contractor to perform - installation of new baggage handling conveyor system at austin bergstrom int. airport for federal imigration services. 3 new public claim units and inbound conveyors.
Status: Final
Jan 23, 2025
Plumbing Permit Plumbing Service Line
Installation of 8 and 6 sanitary sewer
ref: 2023-069869 sc
Status: Final
Nov 18, 2024
Mechanical Permit Remodel
Fis- expansion that will reconfigure the existing bag claim system to be used as domestic/ international. expansion includes reconfiguring the inbound
Status: Final
Oct 22, 2024
Electrical Permit Repair
Need to run a new dedicated circuit in existing conduit from a panel that is roughly 80 away to a ground box to install a new receptacle for the amex kiosk located outside gate a10 in austin bergstrom international airport.
Status: Expired
Oct 14, 2024
Electrical Permit Remodel
Terminal-apron level - section b and c - remodel and refresh of aa ramp ops break-room admin space and build out of new locker room. addition of ramp placed storage units
Status: Final
Sep 19, 2024
Electrical Permit Repair
Install one l5-30 receptacle for new ait machine by leidos
separate from any building permits on the property
Status: Final
Sep 4, 2024
Electrical Permit Remodel
Part of the barbara jordan terminal optimization package 3a includes the in-kind replacement of existing passenger boarding bridges (pbbs) with upgraded mep and low-voltage systems. proposed work is within airport security perimeter of rest
Status: Active
Aug 30, 2024
Plumbing Permit Remodel
Part of the barbara jordan terminal optimization package 3a includes the in-kind replacement of existing passenger boarding bridges (pbbs) with upgraded mep and low-voltage systems. proposed work is within airport security perimeter of rest
Status: Final
Aug 29, 2024
Building Permit Remodel
Terminal-apron level - section b and c - remodel and refresh of aa ramp ops break-room admin space and build out of new locker room. addition of ramp placed storage units
Status: Final
Aug 28, 2024
Electrical Permit Remodel
Fis- expansion that will reconfigure the existing bag claim system to be used as domestic/ international. expansion includes reconfiguring the inbound
Status: Final
Aug 23, 2024
Building Permit Remodel
Fis- expansion that will reconfigure the existing bag claim system to be used as domestic/ international. expansion includes reconfiguring the inbound
Status: Active
Aug 15, 2024
Mechanical Permit Remodel
Design and construction for upgrades to existing checked baggage inspection systems at the terminal bag claim level. requires relocation and reconfiguration of existing west tenant spaces to accommodate new bag screening area. the buildin
Status: Final
Jul 26, 2024
Building Permit Remodel
Part of the barbara jordan terminal optimization package 3a includes the in-kind replacement of existing passenger boarding bridges (pbbs) with upgraded mep and low-voltage systems. proposed work is within airport security perimeter of rest
Status: Active
Jul 19, 2024
Plumbing Permit Addition and Remodel
Expansion to abia that will add over 75000 square feet over 4 levels. this expansion includes the baggage claim apron concourse mezzanine and roof levels.
Status: Active
Jun 18, 2024
Mechanical Permit Addition and Remodel
Expansion to abia that will add over 75000 square feet over 4 levels. this expansion includes the baggage claim apron concourse mezzanine and roof levels.
Status: Final
Jun 18, 2024
Electrical Permit Addition and Remodel
Expansion to abia that will add over 75000 square feet over 4 levels. this expansion includes the baggage claim apron concourse mezzanine and roof levels.
tnfm1
Status: Active
Jun 11, 2024
Building Permit Addition and Remodel
Expansion to abia that will add over 75000 square feet over 4 levels. this expansion includes the baggage claim apron concourse mezzanine and roof levels.
Status: Active
May 29, 2024
Mechanical Permit Addition and Remodel
Aus terminal expansion at the west-end 3 new gates will be added and 2 gates will be relocated. includes
additional hold room space public restrooms shell space for concession and airline tenants
Status: Active
Apr 2, 2024
Plumbing Permit Addition and Remodel
Aus terminal expansion at the west-end 3 new gates will be added and 2 gates will be relocated. includes
additional hold room space public restrooms shell space for concession and airline tenants
Status: Active
Apr 2, 2024
Electrical Permit Repair
Installing power to feed (2) - 24 fans on concourse level over tsa checkpoints 2e & 2w.
Status: Final
Feb 13, 2024
Electrical Permit Addition and Remodel
Aus terminal expansion at the west-end 3 new gates will be added and 2 gates will be relocated. includes
additional hold room space public restrooms shell space for concession and airline tenants
Status: Active
Feb 1, 2024
Electrical Permit Remodel
Selective demolition of checkpoint 3 passenger bridge and parts of the exterior fascade. additional soil retention nails will be added as part of enabling work
Status: Final
Jan 30, 2024
Mechanical Permit Remodel
Selective demolition of checkpoint 3 passenger bridge and parts of the exterior fascade. additional soil retention nails will be added as part of enabling work
Status: Final
Jan 26, 2024
Building Permit Addition and Remodel
Aus terminal expansion at the west-end 3 new gates will be added and 2 gates will be relocated. includes
additional hold room space public restrooms shell space for concession and airline tenants
Status: Active
Jan 9, 2024
Mechanical Permit Change Out
Replacement of (1) self contained rooftop mounted package unit and (1) rooftop mounted kitchen exhaust fan for the second bar restaurant (unrelated to any active projects)
Status: Expired
Jan 9, 2024
Plumbing Permit Remodel
Selective demolition of checkpoint 3 passenger bridge and parts of the exterior fascade. additional soil retention nails will be added as part of enabling work
Status: Final
Dec 29, 2023
Building Permit Remodel
Selective demolition of checkpoint 3 passenger bridge and parts of the exterior fascade. additional soil retention nails will be added as part of enabling work
Status: Expired
Oct 10, 2023
Building Permit Remodel
Electrical modifications for security screening equipment at checkpoint 3
Status: Expired
Oct 9, 2023
Building Permit Remodel
Electrical modifications for security screening equipment at checkpoint 1
Status: Expired
Oct 9, 2023
Mechanical Permit Change Out
Replacement of complete existing central heat and air system with or without duct work abia arff station.
Status: Final
Sep 21, 2023
Plumbing Permit Repair
Cap off water/wastewater lines for commercial demolition of former bergstrom air force base legacy & aus maintenance buildings 32 units
da-2022-0853 approved
***the building shall not be demolished until after the contractor has fulfilled
Status: Final
Jul 13, 2023
Building Permit Demolition
Demolition of former bergstrom air force base legacy & aus maintenance buildings 32 units
da-2022-0853 approved
***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlin
Status: Final
May 30, 2023
Electrical Permit Remodel
Remodel
*from pr folder: reconfiguration of security screening checkpoint 2 west tsa equipment installation of new storefront for reconfiguration of exiting corridors to baggage reclaim hall
7 day review
Status: Active
May 17, 2023
Electrical Permit Remodel
Electrical modifications for security screening equipment at checkpoint 2e.
Status: Expired
Apr 14, 2023
Building Permit Remodel
Electrical modifications for security screening equipment at checkpoint 2e.
Status: Expired
Apr 13, 2023
Building Permit Remodel
Remodel
Status: Active
Apr 4, 2023
Plumbing Permit Remodel
Reconfiguration of the passenger boarding bridges and minor reconfiguration of the existing hold room area at concourse level to relocate the gate doors for existing aviation services
Status: Final
Apr 3, 2023
Electrical Permit Remodel
Design and construction for upgrades to existing checked baggage inspection systems at the terminal bag claim level. requires relocation and reconfiguration of existing west tenant spaces to accommodate new bag screening area. the buildin
Status: Final
Mar 29, 2023
Mechanical Permit Remodel
Reconfiguration of the passenger boarding bridges and minor reconfiguration of the existing hold room area at concourse level to relocate the gate doors for existing aviation services
Status: Final
Mar 28, 2023
Electrical Permit Remodel
Second phase of the existing terminal centralized baggage handling system upgrades which includes installation of new conveyors in the existing exterior baggage make-up area. (providing electrical installation for baggage handling per mark
Status: Final
Mar 23, 2023
Electrical Permit Remodel
Design and construction for upgrades to existing checked baggage inspection systems at the terminal bag claim level. requires relocation and reconfiguration of existing west tenant spaces to accommodate new bag screening area. the buildin
Status: Final
Mar 23, 2023
Electrical Permit Remodel
Reconfiguration of the passenger boarding bridges and minor reconfiguration of the existing hold room area at concourse level to relocate the gate doors for existing aviation services
Status: Final
Mar 2, 2023
Building Permit Remodel
Reconfiguration of the passenger boarding bridges and minor reconfiguration of the existing hold room area at concourse level to relocate the gate doors for existing aviation services
Status: Final
Mar 1, 2023
Building Permit Demolition
Total demo. of a (2488 sf) brick/wood/metal abandon building (s). circa 1962.
Status: Final
Feb 24, 2023
Electrical Permit Remodel
Electrical modifications for security screening equipment at checkpoint 3
Status: Expired
Feb 13, 2023
Electrical Permit Remodel
Electrical modifications for security screening equipment at checkpoint 1
Status: Expired
Feb 13, 2023
Electrical Permit Remodel
Interior remodel of existing business american airlines break room and offices.
Status: Final
Jan 26, 2023
Building Permit Remodel
Demolition of dormakaba lanes interior storefront systems non-structural partitions ceilings/light fixtures and low-voltage at checkpoint 2e/2w exiting lanes.
Status: Expired
Jan 26, 2023
Electrical Permit Remodel
Remodel of badging office space
Status: Final
Jan 20, 2023
Building Permit Remodel
Remodel of badging office space
Status: Final
Jan 4, 2023
Electrical Permit Remodel
Second phase of the existing terminal centralized baggage handling system upgrades which includes installation of new conveyors in the existing exterior baggage make-up area.
Status: Active
Dec 8, 2022
Building Permit Remodel
Second phase of the existing terminal centralized baggage handling system upgrades which includes installation of new conveyors in the existing exterior baggage make-up area.
Status: Active
Dec 7, 2022
Mechanical Permit Remodel
Second phase of the existing terminal centralized baggage handling system upgrades which includes installation of new conveyors in the existing exterior baggage make-up area.
Status: Final
Dec 7, 2022
Plumbing Permit Remodel
Second phase of the existing terminal centralized baggage handling system upgrades which includes installation of new conveyors in the existing exterior baggage make-up area.
Status: Final
Dec 7, 2022
Electrical Permit Upgrade
Add 4 data rough in 4 - 120 volt 20 amp receptacles to nearest avalable circuit/circuits change out 4 - 2 x 4s and change out light switch (break room near gate 26 of airport) 12/6/2022
Status: Final
Dec 6, 2022
Electrical Permit Remodel
New travel essential retail fit-out with new aluminum structure and integrated lighting that is placed in the existing barbara jordan terminal space with no change to existing base building exterior ceiling and building facade. no mechanica
Status: Final
Dec 5, 2022
Building Permit Remodel
New travel essential retail fit-out with new aluminum structure and integrated lighting that is placed in the existing barbara jordan terminal space with no change to existing base building exterior ceiling and building facade. no mechanica
Status: Final
Nov 29, 2022
Plumbing Permit Remodel
Break room offices and locker room update. [qt]
Status: Final
Oct 3, 2022
Mechanical Permit Remodel
Interior remodel of existing business american airlines break room and offices.
Status: Final
Oct 3, 2022
Mechanical Permit Remodel
Break room offices and locker room update. [qt]
Status: Final
Oct 3, 2022
Mechanical Permit Remodel
Remodel of the gate 13 hold room area to install escalator access (up and down) from the concourse level to the apron level hold room. [7 day review]
Status: Final
Sep 29, 2022
Plumbing Permit Remodel
Remodel of the gate 13 hold room area to install escalator access (up and down) from the concourse level to the apron level hold room. [7 day review]
Status: Final
Sep 29, 2022
Electrical Permit Remodel
Remodel of the gate 13 hold room area to install escalator access (up and down) from the concourse level to the apron level hold room. [7 day review]
Status: Final
Sep 27, 2022
Electrical Permit Remodel
Break room offices and locker room update. [qt]
Status: Final
Sep 14, 2022
Plumbing Permit Remodel
402 s.f. remodel by gate-14 called the ready room for southwest employees. 2138 s.f. remodel of the air ticketing offices (ato)
Status: Final
Sep 12, 2022
Mechanical Permit Remodel
402 s.f. remodel by gate-14 called the ready room for southwest employees. 2138 s.f. remodel of the air ticketing offices (ato)
Status: Final
Sep 12, 2022
Plumbing Permit Repair
Install two rpzs for kitchen chemical dispensers that are currently tied directly to potable water. this is in the huts hamburgers restaurant inside of abia terminal.
Status: Final
Aug 30, 2022
Building Permit Remodel
Interior remodel of existing business american airlines break room and offices.
Status: Final
Aug 22, 2022
Electrical Permit Remodel
402 s.f. remodel by gate-14 called the ready room for southwest employees. 2138 s.f. remodel of the air ticketing offices (ato)
Status: Final
Aug 9, 2022
Building Permit Remodel
402 s.f. remodel by gate-14 called the ready room for southwest employees. 2138 s.f. remodel of the air ticketing offices (ato)
Status: Final
Aug 1, 2022
Building Permit Remodel
Break room offices and locker room update. [qt]
Status: Final
Jul 21, 2022
Building Permit Remodel
Remodel of the gate 13 hold room area to install escalator access (up and down) from the concourse level to the apron level hold room. [7 day review]
Status: Final
Jul 19, 2022
Plumbing Permit Repair
Relocating an existing costa coffee kiosk approximately 8 at abia. the scope would be relocating the existing 3/4 water supply line and drain to the new location about 8. included in scope would be to install and plumb a rpz and water filte
Status: Final
Jul 6, 2022
Plumbing Permit Remodel
Design and construction for upgrades to existing checked baggage inspection systems at the terminal bag claim level. requires relocation and reconfiguration of existing west tenant spaces to accommodate new bag screening area. the buildin
Status: Final
Jun 15, 2022
Electrical Permit Remodel
Design and construction for upgrades to existing checked baggage inspection systems at the terminal bag claim level. requires relocation and reconfiguration of existing west tenant spaces to accommodate new bag screening area. the buildin
Status: Final
Jun 13, 2022
Building Permit Remodel
Design and construction for upgrades to existing checked baggage inspection systems at the terminal bag claim level. requires relocation and reconfiguration of existing west tenant spaces to accommodate new bag screening area. the buildin
Status: Active
Jun 10, 2022
Electrical Permit Repair
Install new 60 amp circuit to feed coffee kiosk
Status: Final
Apr 4, 2022
Electrical Permit Repair
Relocate existing electrical feed for coffee kiosk
Status: Final
Apr 4, 2022
Electrical Permit Remodel
Replacement of existing ticket counters with new ticket counters installation of twelve new self-service passenger ticketing kiosks-united airlines
Status: Final
Mar 29, 2022
Building Permit Remodel
Replacement of existing ticket counters with new ticket counters installation of twelve new self-service passenger ticketing kiosks-united airlines
Status: Final
Mar 29, 2022
Electrical Permit Repair
Secondary electrical contractor handling the wiring of baggage system only.
Status: Final
Mar 19, 2022
Mechanical Permit Remodel
Replacement of two (2) existing exterior baggage carousels with two (2) new baggage carousels
Status: Final
Feb 4, 2022
Plumbing Permit Remodel
Replacement of two (2) existing exterior baggage carousels with two (2) new baggage carousels
Status: Final
Feb 4, 2022
Electrical Permit Remodel
Replacement of two (2) existing exterior baggage carousels with two (2) new baggage carousels
Status: Final
Feb 2, 2022
Building Permit Remodel
Replacement of two (2) existing exterior baggage carousels with two (2) new baggage carousels
contact ** 954-552-7379**
Status: Final
Feb 2, 2022
Plumbing Permit Remodel
Fitout to existing shell space comprises of offices breakrooms lockers & workshops on apron/ground level only & outdoor caged stores.
Status: Final
Jan 12, 2022
Mechanical Permit Remodel
Fitout to existing shell space comprises of offices breakrooms lockers & workshops on apron/ground level only & outdoor caged stores.
Status: Final
Jan 12, 2022
Electrical Permit Remodel
Fitout to existing shell space comprises of offices breakrooms lockers & workshops on apron/ground level only & outdoor caged stores.
Status: Final
Jan 10, 2022
Building Permit Remodel
Fitout to existing shell space comprises of offices breakrooms lockers & workshops on apron/ground level only & outdoor caged stores.
Status: Final
Jan 5, 2022
Electrical Permit Remodel
Eplan: expedited review - modifications to checkpoints 1 and 2 for new tsa ct scanner equipment including minor electrical and telecommunications work at an existing airport terminal (3400 sf)
Status: Final
Dec 1, 2021
Plumbing Permit Repair
Install gas regulator for huts burgers insidebarabara jordan terminal unit 3709
Status: Final
Nov 24, 2021
Electrical Permit New
Install artwork at the old gate 12 at abia - had pre approval meeting with chris johnson if more detail is needed please ask
Status: Final
Sep 20, 2021
Electrical Permit Upgrade
Addition of circuits in an existing panel to feed a display screen.
Status: Final
Sep 7, 2021
Building Permit New
Install artwork at the old gate 12 at abia - had pre approval meeting with chris johnson if more detail is needed please ask
Status: Final
Jul 16, 2021
Building Permit Remodel
Fiber light to install fiber though existing conduit to communication equipment
Status: Expired
Jun 29, 2021
Disclaimer: Permit data comes from Austin's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Austin building department before buying, selling, or planning work.