A&r Solar

Public permit-pulling record, Washington. Actively filing permits (most recent: 2026-04-27).

271 Permits filed
1 City worked in
2010 First permit on record

Permits filed by year

Volume trend in Washington.

2 2010 1 2011 2 2013 8 2014 61 2015 15 2016 4 2017 15 2018 26 2019 14 2020 14 2021 32 2022 31 2023 9 2024 29 2025 10 2026

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows A&r Solar's public permit-pulling record in Washington. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Washington)

Permit counts per city for A&r Solar.

Bellevue Wa 273 permits

Most common project types

Based on permit_type codes in the underlying city data.

Electrical No Plan Review 141
Electrical Plan Review 130
Tenant Improvement 1
Minor Commercial Project 1

Recent permits

The 20 most recent permits filed by A&r Solar across all Washington cities.

Date City Type Status Value
2026-06-01 Bellevue Wa Electrical Plan Review Open
2026-06-01 Bellevue Wa Electrical Plan Review Open
2026-04-27 Bellevue Wa Electrical No Plan Review Issued
2026-04-06 Bellevue Wa Electrical Plan Review Open
2026-03-30 Bellevue Wa Electrical No Plan Review Issued
2026-03-06 Bellevue Wa Electrical Plan Review Open
2026-03-06 Bellevue Wa Electrical Plan Review Open
2026-02-25 Bellevue Wa Electrical Plan Review Open
2026-01-22 Bellevue Wa Electrical Plan Review Open
2026-01-16 Bellevue Wa Electrical Plan Review Pending
2025-12-03 Bellevue Wa Electrical No Plan Review Issued
2025-11-26 Bellevue Wa Electrical No Plan Review Issued
2025-11-24 Bellevue Wa Electrical No Plan Review Issued
2025-11-17 Bellevue Wa Electrical Plan Review Pending
2025-11-05 Bellevue Wa Electrical Plan Review Pending
2025-11-04 Bellevue Wa Electrical No Plan Review Closed
2025-10-03 Bellevue Wa Electrical Plan Review Issued
2025-09-26 Bellevue Wa Electrical Plan Review Closed
2025-09-16 Bellevue Wa Electrical Plan Review Issued
2025-09-11 Bellevue Wa Electrical Plan Review Closed

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Washington?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.