Shed / Outbuilding Permit Requirements in Herriman, UT
CBO Cathryn Nelson. UT 2021 IRC.
When you DON'T need a permit
Detached accessory structures (sheds) 200 sq ft or less and one story are generally exempt from a building permit per IRC R105.2.
Source: Herriman Municipal Code / 2021 IRC
When you DO need a permit
Sheds over 200 sq ft require a building permit.
Estimated fee: $75 – $300
Typical timeline: About 2 weeks
Source: Herriman Municipal Code / 2021 IRC
Sheds with electrical wiring require an electrical permit regardless of size.
Estimated fee: $50 – $150
Typical timeline: About 1 week
Source: Herriman Municipal Code / 2021 IRC
What Makes Herriman Different
Here's how Herriman's shed / outbuilding rules stack up against the standard IRC baseline that most of the country follows.
Stricter Than the IRC
Sheds over 200 sq ft require a building permit.
Sheds with electrical wiring require an electrical permit regardless of size.
More Lenient Than the IRC
Herriman sets the square footage threshold at 200 sq ft — the IRC standard is 120 sq ft. That gives you more room before a permit kicks in.
Shed / Outbuilding Permit Costs: Herriman vs. Nearby
Herriman's fees are right in line with the Utah average — $50 – $300 versus $50 – $168 statewide.
Zoning & HOA Considerations
Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.
If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.
Check your specific project
Answer a few quick questions to get a personalized answer for your exact project.
Check Now — Free →Building Department Contact
Frequently Asked Questions
Estimated permit fees for Shed / Outbuilding projects in Herriman, UT range from $75 – $300. Fees vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Shed / Outbuilding projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit in Herriman can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Shed / Outbuilding permits in Herriman is About 2 weeks. More complex projects may take longer if plan review is required.
If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate — you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.