How to Get a Fence Permit in Bloomington, MN (2026 Guide)

Everything you need to know about fence permits in Bloomington, MN, local requirements, fees, timelines, and how to apply.

By Joey, Founder · Last updated May 23, 2026 · How we research →

$40 – $170 Permit Fees
about 2 weeks Approval Time
3 Local Rules

Check your specific fence project

Get an instant, personalized answer for your exact project details in Bloomington.

Free Permit Lookup →

Do You Need a Fence Permit in Bloomington?

Based on Bloomington's local building codes, you'll need a permit when:

Required·Rule 1

Fences over 6 feet require a building permit.

SourceMinnesota State Building Code (based on 2012 IRC with amendments)

These fence projects are typically exempt in Bloomington:

Exempt·Rule 1

Backyard fences 6 feet or under typically do not require a building permit.

SourceMinnesota State Building Code (based on 2012 IRC with amendments)
Exempt·Rule 2

Front yard fences 4 feet or under typically do not require a permit but must comply with zoning.

SourceMinnesota State Building Code (based on 2012 IRC with amendments)

Permit Fees in Bloomington

Based on local Bloomington permit data, fees for fence projects typically range:

$40 – $170 Bloomington Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Simple residential fence (under 6 ft)$25 – $150
Front-yard or taller fence (6+ ft)$50 – $200
Masonry or engineered fence$150 – $500+
Pool barrier fence$50 – $200
Inspection fee (if separate from permit)$25 – $85
Structural engineering (masonry walls, if required)$500 – $2,000+ (separate from permit)

Fees are typically calculated based on estimated project value. Contact Building & Inspection Division for exact amounts.

How Long Does It Take?

In Bloomington, typical approval time for fence permits is about 2 weeks.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a Fence Permit in Bloomington

  1. 1 Check requirements: Use our free lookup tool or contact Building & Inspection Division to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit online: Bloomington accepts applications online at Building & Inspection Division.
  4. 4 Pay fees: Pay the applicable permit fees ($40 – $170).
  5. 5 Wait for approval: Your application will be reviewed by Bloomington plan reviewers. Typical turnaround is about 2 weeks.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Building & Inspection Division at (952) 563-8930 to schedule required inspections at each phase of the project.

Bloomington Building Department Contact

NameBuilding & Inspection Division
Apply OnlineApply online
Address1800 West Old Shakopee Rd, Bloomington, MN 55431
HoursMon-Fri 8am-4:30pm

Required Inspections in Bloomington

Most fence projects in Bloomington require inspections at each construction stage:

Inspection·Stage 1

Post Hole / Footing Inspection, Hole depth (typically 1/3 to 1/2 of the above-ground post height, and below the frost line in cold climates), hole diameter (typically 3x the post width), bearing on undisturbed soil, correct post locations matching the approved site plan, and proper setback from property lines and easements.

WhenAfter holes are dug but before concrete is poured or backfill is placed, this is the most common fence inspection
Common FailuresHoles not deep enough, posts placed within an easement, fence location doesn't match the approved site plan, holes not below the frost line.
Inspection·Stage 2

Final Inspection, Overall height compliance with the approved plans, correct location and setbacks, structural integrity, proper gate operation, material compliance, 'good side out' compliance (if applicable), and general code compliance. For pool barrier fences: self-closing gates, self-latching mechanism at 54 inches, no climbable features, and no openings larger than 4 inches.

WhenAfter the fence is fully installed, posts, rails, pickets/panels, and gates
Common FailuresFence exceeds approved height, gate doesn't self-close properly (pool fences), fence not matching the approved location, 'good side' facing inward instead of outward.

Schedule inspections with Building & Inspection Division at (952) 563-8930 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your fence project. In Bloomington, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for fence projects in Bloomington typically range from $40 – $170. Fees are usually based on the estimated project value.

Typical approval time in Bloomington is about 2 weeks. Complex projects requiring structural review may take longer.

In most cases, homeowners in Bloomington can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Bloomington can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your fence project in Bloomington?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

Fence Permits in Nearby Cities

See fence permit requirements in other Minnesota cities:

See Detailed Fence Rules for Bloomington

View all local rules, exemptions, and fee details on the permit page.

Fence Permit Rules →
Disclaimer: This guide provides general information about fence permit requirements in Bloomington, MN. Requirements can change. Always confirm with Building & Inspection Division before starting any project. PermitMint provides general guidance, not legal advice.