Window / Door Permit Requirements in New Braunfels, TX

Uses 2015 IRC. Comal/Guadalupe County. Fast-growing Hill Country city.

Population: 90,209 Code: 2015 Verified: 2026-03-21 4 local rules

When you DON'T need a permit

Replacing exterior windows or doors in the same size opening with no structural changes is generally exempt from permits.

Source: City of New Braunfels Building Code (2015 IRC)

Replacing interior doors in the same opening does not require a permit.

Source: City of New Braunfels Building Code (2015 IRC)

When you DO need a permit

Changing the size of an exterior window or door opening requires a building permit due to structural header and framing modifications.

Estimated fee: $50 – $210

Typical timeline: 5 business days

Source: City of New Braunfels Building Code (2015 IRC)

Replacing 10 or more windows at once typically requires a permit for energy code compliance verification.

Estimated fee: $70 – $280

Typical timeline: 5 business days

Source: City of New Braunfels Building Code (2015 IRC)

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now — Free →

Free Lookup vs. Pro Report

$7.99

Less than a coffee. Could save you a $5,000 fine.

Free (what you see above)
  • Permit required / exempt answer
  • Code citation
  • Estimated fee range
  • Approval timeline
  • Building dept contact
Pro Report adds:
  • Step-by-step application guide
  • Required documents checklist
  • Complete fee breakdown
  • Contractor vs. owner-builder info
  • Setback & height requirements
  • Printable PDF-ready report
Get Pro Report →

See a sample report

One-time payment. 30-day money-back guarantee.

Contractors: speed up your bidding — get exact requirements for your client in seconds.

Building Department Contact

NameBuilding Safety
Address550 Landa St, New Braunfels, TX 78130
HoursMon-Fri 8am-5pm

Frequently Asked Questions

Estimated permit fees for Window / Door projects in New Braunfels, TX range from $50 – $210. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Window / Door projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in New Braunfels can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Window / Door permits in New Braunfels is 5 business days. More complex projects may take longer if plan review is required.

Learn More About Window / Door Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Window / Door Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-21. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.