EV Charger Permit Requirements in Camden, SC

SC Building Code (2018 IRC); oldest inland city in SC; historic district overlay may apply

Population: 7,185 Code: 2018 Verified: 2026-03-28 4 local rules

When you DON'T need a permit

Plugging a Level 1 (120V) EV charger into an existing outlet is NOT considered new electrical work and does not require a permit. This is the only permit-free EV charging method — just plug in and charge. Adds approximately 4-5 miles of range per hour.

Source: 2021 South Carolina Residential Code

When you DO need a permit

Level 2 (240V) EV charger installations require an electrical permit. This applies whether the charger is hardwired or installed via a new NEMA 14-50 outlet. The circuit must be sized at 125% of the EVSE nameplate amperage per NEC 625.41, with GFCI protection per NEC 625.54.

Estimated fee: $75 – $300

Typical timeline: About 2 weeks

Source: 2021 South Carolina Residential Code

Installing a new NEMA 14-50 outlet for EV charging requires an electrical permit. Even though you may plug a portable EVSE into it, the outlet installation itself is new electrical work on a dedicated 50-amp circuit, which must meet NEC requirements for branch circuit sizing, GFCI protection, and grounding.

Estimated fee: $75 – $250

Typical timeline: About 2 weeks

Source: 2021 South Carolina Residential Code

Upgrading the electrical service panel to support an EV charger requires a separate electrical permit and typically utility coordination for the service change. A 100A panel usually needs an upgrade to 200A to accept a full-speed Level 2 charger, or an Energy Management System (NEC 625.42) can be used as an alternative to avoid the service upgrade.

Estimated fee: $150 – $500

Typical timeline: About 3 weeks

Source: 2021 South Carolina Residential Code

EV Charger Permit Costs: Camden vs. Nearby

Camden comes in on the low side for South Carolina. You're looking at $75 – $500 here, compared to the state average of $100 – $350.

CityEstimated Fee
Camden $75 – $500
Charleston $75 – $300
Charleston $75 – $250
Charleston $150 – $500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation.

Zoning Considerations

Zoning

EV chargers in private garages or driveways rarely trigger zoning review. Outdoor pedestal chargers may have setback requirements in some jurisdictions. California AB 1236 prohibits requiring a planning permit for residential EV charger installations — building official review only.

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now — Free →

Building Department Contact

NameCity of Camden Building Department
Address1000 Lyttleton Street, Camden, SC 29020
HoursMon-Fri 8:30am-5:00pm

Frequently Asked Questions

Estimated permit fees for EV Charger projects in Camden, SC range from $75 – $300. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller EV Charger projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Camden can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for EV Charger permits in Camden is About 2 weeks. More complex projects may take longer if plan review is required.

Learn More About EV Charger Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read EV Charger Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-28. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.