How to Get a Shed Permit in Pembroke Pines, FL (2026 Guide)

Everything you need to know about shed permits in Pembroke Pines, FL, local requirements, fees, timelines, and how to apply.

By Joey, Founder · Last updated May 23, 2026 · How we research →

$55 – $550 Permit Fees
about 2 weeks Approval Time
3 Local Rules

Check your specific shed project

Get an instant, personalized answer for your exact project details in Pembroke Pines.

Free Permit Lookup →

Do You Need a Shed Permit in Pembroke Pines?

Based on Pembroke Pines's local building codes, you'll need a permit when:

Required·Rule 1

Even small sheds may require a permit in Pembroke Pines, FL due to wind code requirements.

SourceFlorida Building Code / Broward County
Required·Rule 2

Sheds larger than 100 square feet require a building permit in Pembroke Pines, FL.

SourceFlorida Building Code / Broward County
Required·Rule 3

Sheds with electrical service require building and electrical permits in Pembroke Pines, FL.

SourceFlorida Building Code / Broward County

Permit Fees in Pembroke Pines

Based on local Pembroke Pines permit data, fees for shed projects typically range:

$55 – $550 Pembroke Pines Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Small shed (under 200 sq ft, storage only)$50 – $150
Medium shed (200–400 sq ft)$100 – $300
Large shed or workshop (400+ sq ft)$150 – $500+
Electrical permit (if adding power to shed)$50 – $150 additional
Plumbing permit (if adding water)$50 – $200 additional
Habitable conversion (ADU/tiny home)$500 – $2,000+

Fees are typically calculated based on estimated project value. Contact Building Department for exact amounts.

How Long Does It Take?

In Pembroke Pines, typical approval time for shed permits is about 2 weeks.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a Shed Permit in Pembroke Pines

  1. 1 Check requirements: Use our free lookup tool or contact Building Department to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit online: Pembroke Pines accepts applications online at Building Department.
  4. 4 Pay fees: Pay the applicable permit fees ($55 – $550).
  5. 5 Wait for approval: Your application will be reviewed by Pembroke Pines plan reviewers. Typical turnaround is about 2 weeks.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Building Department at (954) 435-6502 to schedule required inspections at each phase of the project.

Pembroke Pines Building Department Contact

NameBuilding Department
Apply OnlineApply online
Address601 City Center Way, 2nd Floor, Pembroke Pines, FL 33025
HoursMon-Thu 7:30am-5pm

Required Inspections in Pembroke Pines

Most shed projects in Pembroke Pines require inspections at each construction stage:

Inspection·Stage 1

Foundation Inspection, Forms and reinforcing are in place, proper depth below grade, rebar size and spacing, anchor bolt placement, and soil conditions. For simpler foundations (gravel pads), this inspection may be combined with the final.

WhenAfter the foundation is prepared but before the shed is placed or framing begins, applies to sheds on permanent foundations (concrete slabs, piers, or footings)
Common FailuresInsufficient depth, missing anchor bolts, improper rebar placement, foundation not matching approved plans.
Inspection·Stage 2

Framing Inspection (larger sheds), Lumber sizes and grades, connections and nailing patterns, hurricane ties and straps, header sizes over openings, and overall structural compliance with approved plans.

WhenAfter framing is complete but before sheathing and siding are installed, typically required only for larger site-built sheds
Common FailuresWrong lumber sizes, missing hurricane ties, inadequate connections, framing not matching approved plans.
Inspection·Stage 3

Final Inspection, Shed is in the correct location per the approved site plan, proper setbacks from property lines, adequate anchoring and tie-down, roof installation, door and window installation, drainage, and overall compliance with approved plans. If electrical was permitted, wiring and panel are checked separately.

WhenAfter all work is complete, for small sheds, this may be the only inspection required
Common FailuresShed not in the approved location, insufficient anchoring, setback violations, electrical work not to code.

Schedule inspections with Building Department at (954) 435-6502 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your shed project. In Pembroke Pines, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for shed projects in Pembroke Pines typically range from $55 – $550. Fees are usually based on the estimated project value.

Typical approval time in Pembroke Pines is about 2 weeks. Complex projects requiring structural review may take longer.

In most cases, homeowners in Pembroke Pines can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Pembroke Pines can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your shed project in Pembroke Pines?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

See Detailed Shed Rules for Pembroke Pines

View all local rules, exemptions, and fee details on the permit page.

Shed Permit Rules →
Disclaimer: This guide provides general information about shed permit requirements in Pembroke Pines, FL. Requirements can change. Always confirm with Building Department before starting any project. PermitMint provides general guidance, not legal advice.