How to Get a Driveway Permit in Pembroke Pines, FL (2026 Guide)

Everything you need to know about driveway permits in Pembroke Pines, FL, local requirements, fees, timelines, and how to apply.

By Joey, Founder · Last updated May 23, 2026 · How we research →

$75 – $500 Permit Fees
about 3 weeks Approval Time
4 Local Rules

Check your specific driveway project

Get an instant, personalized answer for your exact project details in Pembroke Pines.

Free Permit Lookup →

Do You Need a Driveway Permit in Pembroke Pines?

Based on Pembroke Pines's local building codes, you'll need a permit when:

Required·Rule 1

Any new curb cut requires an encroachment or right-of-way permit. This involves work in the public right-of-way and must meet ADA sidewalk crossing requirements. Contact your city's public works department.

SourceFlorida Building Code / 2021 IRC with local amendments
Required·Rule 2

New driveways require a permit. If a new curb cut is needed, an encroachment or right-of-way permit is also required for work in the public right-of-way. The driveway must meet width limits and impervious surface requirements.

SourceFlorida Building Code / 2021 IRC with local amendments
Required·Rule 3

Widening or extending an existing driveway typically requires a permit because it increases impervious surface coverage and may affect drainage. If the widening involves a modified curb cut, a right-of-way permit is also required.

SourceFlorida Building Code / 2021 IRC with local amendments

These driveway projects are typically exempt in Pembroke Pines:

Exempt·Rule 1

Replacing an existing driveway in the same footprint with no changes to the curb cut is generally exempt from permit requirements.

SourceFlorida Building Code / 2021 IRC with local amendments

Permit Fees in Pembroke Pines

Based on local Pembroke Pines permit data, fees for driveway projects typically range:

$75 – $500 Pembroke Pines Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Driveway replacement (same footprint, where permit needed)$50 – $150
New driveway permit$100 – $400
Curb cut / encroachment permit$150 – $500+
Driveway widening permit$75 – $300
Grading/drainage review (if triggered)$100 – $400 additional

Fees are typically calculated based on estimated project value. Contact Building Department for exact amounts.

How Long Does It Take?

In Pembroke Pines, typical approval time for driveway permits is about 3 weeks.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a Driveway Permit in Pembroke Pines

  1. 1 Check requirements: Use our free lookup tool or contact Building Department to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit online: Pembroke Pines accepts applications online at Building Department.
  4. 4 Pay fees: Pay the applicable permit fees ($75 – $500).
  5. 5 Wait for approval: Your application will be reviewed by Pembroke Pines plan reviewers. Typical turnaround is about 3 weeks.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Building Department at (954) 435-6502 to schedule required inspections at each phase of the project.

Pembroke Pines Building Department Contact

NameBuilding Department
Apply OnlineApply online
Address601 City Center Way, 2nd Floor, Pembroke Pines, FL 33025
HoursMon-Thu 7:30am-5pm

Required Inspections in Pembroke Pines

Most driveway projects in Pembroke Pines require inspections at each construction stage:

Inspection·Stage 1

Curb Cut / Approach Inspection, Approach dimensions meet city standards, sidewalk crossing is ADA-compliant (cross-slope, surface), drainage is directed to the street (not onto the sidewalk or neighboring property), and the curb transition is properly formed.

WhenAfter the curb cut and driveway approach are formed but before final paving, for new curb cuts
Common FailuresApproach width exceeds allowed maximum, sidewalk crossing not ADA-compliant, drainage not directed properly.
Inspection·Stage 2

Final Inspection, Driveway matches approved site plan (location, dimensions, material), proper drainage slope away from the house and not toward neighbors, curb cut properly finished, and no encroachment beyond property lines.

WhenAfter the driveway is complete, paving, grading, and drainage finalized
Common FailuresDriveway wider than approved, drainage directed toward neighbor, material doesn't match approved plans.

Schedule inspections with Building Department at (954) 435-6502 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your driveway project. In Pembroke Pines, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for driveway projects in Pembroke Pines typically range from $75 – $500. Fees are usually based on the estimated project value.

Typical approval time in Pembroke Pines is about 3 weeks. Complex projects requiring structural review may take longer.

In most cases, homeowners in Pembroke Pines can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Pembroke Pines can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your driveway project in Pembroke Pines?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

See Detailed Driveway Rules for Pembroke Pines

View all local rules, exemptions, and fee details on the permit page.

Driveway Permit Rules →
Disclaimer: This guide provides general information about driveway permit requirements in Pembroke Pines, FL. Requirements can change. Always confirm with Building Department before starting any project. PermitMint provides general guidance, not legal advice.