Permit history for 12733 Tesla Rd
Austin, TX · 182 permits on file · 2021–2026
182
Permits on file
2021
First permit
2026
Most recent
Permits on file (182)
Ordered most recent first. Data from the city's open data portal.
Plumbing Permit New
Cell phase 2 building dcw sanitary dhw water heaters
Status: Active
Apr 27, 2026
Plumbing Permit Plumbing Utility Connection
Dc2- 102 cortex 2.0 wet utilities
16wl 24rw 12 ww process piping
Status: Active
Mar 19, 2026
Plumbing Permit New
Sanitary sewer underground - above ground ss & domestic water
Status: Active
Mar 18, 2026
Plumbing Permit New
Chp7 dcw to iw back-flow preventer. 10
Status: Active
Mar 18, 2026
Plumbing Permit Repair
2220 lf of 18and 24 waste water line
Status: Final
Mar 12, 2026
Plumbing Permit Repair
Run new water line to the welcome center. 556 lf of 8 c900 and 281lf of 6 dip. for hydrants
Status: Final
Mar 11, 2026
Plumbing Permit Repair
Reclaimed water giga factory sp -2020-0306d 10 inch north lot
Status: Active
Mar 6, 2026
Plumbing Permit Plumbing Utility Connection
Area cl-v-62 to cl-v-75 domestic water piping stamping
Status: Active
Feb 23, 2026
Plumbing Permit Repair
Dummy lab outside cathode. 2 single use bathrooms w/ sewage holding tank
Status: Active
Jan 14, 2026
Plumbing Permit New
Restroom add-on around columns y.2 and 32 biw
Status: Active
Jan 6, 2026
Plumbing Permit New
Gax1 sanitary sewer top out if-2f d/61-no water heater
Status: Final
Dec 22, 2025
Plumbing Permit New
Main building - 1st floor in pt1 - domestic water sanitary water (1) water heater.
Status: Active
Dec 12, 2025
Plumbing Permit Repair
Main building-biw1-col u/52 1st floor-cc5050 domestic water sanitary sewer (4) water heaters
Status: Active
Dec 10, 2025
Plumbing Permit Repair
Installation of a back flow preventer and water bottle filling station at c/l z-10.6
Status: Active
Dec 10, 2025
Plumbing Permit New
Etj- new commercial for tesla 1000 sq. ft.
run gas piping in high bay 56.1 thru 57.4 and non1 thru r.2
Status: Active
Dec 5, 2025
Plumbing Permit New
3 dcw & 1 1/2 ss for safety shower die shop d11 lv1 inside and outside
Status: Active
Dec 2, 2025
Plumbing Permit New
700 of 1 1/2 gas pipe. casting v-x2.8 - 4.8 lv1
Status: Final
Dec 2, 2025
Plumbing Permit New
Bathroom in biw z65 lv2
Status: Active
Dec 2, 2025
Plumbing Permit Repair
10 gas line cut in 10 valves in biw main building
Status: Final
Dec 2, 2025
Plumbing Permit New
Adding two (2) cafeteria restrooms at tesla in the stamping 2 building. (biw)
Status: Active
Nov 25, 2025
Plumbing Permit New
Cc7050 gax1 2nd floor domestic water sanitary sewer (1) water heater
Status: Active
Nov 19, 2025
Plumbing Permit New
Cc-1634 2nd floor gax1- sanitary sewer pumped discharged dom water 2 water heaters
Status: Active
Nov 6, 2025
Plumbing Permit New
High bay - run condensate drain lines and install hub drains
Status: Final
Nov 6, 2025
Plumbing Permit New
Bathroom in stamping lv1 dcw & ss. x 82
Status: Active
Oct 22, 2025
Plumbing Permit New
Cc7050 du1 2f domestic water sanitary sewer & 1 water heater.
ga-1
Status: Active
Oct 16, 2025
Plumbing Permit New
Dcrt-2054 in cell 1 on 2nd and 3rd floors new domestic water and sanitary sewer
2 water heater installs
Status: Final
Sep 29, 2025
Plumbing Permit New
Cc-5050 biw 1st and 2nd floors cl u/52 5 water heaters
Status: Active
Sep 8, 2025
Plumbing Permit Repair
6 floor sinks
10 hub drains
chiller plant 6
south expansion
25000 square feet
Status: Final
Sep 3, 2025
Plumbing Permit Repair
Domestic water piping biw 2m t62-64 new 8 cpvc line roughly 200
Status: Final
Aug 21, 2025
Plumbing Permit Repair
Domestic water piping
the back flow preventer will be connected to the existing dcw system
the iw will then feed a granulation sink a di system and a power washer.
the location of the scope will be on the second floor of cell phase 1 buil
Status: Final
Aug 19, 2025
Plumbing Permit New
Adding 3-compartment sink on 1st floor cathode building
Status: Final
Aug 11, 2025
Plumbing Permit New
Dcr 1727 domestic water sanitary water and pump discharge. 3 water heaters*
Status: Final
Aug 6, 2025
Plumbing Permit Repair
Install floor sink c/l z
efx industrial will be installing a new section 4 underground sanitary sewer line it will tie in to an existing system in the gax area south of the building column line m.5/n.1 and 65 under slab. [for the floor s
Status: Final
Jul 30, 2025
Plumbing Permit New
Install floor sink at z52 underground 500 sqft biw
Status: Pending
Jul 27, 2025
Plumbing Permit New
3 dcw and 4 sanitary line ga2 c/l m36
Status: Final
Jul 17, 2025
Plumbing Permit New
Office space ga2 dcw and sanitary lines/3d lab- brakes room a66-e66 lv2
Status: Final
May 5, 2025
Plumbing Permit Repair
Area: ga 2 level 1 c/l b1
safety showers
500 sq ft
Status: Final
Apr 24, 2025
Plumbing Permit New
Etj-new commercial (3800 sq. ft.)
general assembly bldg-cy-7040-multi-floors
Status: Final
Apr 21, 2025
Plumbing Permit Repair
2 grease traps 1.500 gal tank f40 lv1 2. 300 gal tank m22 lv1
main building general assembly lv1
Status: Final
Apr 11, 2025
Plumbing Permit New
Natural gas 10 carbon steel biw lv2 w63
Status: Final
Mar 27, 2025
Plumbing Permit New
Natural gas 4 carbon steel (main building casting) lv1
Status: Final
Mar 13, 2025
Plumbing Permit Repair
Will be performing a hot tap on an existing 16 hdpe force main. using a solid stainless steel tapping saddle 16x6 and installing a 6 gate valve. then connecting a 6 c900 waste water pipe to that 6 gate valve and to the existing 6 c900 line
Status: Final
Feb 17, 2025
Plumbing Permit Repair
2 water line with a 2 blackflow installed to the batch plant at telsa
Status: Withdrawn
Feb 11, 2025
Plumbing Permit New
Floor sink install
y46 lv1 ga
Status: Final
Feb 6, 2025
Plumbing Permit New
General assembly bldg-1st floor mezzanine-above ground sanitary sewer no water heaters.
ga-2 c/l d-57
Status: Final
Jan 31, 2025
Plumbing Permit New
Etj
eyewash station
l45 2f
l46 1m
l45 1f
cpvc
300sqr ft
ga-2
Status: Final
Jan 28, 2025
Plumbing Permit New
Etj
sx bathroom
lv1 u90
7 toilet 4 sinks 1 water heater
900 copper pipe
3000 sqr ft
Status: Final
Jan 27, 2025
Plumbing Permit Repair
3 eye was stations
350 copper dcw
sx lv1 & 2 1403
1200 sqr ft
Status: Final
Jan 16, 2025
Plumbing Permit Repair
2 stall bathroom with one sink
ga lv1
drug screen bathroom
800sqr ft
Status: Final
Jan 14, 2025
Plumbing Permit Repair
Siphonic roof drain system in casting along z-line between c/ls 5-12
Status: Final
Dec 18, 2024
Plumbing Permit Repair
Canopy drains a-6 thru a-1o casting
Status: Final
Nov 12, 2024
Plumbing Permit Fireline
Domestic waterreclaim waterwaste water fireline forced main. total sqft 0
valuation 5000 floors 0 units waterheaters 0
Status: Active
Oct 31, 2024
Plumbing Permit Repair
6 sanitary line 60
lv1 a3 under ground
casting
Status: Final
Oct 29, 2024
Plumbing Permit New
Tesla - parking garage underground and above ground storm piping. roof drains. no water heaters. 1743000 sq.ft.
Status: Final
Oct 22, 2024
Plumbing Permit New
Main lift station modification
Status: Final
Oct 18, 2024
Plumbing Permit New
Install dcw and sanitary dwv in the stamping shop square foot 213956
Status: Final
Oct 18, 2024
Plumbing Permit Repair
Domestic water just for biw
Status: Expired
Oct 4, 2024
Plumbing Permit Repair
South expansion dcw line
back flows and rpz station 6 stainless steel
pipefitters
Status: Final
Sep 17, 2024
Plumbing Permit Repair
Tesla 12733 tesla road. ss above ground topout. bldg cy-2173 biw1. no water heaters. 4900 sq ft
Status: Final
Sep 17, 2024
Plumbing Permit Repair
4 sanitary line for 3 floor drains
south expansion
lv1 to lv2
Status: Final
Sep 9, 2024
Plumbing Permit Repair
12 ductile dcw line under ground
80
cl z60 lv1
Status: Final
Aug 20, 2024
Plumbing Permit Repair
8000 gal grease waste tank
400 6 cast iron/pvc under ground
a80 south expansion
Status: Final
Aug 6, 2024
Plumbing Permit New
Tesla casting bldg cy-1201
1st floor domestic water/underground/above ground sanitary sewer
1 water heater
2800 sqft
Status: Final
Jul 18, 2024
Plumbing Permit Repair
113 lf of sdr 26 8 and two manholes
Status: Final
Jul 15, 2024
Plumbing Permit New
New tesla cyber building cy-1208 - underground ss rough in casting within the etj
Status: Final
Jul 2, 2024
Plumbing Permit Repair
600 of sanitary sewer
6 sch 40
drive unitbiw & high bay
with by pass
7000 squ ft
Status: Final
Jun 20, 2024
Plumbing Permit Repair
Cell 2 install 6inch gas line.
Status: Final
May 30, 2024
Plumbing Permit Repair
Cell building phase 1
100 square feet
no gas
install and pressure test domestic water piping to gowning room 1cp2f8d
also includes sanitary
Status: Final
May 30, 2024
Plumbing Permit Repair
Installing the two manholes highlighted yellow and the run of pipe between the two. 400 lf of 18� ww (astm f679 / class ps 115)
ga2 expansion
Status: Final
May 6, 2024
Plumbing Permit Repair
2200ft gas pipe
cyber coatings building ga2
cy-500
lv1 & 2
Status: Final
Apr 25, 2024
Plumbing Permit New
Bldg cell 1m - dcrt-1550 - ss underground & above ground dw. (1) water heater
Status: Final
Apr 19, 2024
Plumbing Permit New
Bldg stamping 2 - cy-1327 - ss underground & above ground dw. no water heaters.
Status: Final
Apr 19, 2024
Plumbing Permit Repair
2 floor sinks underground
n49 & n63 ga 2
Status: Final
Apr 17, 2024
Plumbing Permit New
Bldg gax/hb1/st2-cy-209-ss sd underground and above ground through the 3rd floor and no water heaters
Status: Final
Apr 8, 2024
Plumbing Permit New
Cy-310 f/76 restroom ss dwh (1)dwh area gax 1m
Status: Final
Apr 2, 2024
Plumbing Permit New
Cy-310 h/52 restroom ss dwh (2)dwh area gax 1m
Status: Final
Apr 2, 2024
Plumbing Permit New
Cy-310 j/75 restroom ss dwh (2)dwh area gax 1f
Status: Withdrawn
Apr 2, 2024
Plumbing Permit New
Tesla manufacturing facilityplumbing south expansion sx-301 554895 sq. ft. etj
adding domestic water to the plumbing scope and a backflow preventor. 200 sq ft additional. no hw heaters no taps no gas
Status: Final
Apr 1, 2024
Plumbing Permit Repair
1500gal grease trap install at e83 ga2
Status: Final
Mar 26, 2024
Plumbing Permit Repair
4 floor sink 100 of sanitary pipe
ga1 g22 lv1
Status: Final
Mar 26, 2024
Plumbing Permit Repair
12 eye wash station and dcw water tie into bathroom
500 of copper
for ga 2
Status: Final
Mar 26, 2024
Plumbing Permit New
1f l/52 dw overhead & ss underground 1 water heater.
cyber cy-312 bldg gax ga2
Status: Final
Mar 11, 2024
Plumbing Permit New
1m j/75 dw overhead & ss overhead 1 water heater
cyber cy-306 in bldg gax
Status: Final
Mar 11, 2024
Plumbing Permit Repair
M44-m60 ga-1 1000 dcr cy-503 lv1
gas line
Status: Final
Feb 24, 2024
Plumbing Permit New
3 floor sinks 3 sanitary
200 sqr. ft
cl a40 lv1
ga1
Status: Final
Feb 21, 2024
Plumbing Permit New
Ga-1
600 dcw 10 eye wash stations
12500 sqr ft
n47
Status: Final
Feb 8, 2024
Plumbing Permit New
Ga 1
tesla my-7518 barista bar
196 square foot
no gas
Status: Final
Jan 24, 2024
Plumbing Permit New
New construction in etj cyber cafe
this is gax south side of the building column lines 82.5 to 85 and e to m.5. we will be working on 1m overhead on 1 f
Status: Final
Jan 3, 2024
Plumbing Permit Repair
Natural gas line building biw location 1f/t37
Status: Final
Dec 28, 2023
Plumbing Permit New
Etj interior plumbing for biw area
Status: Final
Dec 7, 2023
Plumbing Permit Repair
Area ga2- dcw backflow station
300
2 rpzs 2 backflows
6 dcw n61 lv1 -n59 lv2
Status: Final
Dec 7, 2023
Plumbing Permit Repair
Drive unit shop level 1m @ column line t and 55 (manufacturing facility)
single gas line- per chad watson
Status: Final
Nov 29, 2023
Plumbing Permit Fireline
Main water for fire and domestic 16 inch c900 pvc at south of factory reference 2020-0306dr2. okay per chad watson
Status: Final
Nov 22, 2023
Plumbing Permit Repair
Tying into domestic cold water existing sanitary to route to space in general assembly
for a lab 4 water heaters no gas 2 floors 7845 square feet.
area-tesla giga factory austin general assembly 1 (shop ga1)
Status: Final
Nov 20, 2023
Plumbing Permit Repair
Tesla giga factory austin cell plant 1
domestic water to backflow for humidifier drain lines for condensate single two-bay sink with dwv and hot and cold water.
1 water heater
2 floors
150 square feet
no gas
Status: Final
Nov 20, 2023
Plumbing Permit New
Cy-1404. 6750sf no dwh (1) 8 floor sink (1) 6 trench drain 60 lf. install underground sanitary waste and vent in high bay hb-1.
Status: Active
Nov 14, 2023
Plumbing Permit New
Ga-2 restrooms on level 1m my-7517 1 water heater 1 water cooler. column lines 41-m.5 through 43-n.
3700 square foot.
Status: Final
Nov 14, 2023
Plumbing Permit New
Cell phase 2 (cp2). 200000sf (4 floors) 9 water heaters various fixtures and rr buildouts. install aboveground plumbing systems for cp2. scope includes dcw/dhw natural gas sanitary waste and vent.
Status: Final
Nov 14, 2023
Plumbing Permit New
12 floor sinks undeground
1200 sq ft
work at n64-68 lv 1
ga2
Status: Active
Nov 1, 2023
Plumbing Permit Repair
6 gas line 2600 gax2 cl45-83
Status: Final
Nov 1, 2023
Plumbing Permit Repair
6 gas line biw 2400 cl 20 - 66
Status: Final
Nov 1, 2023
Plumbing Permit Repair
Tesla gax column line m/52. sanitary sewer underground. 200 sq ft. no water heater.
Status: Final
Oct 17, 2023
Plumbing Permit New
New etj
5000 square ft. - building 1406 column m5
8 boilers ng sanitary dw
gax
Status: Final
Oct 9, 2023
Plumbing Permit New
Tesla my-7518 2 floors approximately 75 fitures 1 water heater f-2 factory work in columns c40-c44
ga-1 4100 square foot no gas
Status: Final
Oct 4, 2023
Plumbing Permit New
500gal grease trap
ga a54
underground
Status: Final
Sep 22, 2023
Plumbing Permit New
8 natural gas line with new prv station
paint building t-19
Status: Final
Aug 23, 2023
Plumbing Permit New
4 floor sinks
200 sqr ft
ga2 expansion
Status: Final
Aug 16, 2023
Plumbing Permit New
Lowering 2 roof drains in biw z-line
Status: Final
Aug 16, 2023
Plumbing Permit Repair
Gax l1. cy-115. sanitary floor sinks. installation of (2) floor sinks in slab on level 1. 52000 sq ft
ga2
Status: Final
Aug 2, 2023
Plumbing Permit New
Install 2 new hub drains 100 sq ft
Status: Final
Jul 12, 2023
Plumbing Permit New
Install 1 new hub drain 1st floor 25 sq ft
Status: Final
Jul 12, 2023
Plumbing Permit New
One grease trap and one sink
k22 cl
100sqr ft
ga-1
Status: Final
Jun 2, 2023
Plumbing Permit New
Cy-2201 battery dcw in general assy from levels 1m thru 2m. san waste vent and dom water all aboveground. (3) distribution lines (2) water coolers (2) emerg eyewash stations (1) water heater (2) mop sinks (3) floor sinks. 1500 sq ft ga2
Status: Final
May 31, 2023
Plumbing Permit New
Cy-302 cyber rr on 1f col line j/67 in general assy. approx. 1500 sf. san waste and vent (undgrd & abvgrd) dom water. (1) water heater. ga2
Status: Final
May 31, 2023
Plumbing Permit New
Cy-302 cyber rr on 1f col line n/59 in general assy. approx. 1500 sf. san waste and vent (undgrd & abvgrd) dom water. (1) water heater. ga2
Status: Final
May 31, 2023
Plumbing Permit New
Cy-302 cyber rr on 1f col line n/72 in general assy. approx. 1500 sf. san waste and vent (undgrd & abvgrd) dom water. (1) water heater. ga2
Status: Final
May 31, 2023
Plumbing Permit New
4 sump pumps for switch yard
4000sqr ft
Status: Final
May 30, 2023
Plumbing Permit New
4 floor sink s ga2
77a underground
57d lv1
83n underground
66d lv1
Status: Final
May 30, 2023
Plumbing Permit New
Tie in to existing 4 ng line. run roughly 1492 of new gas piping. 4 and smaller pipe. ga 1
Status: Final
May 11, 2023
Plumbing Permit New
Shop-stamping 2. 8 domestic cold water installation from col line t83-n83 & vertical drop to backflow preventer station. 1 floor. no water heaters.
Status: Final
Apr 20, 2023
Plumbing Permit New
Stamping 2 8 domestic water line above ground running on south side of facility. no water htrs sf n/a.
Status: Withdrawn
Apr 18, 2023
Plumbing Permit New
Shop-stamping 1. 8 domestic cold water main installation from col line v.7/75 to v.7/83 & col line z83 to t83. 1 floor no water heaters
Status: Final
Apr 18, 2023
Plumbing Permit New
Shop-general assembly 2. 8 and 6 domestic cold water main riser installation between n/82.5 and n/83.5. ga2 is 3 floors. no water heaters.
Status: Final
Apr 18, 2023
Plumbing Permit New
Paint shop pt1. 3 flrs level 1f @ col 26/27. dw/ss rough in walls. 4500 sf 2 water heaters
Status: Final
Apr 17, 2023
Plumbing Permit New
Allegiant will be installing a mixture of 3 4 6 & 8 pvc underground approximately 280 feet in total length for a sanitary sewer system in st2 c/l n83 stamping 2.
-1st floor
-low hazard
-0 water heaters
Status: Active
Apr 17, 2023
Plumbing Permit New
General assembly ga pack & tear down. above ground san waste & vent & dom water. 2f col n/28-30. 0 water heaters. 4 floors - 1f 1m 2f 2m. 4050 sf.
Status: Final
Apr 17, 2023
Plumbing Permit New
All above ground plumbing cathode
Status: Final
Apr 17, 2023
Plumbing Permit New
Du shop drive unit. 3 floors 1 water heater. 10125 sf san waste & vent above & below ground dom water for people spaces 1m col n-t/54-55.1.
Status: Final
Apr 17, 2023
Plumbing Permit New
The work description would be: above ground natural gas condensate condensate drain sanitary vent & sanitary waste piping.
bldg sq ft
cell â¿¿ 318k
number of floors
cell - 3
number of units
cell - 0
group: f-2 factory or industri
Status: Final
Mar 21, 2023
Plumbing Permit New
Above ground natural gas condensate condensate drain sanitary vent & sanitary waste piping
a. bldg sq ft- 31000sf
plastics
b. number of floors
plastics - 3
c. number of units
plastics - 0
d. group: f-2 factory or industrial low-hazard
p
Status: Final
Mar 21, 2023
Plumbing Permit New
Above ground natural gas condensate condensate drain sanitary vent & sanitary waste piping.
bldg sq ft
paint â¿¿ 75k
b. number of floors
paint - 3
c. number of units
paint - 0
d. group: f-2 factory or industrial low-hazard
paint -
Status: Final
Mar 21, 2023
Plumbing Permit New
Above ground natural gas condensate condensate drain sanitary vent & sanitary waste piping.
bldg sq ft
casting -232k
b. number of floors
casting - 1
c. number of units
casting - 0
d. group: f-2 factory or industrial low-hazard
casting - f-2
Status: Final
Mar 21, 2023
Plumbing Permit Repair
Tesla gigafactory (biw1)
column line x67
allegiant is to install a 12x12 floor sink on the 2nd floor biw1 near c/l x67 that ties into a 3 san sewer system.
Status: Final
Mar 10, 2023
Plumbing Permit Repair
Tesla gigafactory (biw1)
column line x65 to x67
allegaint industrial is to tie into an existing 2-1/2 domestic cold water line @ column line y66 using copper viega propress and run about 40 west then about 70 south before turning up to a 2
Status: Final
Mar 10, 2023
Plumbing Permit New
Tesla ga shop area. cy-301 cyber restroom on 2f col line n/64. sanitary waste & vent (above ground) and domestic water.
1800 sq ft one water heater
Status: Final
Mar 9, 2023
Plumbing Permit New
Tesla ga shop area. cy-301 cyber restroom on 1f col line n/46. sanitary waste & vent (both above ground & underground) and domestic water.
1800 sq ft one water heater
Status: Final
Mar 9, 2023
Plumbing Permit New
Tesla ga shop area. cyber restroom on 2f col line n/80. sanitary waste & vent (above ground) and domestic water.
1800 sq ft 1 water heater
Status: Final
Mar 9, 2023
Plumbing Permit New
Tesla southside building expansion area. col lines 85-93. underground sanitary waste & vent siphonic storm and condensate.
underground storm
421000 sq ft
Status: Final
Mar 9, 2023
Plumbing Permit New
Ga shop col c-n1/51-59 for domestic water and sanitary sewer 218205 sf
Status: Final
Mar 1, 2023
Plumbing Permit Repair
Waste water from exterior of building to the lift station and lift station install
adding water/fire lines
Status: Final
Mar 1, 2023
Plumbing Permit New
Domestic water on entry level 1 of pt1 col line n/1 to rpz station level 3 @ col line q/r & col 1. san sewer floor sink f/rpz station 3f @ col q/r & col 1. tie in pt on 1f col 2/p. rr and breakroom build out level 1 col q/r & col 26-28.
Status: Active
Mar 1, 2023
Plumbing Permit New
Natural gas for die cast machines; casting; 50k sq ft; no water heaters etj
Status: Final
Feb 16, 2023
Plumbing Permit Repair
Domestic water reclaim water
waste water forced main
Status: Final
Feb 9, 2023
Plumbing Permit New
Underground plumbing system for tesla project cell phase 2 column lines g-m and 1-22.1. sq ft 255150
Status: Final
Feb 7, 2023
Plumbing Permit Fireline
Fireline water line for site plan development sp-2022-0340d
Status: Active
Jan 26, 2023
Plumbing Permit Fireline
Install outside underground fireline and water piping for tesla cathode building etj.
Status: Final
Jan 17, 2023
Plumbing Permit New
Etj interior plumbing for cell area
Status: Final
Dec 15, 2022
Plumbing Permit Auxiliary Water
Repair/install new force main valve.
Status: Final
Dec 14, 2022
Plumbing Permit Repair
Make up paint shop tool natural gas connections
wenker 3 and 1.5 branches
Status: Final
Dec 7, 2022
Plumbing Permit New
107000 sq ft. build under ground sanitary and storm above ground sanitary vent dcw and storm single story and 2 water heaters cathode (die shop)
Status: Final
Nov 17, 2022
Plumbing Permit Repair
Sp-2020-0306d - please reference this no. plumbing work for repair/install new force main valve.
Status: Final
Nov 10, 2022
Plumbing Permit Repair
The installation of 300 below grade plumbing in stamping 2. column t-q 67- 71 allegiant
Status: Final
Oct 28, 2022
Plumbing Permit New
Addition of a rest room and cafeteria dcwdwv 1 water heater
ga 1 porter
Status: Final
Oct 17, 2022
Plumbing Permit New
Paint shop tool connections 20 1.5 branch lines to: e coat top coat flash asu6 & asu7. permit for wenker
natural gas hookups.
Status: Final
Oct 17, 2022
Plumbing Permit Repair
Cell shop 5 emergency showers 800 dcw 4000 sq.ft. improvements in existing building
Status: Final
Oct 10, 2022
Plumbing Permit New
Below and above ground plumbing for cathode are cell test building 2560 square foot freestanding structure
Status: Final
Oct 10, 2022
Plumbing Permit Repair
Extend 6 natural gas main in the casting shop included are two 1-1/2 equipment drops
Status: Final
Oct 10, 2022
Plumbing Permit Repair
4800 sq.ft. remodel dcw dwv above grade 3 rpzs. 2m break room bathroom and conference room located cl: e 33/34 for polk ga 1
Status: Final
Oct 10, 2022
Plumbing Permit New
Cathode building underslab dwv siphonic underslab dcw & rw mains from 5 exterior to the inside.
square foot 38228
Status: Final
Aug 2, 2022
Plumbing Permit New
Ga1 cafeteria; install under slab sanitary above slab dwv and dcw 3 waterheaters 6 ea rpzs polk dcr 336 square foot 5830. also includes war room and mothers room.
Status: Final
Jul 13, 2022
Plumbing Permit New
Demo rr at 15.6 z and rebuild new design in the same location 5 wc 4 lav 1 ms. 500 sq.ft. project casting
Status: Final
Jul 13, 2022
Plumbing Permit New
Paint shop dcr 439 1200 sq. ft rest room build. ug dwv above grade dcw & dwv 4 water heaters. also will include people space area.
Status: Final
Jul 13, 2022
Plumbing Permit New
All above ground piping and underground plumbing ga 2 and 3 expansion 500000 square foot.
Status: Final
Jul 1, 2022
Plumbing Permit Repair
Add additional 8 branch connection to lift station 4 re connect existing 6 branch to new 8 lateral. once combined the pipe size to the lift station is 10 add clean outs and terminate 3 into the building interior
Status: Final
Jun 23, 2022
Plumbing Permit New
Etj ga 1 restrooms break area hydration station scope. 11613 sq.ft. dwv sanitary tie in dcw
Status: Final
Jun 9, 2022
Plumbing Permit Repair
Extend natural gas line from header to 3 ovens and 1 ahu for a total kw load of 1470 paint
Status: Final
Jun 9, 2022
Plumbing Permit New
Ga 1: continue lateral branches from natural gas main to the tool connections
remodel 2 bathrooms/add fixtures 2f 35 f-g and 40-41 n. includes underslab & above grade dwv and domestic water
square foot 30850
Status: Final
Mar 8, 2022
Plumbing Permit New
Cell shop natural gas add laterials from gas main root valve to tool pocs square foot 12 150
Status: Final
Mar 8, 2022
Plumbing Permit Repair
Install 160 10 and 1100 6 hdpe underground on the north end of the building. the line runs from the ih 130 east area to a line the branching to the e line at the casting area.
Status: Final
Mar 1, 2022
Plumbing Permit New
Stamping 2 ug plumbing and storm above grade water dwv a storm etj shell
Status: Final
Feb 8, 2022
Plumbing Permit New
Highbay install ug plumbing and storm above ground water wasteand storm plumbing eud.
Status: Final
Feb 8, 2022
Plumbing Permit Repair
Ga-1 install floor sink and grade clean out 1f a-31 receptor for rpz eud.
Status: Final
Feb 8, 2022
Plumbing Permit New
Install above grade and underground plumbing dcwdwv and back flow devices general assembly 2 square foot 2162406
Status: Final
Jan 14, 2022
Plumbing Permit Repair
All above ground piping for natural gas and drain waste and vent plastics (pl1)
Status: Final
Dec 2, 2021
Plumbing Permit New
Work to include storm natural-gas-body in white (biw) building only
austin 2 mile etj
ref: sp-2020-0306d
Status: Final
Aug 3, 2021
Plumbing Permit Repair
Tesla giga factory sanitary lift station installation
Status: Final
Jul 19, 2021
Plumbing Permit New
Above ground work for plumbing pipingundergournd work storm sanitary domestic water piping. drivetrain
austin 2 mile etj
ref: sp-2020-0306d
Status: Final
Jul 8, 2021
Plumbing Permit New
Natural gas piping for new factory - cell building
Status: Final
Jul 6, 2021
Plumbing Permit New
Install above and below ground plumbing including storm sanitary domestic water and natural gas - paint
Status: Final
Jul 1, 2021
Plumbing Permit New
Above ground work for plumbing piping sanitary domestic water -body in white (biw) building only
austin 2 mile etj
ref: sp-2020-0306d
chiller plant work
Status: Final
Jun 17, 2021
Plumbing Permit Fireline
Install multiple fire line and fdc risers (5 outs)
Status: Final
Jun 11, 2021
Plumbing Permit New
Above ground work for plumbing piping storm sanitary domestic water and process cooling water (paint)
Status: Expired
May 13, 2021
Disclaimer: Permit data comes from Austin's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Austin building department before buying, selling, or planning work.