Do You Need a Fence Permit in Henrico?

Based on Henrico's local building codes, you'll need a permit when:

Required·Rule 1

Fences over 6 feet require a building permit.

SourceHenrico County Code / VUSBC 2021 / 2021 IRC

These fence projects are typically exempt in Henrico:

Exempt·Rule 1

Backyard fences 6 feet or under typically do not require a building permit.

SourceHenrico County Code / VUSBC 2021 / 2021 IRC
Exempt·Rule 2

Front yard fences 4 feet or under typically do not require a permit but must comply with zoning.

SourceHenrico County Code / VUSBC 2021 / 2021 IRC

Permit Fees in Henrico

Based on local Henrico permit data, fees for fence projects typically range:

$100 – $200 Henrico Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Simple residential fence (under 6 ft)$25 – $150
Front-yard or taller fence (6+ ft)$50 – $200
Masonry or engineered fence$150 – $500+
Pool barrier fence$50 – $200
Inspection fee (if separate from permit)$25 – $85
Structural engineering (masonry walls, if required)$500 – $2,000+ (separate from permit)

Fees are typically calculated based on estimated project value. Contact Henrico County Building Inspections for exact amounts.

How Long Does It Take?

In Henrico, typical approval time for fence permits is about 2 weeks.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a Fence Permit in Henrico

  1. 1 Check requirements: Use our free lookup tool or contact Henrico County Building Inspections to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit online: Henrico accepts applications online at Henrico County Building Inspections.
  4. 4 Pay fees: Pay the applicable permit fees ($100 – $200).
  5. 5 Wait for approval: Your application will be reviewed by Henrico plan reviewers. Typical turnaround is about 2 weeks.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Henrico County Building Inspections at (804) 501-4360 to schedule required inspections at each phase of the project.

Henrico Building Department Contact

NameHenrico County Building Inspections
Apply OnlineApply online
Address4301 E. Parham Rd., Henrico, VA 23228
HoursMon-Fri 8am-4:30pm

Required Inspections in Henrico

Most fence projects in Henrico require inspections at each construction stage:

Inspection·Stage 1

Post Hole / Footing Inspection, Hole depth (typically 1/3 to 1/2 of the above-ground post height, and below the frost line in cold climates), hole diameter (typically 3x the post width), bearing on undisturbed soil, correct post locations matching the approved site plan, and proper setback from property lines and easements.

WhenAfter holes are dug but before concrete is poured or backfill is placed, this is the most common fence inspection
Common FailuresHoles not deep enough, posts placed within an easement, fence location doesn't match the approved site plan, holes not below the frost line.
Inspection·Stage 2

Final Inspection, Overall height compliance with the approved plans, correct location and setbacks, structural integrity, proper gate operation, material compliance, 'good side out' compliance (if applicable), and general code compliance. For pool barrier fences: self-closing gates, self-latching mechanism at 54 inches, no climbable features, and no openings larger than 4 inches.

WhenAfter the fence is fully installed, posts, rails, pickets/panels, and gates
Common FailuresFence exceeds approved height, gate doesn't self-close properly (pool fences), fence not matching the approved location, 'good side' facing inward instead of outward.

Schedule inspections with Henrico County Building Inspections at (804) 501-4360 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your fence project. In Henrico, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for fence projects in Henrico typically range from $100 – $200. Fees are usually based on the estimated project value.

Typical approval time in Henrico is about 2 weeks. Complex projects requiring structural review may take longer.

In most cases, homeowners in Henrico can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Henrico can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your fence project in Henrico?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

See Detailed Fence Rules for Henrico

View all local rules, exemptions, and fee details on the permit page.

Fence Permit Rules →
Disclaimer: This guide provides general information about fence permit requirements in Henrico, VA. Requirements can change. Always confirm with Henrico County Building Inspections before starting any project. PermitMint provides general guidance, not legal advice.