How to Get a Shed Permit in Colorado Springs, CO (2026 Guide)
Everything you need to know about shed permits in Colorado Springs, CO, local requirements, fees, timelines, and how to apply.
By Joey, Founder · Last updated May 23, 2026 · How we research →
Check your specific shed project
Get an instant, personalized answer for your exact project details in Colorado Springs.
Free Permit Lookup →Do You Need a Shed Permit in Colorado Springs?
Based on Colorado Springs's local building codes, you'll need a permit when:
Sheds over 120 sq ft require a building permit.
Sheds with electrical wiring require an electrical permit regardless of size.
These shed projects are typically exempt in Colorado Springs:
Accessory structures (sheds) 120 sq ft or less are generally exempt from a building permit.
Permit Fees in Colorado Springs
Based on local Colorado Springs permit data, fees for shed projects typically range:
Here's how fees break down by project scope nationally:
| Project Scope | Typical Permit Fee |
|---|---|
| Small shed (under 200 sq ft, storage only) | $50 – $150 |
| Medium shed (200–400 sq ft) | $100 – $300 |
| Large shed or workshop (400+ sq ft) | $150 – $500+ |
| Electrical permit (if adding power to shed) | $50 – $150 additional |
| Plumbing permit (if adding water) | $50 – $200 additional |
| Habitable conversion (ADU/tiny home) | $500 – $2,000+ |
Fees are typically calculated based on estimated project value. Contact Pikes Peak Regional Building Department (PPRBD) for exact amounts.
How Long Does It Take?
In Colorado Springs, typical approval time for shed permits is about 2 weeks.
More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.
How to Apply for a Shed Permit in Colorado Springs
- 1 Check requirements: Use our free lookup tool or contact Pikes Peak Regional Building Department (PPRBD) to confirm your project needs a permit.
- 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
- 3 Submit online: Colorado Springs accepts applications online at Pikes Peak Regional Building Department (PPRBD).
- 4 Pay fees: Pay the applicable permit fees ($50 – $300).
- 5 Wait for approval: Your application will be reviewed by Colorado Springs plan reviewers. Typical turnaround is about 2 weeks.
- 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
- 7 Schedule inspections: Call Pikes Peak Regional Building Department (PPRBD) at (719) 327-2880 to schedule required inspections at each phase of the project.
Colorado Springs Building Department Contact
Required Inspections in Colorado Springs
Most shed projects in Colorado Springs require inspections at each construction stage:
Foundation Inspection, Forms and reinforcing are in place, proper depth below grade, rebar size and spacing, anchor bolt placement, and soil conditions. For simpler foundations (gravel pads), this inspection may be combined with the final.
Framing Inspection (larger sheds), Lumber sizes and grades, connections and nailing patterns, hurricane ties and straps, header sizes over openings, and overall structural compliance with approved plans.
Final Inspection, Shed is in the correct location per the approved site plan, proper setbacks from property lines, adequate anchoring and tie-down, roof installation, door and window installation, drainage, and overall compliance with approved plans. If electrical was permitted, wiring and panel are checked separately.
Schedule inspections with Pikes Peak Regional Building Department (PPRBD) at (719) 327-2880 at least 24–48 hours in advance.
Frequently Asked Questions
Whether you need a permit depends on the size and scope of your shed project. In Colorado Springs, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.
Permit fees for shed projects in Colorado Springs typically range from $50 – $300. Fees are usually based on the estimated project value.
Typical approval time in Colorado Springs is about 2 weeks. Complex projects requiring structural review may take longer.
In most cases, homeowners in Colorado Springs can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.
Working without a required permit in Colorado Springs can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.
Ready to check your shed project in Colorado Springs?
Use our free lookup tool to get a personalized answer based on your specific project details.
Free Permit Lookup →Other Permit Guides for Colorado Springs, CO
Explore more permit guides for Colorado Springs:
Shed Permits in Nearby Cities
See shed permit requirements in other Colorado cities:
See Detailed Shed Rules for Colorado Springs
View all local rules, exemptions, and fee details on the permit page.
Shed Permit Rules →