Do You Need a Fence Permit in Arvada?

Based on Arvada's local building codes, you'll need a permit when:

Required·Rule 1

Fences over 6 feet require a building permit.

SourceCity of Arvada Code / 2018 IRC
Required·Rule 2

Masonry/block fences require a building permit due to structural and footing requirements.

SourceCity of Arvada Code / 2018 IRC
Required·Rule 3

Pool barrier fences must meet safety requirements and typically require a permit.

SourceCity of Arvada Code / 2018 IRC

These fence projects are typically exempt in Arvada:

Exempt·Rule 1

Backyard fences 6 feet or under do not require a building permit.

SourceCity of Arvada Code / 2018 IRC
Exempt·Rule 2

Front yard fences 4 feet or under typically do not require a permit but must comply with zoning.

SourceCity of Arvada Code / 2018 IRC

Permit Fees in Arvada

Based on local Arvada permit data, fees for fence projects typically range:

$50 – $285 Arvada Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Simple residential fence (under 6 ft)$25 – $150
Front-yard or taller fence (6+ ft)$50 – $200
Masonry or engineered fence$150 – $500+
Pool barrier fence$50 – $200
Inspection fee (if separate from permit)$25 – $85
Structural engineering (masonry walls, if required)$500 – $2,000+ (separate from permit)

Fees are typically calculated based on estimated project value. Contact Building Services for exact amounts.

How Long Does It Take?

In Arvada, typical approval time for fence permits is about 2 weeks.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a Fence Permit in Arvada

  1. 1 Check requirements: Use our free lookup tool or contact Building Services to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit online: Arvada accepts applications online at Building Services.
  4. 4 Pay fees: Pay the applicable permit fees ($50 – $285).
  5. 5 Wait for approval: Your application will be reviewed by Arvada plan reviewers. Typical turnaround is about 2 weeks.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Building Services at (720) 898-7620 to schedule required inspections at each phase of the project.

Arvada Building Department Contact

NameBuilding Services
Apply OnlineApply online
Address8101 Ralston Rd., Arvada, CO 80002
HoursMon-Fri 8am-5pm

Required Inspections in Arvada

Most fence projects in Arvada require inspections at each construction stage:

Inspection·Stage 1

Post Hole / Footing Inspection, Hole depth (typically 1/3 to 1/2 of the above-ground post height, and below the frost line in cold climates), hole diameter (typically 3x the post width), bearing on undisturbed soil, correct post locations matching the approved site plan, and proper setback from property lines and easements.

WhenAfter holes are dug but before concrete is poured or backfill is placed, this is the most common fence inspection
Common FailuresHoles not deep enough, posts placed within an easement, fence location doesn't match the approved site plan, holes not below the frost line.
Inspection·Stage 2

Final Inspection, Overall height compliance with the approved plans, correct location and setbacks, structural integrity, proper gate operation, material compliance, 'good side out' compliance (if applicable), and general code compliance. For pool barrier fences: self-closing gates, self-latching mechanism at 54 inches, no climbable features, and no openings larger than 4 inches.

WhenAfter the fence is fully installed, posts, rails, pickets/panels, and gates
Common FailuresFence exceeds approved height, gate doesn't self-close properly (pool fences), fence not matching the approved location, 'good side' facing inward instead of outward.

Schedule inspections with Building Services at (720) 898-7620 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your fence project. In Arvada, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for fence projects in Arvada typically range from $50 – $285. Fees are usually based on the estimated project value.

Typical approval time in Arvada is about 2 weeks. Complex projects requiring structural review may take longer.

In most cases, homeowners in Arvada can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Arvada can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your fence project in Arvada?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

See Detailed Fence Rules for Arvada

View all local rules, exemptions, and fee details on the permit page.

Fence Permit Rules →
Disclaimer: This guide provides general information about fence permit requirements in Arvada, CO. Requirements can change. Always confirm with Building Services before starting any project. PermitMint provides general guidance, not legal advice.