Deck / Patio Permit Requirements in San Bernardino, CA

San Bernardino is a city of 222,101 residents in California that follows the 2022 CBC building code. Whether you need a building permit for your Deck / Patio project depends on the scope of work — here's what San Bernardino's building department requires.

Population: 222,101 Code: 2022 CBC Verified: 2026-03-21 4 local rules

When you DON'T need a permit

Freestanding decks not more than 30 inches above grade are exempt from a building permit per IRC R105.2.

Source: City of San Bernardino Municipal Code / CBC Title 24

When you DO need a permit

Attached decks require a building permit even if under 30 inches, as the ledger board attachment affects the dwelling structure.

Estimated fee: $85 – $300

Typical timeline: About 2 weeks

Source: City of San Bernardino Municipal Code / CBC Title 24

Decks more than 30 inches above grade require a building permit with plans showing footings, structural connections, and guardrails.

Estimated fee: $130 – $425

Typical timeline: About 2 weeks

Source: City of San Bernardino Municipal Code / CBC Title 24

Covered decks or those over 300 sq ft require a building permit and may trigger additional zoning review.

Estimated fee: $170 – $510

Typical timeline: About 2 weeks

Source: City of San Bernardino Municipal Code / CBC Title 24

Zoning Note

Decks may be subject to zoning setback and lot coverage requirements. Check with your local planning department before building near property lines.

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now — Free →

Free Lookup vs. Pro Report

$7.99

Less than a coffee. Could save you a $5,000 fine.

Free (what you see above)
  • Permit required / exempt answer
  • Code citation
  • Estimated fee range
  • Approval timeline
  • Building dept contact
Pro Report adds:
  • Step-by-step application guide
  • Required documents checklist
  • Complete fee breakdown
  • Contractor vs. owner-builder info
  • Setback & height requirements
  • Printable PDF-ready report
Get Pro Report →

See a sample report

One-time payment. 30-day money-back guarantee.

Contractors: speed up your bidding — get exact requirements for your client in seconds.

Building Department Contact

NameCommunity Development - Building & Safety
Address201 N E St, San Bernardino, CA 92401
HoursMon-Tue-Thu 8am-5pm, Wed 10am-5pm, Fri 8am-4pm

Frequently Asked Questions

Estimated permit fees for Deck / Patio projects in San Bernardino, CA range from $85 – $300. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Deck / Patio projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in San Bernardino can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Deck / Patio permits in San Bernardino is About 2 weeks. More complex projects may take longer if plan review is required.

Learn More About Deck / Patio Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Deck / Patio Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-21. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.