Driveway / Paving Permit Requirements in Coconut Creek, FL

Florida Building Code 8th Edition (2023, based on 2021 IRC). 4-day work week — closed Fridays. ePermits system for all permits. Located in Broward County.

Population: 60,878 Code: 2021 Verified: 2026-04-07 4 local rules

When you DON'T need a permit

Replacing an existing driveway in the same footprint with no changes to the curb cut is generally exempt from permit requirements.

Source: City of Coconut Creek Building Department / Florida Building Code 8th Edition (based on 2021 IRC)

When you DO need a permit

Any new curb cut requires an encroachment or right-of-way permit. This involves work in the public right-of-way and must meet ADA sidewalk crossing requirements. Contact your city's public works department.

Typical timeline: About 3 weeks

Source: City of Coconut Creek Building Department / Florida Building Code 8th Edition (based on 2021 IRC)

New driveways require a permit. If a new curb cut is needed, an encroachment or right-of-way permit is also required for work in the public right-of-way. The driveway must meet width limits and impervious surface requirements.

Typical timeline: About 2 weeks

Source: City of Coconut Creek Building Department / Florida Building Code 8th Edition (based on 2021 IRC)

Widening or extending an existing driveway typically requires a permit because it increases impervious surface coverage and may affect drainage. If the widening involves a modified curb cut, a right-of-way permit is also required.

Typical timeline: About 2 weeks

Source: City of Coconut Creek Building Department / Florida Building Code 8th Edition (based on 2021 IRC)

What Makes Coconut Creek Different

Here's how Coconut Creek's driveway / paving rules stack up against the standard IRC baseline that most of the country follows.

Stricter Than the IRC

Any new curb cut requires an encroachment or right-of-way permit. This involves work in the public right-of-way and must meet ADA sidewalk crossing requirements. Contact your city's public works department.

New driveways require a permit. If a new curb cut is needed, an encroachment or right-of-way permit is also required for work in the public right-of-way. The driveway must meet width limits and impervious surface requirements.

Widening or extending an existing driveway typically requires a permit because it increases impervious surface coverage and may affect drainage. If the widening involves a modified curb cut, a right-of-way permit is also required.

1 rule match the IRC baseline — no surprises there.

Driveway / Paving Permit Costs: Coconut Creek vs. Nearby

CityEstimated Fee
Coconut Creek
Jacksonville $100 – $400
Jacksonville $150 – $500
Jacksonville $75 – $300

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation.

Zoning & HOA Considerations

Zoning

Driveways that require a new curb cut involve public right-of-way work and always need a permit. Driveway width and impervious surface limits vary by city.

HOA Communities

If you live in an HOA community: hOAs often regulate driveway materials, width, and appearance. Widening a driveway or changing from concrete to gravel (or vice versa) may need architectural review approval.

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now — Free →

Building Department Contact

NameBuilding Department
Address4800 West Copans Road, Coconut Creek, FL 33063
HoursMon-Thu 7am-6pm; Fri closed

Frequently Asked Questions

Contact Coconut Creek's building department for current Driveway / Paving permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Driveway / Paving projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Coconut Creek can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Driveway / Paving permits in Coconut Creek is About 3 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate — you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Driveway / Paving Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Driveway / Paving Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-07. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.