Deck / Patio Permit Requirements in Burlington, VT

Vermont adopted the 2021 Vermont Fire & Building Safety Code based on 2021 IRC. Trades Division (construction permits): (802) 863-9094 x3.

Population: 44,275 Code: 2021 Verified: 2026-03-28 4 local rules

When you DON'T need a permit

Freestanding decks not more than 30 inches above grade are exempt from a building permit per IRC R105.2.

Source: City of Burlington Code / Vermont RBES (IRC 2021)

When you DO need a permit

Attached decks require a building permit even if under 30 inches above grade.

Estimated fee: $100 – $350

Typical timeline: About 2 weeks

Source: City of Burlington Code / Vermont RBES (IRC 2021)

Decks more than 30 inches above grade require a building permit.

Estimated fee: $150 – $500

Typical timeline: About 2 weeks

Source: City of Burlington Code / Vermont RBES (IRC 2021)

Covered decks or those over 300 sq ft require a building permit.

Estimated fee: $200 – $600

Typical timeline: About 3 weeks

Source: City of Burlington Code / Vermont RBES (IRC 2021)

What Makes Burlington Different

Here's how Burlington's deck / patio rules stack up against the standard IRC baseline that most of the country follows.

Stricter Than the IRC

Attached decks require a building permit even if under 30 inches above grade.

Decks more than 30 inches above grade require a building permit.

1 rule match the IRC baseline — no surprises there.

Deck / Patio Permit Costs: Burlington vs. Nearby

Burlington's fees are right in line with the Vermont average — $100 – $600 versus $115 – $372 statewide.

CityEstimated Fee
Burlington $100 – $600
South Burlington $100 – $350
South Burlington $150 – $500
South Burlington $200 – $600

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation.

Zoning & HOA Considerations

Zoning

Decks may be subject to zoning setback and lot coverage requirements. Check with your local planning department before building near property lines.

HOA Communities

If you live in an HOA community: many HOAs restrict deck materials, colors, size, and placement. Review your CC&Rs and submit an architectural review request before applying for a building permit. HOA approval can take 1–6 weeks.

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now — Free →

Free Lookup vs. Pro Report

$7.99

Less than a coffee. Could save you a $5,000 fine.

Free (what you see above)
  • Permit required / exempt answer
  • Code citation
  • Estimated fee range
  • Approval timeline
  • Building dept contact
Pro Report adds:
  • Step-by-step application guide
  • Required documents checklist
  • Complete fee breakdown
  • Contractor vs. owner-builder info
  • Setback & height requirements
  • Printable PDF-ready report
Get Pro Report →

See a sample report

One-time payment. 30-day money-back guarantee.

Contractors: speed up your bidding — get exact requirements for your client in seconds.

Building Department Contact

NameCity of Burlington Department of Permitting & Inspections
Address645 Pine St, Burlington, VT 05401
HoursMon-Fri 8:00am-4:30pm

Frequently Asked Questions

Estimated permit fees for Deck / Patio projects in Burlington, VT range from $100 – $350. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Deck / Patio projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Burlington can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Deck / Patio permits in Burlington is About 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate — you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Deck / Patio Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Deck / Patio Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-28. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.