Demolition Permit Requirements in Aurora, CO

Uses 2021 I-Codes with local amendments (Aurora Municipal Code Ch. 22). High altitude (5,471 ft), HVAC derating required. Spans Arapahoe, Adams, and Douglas counties. Aurora4Biz portal for permits. Flat-rate permits available for simple jobs. Email: permitcounter@auroragov.org

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 386,261 Code: 2021 Verified: 2026-03-29 4 local rules

When you don’t need a Demolition permit in Aurora

Exempt·Rule 1

Removing a small accessory structure (shed, carport, small outbuilding) built after 1978 and not in a historic district may be exempt from a demolition permit. However, utility disconnection and proper disposal are still required. Check with your building department.

SourceColorado Building Code / 2021 IRC with local amendments

When you need a Demolition permit in Aurora

Required·Rule 1

Full building demolition requires a demolition permit. All utilities (gas, electric, water, sewer) must be disconnected before work begins. An asbestos survey is required for structures built before 1978.

Estimated Fee$200 – $1,000
Typical Timelineabout 3 weeks
SourceColorado Building Code / 2021 IRC with local amendments
Required·Rule 2

Demolition of structures built before 1978 requires a permit and an asbestos survey before any work begins. Federal EPA NESHAP regulations require asbestos-containing materials to be identified and properly abated. Lead paint may also be present and require special handling.

Estimated Fee$200 – $800
Typical Timelineabout 3 weeks
SourceColorado Building Code / 2021 IRC with local amendments
Required·Rule 3

Partial demolition that involves removing structural elements (walls, roof sections, floors) requires a building permit. Structural plans may be required showing how the remaining structure will be supported.

Estimated Fee$100 – $500
Typical Timelineabout 2 weeks
SourceColorado Building Code / 2021 IRC with local amendments

What Makes Aurora Different

Here's how Aurora's demolition rules stack up against the standard IRC baseline that most of the country follows.

More Lenient Than the IRC

Removing a small accessory structure (shed, carport, small outbuilding) built after 1978 and not in a historic district may be exempt from a demolition permit. However, utility disconnection and proper disposal are still required. Check with your building department.

3 rules match the IRC baseline, no surprises there.

Demolition Permit Costs: Aurora vs. Nearby

Aurora comes in on the low side for Colorado. You're looking at $100 – $1,000 here, compared to the state average of $166 – $766.

CityEstimated Fee
Aurora $100 – $1,000
Denver $100 – $1,000
Colorado Springs $100 – $1,000
Fort Collins $100 – $1,000

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Aurora permit costs →

Zoning & HOA Considerations

Zoning

Properties in historic districts may require historic review board approval before demolition. Some cities require a waiting period for demolition permits to allow for public comment.

HOA Communities

If you live in an HOA community: demolition of visible structures (garages, sheds, accessory buildings) may require HOA notification or approval. Check your CC&Rs, some communities require maintaining certain structures or replacing them within a set timeframe.

Estimated Project Timeline in Aurora

Here's a typical timeline for a demolition project in Aurora, CO:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Aurora's building department, apply online here.
Week 4-6
Plan review & approval
Typical processing time in Aurora: about 3 weeks. Plan review examiner checks drawings for code compliance.
Week 7+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Aurora's typical about 3 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Demolition permit in Aurora, CO?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameBuilding Division
Address15151 E. Alameda Pkwy., Suite 2400, Aurora, CO 80012
HoursMon/Tue/Thu/Fri 7:30am-4:30pm, Wed 8:30am-4:30pm

Frequently Asked Questions

Estimated permit fees for Demolition projects in Aurora, CO range from $100 – $1,000. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Demolition projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Aurora can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Demolition permits in Aurora is about 3 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Demolition Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Demolition Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.