Evergreen Power Systems Inc

Public permit-pulling record, Washington. Actively filing permits (most recent: 2026-05-27).

1,162 Permits filed
1 City worked in
2005 First permit on record

Permits filed by year

Volume trend in Washington.

77 2005 132 2006 63 2007 52 2008 31 2009 68 2010 78 2011 47 2012 79 2013 54 2014 47 2015 34 2016 62 2017 35 2018 57 2019 37 2020 46 2021 38 2022 32 2023 45 2024 32 2025 16 2026

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Evergreen Power Systems Inc's public permit-pulling record in Washington. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Washington)

Permit counts per city for Evergreen Power Systems Inc.

Bellevue Wa 1,162 permits

Most common project types

Based on permit_type codes in the underlying city data.

Electrical No Plan Review 878
Electrical Plan Review 208
Electrical Fire Alarm 65
Fire Alarm No Plan Review 7
Row Street Use 2
Row Short-term Commercial 1

Recent permits

The 20 most recent permits filed by Evergreen Power Systems Inc across all Washington cities.

Date City Type Status Value
2026-05-27 Bellevue Wa Electrical No Plan Review Ready to Issue
2026-05-21 Bellevue Wa Electrical Plan Review Open
2026-05-19 Bellevue Wa Electrical No Plan Review Issued
2026-05-15 Bellevue Wa Electrical Plan Review Open
2026-04-24 Bellevue Wa Electrical No Plan Review Issued
2026-04-03 Bellevue Wa Electrical No Plan Review Ready to Issue
2026-04-02 Bellevue Wa Electrical Plan Review Open
2026-04-01 Bellevue Wa Electrical No Plan Review Issued
2026-03-30 Bellevue Wa Electrical No Plan Review Issued
2026-03-25 Bellevue Wa Electrical No Plan Review Issued
2026-03-25 Bellevue Wa Electrical No Plan Review Issued
2026-03-24 Bellevue Wa Electrical No Plan Review Issued
2026-03-13 Bellevue Wa Electrical No Plan Review Issued
2026-02-03 Bellevue Wa Electrical Plan Review Open
2026-01-29 Bellevue Wa Electrical Plan Review Open
2026-01-26 Bellevue Wa Electrical Plan Review Open
2025-12-17 Bellevue Wa Electrical No Plan Review Ready to Issue
2025-12-16 Bellevue Wa Electrical Plan Review Open
2025-11-05 Bellevue Wa Electrical No Plan Review Issued
2025-11-05 Bellevue Wa Electrical No Plan Review Issued

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Washington?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.