Swimming Pool / Hot Tub Permit Requirements in Fargo, ND

North Dakota adopted the 2024 IRC effective January 1, 2026.

Population: 136,285 Code: 2024 Verified: 2026-03-28 4 local rules

When you DON'T need a permit

Small above-ground pools 24 inches deep or less are exempt from a permit.

Source: City of Fargo / 2024 IRC

When you DO need a permit

Above-ground pools deeper than 24 inches require building and electrical permits.

Estimated fee: $200 – $600

Typical timeline: About 2 weeks

Source: City of Fargo / 2024 IRC

In-ground pools require building, electrical, and plumbing permits.

Estimated fee: $500 – $2,000

Typical timeline: About 3 weeks

Source: City of Fargo / 2024 IRC

Hot tubs with permanent electrical connections require building and electrical permits.

Estimated fee: $125 – $400

Typical timeline: About 2 weeks

Source: City of Fargo / 2024 IRC

Swimming Pool / Hot Tub Permit Costs: Fargo vs. Nearby

Fargo comes in on the low side for North Dakota. You're looking at $125 – $2,000 here, compared to the state average of $194 – $714.

CityEstimated Fee
Fargo $125 – $2,000
Bismarck $200 – $600
Bismarck $500 – $2,000
Bismarck $125 – $400

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation.

Zoning & HOA Considerations

Zoning

Pools may require zoning approval for setback compliance. Many jurisdictions have minimum distance requirements from property lines and easements.

HOA Communities

If you live in an HOA community: many HOAs regulate pool placement, fencing requirements, and equipment screening (pump/filter visibility). Some communities prohibit above-ground pools entirely. Check your CC&Rs before planning.

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now — Free →

Free Lookup vs. Pro Report

$7.99

Less than a coffee. Could save you a $5,000 fine.

Free (what you see above)
  • Permit required / exempt answer
  • Code citation
  • Estimated fee range
  • Approval timeline
  • Building dept contact
Pro Report adds:
  • Step-by-step application guide
  • Required documents checklist
  • Complete fee breakdown
  • Contractor vs. owner-builder info
  • Setback & height requirements
  • Printable PDF-ready report
Get Pro Report →

See a sample report

One-time payment. 30-day money-back guarantee.

Contractors: speed up your bidding — get exact requirements for your client in seconds.

Building Department Contact

NameCity of Fargo Inspections Department
Address225 4th St N, Fargo, ND 58102
HoursMon-Fri 7:45am-4:30pm

Frequently Asked Questions

Estimated permit fees for Swimming Pool / Hot Tub projects in Fargo, ND range from $200 – $600. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Swimming Pool / Hot Tub projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Fargo can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Swimming Pool / Hot Tub permits in Fargo is About 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate — you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Swimming Pool / Hot Tub Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Swimming Pool / Hot Tub Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-28. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.