Garage / Carport Permit Requirements in Farmington Hills, MI

Farmington Hills is a city of 84,173 residents in Michigan that follows the 2021 IRC. Farmington Hills is generally more lenient than the standard IRC when it comes to garage / carport projects — more exemptions and fewer permit triggers. You're looking at roughly $100 – $350 in permit fees, plan on about About 2 weeks for approval — plus you can apply online.

Population: 84,173 Code: 2021 Verified: 2026-04-11 5 local rules

When you DON'T need a permit

Detached garages 120 sq ft or less are exempt from a building permit per IRC R105.2.

Source: Michigan Building Code / 2021 IRC with local amendments

When you DO need a permit

Detached garages over 120 sq ft require a building permit.

Estimated fee: $100 – $350

Typical timeline: About 2 weeks

Source: Michigan Building Code / 2021 IRC with local amendments

Attached garages require a building permit in Portage, MI.

Estimated fee: $175 – $725

Typical timeline: About 3 weeks

Source: Michigan Building Code / 2021 IRC with local amendments

Carports require a building permit in Portage, MI.

Estimated fee: $100 – $350

Typical timeline: About 2 weeks

Source: Michigan Building Code / 2021 IRC with local amendments

Converting a garage to living space requires permits in Portage, MI.

Estimated fee: $175 – $725

Typical timeline: About 3 weeks

Source: Michigan Building Code / 2021 IRC with local amendments

What Makes Farmington Hills Different

Here's how Farmington Hills's garage / carport rules stack up against the standard IRC baseline that most of the country follows.

More Lenient Than the IRC

Detached garages 120 sq ft or less are exempt from a building permit per IRC R105.2.

4 rules match the IRC baseline — no surprises there.

Garage / Carport Permit Costs: Farmington Hills vs. Nearby

Farmington Hills comes in on the low side for Michigan. You're looking at $100 – $725 here, compared to the state average of $172 – $714.

CityEstimated Fee
Farmington Hills $100 – $725
Detroit $300 – $1,300
Detroit $350 – $1,500
Detroit $210 – $900

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation.

Zoning & HOA Considerations

Zoning

Detached garages and carports may require zoning approval for setback and lot coverage compliance. Garage conversions to living space may trigger zoning occupancy requirements.

HOA Communities

If you live in an HOA community: many HOAs regulate garage door styles, colors, and materials. Garage conversions to living space are prohibited in some communities. Carports may be restricted or banned entirely.

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now — Free →

Building Department Contact

NameBuilding Division
Address31555 W Eleven Mile Road, Farmington Hills, MI 48336
HoursMon-Fri 8:30am-4:30pm

Frequently Asked Questions

Estimated permit fees for Garage / Carport projects in Farmington Hills, MI range from $100 – $350. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Garage / Carport projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Farmington Hills can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Garage / Carport permits in Farmington Hills is About 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate — you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Garage / Carport Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Garage / Carport Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-11. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.