Do You Need a Demolition Permit in Franklin County?

Based on Franklin County's local building codes, you'll need a permit when:

Required·Rule 1

Full building demolition requires a demolition permit. All utilities (gas, electric, water, sewer) must be disconnected before work begins. An asbestos survey is required for structures built before 1978.

SourceOhio Building Code / 2018 IRC with local amendments
Required·Rule 2

Demolition of structures built before 1978 requires a permit and an asbestos survey before any work begins. Federal EPA NESHAP regulations require asbestos-containing materials to be identified and properly abated. Lead paint may also be present and require special handling.

SourceOhio Building Code / 2018 IRC with local amendments
Required·Rule 3

Partial demolition that involves removing structural elements (walls, roof sections, floors) requires a building permit. Structural plans may be required showing how the remaining structure will be supported.

SourceOhio Building Code / 2018 IRC with local amendments

These demolition projects are typically exempt in Franklin County:

Exempt·Rule 1

Removing a small accessory structure (shed, carport, small outbuilding) built after 1978 and not in a historic district may be exempt from a demolition permit. However, utility disconnection and proper disposal are still required. Check with your building department.

SourceOhio Building Code / 2018 IRC with local amendments

Permit Fees in Franklin County

Based on local Franklin County permit data, fees for demolition projects typically range:

$100 – $1,000 Franklin County Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Small accessory structure removal (where permit needed)$50 – $200
Interior demolition / gutting permit$100 – $500
Partial structural demolition$150 – $500
Full residential building demolition$200 – $1,000+
Asbestos survey (pre-1978 structures)$300 – $800 (separate from permit)
Asbestos abatement (if ACM found)$1,500 – $15,000+ (separate from permit)

Fees are typically calculated based on estimated project value. Contact Franklin County Economic Development & Planning - Building Division for exact amounts.

How Long Does It Take?

In Franklin County, typical approval time for demolition permits is about 3 weeks.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a Demolition Permit in Franklin County

  1. 1 Check requirements: Use our free lookup tool or contact Franklin County Economic Development & Planning - Building Division to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit online: Franklin County accepts applications online at Franklin County Economic Development & Planning - Building Division.
  4. 4 Pay fees: Pay the applicable permit fees ($100 – $1,000).
  5. 5 Wait for approval: Your application will be reviewed by Franklin County plan reviewers. Typical turnaround is about 3 weeks.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Franklin County Economic Development & Planning - Building Division at (614) 525-3166 to schedule required inspections at each phase of the project.

Franklin County Building Department Contact

NameFranklin County Economic Development & Planning - Building Division
Apply OnlineApply online
Address142 S. Front St, Columbus, OH 43215
HoursMon-Fri by appointment

Required Inspections in Franklin County

Most demolition projects in Franklin County require inspections at each construction stage:

Inspection·Stage 1

Pre-Demolition Inspection, Utilities are confirmed disconnected (gas, electric, water, sewer), asbestos abatement is complete (for pre-1978 structures), demolition permit is posted, erosion control measures are in place, and the contractor has proper equipment and safety measures.

WhenBefore demolition work begins, may be required to verify utility disconnection and asbestos abatement completion
Common FailuresUtilities not fully disconnected, asbestos abatement not completed or documented, erosion control not installed.
Inspection·Stage 2

Final Site Inspection, All structures fully removed, basement or foundation properly filled and compacted, site graded to drain properly (not toward neighboring properties), debris removed, erosion control in place, and the site is safe and stable.

WhenAfter demolition is complete and the site has been cleared and graded
Common FailuresFoundation not filled or improperly compacted, site not graded (water pooling), debris remaining, erosion control missing.

Schedule inspections with Franklin County Economic Development & Planning - Building Division at (614) 525-3166 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your demolition project. In Franklin County, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for demolition projects in Franklin County typically range from $100 – $1,000. Fees are usually based on the estimated project value.

Typical approval time in Franklin County is about 3 weeks. Complex projects requiring structural review may take longer.

In most cases, homeowners in Franklin County can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Franklin County can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your demolition project in Franklin County?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

Demolition Permits in Nearby Cities

See demolition permit requirements in other Ohio cities:

See Detailed Demolition Rules for Franklin County

View all local rules, exemptions, and fee details on the permit page.

Demolition Permit Rules →
Disclaimer: This guide provides general information about demolition permit requirements in Franklin County, OH. Requirements can change. Always confirm with Franklin County Economic Development & Planning - Building Division before starting any project. PermitMint provides general guidance, not legal advice.