Free Permit Lookup →Do You Need a Demolition Permit in Silver Spring?
Based on Silver Spring's local building codes, you'll need a permit when:
Full building demolition requires a demolition permit. All utilities (gas, electric, water, sewer) must be disconnected before work begins. An asbestos survey is required for structures built before 1978.
Demolition of structures built before 1978 requires a permit and an asbestos survey before any work begins. Federal EPA NESHAP regulations require asbestos-containing materials to be identified and properly abated. Lead paint may also be present and require special handling.
Partial demolition that involves removing structural elements (walls, roof sections, floors) requires a building permit. Structural plans may be required showing how the remaining structure will be supported.
These demolition projects are typically exempt in Silver Spring:
Removing a small accessory structure (shed, carport, small outbuilding) built after 1978 and not in a historic district may be exempt from a demolition permit. However, utility disconnection and proper disposal are still required. Check with your building department.
Permit Fees in Silver Spring
Based on local Silver Spring permit data, fees for demolition projects typically range:
Here's how fees break down by project scope nationally:
| Project Scope | Typical Permit Fee |
|---|---|
| Small accessory structure removal (where permit needed) | $50 – $200 |
| Interior demolition / gutting permit | $100 – $500 |
| Partial structural demolition | $150 – $500 |
| Full residential building demolition | $200 – $1,000+ |
| Asbestos survey (pre-1978 structures) | $300 – $800 (separate from permit) |
| Asbestos abatement (if ACM found) | $1,500 – $15,000+ (separate from permit) |
Fees are typically calculated based on estimated project value. Contact Montgomery County DPS for exact amounts.
How Long Does It Take?
In Silver Spring, typical approval time for demolition permits is about 3 weeks.
More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.
How to Apply for a Demolition Permit in Silver Spring
- 1 Check requirements: Use our free lookup tool or contact Montgomery County DPS to confirm your project needs a permit.
- 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
- 3 Submit online: Silver Spring accepts applications online at Montgomery County DPS.
- 4 Pay fees: Pay the applicable permit fees ($100 – $1,000).
- 5 Wait for approval: Your application will be reviewed by Silver Spring plan reviewers. Typical turnaround is about 3 weeks.
- 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
- 7 Schedule inspections: Call Montgomery County DPS at (311) 311-0000 to schedule required inspections at each phase of the project.
Silver Spring Building Department Contact
Required Inspections in Silver Spring
Most demolition projects in Silver Spring require inspections at each construction stage:
Pre-Demolition Inspection, Utilities are confirmed disconnected (gas, electric, water, sewer), asbestos abatement is complete (for pre-1978 structures), demolition permit is posted, erosion control measures are in place, and the contractor has proper equipment and safety measures.
Final Site Inspection, All structures fully removed, basement or foundation properly filled and compacted, site graded to drain properly (not toward neighboring properties), debris removed, erosion control in place, and the site is safe and stable.
Schedule inspections with Montgomery County DPS at (311) 311-0000 at least 24–48 hours in advance.
Frequently Asked Questions
Whether you need a permit depends on the size and scope of your demolition project. In Silver Spring, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.
Permit fees for demolition projects in Silver Spring typically range from $100 – $1,000. Fees are usually based on the estimated project value.
Typical approval time in Silver Spring is about 3 weeks. Complex projects requiring structural review may take longer.
In most cases, homeowners in Silver Spring can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.
Working without a required permit in Silver Spring can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.
Ready to check your demolition project in Silver Spring?
Use our free lookup tool to get a personalized answer based on your specific project details.
Free Permit Lookup →Other Permit Guides for Silver Spring, MD
Explore more permit guides for Silver Spring:
Demolition Permits in Nearby Cities
See demolition permit requirements in other Maryland cities:
See Detailed Demolition Rules for Silver Spring
View all local rules, exemptions, and fee details on the permit page.
Demolition Permit Rules →