Swimming Pool / Hot Tub Permit Requirements in Daly City, CA

Daly City is a city of 102,560 residents in California that follows the 2022 CBC building code. Whether you need a building permit for your Swimming Pool / Hot Tub project depends on the scope of work — here's what Daly City's building department requires.

Population: 102,560 Code: 2022 CBC Verified: 2026-03-21 4 local rules

When you DON'T need a permit

Small above-ground pools (24 inches deep or less) do not require a building permit.

Source: City of Daly City Code / 2022 CBC

When you DO need a permit

Above-ground pools deeper than 24 inches require a building permit and safety barrier.

Estimated fee: $90 – $360

Typical timeline: About 2 weeks

Source: City of Daly City Code / 2022 CBC

In-ground pools require building, electrical, and plumbing permits.

Estimated fee: $360 – $1,350

Typical timeline: About 3 weeks

Source: City of Daly City Code / 2022 CBC

Hot tub installations require an electrical permit.

Estimated fee: $45 – $180

Typical timeline: About 1 week

Source: City of Daly City Code / 2022 CBC

Zoning Note

Pools may require zoning approval for setback compliance. Many jurisdictions have minimum distance requirements from property lines and easements.

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now — Free →

Free Lookup vs. Pro Report

$7.99

Less than a coffee. Could save you a $5,000 fine.

Free (what you see above)
  • Permit required / exempt answer
  • Code citation
  • Estimated fee range
  • Approval timeline
  • Building dept contact
Pro Report adds:
  • Step-by-step application guide
  • Required documents checklist
  • Complete fee breakdown
  • Contractor vs. owner-builder info
  • Setback & height requirements
  • Printable PDF-ready report
Get Pro Report →

See a sample report

One-time payment. 30-day money-back guarantee.

Contractors: speed up your bidding — get exact requirements for your client in seconds.

Building Department Contact

NameBuilding Division
Address333 90th St, City Hall 2nd Floor, Daly City, CA 94015
HoursMon-Fri 8am-5pm

Frequently Asked Questions

Estimated permit fees for Swimming Pool / Hot Tub projects in Daly City, CA range from $90 – $360. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Swimming Pool / Hot Tub projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Daly City can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Swimming Pool / Hot Tub permits in Daly City is About 2 weeks. More complex projects may take longer if plan review is required.

Learn More About Swimming Pool / Hot Tub Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Swimming Pool / Hot Tub Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-21. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.