Fortville adopted Ordinance No. 2021-9C incorporating Indiana state building codes (675 IAC Articles 13-28) by reference. Permits available online via iWorQ portal. Building Inspector: Jerry Santen, (765) 461-5866. Indiana has no statewide contractor licensing for general contractors; plumbing is the only state-regulated trade.

Population: 4,802 Code: 2018 Verified: 2026-04-07 3 local rules

When you DO need a permit

Building a detached ADU (accessory dwelling unit) requires building, electrical, plumbing, and mechanical permits. Zoning approval may also be required.

Typical timeline: About 4 weeks

Source: Town of Fortville Building Code / Ordinance No. 2021-9C / 2018 IRC

An attached ADU or in-law suite requires building, electrical, plumbing, and mechanical permits.

Typical timeline: About 4 weeks

Source: Town of Fortville Building Code / Ordinance No. 2021-9C / 2018 IRC

Converting an existing structure (garage, basement) into a dwelling unit requires building, electrical, and plumbing permits.

Typical timeline: About 3 weeks

Source: Town of Fortville Building Code / Ordinance No. 2021-9C / 2018 IRC

ADU / Guest House Permit Costs: Fortville vs. Nearby

CityEstimated Fee
Fortville
Indianapolis $1,000 – $5,000
Indianapolis $500 – $3,000
Indianapolis $800 – $4,000

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation.

Zoning Considerations

Zoning

ADU regulations vary dramatically by state and city. Many states (CA, OR, WA) have preemption laws that override local zoning restrictions. Check both state law and local zoning before designing.

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now — Free →

Building Department Contact

NamePlanning & Building Department
Address714 E. Broadway St., Fortville, IN 46040
HoursMon-Fri 8am-4pm

Frequently Asked Questions

Contact Fortville's building department for current ADU / Guest House permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller ADU / Guest House projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Fortville can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for ADU / Guest House permits in Fortville is About 4 weeks. More complex projects may take longer if plan review is required.

Learn More About ADU / Guest House Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read ADU / Guest House Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-07. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.